Page 1: IPO Meeting€¦ · Grade S235JR S460M Profil IPE 600 IPE 500 Weight 2.12 t (100%) 1.61 t (76%) Cost 100% 83% Tonnage of all beams 530 t 403 t Beams per Truck 10 14 Required trucks

www.bauforumstahl.de

IPO Meeting Zürich 14 November 2014

Replacing S235 by S355

Page 2: IPO Meeting€¦ · Grade S235JR S460M Profil IPE 600 IPE 500 Weight 2.12 t (100%) 1.61 t (76%) Cost 100% 83% Tonnage of all beams 530 t 403 t Beams per Truck 10 14 Required trucks

1. Start 2015: S355 is economic, sustainable and available.

I. Common pool of arguments, examples for economy and sustainability, design tools

II. Coordiantion with producers and stockholders about availability and additional

costs

III. Press informations, technical papers, webpages, newsletters by all IPOs,

producers, stockholders, fabricators etc.

2. Further Development.

Design tools, cost estimation, information for fabricators etc.

Repeat 1. and 2 with improved arguments and tool.

Ideas for next steps

Page 3: IPO Meeting€¦ · Grade S235JR S460M Profil IPE 600 IPE 500 Weight 2.12 t (100%) 1.61 t (76%) Cost 100% 83% Tonnage of all beams 530 t 403 t Beams per Truck 10 14 Required trucks

At mid term S235 shall be replaced by S355 and higher grades.

Strategie for the comming years

- What are our arguments for whom

- What do we need to develop or improve

- Who needs to be involved

Idea for next steps

Page 4: IPO Meeting€¦ · Grade S235JR S460M Profil IPE 600 IPE 500 Weight 2.12 t (100%) 1.61 t (76%) Cost 100% 83% Tonnage of all beams 530 t 403 t Beams per Truck 10 14 Required trucks

Savings and Potentials

compared to low grade steel S235 J2

Grade S355 J2 S460 M

Cost +5 % +10 %

Strength +50 % +100 %

Examples

Page 5: IPO Meeting€¦ · Grade S235JR S460M Profil IPE 600 IPE 500 Weight 2.12 t (100%) 1.61 t (76%) Cost 100% 83% Tonnage of all beams 530 t 403 t Beams per Truck 10 14 Required trucks

Examples

0

2000

4000

6000

8000

10000

12000

14000

0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

Knicklänge Lcr [m]

Tra

gfä

hig

ke

it N

b,R

d [

kN

]

S 355

S 235

S 420

S 460

S 690

QHP300x16

Typical range of

buckling length

for multy storey

buildings Lcr

Fd

Page 6: IPO Meeting€¦ · Grade S235JR S460M Profil IPE 600 IPE 500 Weight 2.12 t (100%) 1.61 t (76%) Cost 100% 83% Tonnage of all beams 530 t 403 t Beams per Truck 10 14 Required trucks

Examples

Köln Fair: lattice girder

Upper chord

Box section with 2 UPE 400

and plates t=10-30 mm S355

Diagonales:

HEB 260, HEA 260 A, IPE 270 S235

Lower chord:

HD 260x114 and HD 260x142 S460

Page 7: IPO Meeting€¦ · Grade S235JR S460M Profil IPE 600 IPE 500 Weight 2.12 t (100%) 1.61 t (76%) Cost 100% 83% Tonnage of all beams 530 t 403 t Beams per Truck 10 14 Required trucks

Examples

Carpark Airport Düsseldorf

Car park floor beam Variant 1 Variant 2

Grade S235JR S460M

Profil IPE 600 IPE 500

Weight 2.12 t (100%) 1.61 t (76%)

Cost 100% 83%

Tonnage of all beams 530 t 403 t

Beams per Truck 10 14

Required trucks 25 18

Savings through high strengtn steel ca. 180.000 €

Page 8: IPO Meeting€¦ · Grade S235JR S460M Profil IPE 600 IPE 500 Weight 2.12 t (100%) 1.61 t (76%) Cost 100% 83% Tonnage of all beams 530 t 403 t Beams per Truck 10 14 Required trucks

Examples

World Financial Center Shanghai

Hight 492 m | 101 Storys

Dillinger Hütte: 23.000 t, incl. 7.700 t DI-MC 460

ArcelorMittal: 13.000 t, incl. 10.000 t Histar 460

Material saving: ca. 25 %

Cost saving : ca. 15 %

Page 9: IPO Meeting€¦ · Grade S235JR S460M Profil IPE 600 IPE 500 Weight 2.12 t (100%) 1.61 t (76%) Cost 100% 83% Tonnage of all beams 530 t 403 t Beams per Truck 10 14 Required trucks

» Beispiel: Neubau des

Penny-Marktes in Werne

» Spannbetonbinder,

Holzleimbinder oder

Lochstegträger?

» Gesamtbilanz

Einsparung 14 .000 €

für Lochstegträger S355

(Außenwand, Innenwand

Glasfassade)

» Besonders effizient:

Hybridträger

Lochstegträger

Page 10: IPO Meeting€¦ · Grade S235JR S460M Profil IPE 600 IPE 500 Weight 2.12 t (100%) 1.61 t (76%) Cost 100% 83% Tonnage of all beams 530 t 403 t Beams per Truck 10 14 Required trucks

Welche Stahlgüte ist für Verbundträger wirtschaftlich, S235, S355, S460?

Diplomarbeit Jacek Pilarski, FH Frankfurt

mittlere Kosten [€/m] für Verbundträger (C20 bzw. C40; b=3m; q=5kN/m²; g2=2kN/m²)

Kostenvergleich (C20/25; b=3m)

0

1.000

2.000

3.000

4.000

5.000

6.000

7.000

8.000

9.000

10.000

11.000

12.000

13.000

14.000

201918171615141312111098765

Spannweite [m]

Ko

ste

n [

€]

C20; S235; D22

C20; S355; D22

C20; S460; D22

Kostenvergleich (C40/50; b=3m)

0

1.000

2.000

3.000

4.000

5.000

6.000

7.000

8.000

9.000

10.000

11.000

12.000

13.000

201918171615141312111098765

Spannweite [m]

Ko

ste

n [

€]

C40; S235; D22

C40; S355; D22

C40; S460; D22

S460

Verbundträger

Page 11: IPO Meeting€¦ · Grade S235JR S460M Profil IPE 600 IPE 500 Weight 2.12 t (100%) 1.61 t (76%) Cost 100% 83% Tonnage of all beams 530 t 403 t Beams per Truck 10 14 Required trucks

Belastung

1700 kg/m² Eigengewicht

1400 kg/m² Verkehrslast +

SLW60

Bsp. BoA Niederaußem,

Konstruktionen, Kosten, Bauhöhe, Diplomarbeit Jacek Pilarski, FH

Frankfurt

Stahlbeton C30/37 (ausgeführt)

Verbund C30/37, S235

HL-Verbund C50/60, S460

Stahlbeton Verbund

+0,5%HV-Verbund

-1,5 %

Stahlbeton

h=110 cm

Verbund

h=115 cm

HV-Verbund

h=90 cm

VerbundträgerHerstellungskosten | Bauhöhe

Page 12: IPO Meeting€¦ · Grade S235JR S460M Profil IPE 600 IPE 500 Weight 2.12 t (100%) 1.61 t (76%) Cost 100% 83% Tonnage of all beams 530 t 403 t Beams per Truck 10 14 Required trucks

l=10m

Bsp. Mercedes Benz Plaza Moskau,Dachdecke über Show Room.

2 14 31516 14 13 12 11 10 9 8 7 6 5

Belastung

180 kg/m² Schnee

+ Schneekeil

VerbundträgerHerstellungskosten

Page 13: IPO Meeting€¦ · Grade S235JR S460M Profil IPE 600 IPE 500 Weight 2.12 t (100%) 1.61 t (76%) Cost 100% 83% Tonnage of all beams 530 t 403 t Beams per Truck 10 14 Required trucks

Bsp. Mercedes Benz Plaza Moskau,

Konstruktion, Kosten. Diplomarbeit Jacek Pilarski, FH Frankfurt, jetzt HOCHTIEF

Verbund C30/37, S235 (ausgeführt)

HL-Verbund C50/60, S460

Stahlbeton

Verbund

-2,4%

8.2

7.3

6

7

8

9

1

VerbundHV-Verbund

-14 %

Stahlbeton

VerbundträgerHerstellungskosten