ISM Code Amendments Summary
ISM Amendment ISM Amendment
1.1.10 Definition of major-
12.1 Internal audits at intervals not
1.2.2 Introduces the need for someform of assessment of risks 12.2 Company to periodically reviewthe effectiveness of SMS
5.1.5 Periodical review SMS by 13.12 New paragraph. Renewal auditsas er one a er cer ca e exp ry.
7 New title ShipboardOperations. Clarifies the
intent of the element.
13.13 New paragraph.SMC may be endorsed uponcompletion of renewal audit.
8.1 Delete words Establishprocedures to Clarifies the
intent of the element.
13.14 New paragraph.Administration may extend
validity of SMC to allow vessel tocomplete voyage.
9.2 Introduces the need forpreventive action
14.4.3 Clarifies that internal audits becompleted within 3 months of
interim audit
10.3 Clarifies the intent to identify
3
critical standby systems
-
8/8/2019 ISM Code Amendments_MSC Res 273(85)
4/19
1.1: Definitions
1.1.10 Major non-conformity
" " . . -
deviation that poses a serious threat to the safety ofpersonnel or the ship or a serious risk to the
action and includes or the lack of effective andsystematic implementation of a requirement of thisCode.
The words and includes are replaced with or
4
-
8/8/2019 ISM Code Amendments_MSC Res 273(85)
5/19
1.2.2: Safety Management Objectives
1.2.2 Safety management objectives of the Company should,inter alia:
establish safeguards against all identified risks; and assess allidentified risks to its ships, personnel and the environment andestablish appropriate safeguards;
Makes explicit what was earlier implicit in the Code
Introduces the need for some form of assessment of risks becarried out by the Company
Likely to have the most impact even though the revised text
Introduces a new auditable requirement
5
Company to demonstrate how it meets its obligation under 1.2.2
-
8/8/2019 ISM Code Amendments_MSC Res 273(85)
6/19
5: Masters Responsibility & Authority
5.1 The Company should clearly define anddocument the master's responsibility with regard to
5.1.5 periodically reviewing the safety managementsystem and reporting its deficiencies to the shore-
The word periodically has added
Likely impact: low or none
6
-
8/8/2019 ISM Code Amendments_MSC Res 273(85)
7/19
-
8/8/2019 ISM Code Amendments_MSC Res 273(85)
8/19
8: Emergency Preparedness
New text: 8.1 The Company should establishprocedures to identify potential emergency shipboardsituations and establish procedures to respond tothem.
Likely impact: low or none; clarifies the intent ofelement 8
8
-
8/8/2019 ISM Code Amendments_MSC Res 273(85)
9/19
9: Reports & Analysis of Non-Conformities,Accidents & Hazardous Occurrences
9.2 The Company should establish procedures forthe implementation of corrective action, includingmeasures intended to prevent recurrence.
Preventive actions were implied earlier
Amendment introduces the concept of preventiveaction
clearly include measures taken to prevent recurrence
Introduces a new auditable re uirement
9
-
8/8/2019 ISM Code Amendments_MSC Res 273(85)
10/19
10: Maintenance of Ship & Equipment
10.3 amended to read The Company shouldestablish procedures in its SMS to identify equipmentand technical systems the sudden operational failureof which may result in hazardous situations. Thesafety management system should provide forspecific measures aimed at promoting the reliabilityof such equipment or systems. These measures
should include the regular testing of stand-byarrangements and equipment or technical systemsthat are not in continuous use.
management system to
Likel im act: low or none
10
-
8/8/2019 ISM Code Amendments_MSC Res 273(85)
11/19
-
8/8/2019 ISM Code Amendments_MSC Res 273(85)
12/19
12: Company Verification, Review & Evaluation
New text: 12.2 The Company should periodicallyevaluate the effectiveness efficiency of and whenneeded review of the safety management system inaccordance with procedures established by theCompany
Makes explicit that management reviews are to be
carried out periodically Company to provide evidence that the reviews
evaluate the effectiveness of the SMS
need to be revamped
Introduces a new auditable re uirement
12
-
8/8/2019 ISM Code Amendments_MSC Res 273(85)
13/19
13: Certification & Periodical Verification
Three new paragraphs added: 13.12, 13.13 and 13.14
expiry date of the existing Safety Management Certificate,the new Safety Management Certificate should be validfrom the date of completion of the renewal verification to aa e no excee ng ve years rom e a e o exp ry o e
existing Safety Management Certificate.
13.13 If a renewal verification has been completed and anew a e y anagemen er ca e canno e ssue orplaced on board the ship before the expiry date of theexisting certificate, the Administration or organizationreco nized b the Administration ma endorse the existin
certificate and such a certificate should be accepted as validfor a further period which should not exceed five monthsfrom the expiry date.
13
-
8/8/2019 ISM Code Amendments_MSC Res 273(85)
14/19
13: Certification & Periodical Verification
13.14 If a ship at the time when a Safety ManagementCertificate expires is not in a port in which it is to be verified, the
Management Certificate but this extension should be grantedonly for the purpose of allowing the ship to complete its voyageto the port in which it is to be verified, and then only in caseswhere it appears proper and reasonable to do so. No SafetyManagement Certificate should be extended for a period of
longer than three months, and the ship to which an extension is,verified, be entitled by virtue of such extension to leave that portwithout having a new Safety Management Certificate. When therenewal verification is completed, the new Safety Management
ert cate s ou e va to a ate not excee ng ve yearsfrom the expiry date of the existing Safety ManagementCertificate before the extension was granted.
14
Likely impact: none
-
8/8/2019 ISM Code Amendments_MSC Res 273(85)
15/19
14: Interim Certification
New text: 14.4.3 The Company has planned theinternal audit of the ship within three months
Additional word internal added Clarifies what was implied earlier
Likely impact: none
15
-
8/8/2019 ISM Code Amendments_MSC Res 273(85)
16/19
Safety Management Certificate
New section to be added to existing format:
(if required)
Certificate Number
part B 13.13 of the ISM Code applies
The ship complies with the relevant provisions of part B of the ISM, , .the ISM Code, be accepted as valid until
Signed
gna ure o au or ze o c a
Place
Date
16
-
8/8/2019 ISM Code Amendments_MSC Res 273(85)
17/19
Safety Management Certificate
New section to be added to existing format
(if required)
Certificate Number
port of verification where part B 13.12 of the ISM Code applies orfor a period of grace where part B 13.14 of the ISM Code applies
, .part B 13.14 of the ISM Code, be accepted as valid until
Signed
gna ure o au or ze o c a
Place
Date
17
-
8/8/2019 ISM Code Amendments_MSC Res 273(85)
18/19
ISM Code Amendments
Some amendments are purely administrative
However, some introduce new auditable requirements
1.2.2 Assessment of all risks
.
12.1 Internal audits intervals
12.2 Com an to review effectiveness of SMS