iowa department of natural resources addendum …

24
2/3/2017 ADDENDUM #1 IOWA DEPARTMENT OF NATURAL RESOURCES ADDENDUM No. 1 ENGINEERING BUREAU WALLACE STATE OFFICE BUILDING LAKE MANAWA STATE PARK PICNIC AREA POTTAWATTAMIE COUNTY, IOWA PROJECT NO. 16-04-78-01 February 3, 2017 This Addendum is issued to modify, explain or correct the original Drawings and Specifications, and is hereby made a part of the Contract Documents. Please attach this Addendum to the Project Manual in your possession. Insert the number and issue date of this Addendum in the blank space provided on the Proposal Form. SPECIFICATIONS A. The Amount of Proposal Guarantee, Liquidated Damages Per Day and Estimated Probable Cost for this project has been updated in the Section 00120 Special Notice to Contractors. B. The following bid items have been updated in the schedule of prices in Section 00300 Proposal. 17 Water Main, 2" HDPE, 1810 LF 34 Parking Lot, PCC, 6” C. The following bid items have been removed in the schedule of prices in Section 00300 Proposal. 41 Vegetative Noise Barrier 600 LF D. The following bid items have been added in the schedule of prices in Section 00300 Proposal. 49 Water Main, 1" HDPE, 463 LF 50 Rural Seeding, Fertilizing and Mulching 2.8 ACRE E. The Liquidated Damages Per Day amount for this project has been updated in the in Section 00500 Contract. PLANS A. B.01 a. Changed to 6" Non-Reinforced Concrete Pavement w/ IDOT C4 Mix b. Vegetative Noise Barrier detail removed B. B.02 a. Changed yard hydrant stone to Septic Stone (1-1/2” Washed) River Gravel C. B.03 a. Added gate valve and valve handle extensions to the drain-down pit. D. C.01 a. Changed Parking Lot, PCC thickness to 6”. b. Changed quantity for Water Main, 2" HDPE. c. Changed quantity for Excavation, Class 10, Roadway and Borrow. d. Changed quantity for Embankment-In-Place. e. Removed bid item for Vegetative Noise Barrier following bid items renumbered. f. Added bid item for Water Main, 1" HDPE for water main shown on sheet D.06. g. Added bid item for Rural Seeding, Fertilizing and Mulching. E. C.02 a. Removed note C from Water Main, 2" HDPE. b. Added note B to Embankment-In-Place. c. Added notes for Heavy Jet Cleaning, Sanitary Sewer to sheet C.02. d. Added notes for Water Main, 1" HDPE. e. Added notes for Rural Seeding, Fertilizing and Mulching.

Upload: others

Post on 10-Nov-2021

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: IOWA DEPARTMENT OF NATURAL RESOURCES ADDENDUM …

2/3/2017 ADDENDUM #1

IOWA DEPARTMENT OF NATURAL RESOURCES ADDENDUM No. 1

ENGINEERING BUREAU

WALLACE STATE OFFICE BUILDING

LAKE MANAWA STATE PARK

PICNIC AREA

POTTAWATTAMIE COUNTY, IOWA

PROJECT NO. 16-04-78-01

February 3, 2017

This Addendum is issued to modify, explain or correct the original Drawings and

Specifications, and is hereby made a part of the Contract Documents. Please

attach this Addendum to the Project Manual in your possession. Insert the number

and issue date of this Addendum in the blank space provided on the Proposal Form.

SPECIFICATIONS

A. The Amount of Proposal Guarantee, Liquidated Damages Per Day and

Estimated Probable Cost for this project has been updated in the Section

00120 Special Notice to Contractors.

B. The following bid items have been updated in the schedule of prices in Section 00300 Proposal.

17 Water Main, 2" HDPE, 1810 LF

34 Parking Lot, PCC, 6”

C. The following bid items have been removed in the schedule of prices in Section 00300 Proposal.

41 Vegetative Noise Barrier 600 LF

D. The following bid items have been added in the schedule of prices in Section 00300 Proposal.

49 Water Main, 1" HDPE, 463 LF

50 Rural Seeding, Fertilizing and Mulching 2.8 ACRE

E. The Liquidated Damages Per Day amount for this project has been updated in the in Section 00500 Contract.

PLANS

A. B.01 a. Changed to 6" Non-Reinforced Concrete Pavement w/ IDOT C4 Mix b. Vegetative Noise Barrier detail removed

B. B.02 a. Changed yard hydrant stone to Septic Stone (1-1/2” Washed) River

Gravel

C. B.03 a. Added gate valve and valve handle extensions to the drain-down

pit.

D. C.01 a. Changed Parking Lot, PCC thickness to 6”. b. Changed quantity for Water Main, 2" HDPE. c. Changed quantity for Excavation, Class 10, Roadway and Borrow. d. Changed quantity for Embankment-In-Place. e. Removed bid item for Vegetative Noise Barrier following bid items

renumbered.

f. Added bid item for Water Main, 1" HDPE for water main shown on sheet D.06.

g. Added bid item for Rural Seeding, Fertilizing and Mulching. E. C.02

a. Removed note C from Water Main, 2" HDPE. b. Added note B to Embankment-In-Place. c. Added notes for Heavy Jet Cleaning, Sanitary Sewer to sheet C.02. d. Added notes for Water Main, 1" HDPE. e. Added notes for Rural Seeding, Fertilizing and Mulching.

Page 2: IOWA DEPARTMENT OF NATURAL RESOURCES ADDENDUM …

2/3/2017 ADDENDUM #1

F. C.03 a. Removed the notes for the Vegetative Noise Barrier. b. Moved the notes for Heavy Jet Cleaning, Sanitary Sewer to sheet

C.02.

G. D.01 a. Added 2” HDPE water line note.

H. D.02 a. Added notes to reconnect fish cleaning station and building to the

water line.

b. Added 2” HDPE water line note. I. D.03

a. Added 2” HDPE water line note. b. Relocated the drain-down pit to north east corner of the restroom. c. Changed note Vegetative Noise Barrier to be Done by Others.

J. D.06 a. Added 1” HDPE water line note.

K. D.07 a. Changed all elevations except at tie in to existing pavement. b. Changed low point location. c. Sidewalk slope notes added.

L. D.08 a. Changed low point coordinates.

M. E.05 – E.08 a. Added notes to grade to drain and use rural seeding.

Page 3: IOWA DEPARTMENT OF NATURAL RESOURCES ADDENDUM …

2/2/2017 SPECIAL NOTICE TO CONTRACTORS

00120-1

SPECIAL NOTICE TO CONTRACTORS

CONTRACTOR IS RESPONSIBLE FOR CONTACTING STATE STORMWATER PROGRAM

COORDINATOR (515/281-7017) FOR INFORMATION RELATING TO STORM WATER PERMIT

THAT IS NECESSARY IF CONSTRUCTION ACTIVITIES DISTURB ONE ACRE OR MORE.

THE ESTIMATED PROBABLE COST FOR THIS PROJECT IS $1,543,000.00.

Direct questions concerning the Project Design, Drawings and Specifications to:

Mandi Aldrich Peters, PE

Facilities Engineer

Wallace State Office Bldg

Des Moines, IA 50319

Ph: (515) 205-1698

Direct questions concerning Site Review and Project Inspection to:

Mark Johnson

District Engineer

Ph: (515) 250-3713

Direct questions concerning Bidding and Contract Procedures to:

Kim Alliss, DNR Procurement

Wallace State Office Building

Des Moines, Iowa 50319-0034

Telephone: 515/725-0733

In accordance with House File 2622 implemented by Iowa Code Sections 442.42 (15) & (16) and

422.47.47(5), Contractors may purchase qualifying items for work on this contract exempt from sales

tax. The DEPARTMENT will issue an authorization letter and exemption certificate to the prime

contractor and each approved subcontractor." Complete information on qualifying materials and

supplies can be found at www.state.ia.us/tax, the Iowa Department of Revenue and Finance (IDRF) Web

site. Links are found in the Business Taxes and Local Government categories. 701 IAC 19.1-20 is found

in Tax Research/Tax Research Library.

Recorded bid results can be accessed at https://programs.iowadnr.gov/engreal/projectlist.asp. Printed

bid tabs will not be available for 3 working days after the Letting date.

Page 4: IOWA DEPARTMENT OF NATURAL RESOURCES ADDENDUM …

PF-1 PROPOSAL

CPD-57924 00300-1

Time and Date of Letting 11:00 AM, February 16, 2017 PROPOSAL Project Description and Location Project No. 16-04-78-01

LAKE MANAWA STATE PARK

PICNIC AREA

POTTAWATTAMIE COUNTY, IOWA

Proposal of:

(Name of Bidder)

Located at: ( ) (Address) (Area) (Telephone)

Amount of

Proposal Guarantee

Specified completion date

or Number of Working Days

Approx. or Specified Starting Date

or Number of Working Days

Liquidated Damages

Per Day

$70,000.00 September 15, 2017 April 1, 2017 $750.00

The undersigned hereby agrees, if awarded the contract, to execute the proposed contract and to furnish an approved performance bond in a amount not less than 100 percent of the contract award within 30 days after the date of approval of award of the contract, and to provide all labor, materials, and equipment required to complete the project designated above, for the price hereinafter set forth, in strict compliance with the contract documents prepared by the Iowa Department of Natural Resources.

The undersigned agrees, if awarded the contract, to commence the work within a reasonable time after the preconstruction conference or by the specific starting date, if so specified, and to complete the work within the contract period, or to pay liquidated damages in the amount stipulated herein for each calendar day the work remains uncompleted after the expiration of the contract period or any authorized reduction thereof.

A proposal guarantee in the amount stipulated herein is included with this proposal, to be forfeited to the Iowa Department of Natural Resources if the undersigned fails to execute the contract and furnish an approved performance bond, if awarded the contract.

By virtue of statutory authority, preference will be given to products and provisions grown and coal produced within the state of Iowa, and also, a resident bidder shall be allowed a preference against a nonresident bidder from a state or foreign country which gives or requires a preference to bidders from that state or foreign country on projects in which there are no federal funds involved.

BY

(Iowa Contractor Registration No.)

(Signed) (Date)

(FID/EIN/SSN)

(Phone Number) (Fax Number)

(Email Address)

THE FOLLOWING AFFIDAVIT MUST BE COMPLETED AND NOTORIZED, OR THIS BID WILL BE REJECTED. - AFFIDAVIT-

The signatory. being duly sworn, does depose and say that the undersigned is an authorized representative of:

(Name of Firm)

Located at:

Hereinafter referred to as “Bidder” and does hereby affirm to have personal knowledge that said bidder has examined the drawings and specifications, carefully prepared the proposal form, and has checked the same in detail before submitting; and that said bidder, or the agents, officers, or employees thereof, have not either directly or indirectly, entered into any agreement, participated in any collusion or fraud, or otherwise taken any action in restraint of free competitive bidding in connection with this bid.

(Signed)

Day of , 20

(Signed Notary)

My Commission Expires , 20

Page 5: IOWA DEPARTMENT OF NATURAL RESOURCES ADDENDUM …

PF-1 PROPOSAL

CPD-57924 00300-2

SCHEDULE OF PRICES

Project Description and Location

PICNIC AREA, LAKE MANAWA STATE PARK, POTTAWATTAMIE COUNTY Name of Bidder

THE “UNIT PRICE” AND “AMOUNT” COLUMNS MUST BE FILLED IN FOR THIS PROPOSAL TO BE CONSIDERED

COMPLETE. IF THERE IS A DISCREPANCY BETWEEN UNIT BID PRICES, EXTENSIONS, OR TOTAL AMOUNTS

OF BID, THE UNIT PRICES SHALL GOVERN.

Item No.

Description Estimated Quantity Unit Price Amount

1 Clearing and Grubbing LUMP SUM

2 Remove Existing Roadway Pavement 9,973 SY

3 Remove Existing Trail 17 SY

4 Remove Existing Sidewalk 219 SY

5 Remove Existing Gravel Parking 210.9 SY

6 Remove Existing Paved Parking 11,159.2 SY

7 Remove Camp Pads 6,069 SY

8 Remove Existing Hydrants and Posts 10 EACH

9 Abandon Existing Sanitary Sewer Pipe 264 LF

10 Remove Existing Sanitary Sewer Manholes 1 EACH

11 Remove Existing Sanitary Sewer Pipe, 6" 210 LF

12 Remove Existing Water Line 729 LF

13 Remove Existing Electrical Line 200 LF

14 Remove Existing Dump Station LUMP SUM

15 Demolition LUMP SUM

16 Sanitary Sewer Main, 6" Schedule 40 PVC 225 LF

17 Water Main, 2" HDPE 1810 LF

18 Hydrants 2 EACH

19 Design Guide Shelter, Slab and Electric 1 EACH

20 Design Guide Restroom, Slab and MEP 1 EACH

21 Precast Concrete Double Vault 1 EACH

22

Pilot Rock Grill Q3-2460 B8 Surface Mount

Grill with Model S7 2 EACH

23

Contour 6’ Redwood Bench with Powder

Coated (Black) Surface Mount Frame 5 EACH

24 Furnish and Install Light Fixture 2 EACH

25 Light Pole and Base, Complete 2 EACH

26 Electrical Line 610 LF

27 Urban Seeding, Fertilizing and Mulching 2.6 ACRE

28

Native Grass Seeding, Fertilizing and

Mulching 4.6 ACRE

29 Class "A" Crushed Stone 37.0 TON

30 Special Backfill 5,374.6 SY

31 Roadway Pavement, PCC, 7" 428.4 SY

32 Shoulder Construction, Earth 4.0 STA

33 Sidewalk, PCC, 5" 1,127 SY

34 Parking Lot, PCC, 6" 4,658 SY

35 Detectable Warning Panel 96 SF

36 Signing 4 EACH

37

Painted Pavement Markings,

Waterborne/Solvent - White 26 STA

38 Excavation, Class 10, Roadway and Borrow 370 CY

Page 6: IOWA DEPARTMENT OF NATURAL RESOURCES ADDENDUM …

PF-1 PROPOSAL

CPD-57924 00300-3

39 Embankment-In-Place 5,172 SY

40 Erosion Control 2,076 LF

41 Drain-Down Pit LUMP SUM

42 Full Depth HMA Finish Pacthes by Sy. Yd. 52 SY

43

Full Depth HMA Finish Joint Pacthes by

Count 2 EACH

44 Subbase Repair 52 SY

45 Heavy Jet Cleaning, Sanitary Sewer 265 LF

46 Furnish and Install Electric Meter 1 EACH

47 Construction Staking LUMP SUM

48 Mobilization LUMP SUM

49 Water Main, 1" HDPE 463 LF

50 Rural Seeding, Fertilizing and Mulching 2.8 ACRE

TOTAL

Bidder Acknowledges Receipt of Any Issued Addenda

Below (Number and Date)

Page 7: IOWA DEPARTMENT OF NATURAL RESOURCES ADDENDUM …

CF-1 CONTRACT FORM CPD-57183 1/87 00500-1

STATE OF IOWA DEPARTMENT OF NATURAL RESOURCES CONTRACT

(CAPITAL IMPROVEMENT)

LAKE MANAWA STATE PARK

PICNIC AREA

PROJECT NO. 16-04-78-01

POTTAWATTAMIE COUNTY, IOWA

THIS AGREEMENT, made this _______ day of, ______________20________by and between the state of Iowa acting through

the Department of Natural Resources hereinafter called the DEPARTMENT and:

located at

hereinafter called the CONTRACTOR

WITNESSETH: That the DEPARTMENT agrees to pay the CONTRACTOR the contract price provided herein for the fulfillment of the

work and the performance of the covenants set forth herein, and the CONTRACTOR agrees with the DEPARTMENT to commence and complete the project described as follows:

The project involves the removal of the existing roadways, camp pads, utilities, restroom and shower building in

the campground to construct a picnic area. Construction includes a new road, parking lot, modern restroom,

shelter and utilities at Lake Manawa State Park, Pottawattamie County, Iowa.

For the Sum of: Dollars ($) and all extra work in connection therewith, all in accordance with the terms and conditions herein contained: and to furnish at the

CONTRACTOR’S own proper cost and expense, all material, equipment, labor, insurance, and other accessories and services necessary to construct and complete, in a workmanlike manner, ready for continuous operation, the above mentioned project. The work shall be performed in accordance with the requirements and provisions of the following documents, all of which are made a part hereof and collectively evidence and constitute the contract:

1. Notice to Bidders. 2. Instructions to bidders. 3. IDNR Standard Specifications and Current Supplemental Specifications 4. Project Specifications Including Addenda Number Through

5. Drawings, Sheet Number A.01 Through V.19 Inclusive

6. Contractor’s Proposal. 7. Proposal Guarantee Bond. 8. Performance Bond. 9. This Instrument.

10. Modifications or Change Orders pursuant to IDNR Standard Specifications 11. Resident Bidder Preference Certification on Non-Federal-Aid Projects

The parties to this contract understand that time of completion of the work under this contract is the essence to the contract. The

CONTRACTOR hereby agrees to commence work under this contract in accordance with Section 1108 of the IDNR Standard Specifications and to complete all the work by

September 15, 2017

The CONTRACTOR hereby agrees that liquidated damages in the amount of Seven hundred

fifty

Dollars $ 750.00

shall be retained or assessed against the CONTRACTOR for each day and every day the completion of the work is delayed beyond

the time specified herein, not as a penalty, but as a mutually agreed to, predetermined amount to reimburse the DEPARTMENT for salaries of engineers and reviewers, clerk hire, interest charged during the period for delays and loss of use.

Page 8: IOWA DEPARTMENT OF NATURAL RESOURCES ADDENDUM …

CF-1 CONTRACT FORM CPD-57183 1/87 00500-2

It is understood that the CONTRACTOR consents to the jurisdiction of the courts of Iowa, to hear, determine and render judgment as to any controversy arising hereunder, and that this contract shall be governed by, and construed according to, the laws of the state of Iowa.

IN WITNESS WHEREOF, the parties hereto have executed this Agreement, in the day and year first above mentioned.

FOR THE DEPARTMENT: FOR THE CONTRACTOR:

Deputy Director (Signature and Title)

This contract was approved by the NATURAL RESOURCES

COMMISSION at its meeting held on

(Firm)

(Date) (Address and Zip Code)

Seal if by a Corporation:

Identification Number

Soc. Sec. No.

Or Fed. I. D. No.

Page 9: IOWA DEPARTMENT OF NATURAL RESOURCES ADDENDUM …

QU

AN

TITIE

S & N

OTES

B.01

Normal Foreslope - 4:1

2.0%

2’

Pavement w/ IDOT C4 Mix

6" Non-Reinforced Concrete

2’

12" Prepared Subgrade

24’

2.0’

Top of Subgrade

Earth

6" Special Backfill

Backfill

6" Special

Typical Earth Shoulder

4:14:1

Cross slope transition at 1% per foot or less

traverse to sidewalk

longitudinally, and #4 bars spaced 3’ on center

Reinforce concrete with #4 bars, 18" on center

TYPICAL SIDEWALK DETAILS

6" Class "A" Crushed Stone

5" PCC placed on variable.

Slope G may be

Note:

GRADE POINT

if required Back of Curb

C

G

Normal 2% SLOPE

G

A B

STATION TO STATION

ALL

SIDEA

Feet

2 5

Feet

B C

Feet

2

CONSTRUCTION

NEW

Typical Pavement

LA

KE M

AN

AW

A S

TA

TE P

AR

K

16-04-78-01

PIC

NIC A

RE

A F

OR:

PO

TTA

WA

TTA

MIE C

OU

NTY, IO

WA

Jan 2017

PROJECT NUMBER:

DATE:

NO.DATE

BYREVISION

DRAWN BY:

CHK’D BY:

NA

TU

RA

L R

ES

OU

RC

ES

IOW

A D

EP

ART

ME

NT O

F

502 E. 9TH S

T., D

ES M

OIN

ES, IA 5

0319-0

034

EN

GIN

EERIN

G S

ER

VIC

ES - W

ALLA

CE B

UILIN

G

CO

NS

ULTA

NT:

SHEET No:

12:36:31

PM

2/2/2017

maldric

N:\

Conservation

Recreation\

Land and

Waters\

Engineering\

PR

OJ

EC

TS\

AC

TI

VE\

PO

TT

AW

AT

TA

MIE\16-04-78-01

Lake

Mana

wa

Picnic

Area\02

Design\16-04-78-01

Lake

Mana

wa

Picnic

Area_

B01.dgn

Page 10: IOWA DEPARTMENT OF NATURAL RESOURCES ADDENDUM …

QU

AN

TITIE

S & N

OTES

B.02

HANDICAP SIGN DETAIL

PAINTING DETAIL

ACCESS ISLE

JOINT

CONTRACTION

JOINT

CONTRACTION

1’-6"

6"

POST (2 LBS./FT.)

"U"-CHANNEL

SPACES ONLY

ACCESSIBLE

REQUIRED FOR VAN

BACKGROUND

REFLECTIVE WHITE

LEGEND AND BORDER

SOLID GREEN

MUTCD R7-8P

BLUE BACKGROUND

SYMBOL ON

ACCESSIBILITY

WHITE

BACKGROUND

REFLECTIVE WHITE

LEGEND AND BORDER

SOLID GREEN

MUTCD R7-8

7’

3’AREA OR SIDEWALK

SIGN IS IN PAVED

WHENONLY

TRAFFIC YELLOW

AND PAINTED

W/CONCRETE

BOLLARD FILLED

USE 6" PIPE

CONCRETE

SLOPE TOP OF

SURFACE

GROUND/PAVING

3’

REQUIRED)

NOT

FOUNDATION

INSTALLED,

NOT

BOLLARD IS

(WHEN PIPE

CONCRETE

P.C.

3500 P.S.I.

6"

1’-6"

SIGN MEETING THE REQUIREMENTS OF THE MUTCD AND ADAAG.

5. ALL SIGNAGE SHALL BE ENGINEER GRADE .080 ALUMINUM REFLECTIVE

ACCESSIBLE SPACES PER ADAAG REQUIREMENTS.

ACCESSIBLE SPACE SHALL BE PROVIDED, MINIMUM, WITH ADDITIONAL VAN

REQUIRED NUMBER OF ACCESSIBLE SPACE. PER ADAAG, ONE VAN

BARRIERS ACT ACCESSIBILITY GUIDELINES (ADAAG), LATEST EDITION, FOR

4. REFER TO AMERICANS WITH DISABILITIES ACT AND ARCHITECTURAL

CENTERED ON THE WIDTH OF THE SPACE.

3. SIGNAGE SHALL BE INSTALLED IN FRONT OF EACH ACCESSIBLE SPACE,

BE APPROVED BY THE FIELD INSPECTOR PRIOR TO CONSTRUCTION.

MINIMUM OF 3’ BELOW FINISHED GRADE. ALTERNATE MOUNTING POSTS MUST

INSTALLED IN LANDSCAPE AREAS, MOUNTING POST SHALL BE DRIVEN A

2. BOLLARD MAY BE OMITTED IF INSTALLED IN LANDSCAPE AREAS. WHEN

ARE NOT EXPECTED TO USE.

REDUCED TO 5’ IF PLACED IN A LANDSCAPE AREA IN WHICH PEDESTRIANS

FINISH GRADE TO BOTTOM EDGE OF SIGN FACE. MOUNTING HEIGHT MAY BE

1. 12"x18" ACCESSIBILITY SIGN (R7-8) SHALL BE MOUNTED 7’ FROM

NOTES

NOT TO SCALE

PARKING

RESERVED

ACCESSIBLE

VAN

SIDEWALK JOINT DETAIL

2’

45°

8’ MIN.

Waterborne/Solvent - White

Painted Pavement Markings,

CONCRETE BASE

MANUFACTURER

FURNISHED BY POLE

ANCHOR BOLTS TO BE

6 NO.4 REBARS

1/2" RADIUS

NO.2 TIE RODS

LIGHT POLE BASE DETAIL

24" DIA. SONOTUBE

3"

2’

6’

NOT TO SCALE

AND THE PAVEMENT.

EXPANSION JOINT BETWEEN THE BUILDING OR SLAB

A PARKING LOT OR SIDEWALK PAVEMENT, INSTALL AN

* WHEN A BUILDING OR SLAB IS PLACED ALONGSIDE

JOINT

EXPANSION

JOINT

EXPANSION

PARKING LOT PAVEMENT

BUILDING OR CONCRETE SLAB

EARTH BACK-FILLWORD "WATER" ON COVER

CURB BOX

2’-0"

EXISTING GROUNDLINE

28-1/2"

BARRIER

6 MIL POLY.

3’-0"

VARIES 5’-0"

CONCRETE SLAB

1’-3" SQ. X 6" THICK

CURB STOP

BRICK BASE

PREVENTER

BACKFLOW

DIVERTER(5’-0" BURY DEPTH)

WOODFORD MODEL S-3

SANITARY YARD HYDRANT,

APPROVED FILTER FABRIC

WRAP GRAVEL DRAIN PIT WITH AN

NOTE:

NOT TO SCALE

YARD HYDRANT DETAIL

SERVICE

1" DIA WATER

COVER

MIN.

5’-0"DEPTH

5’-0" BURY

3"

INSTALLATION)

(INCIDENTAL TO HYDRANT

2’-6" X 3’ -6" X 6" THK

CONCRETE SPLASH PAD

D.N.R INSPECTOR WILL DETERMINE IN THE FIELD

BRICK BASE

(SEAL WITH APPROVED MATERIAL)

FROST EXPANSION SLEEVE

HINGED STRAINER

WITH VANDAL PROOF

WITHOUT TRAP-FITTED

6"x6" SQUARE TOP DRAIN

HYDRANT INSTALLATION)

ENGINEER (INCIDENTAL TO

AS DIRECTED BY THE

RIVER GRAVEL

(1-1/2" WASHED)

FILL SEPTIC STONE

3’x3’x3’ DRAIN PIT -

LA

KE M

AN

AW

A S

TA

TE P

AR

K

16-04-78-01

PIC

NIC A

RE

A F

OR:

PO

TTA

WA

TTA

MIE C

OU

NTY, IO

WA

Jan 2017

PROJECT NUMBER:

DATE:

NO.DATE

BYREVISION

DRAWN BY:

CHK’D BY:

NA

TU

RA

L R

ES

OU

RC

ES

IOW

A D

EP

ART

ME

NT O

F

502 E. 9TH S

T., D

ES M

OIN

ES, IA 5

0319-0

034

EN

GIN

EERIN

G S

ER

VIC

ES - W

ALLA

CE B

UILIN

G

CO

NS

ULTA

NT:

SHEET No:

12:36:31

PM

2/2/2017

maldric

N:\

Conservation

Recreation\

Land and

Waters\

Engineering\

PR

OJ

EC

TS\

AC

TI

VE\

PO

TT

AW

AT

TA

MIE\16-04-78-01

Lake

Mana

wa

Picnic

Area\02

Design\16-04-78-01

Lake

Mana

wa

Picnic

Area_

B02.dgn

Page 11: IOWA DEPARTMENT OF NATURAL RESOURCES ADDENDUM …

GE

NER

AL D

ETAIL

S

B.03

RECESSED LOCK

MANHOLE COVERNOT TO SCALE

PROOF BOLTS

HINGES WITH TAMPER

316 STAINLESS STEEL

(732 KG/SQ.M)

FOR 150 PSF

3/16" (5MM)

DIAMOND PLATE

150 POUNDS PER SQ. FOOT (732 KG PER SQ.M)LOADING:

NUTS & BOLTS, HINGES, AND HOLD OPEN ARM

ALUMINUN WITH 316 STAINLESS STEELMATERIAL:

NOTE

ARM WITH RED VINYL GRIP

AUTOMATIC HOLD OPEN

316 STAINLESS STEEL

ANCHOR FLANGE

& CONTINOUS

INTEGRAL SEAT

FRAME WITH

EXTRUDED ANGLE

GRADE

SIDE VIEW

TOP VIEW

MANHOLE COVER

NOT TO SCALE

NOT TO SCALE

DRAIN-DOWN PIT

MANHOLE (ASTM 478)

48" DIA. PRECAST CONCRETE

1’-0" (MIN.) TO 1’-4" (MAX.)

MANHOLE STEPS SPACED

MANHOLE (ASTM 478)

48"DIA. PRECAST CONCRETE

RIVER GRAVEL

(1-1/2" WASHED)

SEPTIC STONE

OR APPROVED EQUAL.

& STAINLESS BOLTS,NUTS & HINGES

HATCH TO HAVE RECESSED PADLOCK

COMPANY APS150 CAST IN TOP

U.S FOUNDRY & MANUFACTURING

MANHOLE COVER

4’-0"

6"

5’-0"

MI

NI

MU

M1’-0"

1’-6"

6"

30"

30"

(76MM)

3"

(25

MM)

1"

24"

23"

24"

21"

GATE VALVE

GATE VALVE

FROM MAIN

2" HDPE PIPE

TO BUILDING

1" HDPE PIPE

2" TO 1" REDUCER

DRAIN VALVE

DRAIN VALVE

2" TO 1" REDUCER

VALVE HANDLE EXTENSIONS

LA

KE M

AN

AW

A S

TA

TE P

AR

K

16-04-78-01

PIC

NIC A

RE

A F

OR:

PO

TTA

WA

TTA

MIE C

OU

NTY, IO

WA

Jan 2017

PROJECT NUMBER:

DATE:

NO.DATE

BYREVISION

DRAWN BY:

CHK’D BY:

NA

TU

RA

L R

ES

OU

RC

ES

IOW

A D

EP

ART

ME

NT O

F

502 E. 9TH S

T., D

ES M

OIN

ES, IA 5

0319-0

034

EN

GIN

EERIN

G S

ER

VIC

ES - W

ALLA

CE B

UILIN

G

CO

NS

ULTA

NT:

SHEET No:

12:36:33

PM

2/2/2017

maldric

N:\

Conservation

Recreation\

Land and

Waters\

Engineering\

PR

OJ

EC

TS\

AC

TI

VE\

PO

TT

AW

AT

TA

MIE\16-04-78-01

Lake

Mana

wa

Picnic

Area\02

Design\16-04-78-01

Lake

Mana

wa

Picnic

Area_

B03.dgn

Page 12: IOWA DEPARTMENT OF NATURAL RESOURCES ADDENDUM …

QU

AN

TITIE

S & N

OTES

C.01

INFRASTRUCTUREESTIMATED PROJECT QUANTITIES

ITEM NO. ITEM UNIT TOTALDIVISION 1 DIVISION 2

DIVISION 2=

DIVISION 1= P&I FUNDS

LA

KE M

AN

AW

A S

TA

TE P

AR

K

16-04-78-01

PIC

NIC A

RE

A F

OR:

PO

TTA

WA

TTA

MIE C

OU

NTY, IO

WA

Jan 2017

PROJECT NUMBER:

DATE:

NO.DATE

BYREVISION

DRAWN BY:

CHK’D BY:

NA

TU

RA

L R

ES

OU

RC

ES

IOW

A D

EP

ART

ME

NT O

F

502 E. 9TH S

T., D

ES M

OIN

ES, IA 5

0319-0

034

EN

GIN

EERIN

G S

ER

VIC

ES - W

ALLA

CE B

UILIN

G

CO

NS

ULTA

NT:

SHEET No:

12:36:34

PM

2/2/2017

maldric

N:\

Conservation

Recreation\

Land and

Waters\

Engineering\

PR

OJ

EC

TS\

AC

TI

VE\

PO

TT

AW

AT

TA

MIE\16-04-78-01

Lake

Mana

wa

Picnic

Area\02

Design\16-04-78-01

Lake

Mana

wa

Picnic

Area_

C01.dgn

All construction shall be completed.September 15, 2017 -

to August 31, 2017.

Construction may begin in the vicinity of the eagles nest. No work shall be allowed in the vicinity priorSeptember 1, 2017 -

All construction in the picnic area shall be completed by August 20th and the area open for use.August 20, 2017 -

Improvements (SUDAS) Section 9010, Part 2.02-H.

All native seeding shall be completed per Statewide Urban Standard Design Specifications for Public June 30, 2017 -

CONSTRUCTION DATES:

50

49

48

47

46

45

44

43

42

41

40

39

38

37

36

35

34

33

32

31

30

29

28

27

26

25

24

23

22

21

20

19

18

17

16

15

14

13

12

11

10

9

8

7

6

5

4

3

2

1

Rural Seeding, Fertilizing and Mulching

Water Main, 1" HDPE

Mobilization

Construction Staking

Furnish and Install Electric Meter

Heavy Jet Cleaning, Sanitary Sewer

Subbase Repair

Full Depth HMA Finish Joint Pacthes by Count

Full Depth HMA Finish Pacthes by Sy. Yd.

Drain-Down Pit

Erosion Control

Embankment-In-Place

Excavation, Class 10, Roadway and Borrow

Painted Pavement Markings, Waterborne/Solvent - White

Signing

Detectable Warning Panel

Parking Lot, PCC, 6"

Sidewalk, PCC, 5"

Shoulder Construction, Earth

Roadway Pavement, PCC, 7"

Special Backfill

Class "A" Crushed Stone

Native Grass Seeding, Fertilizing and Mulching

Urban Seeding, Fertilizing and Mulching

Electrical Line

Light Pole and Base, Complete

Furnish and Install Light Fixture

Contour 6’ Redwood Bench with Powder Coated (Black) Surface Mount Frame

Pilot Rock Grill Q3-2460 B8 Surface Mount Grill with Model S7

Precast Concrete Double Vault

Design Guide Restroom, Slab and MEP

Design Guide Shelter, Slab and Electric

Hydrants

Water Main, 2" HDPE

Sanitary Sewer Main, 6" Schedule 40 PVC

Demolition

Remove Existing Dump Station

Remove Existing Electrical Line

Remove Existing Water Line

Remove Existing Sanitary Sewer Pipe, 6"

Remove Existing Sanitary Sewer Manholes

Abandon Existing Sanitary Sewer Pipe

Remove Existing Hydrants and Posts

Remove Camp Pads

Remove Existing Paved Parking

Remove Existing Gravel Parking

Remove Existing Sidewalk

Remove Existing Trail

Remove Existing Roadway Pavement

Clearing and Grubbing

ACRE

LF

LS

LS

EACH

LF

SY

EACH

SY

LS

LF

CY

CY

STA

EACH

SF

SY

SY

STA

SY

SY

TON

ACRE

ACRE

LF

EACH

EACH

EACH

EACH

EACH

EACH

EACH

EACH

LF

LF

LS

LS

LF

LF

LF

EACH

LF

EACH

SY

SY

SY

SY

SY

SY

LS

2.8

463

1

1

1

265

52

2

52

1

2,076

5,172

370

26

4

96

4,658

1,127

4.0

428.4

5,374.6

37.0

4.6

2.6

610

2

2

5

2

1

1

1

2

1,810

225

1

1

200

729

210

1

264

10

6,069

11,159.2

210.9

219

17

9,973

1

0.50

0.50

907

327

185

1941

4.0

428.4

2,477.4

1.3

0.75

100.00

364.50

5

2,048

127.0

118.6

142

3,114

0.50

2.8

463

0.50

1

1

265

52

2

52

1

1,169

4,845

185

26.0

4

96

2,717

1,127

2,897.1

37.0

4.6

1.3

610

2

2

5

2

1

1

1

2

1,810

225

0.25

1

100.00

364.50

210

1

264

5

4,021

11,032

92.3

77

17

6,858

0.50

Page 13: IOWA DEPARTMENT OF NATURAL RESOURCES ADDENDUM …

QU

AN

TITIE

S & N

OTES

C.02

ESTIMATE REFERENCE INFORMATION

DESCRIPTIONITEM

NO.

LA

KE M

AN

AW

A S

TA

TE P

AR

K

16-04-78-01

PIC

NIC A

RE

A F

OR:

PO

TTA

WA

TTA

MIE C

OU

NTY, IO

WA

Jan 2017

ESTIMATE REFERENCE INFORMATION

DESCRIPTIONITEM

NO.

PROJECT NUMBER:

DATE:

NO.DATE

BYREVISION

DRAWN BY:

CHK’D BY:

NA

TU

RA

L R

ES

OU

RC

ES

IOW

A D

EP

ART

ME

NT O

F

502 E. 9TH S

T., D

ES M

OIN

ES, IA 5

0319-0

034

EN

GIN

EERIN

G S

ER

VIC

ES - W

ALLA

CE B

UILIN

G

CO

NS

ULTA

NT:

SHEET No:

12:36:34

PM

2/2/2017

maldric

N:\

Conservation

Recreation\

Land and

Waters\

Engineering\

PR

OJ

EC

TS\

AC

TI

VE\

PO

TT

AW

AT

TA

MIE\16-04-78-01

Lake

Mana

wa

Picnic

Area\02

Design\16-04-78-01

Lake

Mana

wa

Picnic

Area_

C02.dgn

shelter and light poles.

transformer to the restroom panel and underground service from the restrrom panel to the

C. Includes materials and labor to install underground electrical service from the existing

B. Materials and labor to connect to the existing utilities are incidental.

connections to distribution panels to ensure compliance with the National Electric Code (NEC).

A. The contractor shall use copper wire of sufficient size and type for electrical

ELECTRICAL LINE26

A. Light poles are to be Lithonia Lighting model SSS-20-4G_-_-DDB or approved equal.

LIGHT POLE AND BASE, COMPLETE25

DSX1LED-30C-700-50K-T4M-120-SPA-PIRH-_-DDBXB or approved equal.

A. Light Fixtures are to be Lithonia Lighting model

FURNISH AND INSTALL LIGHT FIXTURE24

T: (715) 723-7446

Chippewa Falls, WI 54729

74154 123rd Street

Huffcutt Concrete, Inc.

D. Approved manufacturer:

C. Site restoration for the installation of the structure to be considered incidental.

B. Do not include drinking fountains.

specifications.

A. Contractor will provide and install the structure by the plans and Engineer’s

PRECAST CONCRETE DOUBLE VAULT21

A. Furnish and install standard "S3" yard hydrants.

HYDRANTS18

pipe restraints, thrust blocks and all appurtenances shall be incidental.

B. All fittings required to make the connection to the existing main, other pipe fittings,

A. Includes reconnecting the fish cleaning station, existing building and the new water hydrant.

WATER MAIN, 2" HDPE17

A. Minimum slope of 0.5%.

SANITARY SEWER MAIN, 6" SCHEDULE 40 PVC16

C. Submitting the Air Quality Notice and disposal is the responsibility of the contractor.

B. The contractor shall ensure that all utilities are disconnected prior to demolition.

A. Includes the removal and disposal of the existing building, sidewalk and granular base.

DEMOLITION15

A. Disposal is the responsibility of the contractor.

REMOVE EXISTING DUMP STATION14

B. Disposal is the responsibility of the contractor.

A. Remove within the construction limits from begining of project to Station 6+50.

REMOVE EXISTING ELECTRICAL LINE13

REMOVE EXISTING WATER LINE12

A. Disposal is the responsibility of the contractor.

REMOVE EXISTING SANITARY SEWER PIPE, 6" 11

REMOVE EXISITNG SANITARY SEWER MANHOLES10

A. Fill the existing line with flowable mortar.

ABANDON EXISTING SANITARY SEWER PIPE9

A. Disposal is the responsibility of the contractor.

REMOVE EXISTING HYDRANTS AND POSTS8

REMOVE CAMP PADS7

B. Disposal is the responsibility of the contractor.

A. All saw cuts shall be incidental.

REMOVE EXISTING PAVED PARKING6

REMOVE EXISTING GRAVEL PARKING5

REMOVE EXISTING SIDEWALK4

REMOVE EXISTING TRAIL3

B. Disposal is the responsibility of the contractor.

A. All saw cuts shall be incidental.

REMOVE EXISTING ROADWAY PAVEMENT2

B. Disposal is the responsibility of the contractor.

project to Station 6+50 as shown in the plans and as directed by the DNR Inspector.

A. Includes the removal and disposal of trees within the construction limits from begining of

CLEARING AND GRUBBING1

B. Use Class "C" seed mixture.

for Public Improvements (SUDAS) Section 9010.

A. All rural seeding shall be completed per Statewide Urban Standard Design Specifications

RURAL SEEDING, FERTILIZING AND MULCHING50

pipe restraints, thrust blocks and all appurtenances shall be incidental.

B. All fittings required to make the connection to the existing main, other pipe fittings,

A. Includes reconnecting the fish cleaning station, existing building and the new water hydrant.

WATER MAIN, 1" HDPE49

A. Contractor is responsible for the survey staking of the construction of the project.

CONSTRUCTION STAKING47

surrounds the building.

a minimum depth of 24" to final grade) and stub out a 2" pipe beyond the sidewalk that

required per NEC) with a 2" Sch80 riser pipe, expansion joint, 18" sweep(installed at

the chase door, a Milbank U4721-O-BL wall mount meter socket (if no outside disconnect is

A. Contractor shall furnish and install on the exterior of the restroom on the south side of

FURNISH AND INSTALL ELECTRIC METER46

drainage channels, or existing sanitary sewers is not allowed.

sediment and other debris by vacuum extraction. Discharging soil sediment or debris to

A. Contractor will clean all sanitary sewers by using high pressure water and removing soil

HEAVY JET CLEANING, SANITARY SEWER45

remove once the site is stabilized.

site and shall remain in place and be maintained during construction. DNR Park staff will

A. Filter sock shall be installed as detailed to prevent sediment from exiting the project

EROSION CONTROL40

B. No shrink factor is applied.

be allowed.

A. A suitable borrow site shall be obtained by the contractor. No payment for overhaul will

EMBANKMENT-IN-PLACE39

F. No payment for overhaul will be allowed.

and mulch on all disturbed areas as directed by the DNR Inspector.

E. Place top soil in those areas outside of the new construction. Seed, fertilizer

D. Dispose of any waste material as directed by the DNR Inspector.

C. Sod to be stripped in areas where fill is placed.

B. Material to be used as fill where needed.

A. Remove existing topsoil to an average depth of 6 inch.

EXCAVATION, CLASS 10, ROADWAY AND BORROW38

B. 2x4 surface applied truncated dome, detectable warning tactile surface.

A. Shall be installed on the sidewalk running along the parking lot. See sheet D.03 for location.

DETECTABLE WARNING PANEL35

C. Joints shall not be sealed.

B. Excavation for parking lot construction is considered incidental.

sidewalk around the building and the parking/sidewalk in front of the building.

installed between the sidewalk and the parking lot. KT-1 Joint shall be placed between the

A. Contraction joints shall be sawcut at standard spacing. An expansion joint shall be

PARKING LOT, PCC, 7"34

B. Excavation for sidewalk construction is considered incidental.

and the sidewalks leading up to the building.

installed around the perimeter of the building and between the sidewalk around the building

A. Contraction joints shall be sawcut at 5’ maximum spacing. Expansion joints shall be

SIDEWALK, PCC, 5"33

A. Shall be cosntructed on both sides along the roadway leading to the parking lot.

SHOULDER CONSTRUCTION, EARTH32

A. The sidewalk is to be set on a 6" base.

CLASS "A" CRUSHED STONE29

Improvements (SUDAS) Table 9010.13: Native Grass and Forbs (Wildflower) Seeding Mixture.

B. Nataive grass seeding mix per Statewide Urban Standard Design Specifications for Public

for Public Improvements (SUDAS) Section 9010.

A. All native seeding shall be completed per Statewide Urban Standard Design Specifications

NATIVE GRASS SEEDING, FERTILIZING AND MULCHING28

Improvements (SUDAS) Table 9010.06: Type 1 Seed Mixture.

B. Urban seeding mix per Statewide Urban Standard Design Specifications for Public

for Public Improvements (SUDAS) Section 9010.

A. All urban seeding shall be completed per Statewide Urban Standard Design Specifications

URBAN SEEDING, FERTILIZING AND MULCHING27

Page 14: IOWA DEPARTMENT OF NATURAL RESOURCES ADDENDUM …

C.03

GE

NER

AL N

OTES

LA

KE M

AN

AW

A S

TA

TE P

AR

K

16-04-78-01

PIC

NIC A

RE

A F

OR:

PO

TTA

WA

TTA

MIE C

OU

NTY, IO

WA

Jan 2017

GENERAL NOTES

PROJECT NUMBER:

DATE:

NO.DATE

BYREVISION

DRAWN BY:

CHK’D BY:

NA

TU

RA

L R

ES

OU

RC

ES

IOW

A D

EP

ART

ME

NT O

F

502 E. 9TH S

T., D

ES M

OIN

ES, IA 5

0319-0

034

EN

GIN

EERIN

G S

ER

VIC

ES - W

ALLA

CE B

UILIN

G

CO

NS

ULTA

NT:

SHEET No:

12:36:35

PM

2/2/2017

maldric

N:\

Conservation

Recreation\

Land and

Waters\

Engineering\

PR

OJ

EC

TS\

AC

TI

VE\

PO

TT

AW

AT

TA

MIE\16-04-78-01

Lake

Mana

wa

Picnic

Area\02

Design\16-04-78-01

Lake

Mana

wa

Picnic

Area_

C03.dgn

through 11 apply to work on this project.

N. Statewide Urban Standard Design Specifications for Public Improvements (SUDAS) Divisions 2

be subject to the approval of the DNR Engineer.

equipment or use these areas for storage of materials. Storage, parking and service areas will

construction limits. The contractor will not be permitted to park or service vehicles and

M. The contractor shall not disturb desirable grass areas and desirable trees outside the

or delay caused by such work.

No claims for additional compensation will be allowed to the contractor for any interference

responsibility to determine their existence and exact location and to avoid damage thereto.

others, the existence of which is presently not known or shown. It is the contractor’s

therefore their locations must be considered approximate only. It is possible there may be

facilities, structures and utilities have been plotted from available surveys and records and

afforded access to these facilities for necessary modification of services. Underground

Engineer of those utilities prior to the beginning of any construction. The contractor shall be

construction area, it shall be the responsibility of the contractor to notify the DNR

L. Where utilities and fixtures are shown as existing on the plans or encountered within the

Backfill to the top of all rock or paved surfaces.K.

Topsoil shall be spread to a minimum thickness of 6 inches on all disturbed unpaved areas. J.

to finish grade.

The contractor shall shape graded area to maintain surface drainage. All elevations shown are I.

silt fence, rock ditch checks, silt basins or silt dikes.

to install and maintain erosion control features of the project. This may involve seeding,

The contractor is expected to have materials, equipment, and labor available on a daily basis H.

considered incidental to other bid items in the project.

any such operations shall be restored to an applicable condition. This operation shall be

the right of way or project limits (including borrow areas and operation sites) disturbed by

practical - preferably the day created and not later than the following day. Any portion of

directed by the Engineer to prevent future settlement. The voids shall be filled as soon as

fence posts, utility poles or piers, shall be filled and consolidated to finish grade as

All holes resulting from operations of the contractor, including removal of guardrail posts, G.

right-of-way, unless specifically stated in the plans or approved by the DNR Engineer.

allowed for material hauled to these sites. No material shall be placed within the

incorporated into the work involved on this project. No payment for overhaul will be

excess material (excavated material or broken concrete) which is not desirable to be

F. It shall be the contractor’s responsibility to provide waste areas or disposal sites for

ordinances.

All work shall conform to and be preformed in accordance with all applicable codes and E.

owner.

their negligence, or that of a subcontractor, and said repairs shall be approved by the

D. The contractor shall be responsible for any damage to existing facilities resulting from

proceeding with the work.

shall notify the DNR Engineer of any discrepancies, omissions, and/or conflicts prior to

C. The contractor shall verify, at the site, all dimensions and conditions shown on the plans and

to the plans, specification, special provisions and contract.

visit the project site shall not relieve the contractor from performing the work in accordance

themselves with the actual job conditions prior to bidding and the start of work. Failure to

The contractor shall visit the site and inspect the project area and thoroughly familiarize B.

District Inspector: Mark Johnson (515) 250-3713a.

The contractor shall notify the following two weeks prior to demolition and/ or construction:A.

Page 15: IOWA DEPARTMENT OF NATURAL RESOURCES ADDENDUM …

PROJECT NUMBER:

DATE:

NO.DATE

BYREVISION

DRAWN BY:

CHK’D BY:

NA

TU

RA

L R

ES

OU

RC

ES

IOW

A D

EP

ART

ME

NT O

F

502 E. 9TH S

T., D

ES M

OIN

ES, IA 5

0319-0

034

EN

GIN

EERIN

G S

ER

VIC

ES - W

ALLA

CE B

UILIN

G

CO

NS

ULTA

NT:

SHEET No:

12:36:39

PM

2/2/2017

maldric

N:\

Conservation

Recreation\

Land and

Waters\

Engineering\

PR

OJ

EC

TS\

AC

TI

VE\

PO

TT

AW

AT

TA

MIE\16-04-78-01

Lake

Mana

wa

Picnic

Area\02

Design\16-04-78-01

Lake

Mana

wa

Picnic

Area_

D01.dgn

LA

KE M

AN

AW

A S

TA

TE P

AR

K

16-04-78-01

PIC

NIC A

RE

A F

OR:

PO

TTA

WA

TTA

MIE C

OU

NTY, IO

WA

Jan 2017

Line

Existing Water

Connect to

of Trail

from Edge

5’ Offset

of Trail

from Edge

5’ Offset

Trail

Protect

Trail

Protect

Install Valve

Patch

Trail

HMA

Water Line

2" HDPE

WATER

SSMH

TOP

IN

IN2

OUT

: 972.90

: 972.90-IN

: 972.90-IN2

: 972.90-OUT

SSMH

TOP

IN

IN2

OUT

: 974.23

: 974.23-IN

: 974.23-IN2

: 974.23-OUT

SSMH

TOP

IN

IN2

OUT

: 974.38

: 974.38-IN

: 974.38-IN2

: 974.38-OUT

D.01

PLA

N S

HEET

O

FEET

5O

Page 16: IOWA DEPARTMENT OF NATURAL RESOURCES ADDENDUM …

26.4’

Manhole

Existing

Protect

Sewer Pipe

Sanitary

Existing

Protect

0+00

1+00

2+00

Outlet)

and Unplug

Intake (Locate

Protect Existing

24’

Noise Barrier

600’ of Vegetative

PROJECT NUMBER:

DATE:

NO.DATE

BYREVISION

DRAWN BY:

CHK’D BY:

NA

TU

RA

L R

ES

OU

RC

ES

IOW

A D

EP

ART

ME

NT O

F

502 E. 9TH S

T., D

ES M

OIN

ES, IA 5

0319-0

034

EN

GIN

EERIN

G S

ER

VIC

ES - W

ALLA

CE B

UILIN

G

CO

NS

ULTA

NT:

SHEET No:

12:36:48

PM

2/2/2017

maldric

N:\

Conservation

Recreation\

Land and

Waters\

Engineering\

PR

OJ

EC

TS\

AC

TI

VE\

PO

TT

AW

AT

TA

MIE\16-04-78-01

Lake

Mana

wa

Picnic

Area\02

Design\16-04-78-01

Lake

Mana

wa

Picnic

Area_

D02.dgn

LA

KE M

AN

AW

A S

TA

TE P

AR

K

16-04-78-01

PIC

NIC A

RE

A F

OR:

PO

TTA

WA

TTA

MIE C

OU

NTY, IO

WA

Jan 2017

Filter Sock

Filter Sock

Sidewalk

Replace

of Trail

from Edge

5’ Offset

East Side of Building

Booth to Sidewalk on

Sidewalk Near Phone

to Connect Existing

Construct Sidewalk

Trail

Protect

Trail

Protect

R=10

Sewer Pipe

Sanitary

Existing

Protect

Storm Sewer Outlet

Unplug Existing

Locate and

Seeding

Urban

drain

to

Grade

R=25’

Patch

Roadway

HMA

Water Line

2" HDPE

to Water Line

Cleaning Station

Reconnect Fish

to Water Line

Reconnect Building

WATER

SSMH

WATER VALVE

WATER

24" COTTONWOOD

SSMH

TOP

IN

: 973.93

: 964.63

36" COTTONWOOD

SSMH

TOP

IN

IN2

OUT

: 974.38

: 974.38-IN

: 974.38-IN2

: 974.38-OUT

28" COTTONWOOD

18" MAPLE

32" COTTONWOOD

SSMH

TOP

OUT

: 974.95

: 965.25

SSMH

TOP : 975.13

18" COTTONWOOD

PINE8

PINE6

PINE8

PINE8

" WELL

24" COTTONWOOD

PINE6

28" COTTONWOOD

PINE8

SSMH

OUT

TOP : 975.80

IN FISH CLEAN

IN DUMP STA

IN BUILDING

: 970.75

: 970.70

: 972.00

: 965.30

8" COTTONWOOD

PINE6

PINE6

PINE8

18" COTTONWOOD

2CAMPPOST

PINE5

" INTAKE

24" COTTONWOOD

24" COTTONWOOD

PINE12

SSMH

TOP

IN

IN2

OUT

: 976.28

: 976.28-IN

: 976.28-IN2

: 976.28-OUT

POST

PINE8

WATER VALVE

WATER

PINE8 DEAD

POST

60" COTTONWOOD

POST

HYDRANT

POST

30" COTTONWOOD

HYDRANT

36" COTTONWOOD36" COTTONWOOD

POST

50" COTTONWOOD

4CAMPPOST

12" MAPLE

18" MAPLE

WATER

972973

974975

975

975

976

976

976

976

976

D.02

PLA

N S

HEET

O

FEET

5O

Page 17: IOWA DEPARTMENT OF NATURAL RESOURCES ADDENDUM …

Hydrant

Water

WHWarning Panels

Detectable

2+00

3+00

4+00

5+00

6+00

7+00

8+00

9+00

6’

96’

32’

324’

32’ Lt.

Sta. 3+27.8,

Light Pole

Install

32’ Lt.

Sta. 4+59.8,

Light Pole

Install

6’

with existing transformer

Connect to power pole

5’

Shelter

Proposed

by Others

to be Done

Noise Barrier

Vegetative

PROJECT NUMBER:

DATE:

NO.DATE

BYREVISION

DRAWN BY:

CHK’D BY:

NA

TU

RA

L R

ES

OU

RC

ES

IOW

A D

EP

ART

ME

NT O

F

502 E. 9TH S

T., D

ES M

OIN

ES, IA 5

0319-0

034

EN

GIN

EERIN

G S

ER

VIC

ES - W

ALLA

CE B

UILIN

G

CO

NS

ULTA

NT:

SHEET No:

12:36:58

PM

2/2/2017

maldric

N:\

Conservation

Recreation\

Land and

Waters\

Engineering\

PR

OJ

EC

TS\

AC

TI

VE\

PO

TT

AW

AT

TA

MIE\16-04-78-01

Lake

Mana

wa

Picnic

Area\02

Design\16-04-78-01

Lake

Mana

wa

Picnic

Area_

D03.dgn

LA

KE M

AN

AW

A S

TA

TE P

AR

K

16-04-78-01

PIC

NIC A

RE

A F

OR:

PO

TTA

WA

TTA

MIE C

OU

NTY, IO

WA

Jan 2017

Filter Sock

drain

Grade to

R=10

Manhole

Protect Existing

drain

Grade to

Urban Seeding

Urban Seeding

Urban Seeding

drain

Grade to

Urban Seeding 0+78.50 to 6+50

Native Seeding 6+50 to 16+80

Native Seeding

Native Seeding

drain

Grade to

drain

to

Grade

Grade to drain

R=25’

to Existing Ground

Slope All Sides at 5:1

drain

Grade to

Seeding

Urban

Seeding

Urban

Water Line

2" HDPE

Restroom

Proposed

Pit

Down

Drain-

"CMP

+

"CMP

+

CAMPPOST

25CAMPPOST

23CAMPPOST

24CAMPPOST

73CAMPPOST

22CAMPPOST

HYDRANTHYDRANT

40" COTTONWOOD

POST

POST

SSMH

TOP

IN

OUT

: 971.43

: 968.40

: 968.39

30" COTTONWOOD30" STUMP

POST

38CAMPPOST

POST

21CAMPPOST

24" COTTONWOOD

39CAMPPOST

20CAMPPOST

36" COTTONWOOD

24" COTTONWOOD24" COTTONWOOD

26CAMPPOST

37CAMPPOST37CAMPPOST

24" COTTONWOOD24" STUMP

24 22" COTTONWOOD

27CAMPPOST

24 24" COTTONWOOD

36" COTTONWOOD

19CAMPPOST

16" COTTONWOOD

60" COTTONWOOD

22" COTTONWOOD

20" COTTONWOOD

24 24 20" COTTONWOOD

24" COTTONWOOD

24" COTTONWOOD

30" COTTONWOOD

16CAMPPOST

16" DEAD

24" COTTONWOOD

15CAMPPOST13CAMPPOST

24" COTTONWOOD

22" ASH

HYDRANT

36" COTTONWOOD

17CAMPPOST

22" ASH

9CAMPPOST

22" ASH

WATER VALVE

WATER

28CAMPPOST

11CAMPPOST36" COTTONWOOD

14CAMPPOST

: 974.95

: 965.25

12CAMPPOST7CAMPPOST

12" TREE

12" TREE5CAMPPOST

44" COTTONWOOD

10CAMPPOST

POST

3CAMPPOST

HYDRANT

POST

29CAMPPOST

POST

10" TREE

8CAMPPOST

2CAMPPOST

6CAMPPOST

14" ASH

8" TREE

WATER VALVE

WATER

8 8" TREE

HYDRANT

30CAMPPOST

32CAMPPOST

POST

POST

POST

31CAMPPOST

18" ASH

6" TREE

POST

34CAMPPOST

12" TREE

14" COTTONWOOD

8" OAK

54" COTTONWOOD

33CAMPPOST

5" TREE

12" ASH

18 18" ASH

24" ASH

Utility Pole #(5117)

OWNER

SERVICE

: Unknown

:

50" COTTONWOOD

32" COTTONWOOD

35CAMPPOST

18" ASH

SSMH

TOP

OUT

: 977.30

: 965.88

12 10" ASH

12 10" ASH18 14" ASH

12 12" ASH

10" ASH

970

971

971

971

971

971

971

972

972

972

972

972

973

973

973

973

973

973

973

974

974974974

974

974

974

975

975

975975

975

975

975

976

976

976

976

976

976

977

977

977

977

978

D.03

PLA

N S

HEET

O

FEET

5O

Page 18: IOWA DEPARTMENT OF NATURAL RESOURCES ADDENDUM …

Hydrant

Water

Water Line

1" HDPE

Double Vault

ProposedWH

(Approximate Location)

At Exisiting Hydrant

Connect New Water Main

PROJECT NUMBER:

DATE:

NO.DATE

BYREVISION

DRAWN BY:

CHK’D BY:

NA

TU

RA

L R

ES

OU

RC

ES

IOW

A D

EP

ART

ME

NT O

F

502 E. 9TH S

T., D

ES M

OIN

ES, IA 5

0319-0

034

EN

GIN

EERIN

G S

ER

VIC

ES - W

ALLA

CE B

UILIN

G

CO

NS

ULTA

NT:

SHEET No:

12:37:08

PM

2/2/2017

maldric

N:\

Conservation

Recreation\

Land and

Waters\

Engineering\

PR

OJ

EC

TS\

AC

TI

VE\

PO

TT

AW

AT

TA

MIE\16-04-78-01

Lake

Mana

wa

Picnic

Area\02

Design\16-04-78-01

Lake

Mana

wa

Picnic

Area_

D06.dgn

LA

KE M

AN

AW

A S

TA

TE P

AR

K

16-04-78-01

PIC

NIC A

RE

A F

OR:

PO

TTA

WA

TTA

MIE C

OU

NTY, IO

WA

Jan 2017

PLA

N S

HEET

D.06

O

FEET

5O

Page 19: IOWA DEPARTMENT OF NATURAL RESOURCES ADDENDUM …

0+00

1+00

2+00

3+00

4+00

5+00

6+00

7+00

FFE=976.45

Shelter

Proposed

PROJECT NUMBER:

DATE:

NO.DATE

BYREVISION

DRAWN BY:

CHK’D BY:

NA

TU

RA

L R

ES

OU

RC

ES

IOW

A D

EP

ART

ME

NT O

F

502 E. 9TH S

T., D

ES M

OIN

ES, IA 5

0319-0

034

EN

GIN

EERIN

G S

ER

VIC

ES - W

ALLA

CE B

UILIN

G

CO

NS

ULTA

NT:

SHEET No:

12:37:18

PM

2/2/2017

maldric

N:\

Conservation

Recreation\

Land and

Waters\

Engineering\

PR

OJ

EC

TS\

AC

TI

VE\

PO

TT

AW

AT

TA

MIE\16-04-78-01

Lake

Mana

wa

Picnic

Area\02

Design\16-04-78-01

Lake

Mana

wa

Picnic

Area_

D07.dgn

LA

KE M

AN

AW

A S

TA

TE P

AR

K

16-04-78-01

PIC

NIC A

RE

A F

OR:

PO

TTA

WA

TTA

MIE C

OU

NTY, IO

WA

Jan 2017

Elv=977.28

Elv=976.24

Elv=976.22

Elv=975.95

Elv=976.00

Elv=976.00

Elv=977.92

Sta 2+31.80

Elv=976.80

Elv=976.00

Rim=977.36

Drain-Down Pit

Elv=976.00

Elv=976.00Elv=976.00

Elv=976.00

FFE=976.06

Restroom

Proposed

Elv=976.00

Elv=977.44

Sta 5+55.80

Elv=976.00

Slope to be 1.5%

Note: Shelter Pad

in the first 25’

out each direction

at the beginning to 2%

matching existing slope

pavement slope from

Transition roadway

Elv=976.00

Elv=977.92

Sta 4+80

Elv=977.44

Sta 5+00

Elv=976.80

Sta 5+00, 32’ RT

Elv=977.28

Sta 4+80, 32’ RT

Slope West

1.5% Cross

0% Slope,

Sidewalk

Slope North

1.5% Cross

0% Slope,

Sidewalk

Slope East

1.5% Cross

0% Slope,

Sidewalk

LP Elv=975.50

24" COTTONWOOD

36" COTTONWOOD

24 22" COTTONWOOD

27CAMPPOST

24 24" COTTONWOOD

36" COTTONWOOD

19CAMPPOST

16" COTTONWOOD

60" COTTONWOOD

22" COTTONWOOD

20" COTTONWOOD

24 24 20" COTTONWOOD

24" COTTONWOOD

WATER VALVE

WATER

24" COTTONWOOD

30" COTTONWOOD

16CAMPPOST

24" COTTONWOOD

SSMH

TOP

IN

: 973.93

: 964.63

24" COTTONWOOD

15CAMPPOST

36" COTTONWOOD

13CAMPPOST

24" COTTONWOOD

HYDRANT

36" COTTONWOOD

17CAMPPOST

9CAMPPOST

WATER VALVE

WATER

28CAMPPOST

11CAMPPOST

28" COTTONWOOD

36" COTTONWOOD

18" MAPLE

14CAMPPOST32" COTTONWOOD

SSMH

TOP

OUT

: 974.95

: 965.25

12CAMPPOST7CAMPPOST

12" TREE

12" TREE5CAMPPOST

44" COTTONWOOD

18" COTTONWOOD

10CAMPPOST

PINE8

POST

3CAMPPOST

HYDRANT

POST

PINE6

PINE8

PINE8

" WELL

24" COTTONWOOD

29CAMPPOST

POST

PINE6

28" COTTONWOOD

10" TREE

8CAMPPOST

PINE8

SSMH

OUT

TOP : 975.80

IN FISH CLEAN

IN DUMP STA

IN BUILDING

: 970.75

: 970.70

: 972.00

: 965.30

8" COTTONWOOD

PINE6

PINE6

PINE8

18" COTTONWOOD

2CAMPPOST

PINE5

6CAMPPOST

14" ASH

" INTAKE

24" COTTONWOOD

8" TREE

WATER VALVE

WATER

24" COTTONWOOD

8 8" TREE

HYDRANT

30CAMPPOST

32CAMPPOST

POST

PINE12

POST

POST

POST

31CAMPPOST

18" ASH

6" TREE

POST

PINE8

WATER VALVE

WATER

PINE8 DEAD

POST

34CAMPPOST

60" COTTONWOOD

POST

HYDRANT

12" TREE

14" COTTONWOOD

POST

8" OAK

30" COTTONWOOD

54" COTTONWOOD

HYDRANT

33CAMPPOST

36" COTTONWOOD

5" TREE

12" ASH

18 18" ASH

36" COTTONWOOD

24" ASH

POST

Utility Pole #(5117)

OWNER

SERVICE

: Unknown

:

50" COTTONWOOD

32" COTTONWOOD

4CAMPPOST

35CAMPPOST

12" MAPLE

18" ASH

18" MAPLE

SSMH

TOP

OUT

: 977.30

: 965.88

12 10" ASH

12 10" ASH18 14" ASH

12 12" ASH

10" ASH

971972

972

972

972

973

973

973

973

973

973

973

974

974

974974

974

974

974

975

975975

975

975

975

975

975

976

976

976

976

976

976

976

976 976

976

977

977

977

977

978

D.07

PLA

N S

HEET

O

FEET

5O

Page 20: IOWA DEPARTMENT OF NATURAL RESOURCES ADDENDUM …

26.4’

0+00

1+00

2+00

3+00

4+00

5+00

6+00

7+00

24’

6’

96’

32’

324’

6’

5’

PROJECT NUMBER:

DATE:

NO.DATE

BYREVISION

DRAWN BY:

CHK’D BY:

NA

TU

RA

L R

ES

OU

RC

ES

IOW

A D

EP

ART

ME

NT O

F

502 E. 9TH S

T., D

ES M

OIN

ES, IA 5

0319-0

034

EN

GIN

EERIN

G S

ER

VIC

ES - W

ALLA

CE B

UILIN

G

CO

NS

ULTA

NT:

SHEET No:

12:37:27

PM

2/2/2017

maldric

N:\

Conservation

Recreation\

Land and

Waters\

Engineering\

PR

OJ

EC

TS\

AC

TI

VE\

PO

TT

AW

AT

TA

MIE\16-04-78-01

Lake

Mana

wa

Picnic

Area\02

Design\16-04-78-01

Lake

Mana

wa

Picnic

Area_

D08.dgn

LA

KE M

AN

AW

A S

TA

TE P

AR

K

16-04-78-01

PIC

NIC A

RE

A F

OR:

PO

TTA

WA

TTA

MIE C

OU

NTY, IO

WA

Jan 2017

R=10

R=10

E=993180.16

N=447098.56

E=993129.87

N=447065.83

E=993225.98

N=447028.16

E=993175.69

N=446995.43

E=993193.73

N=446955.89

E=993219.70

N=446942.99

E=993233.04

N=446969.86

E=993207.07

N=446982.75

E=993182.56

N=446971.66

E=993172.00

N=446844.09

E=992849.10

N=446870.83

E=992859.67

N=446998.39

R=25’

E=993190.07

N=446989.18

LP

24" COTTONWOOD

36" COTTONWOOD

24 22" COTTONWOOD

27CAMPPOST

24 24" COTTONWOOD

36" COTTONWOOD

19CAMPPOST

16" COTTONWOOD

60" COTTONWOOD

22" COTTONWOOD

20" COTTONWOOD

24 24 20" COTTONWOOD

24" COTTONWOOD

WATER VALVE

WATER

24" COTTONWOOD

30" COTTONWOOD

16CAMPPOST

24" COTTONWOOD

SSMH

TOP

IN

: 973.93

: 964.63

24" COTTONWOOD

15CAMPPOST

36" COTTONWOOD

13CAMPPOST

24" COTTONWOOD

HYDRANT

36" COTTONWOOD

17CAMPPOST

9CAMPPOST

WATER VALVE

WATER

28CAMPPOST

11CAMPPOST

28" COTTONWOOD

36" COTTONWOOD

18" MAPLE

14CAMPPOST32" COTTONWOOD

SSMH

TOP

OUT

: 974.95

: 965.25

12CAMPPOST7CAMPPOST

12" TREE

12" TREE5CAMPPOST

44" COTTONWOOD

18" COTTONWOOD

10CAMPPOST

PINE8

POST

3CAMPPOST

HYDRANT

POST

PINE6

PINE8

PINE8

" WELL

24" COTTONWOOD

29CAMPPOST

POST

PINE6

28" COTTONWOOD

10" TREE

8CAMPPOST

PINE8

SSMH

OUT

TOP : 975.80

IN FISH CLEAN

IN DUMP STA

IN BUILDING

: 970.75

: 970.70

: 972.00

: 965.30

8" COTTONWOOD

PINE6

PINE6

PINE8

18" COTTONWOOD

2CAMPPOST

PINE5

6CAMPPOST

14" ASH

" INTAKE

24" COTTONWOOD

8" TREE

WATER VALVE

WATER

24" COTTONWOOD

8 8" TREE

HYDRANT

30CAMPPOST

32CAMPPOST

POST

PINE12

POST

POST

POST

31CAMPPOST

18" ASH

6" TREE

POST

PINE8

WATER VALVE

WATER

PINE8 DEAD

POST

34CAMPPOST

60" COTTONWOOD

POST

HYDRANT

12" TREE

14" COTTONWOOD

POST

8" OAK

30" COTTONWOOD

54" COTTONWOOD

HYDRANT

33CAMPPOST

36" COTTONWOOD

5" TREE

12" ASH

18 18" ASH

36" COTTONWOOD

24" ASH

POST

Utility Pole #(5117)

OWNER

SERVICE

: Unknown

:

50" COTTONWOOD

32" COTTONWOOD

4CAMPPOST

35CAMPPOST

12" MAPLE

18" ASH

18" MAPLE

SSMH

TOP

OUT

: 977.30

: 965.88

12 10" ASH

12 10" ASH18 14" ASH

12 12" ASH

10" ASH

971972

972

972

972

973

973

973

973

973

973

973

974

974

974974

974

974

974

975

975975

975

975

975

975

975

976

976

976

976

976

976

976

976 976

976

977

977

977

977

978

D.08

PLA

N S

HEET

O

FEET

5O

Page 21: IOWA DEPARTMENT OF NATURAL RESOURCES ADDENDUM …

Parking Lot

Roadway &

Remove Existing

PROJECT NUMBER:

DATE:

NO.DATE

BYREVISION

DRAWN BY:

CHK’D BY:

NA

TU

RA

L R

ES

OU

RC

ES

IOW

A D

EP

ART

ME

NT O

F

502 E. 9TH S

T., D

ES M

OIN

ES, IA 5

0319-0

034

EN

GIN

EERIN

G S

ER

VIC

ES - W

ALLA

CE B

UILIN

G

CO

NS

ULTA

NT:

SHEET No:

12:37:36

PM

2/2/2017

maldric

N:\

Conservation

Recreation\

Land and

Waters\

Engineering\

PR

OJ

EC

TS\

AC

TI

VE\

PO

TT

AW

AT

TA

MIE\16-04-78-01

Lake

Mana

wa

Picnic

Area\02

Design\16-04-78-01

Lake

Mana

wa

Picnic

Area_

E05.dgn

LA

KE M

AN

AW

A S

TA

TE P

AR

K

16-04-78-01

PIC

NIC A

RE

A F

OR:

PO

TTA

WA

TTA

MIE C

OU

NTY, IO

WA

Jan 2017

DE

MO

LITIO

N P

LA

N

E.05

drain

Grade to

Seeding

Rural

O 1OOO 1OO

FEET

Page 22: IOWA DEPARTMENT OF NATURAL RESOURCES ADDENDUM …

Parking Lot

Roadway &

Remove Existing

(Approximate Location)

Remove Existing Hydrant

PROJECT NUMBER:

DATE:

NO.DATE

BYREVISION

DRAWN BY:

CHK’D BY:

NA

TU

RA

L R

ES

OU

RC

ES

IOW

A D

EP

ART

ME

NT O

F

502 E. 9TH S

T., D

ES M

OIN

ES, IA 5

0319-0

034

EN

GIN

EERIN

G S

ER

VIC

ES - W

ALLA

CE B

UILIN

G

CO

NS

ULTA

NT:

SHEET No:

12:37:47

PM

2/2/2017

maldric

N:\

Conservation

Recreation\

Land and

Waters\

Engineering\

PR

OJ

EC

TS\

AC

TI

VE\

PO

TT

AW

AT

TA

MIE\16-04-78-01

Lake

Mana

wa

Picnic

Area\02

Design\16-04-78-01

Lake

Mana

wa

Picnic

Area_

E06.dgn

LA

KE M

AN

AW

A S

TA

TE P

AR

K

16-04-78-01

PIC

NIC A

RE

A F

OR:

PO

TTA

WA

TTA

MIE C

OU

NTY, IO

WA

Jan 2017

DE

MO

LITIO

N P

LA

N

E.06

drain

Grade to

Seeding

Rural

O 1OOO 1OO

FEET

Page 23: IOWA DEPARTMENT OF NATURAL RESOURCES ADDENDUM …

Parking Lots

Roadways &

Remove Existing

(Approximate Location)

Remove Existing Hydrant

PROJECT NUMBER:

DATE:

NO.DATE

BYREVISION

DRAWN BY:

CHK’D BY:

NA

TU

RA

L R

ES

OU

RC

ES

IOW

A D

EP

ART

ME

NT O

F

502 E. 9TH S

T., D

ES M

OIN

ES, IA 5

0319-0

034

EN

GIN

EERIN

G S

ER

VIC

ES - W

ALLA

CE B

UILIN

G

CO

NS

ULTA

NT:

SHEET No:

12:37:56

PM

2/2/2017

maldric

N:\

Conservation

Recreation\

Land and

Waters\

Engineering\

PR

OJ

EC

TS\

AC

TI

VE\

PO

TT

AW

AT

TA

MIE\16-04-78-01

Lake

Mana

wa

Picnic

Area\02

Design\16-04-78-01

Lake

Mana

wa

Picnic

Area_

E07.dgn

LA

KE M

AN

AW

A S

TA

TE P

AR

K

16-04-78-01

PIC

NIC A

RE

A F

OR:

PO

TTA

WA

TTA

MIE C

OU

NTY, IO

WA

Jan 2017

DE

MO

LITIO

N P

LA

N

E.07

drain

Grade to

Seeding

Rural

drain

Grade to

Seeding

Rural

O 1OOO 1OO

FEET

Page 24: IOWA DEPARTMENT OF NATURAL RESOURCES ADDENDUM …

No work will be allowed between December 15 and August 31.

Note:

Parking Lot

Roadway &

Remove Existing

PER IDNR SURVEYEAGLES NEST

600’ Radius

330’ Radius

PROJECT NUMBER:

DATE:

NO.DATE

BYREVISION

DRAWN BY:

CHK’D BY:

NA

TU

RA

L R

ES

OU

RC

ES

IOW

A D

EP

ART

ME

NT O

F

502 E. 9TH S

T., D

ES M

OIN

ES, IA 5

0319-0

034

EN

GIN

EERIN

G S

ER

VIC

ES - W

ALLA

CE B

UILIN

G

CO

NS

ULTA

NT:

SHEET No:

12:38:06

PM

2/2/2017

maldric

N:\

Conservation

Recreation\

Land and

Waters\

Engineering\

PR

OJ

EC

TS\

AC

TI

VE\

PO

TT

AW

AT

TA

MIE\16-04-78-01

Lake

Mana

wa

Picnic

Area\02

Design\16-04-78-01

Lake

Mana

wa

Picnic

Area_

E08.dgn

LA

KE M

AN

AW

A S

TA

TE P

AR

K

16-04-78-01

PIC

NIC A

RE

A F

OR:

PO

TTA

WA

TTA

MIE C

OU

NTY, IO

WA

Jan 2017

DE

MO

LITIO

N P

LA

N

E.08

drain

Grade to

Seeding

Rural

O 1OOO 1OO

FEET