Page 1: Island Greenway Bike Path Alternatives Alternative “B“ (New License) Alternative “A“ (New License)

Island Greenway Bike Path Alternatives

Alternative “B“(New License)

Alternative “A“(New License)

Page 2: Island Greenway Bike Path Alternatives Alternative “B“ (New License) Alternative “A“ (New License)

Island Greenway Bike Path Alternatives

Alternative “C“(Existing Easement w/Amendments)

Page 3: Island Greenway Bike Path Alternatives Alternative “B“ (New License) Alternative “A“ (New License)

Island Greenway Bike Path Alternatives• Alt. A – Bike Path on east side of retention pond

– License with no “consideration clause”– Condition of license requires construction of FE-6 fence (min) & 50-ft

clear zone; and maintenance for life of license (i.e. assuming multiple renewals)

• Alt. B – Bike Path on west side of retention pond– License contains “consideration clause” for fair market value (FMV) – Construction of FE-6 fence (min) & 50-ft clear zone ; and maintenance

as “consideration” in first term of license – FMV payment as “consideration” in the subsequent renewals

• Alt. C – No Bike Path– Amend easement to include as-builts for retention pond and require

construction of FE-6 fence (min) & 50-ft clear zone for public safety– No consideration requiredAssumption: Either license (Alt. A or Alt. B) conveys everything from west side

of “Greenway” to the MOTSU boundary to the east

Page 4: Island Greenway Bike Path Alternatives Alternative “B“ (New License) Alternative “A“ (New License)

License Considerations• License include sufficient condition and

liability for the proposed use (bike path)• Any “new” use requires approval at Assistance

Chief of Staff for Installation Management (ACSIM) 60-90 day process

• Anything up to 20-yrs possible, longer terms risk non-approval.

Page 5: Island Greenway Bike Path Alternatives Alternative “B“ (New License) Alternative “A“ (New License)

Independent Action Items

• Amend Easement #DACA21-2-03-3218 to reflect as-built conditions

• Address perceived encroachments• Determine appropriate fence that meets Army

needs

Page 6: Island Greenway Bike Path Alternatives Alternative “B“ (New License) Alternative “A“ (New License)

Potential Alternative Fence

• We can approve the use of a higher-rated security fence that may be more aesthetically pleasing.

• Examples include ornamental fences referenced (with specifications) in Unified Facilities Criteria 4-022-03, dated 1 October 2013 (e.g./ drawings UFC 720 & 721).

Page 7: Island Greenway Bike Path Alternatives Alternative “B“ (New License) Alternative “A“ (New License)

Ornamental Security Fencing Examples