isabella pagano [email protected] catania, 28 feb 20111plato tous welcome &...
TRANSCRIPT
Isabella [email protected]
Catania, 28 Feb 2011 1PLATO TOUs
Welcome & Introduction
PLATO TOU Team meetingCatania, 28 Feb – 01 Mar 2011
Optical DesignINAF Padova Obs.
Demetrio Magrin
AIV Design & Breadboard AIT
INAF Padova Obs.Jacopo Farinato
Mechanical DesignUniv. Bern
Daniele Piazza
Req. & BudgetsBaffle structure
INAF Catania Obs.Salvo Scuderi
TOU ScientistINAF Padova Obs.Roberto Ragazzoni
Thermal AnalysisINAF Brera Obs.
Stefano Basso
Optical Mat. TestINAF Brera Obs.
Mauro Ghigo
Project ManagementINAF Catania Obs.
Isabella Pagano
Straylight Analysis & Baffle Design
INAF Catania Obs.Matteo Munari
Optical EngineerINOA-CNR
Lisa Gambicorti
GSEINAF Padova Obs.
Valentina Viotto
F-TOU ScientistUniversity of Bern
Willy Benz
F-TOU PMUniversity of BernKarsten Seiferlin
CoatingINAF Brera Obs.
Daniele Spiga
PAINAF
Giacinto de Paris
Mech. EngineerINAF Padova Obs.
Marco Dima
F-TOU FiltersStockolms Obs.
Alexis Brandeker
TOU TEAM
F-TOU FiltersStockolms Obs.Göran Oloffson
PA/QPCNES
Samule Melle
Opt. Arch.LESIA
Pernelle Bernardi
PLATO Instrument Project Manager
CNESPierre Bodin
DPS Project ManagerCNES
Bernard Pontet
Instrument System Coordinator
LAMPatrick Levacher
RAIVCNES
René Perez
Cameras Project Manager
CNESDavid Laubier
Det. Arch.LESIA
Tristan Buey
Thermal Arch.CNESHélène
Pasquier
Mech. Arch.LAM
Pascal Vola
Elec.. Arch. SuppLAM
S. Fredon
Manag. & DPS Arch.
LESIAP. Plesson
AlgorithmsLESIA
R. Samadi
Mon. & ControlCNES
M.O. Marché
System TEAM
A update on PLATO status in the Cosmic Vision contest
Catania, 28 Feb 2011 PLATO TOUs 4
Where we are
Start of Definition Phase with two parallel industrial contracts: Jul 2010
Jul 2010 ESA Call for PLATO Mission Consortium Oct 29, 2010 PMC Proposals Due Nov 2010 – Feb, 2011 Proposal evaluation: ESA panels AWG
SSAC SPC decision (10-11 Feb 2011)
Proposal Evaluation Committee Report The Evaluation Committee recommends the pre-selection for the
Definition phase of the PLATO Mission Consortium constituted as described in the proposal.
The Evaluation Committee recommends that the pre-selected PLATO Mission Consortium proceeds with the activities leading to the elaboration and update of the proposal for the Implementation phase, following closely the guidelines given in this report.
The Evaluation Committee requests an intermediate review in the March 2011 timeframe to assess the status of the major findings and of the implementation of the recommendations in preparation of the Implementation phase proposal.
Catania, 28 Feb 2011 PLATO TOUs 5
Evaluation report about PayloadPayload
The Consortium tasks for Payload are well defined but the level of definition for the implementation phase, specifically w.r.t. to the industrialization of the hardware production is low; i.e., potential industrial contractors are not identified and even a survey of potential suppliers is not presented. This omission is very serious considering the kind of recurring production for the PLATO payload where a strong industrial organisation will be necessary and raises a major concern on the realism of the schedule of the implementation phase.
Recommendations: Complete with priority the industrialisation plan, finalise the definition of the planned interactions between the PLATO Mission Consortium and industry and define as early as possible the industrial resources needed for the “chain productions” of i.e., lenses, telescopes AIV, parts and material procurements.
Consider cooperation with industrial partners as early as possible during the Definition phase to ensure a solid industrial basis for the Implementation phase proposal.
Catania, 28 Feb 2011 PLATO TOUs 6
Future milestones
Mar 2011 Intermediate review May 2011 Formal release of updated AO documents
for implementation phase Jun 2011 Completion of industrial studies (Phase A) Jul 2011 Final proposal for implementation phase Oct 2011 M1/M2 mission selection Dec 2011 Completion of industrial studies (Phase
B1) Feb 2012 Final adoption for the Implementation
Phase (B2/C/D/E1) Jul 2012 Start of the Implementation Phase Launch: 2018
Catania, 28 Feb 2011 PLATO TOUs 7
Definition Phase Plan
Validate technical critical points▪ Confirm no need for new development
▪ Demonstrate TRL > 5 at the end of the definition phase
▪ Confirm no critical aspects in the procurement and AIV schedule of the implementation phase
Allow fast transition to implementation phase
Catania, 28 Feb 2011 PLATO TOUs 8
TOUs Specific Activities Study of spherical and aspherical lenses
manufacturability and industrial plan Coatings (thermal, filter, AR): performance and
low temperature Verification of lens alignment at ambient
temperature Assessment of performances in
operational temperature environment Link between performances in operational and
ambient environment Thermal refocusing efficiency
Validation of TOU AIV procedures at industrial level
Catania, 28 Feb 2011 PLATO TOUs 9
Goal of the present meeting
Review the status of the TOU project: optical design, straylight analysis, mechanical design of structure and
baffles, thermal analysis, optical materials and coating, prototyping activities, implementation development plan.
Catania, 28 Feb 2011 PLATO TOUs 10
AGENDA (28 Feb)
An update on PLATO Mission activites (O. Piersanti) 20m An update on PLATO Payload activities (D. Laubier)
20m
Status of TOU Design I Brief Overview (R. Ragazzoni) 20m Optical Design (D. Magrin) 20m Mechanical Structure Design (D. Piazza) 20m Straylight & Ghosts I (M. Munari) 15m Straylight & Ghosts II (G. Olofsson) 15m Baffle Design (M. Munari) 10m TOU Thermal Analysis (S. Basso) 20m F-TOU Filters (A. Brandexer) 20m
Discussion
Catania, 28 Feb 2011 PLATO TOUs 11
AGENDA (01 Mar)
Status of TOU Design II Camera Thermal Analysis (P. Levacher) 20m Optical performances as function of temperature (D. Magrin/R. Ragazzoni) 20m
Discussion 15 m Interfaces & Requirements at camera level (D. Laubier) 20m TOU material analysis
CaF2 test plan (R. Ragazzoni) 10m Lens Coating (D. Spiga/M. Ghigo) 20m
TOU BreadBoard Status (V. Viotto) 15m Planned tests & deliverables (R. Ragazzoni/V. Viotto) 15m
Discussion 10m TOU development plan
N-TOU AIV (R. Ragazzoni/V. Viotto) 20m A view from Selex Galileo (E. Battistelli) 20m F-TOU AIV (D. Piazza) 20m Development plan (I. Pagano) 10m Discussion 20m
Future Activites Short term planning (next meetings, documents...) (I. Pagano) 10m Summary (R. Ragazzoni) 10m Revision of new assigned actions (I. Pagano) 10m
Catania, 28 Feb 2011 PLATO TOUs 12
Action Items Revision
See:http://oberon.oapd.inaf.it/twiki/bin/vi
ew/Main/2010-12-14-ActionItems
Catania, 28 Feb 2011 PLATO TOUs 13
The end
Catania, 28 Feb 2011 14PLATO TOUs