isabella pagano [email protected] catania, 28 feb 20111plato tous welcome &...

14
Isabella Pagano [email protected] Catania, 28 Feb 2011 1 PLATO TOUs Welcome & Introduction PLATO TOU Team meeting Catania, 28 Feb – 01 Mar 2011

Upload: arianna-mccarthy

Post on 28-Mar-2015

215 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Isabella Pagano isabella.pagano@oact.inaf.it Catania, 28 Feb 20111PLATO TOUs Welcome & Introduction PLATO TOU Team meeting Catania, 28 Feb – 01 Mar 2011

Isabella [email protected]

Catania, 28 Feb 2011 1PLATO TOUs

Welcome & Introduction

PLATO TOU Team meetingCatania, 28 Feb – 01 Mar 2011

Page 2: Isabella Pagano isabella.pagano@oact.inaf.it Catania, 28 Feb 20111PLATO TOUs Welcome & Introduction PLATO TOU Team meeting Catania, 28 Feb – 01 Mar 2011

Optical DesignINAF Padova Obs.

Demetrio Magrin

AIV Design & Breadboard AIT

INAF Padova Obs.Jacopo Farinato

Mechanical DesignUniv. Bern

Daniele Piazza

Req. & BudgetsBaffle structure

INAF Catania Obs.Salvo Scuderi

TOU ScientistINAF Padova Obs.Roberto Ragazzoni

Thermal AnalysisINAF Brera Obs.

Stefano Basso

Optical Mat. TestINAF Brera Obs.

Mauro Ghigo

Project ManagementINAF Catania Obs.

Isabella Pagano

Straylight Analysis & Baffle Design

INAF Catania Obs.Matteo Munari

Optical EngineerINOA-CNR

Lisa Gambicorti

GSEINAF Padova Obs.

Valentina Viotto

F-TOU ScientistUniversity of Bern

Willy Benz

F-TOU PMUniversity of BernKarsten Seiferlin

CoatingINAF Brera Obs.

Daniele Spiga

PAINAF

Giacinto de Paris

Mech. EngineerINAF Padova Obs.

Marco Dima

F-TOU FiltersStockolms Obs.

Alexis Brandeker

TOU TEAM

F-TOU FiltersStockolms Obs.Göran Oloffson

Page 3: Isabella Pagano isabella.pagano@oact.inaf.it Catania, 28 Feb 20111PLATO TOUs Welcome & Introduction PLATO TOU Team meeting Catania, 28 Feb – 01 Mar 2011

PA/QPCNES

Samule Melle

Opt. Arch.LESIA

Pernelle Bernardi

PLATO Instrument Project Manager

CNESPierre Bodin

DPS Project ManagerCNES

Bernard Pontet

Instrument System Coordinator

LAMPatrick Levacher

RAIVCNES

René Perez

Cameras Project Manager

CNESDavid Laubier

Det. Arch.LESIA

Tristan Buey

Thermal Arch.CNESHélène

Pasquier

Mech. Arch.LAM

Pascal Vola

Elec.. Arch. SuppLAM

S. Fredon

Manag. & DPS Arch.

LESIAP. Plesson

AlgorithmsLESIA

R. Samadi

Mon. & ControlCNES

M.O. Marché

System TEAM

Page 4: Isabella Pagano isabella.pagano@oact.inaf.it Catania, 28 Feb 20111PLATO TOUs Welcome & Introduction PLATO TOU Team meeting Catania, 28 Feb – 01 Mar 2011

A update on PLATO status in the Cosmic Vision contest

Catania, 28 Feb 2011 PLATO TOUs 4

Page 5: Isabella Pagano isabella.pagano@oact.inaf.it Catania, 28 Feb 20111PLATO TOUs Welcome & Introduction PLATO TOU Team meeting Catania, 28 Feb – 01 Mar 2011

Where we are

Start of Definition Phase with two parallel industrial contracts: Jul 2010

Jul 2010 ESA Call for PLATO Mission Consortium Oct 29, 2010 PMC Proposals Due Nov 2010 – Feb, 2011 Proposal evaluation: ESA panels AWG

SSAC SPC decision (10-11 Feb 2011)

Proposal Evaluation Committee Report The Evaluation Committee recommends the pre-selection for the

Definition phase of the PLATO Mission Consortium constituted as described in the proposal.

The Evaluation Committee recommends that the pre-selected PLATO Mission Consortium proceeds with the activities leading to the elaboration and update of the proposal for the Implementation phase, following closely the guidelines given in this report.

The Evaluation Committee requests an intermediate review in the March 2011 timeframe to assess the status of the major findings and of the implementation of the recommendations in preparation of the Implementation phase proposal.

Catania, 28 Feb 2011 PLATO TOUs 5

Page 6: Isabella Pagano isabella.pagano@oact.inaf.it Catania, 28 Feb 20111PLATO TOUs Welcome & Introduction PLATO TOU Team meeting Catania, 28 Feb – 01 Mar 2011

Evaluation report about PayloadPayload

The Consortium tasks for Payload are well defined but the level of definition for the implementation phase, specifically w.r.t. to the industrialization of the hardware production is low; i.e., potential industrial contractors are not identified and even a survey of potential suppliers is not presented. This omission is very serious considering the kind of recurring production for the PLATO payload where a strong industrial organisation will be necessary and raises a major concern on the realism of the schedule of the implementation phase.

Recommendations: Complete with priority the industrialisation plan, finalise the definition of the planned interactions between the PLATO Mission Consortium and industry and define as early as possible the industrial resources needed for the “chain productions” of i.e., lenses, telescopes AIV, parts and material procurements.

Consider cooperation with industrial partners as early as possible during the Definition phase to ensure a solid industrial basis for the Implementation phase proposal.

Catania, 28 Feb 2011 PLATO TOUs 6

Page 7: Isabella Pagano isabella.pagano@oact.inaf.it Catania, 28 Feb 20111PLATO TOUs Welcome & Introduction PLATO TOU Team meeting Catania, 28 Feb – 01 Mar 2011

Future milestones

Mar 2011 Intermediate review May 2011 Formal release of updated AO documents

for implementation phase Jun 2011 Completion of industrial studies (Phase A) Jul 2011 Final proposal for implementation phase Oct 2011 M1/M2 mission selection Dec 2011 Completion of industrial studies (Phase

B1) Feb 2012 Final adoption for the Implementation

Phase (B2/C/D/E1) Jul 2012 Start of the Implementation Phase Launch: 2018

Catania, 28 Feb 2011 PLATO TOUs 7

Page 8: Isabella Pagano isabella.pagano@oact.inaf.it Catania, 28 Feb 20111PLATO TOUs Welcome & Introduction PLATO TOU Team meeting Catania, 28 Feb – 01 Mar 2011

Definition Phase Plan

Validate technical critical points▪ Confirm no need for new development

▪ Demonstrate TRL > 5 at the end of the definition phase

▪ Confirm no critical aspects in the procurement and AIV schedule of the implementation phase

Allow fast transition to implementation phase

Catania, 28 Feb 2011 PLATO TOUs 8

Page 9: Isabella Pagano isabella.pagano@oact.inaf.it Catania, 28 Feb 20111PLATO TOUs Welcome & Introduction PLATO TOU Team meeting Catania, 28 Feb – 01 Mar 2011

TOUs Specific Activities Study of spherical and aspherical lenses

manufacturability and industrial plan Coatings (thermal, filter, AR): performance and

low temperature Verification of lens alignment at ambient

temperature Assessment of performances in

operational temperature environment Link between performances in operational and

ambient environment Thermal refocusing efficiency

Validation of TOU AIV procedures at industrial level

Catania, 28 Feb 2011 PLATO TOUs 9

Page 10: Isabella Pagano isabella.pagano@oact.inaf.it Catania, 28 Feb 20111PLATO TOUs Welcome & Introduction PLATO TOU Team meeting Catania, 28 Feb – 01 Mar 2011

Goal of the present meeting

Review the status of the TOU project: optical design, straylight analysis, mechanical design of structure and

baffles, thermal analysis, optical materials and coating, prototyping activities, implementation development plan.

Catania, 28 Feb 2011 PLATO TOUs 10

Page 11: Isabella Pagano isabella.pagano@oact.inaf.it Catania, 28 Feb 20111PLATO TOUs Welcome & Introduction PLATO TOU Team meeting Catania, 28 Feb – 01 Mar 2011

AGENDA (28 Feb)

An update on PLATO Mission activites (O. Piersanti) 20m An update on PLATO Payload activities (D. Laubier) 

20m

Status of TOU Design  I Brief Overview (R. Ragazzoni)  20m    Optical Design (D. Magrin)  20m    Mechanical Structure Design (D. Piazza)  20m      Straylight & Ghosts I (M. Munari) 15m Straylight & Ghosts II (G. Olofsson) 15m Baffle Design (M. Munari)  10m    TOU Thermal Analysis (S. Basso)  20m    F-TOU Filters (A. Brandexer)  20m

Discussion

Catania, 28 Feb 2011 PLATO TOUs 11

Page 12: Isabella Pagano isabella.pagano@oact.inaf.it Catania, 28 Feb 20111PLATO TOUs Welcome & Introduction PLATO TOU Team meeting Catania, 28 Feb – 01 Mar 2011

AGENDA (01 Mar)

Status of TOU Design  II  Camera Thermal Analysis (P. Levacher)  20m Optical performances as function of temperature (D. Magrin/R. Ragazzoni) 20m

Discussion 15 m Interfaces & Requirements at camera level (D. Laubier) 20m TOU material analysis    

CaF2 test plan (R. Ragazzoni) 10m    Lens Coating (D. Spiga/M. Ghigo) 20m

TOU BreadBoard     Status (V. Viotto) 15m    Planned tests & deliverables (R. Ragazzoni/V. Viotto) 15m

Discussion 10m TOU development  plan    

N-TOU AIV (R. Ragazzoni/V. Viotto) 20m    A view from Selex Galileo (E. Battistelli)  20m    F-TOU AIV  (D. Piazza) 20m    Development plan (I. Pagano)  10m Discussion 20m

Future Activites     Short term planning (next meetings, documents...)  (I. Pagano) 10m   Summary (R. Ragazzoni)  10m    Revision of new assigned actions  (I. Pagano) 10m

Catania, 28 Feb 2011 PLATO TOUs 12

Page 13: Isabella Pagano isabella.pagano@oact.inaf.it Catania, 28 Feb 20111PLATO TOUs Welcome & Introduction PLATO TOU Team meeting Catania, 28 Feb – 01 Mar 2011

Action Items Revision

See:http://oberon.oapd.inaf.it/twiki/bin/vi

ew/Main/2010-12-14-ActionItems

Catania, 28 Feb 2011 PLATO TOUs 13

Page 14: Isabella Pagano isabella.pagano@oact.inaf.it Catania, 28 Feb 20111PLATO TOUs Welcome & Introduction PLATO TOU Team meeting Catania, 28 Feb – 01 Mar 2011

The end

Catania, 28 Feb 2011 14PLATO TOUs