Irving StreetscapeOpen House
January 30, 2014
![Page 2: Irving Open House Presentation Final - SFMTA...Challenges – Transit Speed and Reliability • Frequent stops contribute to slow trips and train bunching • Boarding from street](https://reader034.vdocuments.mx/reader034/viewer/2022052100/6039fc2c47d08a31c742617d/html5/thumbnails/2.jpg)
What is SFMTA ?
The San Francisco Municipal Transportation Agency (SFMTA) keeps the City moving.
![Page 3: Irving Open House Presentation Final - SFMTA...Challenges – Transit Speed and Reliability • Frequent stops contribute to slow trips and train bunching • Boarding from street](https://reader034.vdocuments.mx/reader034/viewer/2022052100/6039fc2c47d08a31c742617d/html5/thumbnails/3.jpg)
Irving Street Overview
• Vibrant commercial
• Dense residential
• Narrow sidewalks with high pedestrian activity
• One wide lane in each direction
Photo by Flickr user telesle17
![Page 4: Irving Open House Presentation Final - SFMTA...Challenges – Transit Speed and Reliability • Frequent stops contribute to slow trips and train bunching • Boarding from street](https://reader034.vdocuments.mx/reader034/viewer/2022052100/6039fc2c47d08a31c742617d/html5/thumbnails/4.jpg)
N-Judah Overview• 40,000 daily riders• 8 mph average speed outside subway
![Page 5: Irving Open House Presentation Final - SFMTA...Challenges – Transit Speed and Reliability • Frequent stops contribute to slow trips and train bunching • Boarding from street](https://reader034.vdocuments.mx/reader034/viewer/2022052100/6039fc2c47d08a31c742617d/html5/thumbnails/5.jpg)
Challenges - SafetyWithin project area during last 5 years:• 11 people hurt getting on/off trains• 16 pedestrians hurt in collisions with vehicles
![Page 6: Irving Open House Presentation Final - SFMTA...Challenges – Transit Speed and Reliability • Frequent stops contribute to slow trips and train bunching • Boarding from street](https://reader034.vdocuments.mx/reader034/viewer/2022052100/6039fc2c47d08a31c742617d/html5/thumbnails/6.jpg)
Challenges – Transit Speed and Reliability
• Frequent stops contribute to slow trips and train bunching
• Boarding from street is slow
![Page 7: Irving Open House Presentation Final - SFMTA...Challenges – Transit Speed and Reliability • Frequent stops contribute to slow trips and train bunching • Boarding from street](https://reader034.vdocuments.mx/reader034/viewer/2022052100/6039fc2c47d08a31c742617d/html5/thumbnails/7.jpg)
Opportunities on Irving• Repaving - spring 2015• Transit Effectiveness Project• WalkFirst• Transit signal priority
![Page 8: Irving Open House Presentation Final - SFMTA...Challenges – Transit Speed and Reliability • Frequent stops contribute to slow trips and train bunching • Boarding from street](https://reader034.vdocuments.mx/reader034/viewer/2022052100/6039fc2c47d08a31c742617d/html5/thumbnails/8.jpg)
Tools – Sidewalk Widening / Transit Bulbs• Faster safer boarding• Encourages boarding from all doors, less front-door crowding• Improves pedestrian safety• Added space for streetscape amenities
Carl/Cole - Before Carl/Cole - After
![Page 9: Irving Open House Presentation Final - SFMTA...Challenges – Transit Speed and Reliability • Frequent stops contribute to slow trips and train bunching • Boarding from street](https://reader034.vdocuments.mx/reader034/viewer/2022052100/6039fc2c47d08a31c742617d/html5/thumbnails/9.jpg)
Streetscape Amenities
![Page 10: Irving Open House Presentation Final - SFMTA...Challenges – Transit Speed and Reliability • Frequent stops contribute to slow trips and train bunching • Boarding from street](https://reader034.vdocuments.mx/reader034/viewer/2022052100/6039fc2c47d08a31c742617d/html5/thumbnails/10.jpg)
Design Options - Bikes
![Page 11: Irving Open House Presentation Final - SFMTA...Challenges – Transit Speed and Reliability • Frequent stops contribute to slow trips and train bunching • Boarding from street](https://reader034.vdocuments.mx/reader034/viewer/2022052100/6039fc2c47d08a31c742617d/html5/thumbnails/11.jpg)
Tools – Transit Stop LayoutE
xist
ing
Pro
pose
d
![Page 12: Irving Open House Presentation Final - SFMTA...Challenges – Transit Speed and Reliability • Frequent stops contribute to slow trips and train bunching • Boarding from street](https://reader034.vdocuments.mx/reader034/viewer/2022052100/6039fc2c47d08a31c742617d/html5/thumbnails/12.jpg)
Tools – Traffic Signal Upgrades• Improving/adding transit signal priority at existing signals• New signal proposed to replace stop signs at 4th/Irving
![Page 13: Irving Open House Presentation Final - SFMTA...Challenges – Transit Speed and Reliability • Frequent stops contribute to slow trips and train bunching • Boarding from street](https://reader034.vdocuments.mx/reader034/viewer/2022052100/6039fc2c47d08a31c742617d/html5/thumbnails/13.jpg)
Benefits• 25% shorter trips and improved reliability for 20,000 daily
N-Judah riders between 9th/Judah and UCSF – Saves one hour each month for daily riders
• Improved pedestrian and traffic safety• Opportunity to make streetscape more attractive
![Page 14: Irving Open House Presentation Final - SFMTA...Challenges – Transit Speed and Reliability • Frequent stops contribute to slow trips and train bunching • Boarding from street](https://reader034.vdocuments.mx/reader034/viewer/2022052100/6039fc2c47d08a31c742617d/html5/thumbnails/14.jpg)
Next Steps and Feedback• Sign in to receive project updates• Review proposals and complete survey• Encourage your neighbors to review materials and
complete survey online www.sfmta.com/irvingemail comments to [email protected]
• Revised design on website: early February• Neighborhood group meetings (TBD): February• Public Hearing: March 2014• Start Detailed Design: Spring 2014• Repaving: Winter/Spring 2015
![Page 15: Irving Open House Presentation Final - SFMTA...Challenges – Transit Speed and Reliability • Frequent stops contribute to slow trips and train bunching • Boarding from street](https://reader034.vdocuments.mx/reader034/viewer/2022052100/6039fc2c47d08a31c742617d/html5/thumbnails/15.jpg)
Contact Us
• www.sfmta.com/irving
• TEP Project Manager: Sean Kennedy
• Irving Project Manager: Dustin White
• 415.701.4599