invitation for bids cck-2492-20 taylor educational ... · data/telecom installation for this...

15
University of Kentucky Purchasing Division 322 Peterson Service Building Lexington, KY 40506-0005 An Equal Opportunity University INVITATION FOR BIDS CCK-2492-20 Taylor Educational Building – Rooms 151 & 151F Renovations ADDENDUM #4 07/08/2020 ATTENTION: This is not an order. Read all instructions, terms and conditions carefully. IMPORTANT: BID AND ADDENDUM MUST BE RECEIVED BY: 07/15/2020 @ 3:00 P.M. LEXINGTON, KY TIME Bidder must acknowledge receipt of this and any addendum as stated in the Invitation for Bids. 1. Please refer to and incorporate within the offer, the attached written questions and answers. 2. Please refer to and incorporate within the offer, the updated drawings, attached. 3. If you have any questions, please feel free to reach out to Ken Scott at the number listed below or at [email protected]. OFFICIAL APPROVAL SIGNATURE UNIVERSITY OF KENTUCKY ________________________________________ ______________________________________ ________________________________________ Contracting Officer / (859) 257-9102 Typed or Printed Name 07/08/2020

Upload: others

Post on 09-Jul-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: INVITATION FOR BIDS CCK-2492-20 Taylor Educational ... · data/telecom installation for this project. Is that correct? That is correct. The electrical contractor provides rough- in

University of Kentucky Purchasing Division 322 Peterson Service Building Lexington, KY 40506-0005

A n E q u a l O p p o r t u n i t y U n i v e r s i t y

INVITATION FOR BIDS

CCK-2492-20 Taylor Educational Building – Rooms 151 & 151F Renovations

ADDENDUM #4 07/08/2020

ATTENTION: This is not an order. Read all instructions, terms and conditions carefully.

IMPORTANT: BID AND ADDENDUM MUST BE RECEIVED BY: 07/15/2020 @ 3:00 P.M. LEXINGTON, KY TIME Bidder must acknowledge receipt of this and any addendum as stated in the Invitation for Bids. 1. Please refer to and incorporate within the offer, the attached written questions and answers.

2. Please refer to and incorporate within the offer, the updated drawings, attached.

3. If you have any questions, please feel free to reach out to Ken Scott at the number listed below or at

[email protected].

OFFICIAL APPROVAL SIGNATURE UNIVERSITY OF KENTUCKY

________________________________________ ______________________________________

________________________________________ Contracting Officer / (859) 257-9102 Typed or Printed Name

07/08/2020

Page 2: INVITATION FOR BIDS CCK-2492-20 Taylor Educational ... · data/telecom installation for this project. Is that correct? That is correct. The electrical contractor provides rough- in

Written Questions and Answers – Page 1 of 2

Written Questions and Answers CCK-2492-20

UK Taylor Education Building Rooms 151 and 151F Renovations 06/05/2020

No. Question Answer

1. What is the budget?

Construction budget estimate = $140,000

2.

Will UK-CNS-IT be furnishing and installing all communication cables, terminations, and certification of such? (Normally the electrical contractor responsibility is to provide the back-box rough in and a conduit or j-hook pathway with pullstring only, to closest tie-in point as required!)

Yes.

3. What is the anticipated start date for this project? Project can start after Notice to Proceed,

to be issued within one week of bid due date.

4.

Can you clarify the intent of the work required per Note 4 on A-110 “4. INSTALL NEW 8 GAUGE ALUMINUM PANEL BEHIND LOUVER AND CREATE A WATERTIGHT SEAL. INFILL VOID WITH RIGID INSULATION AND FRAME OPENING WITH 3 " METAL STUDS TO ACCEPT ONE LAYER OF 21" PLYWOOD AND INTERIOR FACING MATERIAL TO MATCH EXISTING WALL SURFACE FLUSH. PAINT TO MATCH.”

These instructions are to infill the outside air opening behind the wall fan coil units that are being removed. We want an insulated panel to avoid any condensation. The aluminum is to prevent future corrosion issues.

5.

The finish schedule states for the ceiling grid Suprafine XL, 15/16”, but this is 2 different types. Please confirm if you want Suprafine 9/16 or Standard 15/16” grid.

The grid should be “Prelude XL 15/16”.

6.

The finish schedule states all rooms are to be painted, however, the floor plan only calls for certain rooms to be painted with drywall touch up per Note 5 on A-110. Please advise.

Finish schedule is correct. All rooms are to be painted

Page 3: INVITATION FOR BIDS CCK-2492-20 Taylor Educational ... · data/telecom installation for this project. Is that correct? That is correct. The electrical contractor provides rough- in

Written Questions and Answers – Page 2 of 2

7. Are the existing ceilings in rooms 151a – 151h Gypsum Board or Grid?

151A – 151E & 151H are not in the scope of work but they are grid.

8.

The special conditions section article 32 is worded oddly. In the first part of the paragraph it states that UK IT is responsible for communications pre-wiring and later states the GC needs to coordinate with UK IT for the pre-wiring of the phone system. My assumption is that UK IT will be doing the data/telecom installation for this project. Is that correct?

That is correct. The electrical contractor provides rough-in for data ports only. No telephone wiring is involved in this project.

9.

The special conditions section article 32 is worded oddly. In the first part of the paragraph it states that UK IT is responsible for communications pre-wiring and later states the GC needs to coordinate with UK IT for the pre-wiring of the phone system. My assumption is that UK IT will be doing the data/telecom installation for this project. Is that correct?

That is correct. The electrical contractor provides rough-in for data ports only. No telephone wiring is involved in this project.

10.

In hardware set #1 doors (151G) and (151H) are both listed.

• Door (151G) is the only existing door in the hardware set and does not show on the door schedule that it should receive a hardware set.

• Door (151H) is not listed on the door schedule but is included in hardware set #1. Based on the floorplans it does not appear this opening should be receiving a new door or hardware.

Please clarify whether these doors should receive any new hardware.

Updated drawings are attached. 151G is existing; I will strike it from hardware group for the addendum. I will strike 151H also as it is existing. It’s not on the schedule since it’s not in scope of work.

11.

It shows existing flooring will remain and will be protected in place,. Who will patch the flooring where the storage room and partial wall are removed per notes 1 & 4 on AD-110?

Those repairs per notes 1 & 4, are the contractor’s responsibility.

12.

13.

14.

Page 4: INVITATION FOR BIDS CCK-2492-20 Taylor Educational ... · data/telecom installation for this project. Is that correct? That is correct. The electrical contractor provides rough- in

TAYLOR ED

DESIGN AND CONSTRUCTION ADMINISTRATION PROVIDED BY:

UK PLANNING DESIGN AND CONSTRUCTION GROUP

211 PETERSON SERVICE BUILDING

LEXINGTON, KY 40506

TAYLOR EDUCATION BUILDING

UNIVERSITY OF KENTUCKY

LEXINGTON, KENTUCKY

VICINITY MAP

ROOMS 151 AND 151F RENOVATION PROJECT

THIS PROJECT IS A RENOVATION OF SUITE 151 AND WILL CREATE

SEVEN NEW OFFICES, A STORAGE ROOM AND A WAITING ROOM

WITHIN THE EXISTING SPACE. IMPROVEMENTS INCLUDE NEW CEILING

WITH LED LIGHTS, NEW HVAC EQUIPMENT, AND ADDITIONAL POWER

AND DATA FOR NEW OFFICES. NEW FINISHES WILL MATCH EXISTING

LAYOUT.

PROJECT DESCRIPTION

T-100 TITLE SHEET AND DRAWING INDEX SHEET

A-001 ARCHITECTURAL GENERAL NOTES, ABBREVIATIONS,

AND LEGEND

A-002 ARCHITECTURAL FINISH AND DOOR SCHEDULES AND DETAILS

AD-110 ARCHITECTURAL DEMOLITION PLAN

AD-111 ARCHITECTURAL REFLECTED CEILING DEMOLITION PLAN

A-110 ARCHITECTURAL FLOOR PLAN

A-111 ARCHITECTURAL REFLECTED CEILING PLAN

M-001 MECHANICAL GENERAL NOTES AND LEGEND

MD-110 MECHANICAL DEMOLITION PLANS

M-110 MECHANICAL PLANS

M-400 MECHANICAL SCHEDULES AND DETAILS

E-001 ELECTRICAL GENERAL NOTES AND LEGEND

ED-110 ELECTRICAL DEMOLITION PLANS

ED-111 ELECTRICAL DEMOLITION PLANS

E-100 ELECTRICAL PLAN - BASEMENT ROOM 11

E-110 ELECTRICAL PLANS - ROOM 151

E-111 ELECTRICAL PLANS - ROOM 151F

E-400 ELECTRICAL SCHEDULES

E-500 ELECTRICAL LIGHTING DIAGRAM

DRAWING INDEX

DRAWING NUMBER:

APPROVED BY:

PROJECT N0.:

DATE:

DRAWN BY:

CHECKED BY:

DESIGNED BY:

DATE

REVISIONS

#

BU

ILD

IN

G N

UM

BE

R:

UN

IV

ER

SIT

Y O

F K

EN

TU

CK

Y

Ph

ysic

al P

la

nt D

ivisio

n

04/2020

807002758360

0001

RO

OM

S 151 A

ND

151F

R

EN

OV

AT

IO

N P

RO

JE

CT

TA

YLO

R E

DU

CA

TIO

N B

UILD

IN

G

TIT

LE

S

HE

ET

A

ND

D

RA

WIN

G IN

DE

X

T-100

CS

STAFF

ST-W

BL

06/04/2020

2

2

2

4

07/07/2020

4

4

4

4

4

Page 5: INVITATION FOR BIDS CCK-2492-20 Taylor Educational ... · data/telecom installation for this project. Is that correct? That is correct. The electrical contractor provides rough- in

DRAWING NUMBER:

APPROVED BY:

PROJECT N0.:

DATE:

DRAWN BY:

CHECKED BY:

DESIGNED BY:

DATE

REVISIONS

#

BU

ILD

IN

G N

UM

BE

R:

UN

IV

ER

SIT

Y O

F K

EN

TU

CK

Y

Ph

ysic

al P

la

nt D

ivisio

n

04/2020

807002758360

0001

RO

OM

S 151 A

ND

151F

R

EN

OV

AT

IO

N P

RO

JE

CT

TA

YLO

R E

DU

CA

TIO

N B

UILD

IN

G

AR

CH

IT

EC

TU

RA

L F

IN

IS

H A

ND

D

OO

R S

CH

ED

ULE

S

A-002

CS

STAFF

ST-W

BL

HW#1 - DOORS #151G, 151G2, 151H, 151J, 151K, 151L, 151M, 151N

3EA HINGES A5112X654XNRP

1EA LOCKSET LEVER 1000-1 F04 X 630

1EA WALL STOP L02101

3EA SILENCERS L03011

2EA KICK PLATE J102 10”X2”LDWX630

1EA CLOSER C02021 X 689

DOOR AND FRAME SCHEDULE

DOOR

NO.

151G

SIZE

TYPE MATL.GLAZING

DOOR

TYPE

FRAME

MATL. HEAD JAMB SILL

DETAILS

FIRE

RATING

NO

TE

S:

WD.1

HDW.

#

DOOR TYPES

1

DOOR AND FRAME TYPES

HARDWARE SETS

REMARKS

1

1.) EGRESS DOORS SHALL MEET A.D.A. ACCESSIBLE REQUIREMENTS.

- ALL NEW FIRE RATED DOORS WILL ALSO REQUIRE RATED DOOR FRAMES WITH SAME RATING AS DOOR AND, IF APPLICABLE, MUST

HAVE WIRE MESH FIRE RATED GLAZING.

- ALL EXISTING DOORS, TO REMAIN IN PLACE OR RELOCATED (IN THIS SPACE) WILL BE PATCHED, SANDED PREPARED AND

REFINISHED TO MATCH THE EXISTING BUILDING

151J

ROOM FINISH SCHEDULE

EX

IS

TIN

G

MA

TC

H E

XIS

TIN

G

UN

LE

SS

N

OT

ED

OT

HE

RW

IS

E

ROOM NAME BASE FLOOR WALLS CEILING HGT. CLG. REMARKS

RO

OM

NU

MB

ER

6" V

IN

YL

CO

VE

/T

ILE

EX

IS

TIN

G

PA

IN

T G

YP

SU

M

PA

IN

T E

XIS

TIN

G

2'x2' A

.C

.T

. A

ND

G

RID

EX

IS

TIN

G

PA

IN

T

EX

IS

TIN

G

2'X

2' C

AR

PE

T T

ILE

LV

T P

LA

NK

NO

NE

REFERS TO NOTEX

OFFICE

NO

TE

S:

FIN

IS

HE

S:

CEILING TILE:

ARMSTRONG, USG, OR EQUAL

CEILING TILE

STYLE - ARMSTRONG: 5/8" X 24" X 24" FINE FISSURED,

BEVELED TEGULAR

USG: 5/8" X 24" X 24" RADAR, BEVELED

TEGULAR

COLOR - WHITE

CEILING GRID

STYLE - ARMSTRONG: SUPRAFINE XL, 15/16"

EXPOSED TEE

USG: DONN DX15/16 TEE

COLOR - WHITE

NOTE:

FIELD VERIFY PIPE AND DUCT LOCATIONS TO

DETERMINE CONFLICTS WITH THE DESIGNED

CEILING HEIGHTS.

FLOORING:

EXISTING CARPET

WALL BASE:

ROPPE

STYLE - #100

COLOR - BLACK

TRIM PAINT:

MATCH EXISTING

WALL PAINT:

MATCH EXISTING COLOR

WA

LL T

ILE

1.) REPAIR ALL FLOOR, WALL, AND CEILING, DAMAGED DUE TO HAZARDOUS MATERIAL MITIGATION AND AS REQUIRED FOR

INSTALLATION OF NEW FINISH APPLICATION.

2.) LEVEL EXISTING SUB-FLOOR AND CLEAN SURFACE PRIOR TO INSTALLING NEW FLOORING.

3.) PREPARE ALL WALLS PRIOR TO APPLYING PAINT.

4.) NEW CEILING TO BE INSTALLED WITH AN ELECTRONIC LEVEL AT THE HEIGHT INDICATED ABOVE, IF EQUIPMENT DOES NOT ALLOW

FOR THE CEILING TO BE INSTALLED AT THIS HEIGHT, NOTIFY THE UNIVERSITY OF KENTUCKY CONSTRUCTION MANAGER.

- PATCH ALL HOLES ASSOCIATED WITH THE REMOVAL OF ANY PIPES, FIXTURES, PARTITIONS, ETC. AND SAND SMOOTH FOR NEW

FINISHES.

- REFER TO FINISHES BELOW FOR COLORS AND MATERIALS.

- SAND, SCRAPE, PREPARE AND PAINT ALL PREVIOUSLY PAINTED PIPES, RADIATORS, STEEL COVES, BRACKETS, ETC. TO MATCH

NEW FINISH COLORS.

- NO CEILING TILES TO BE DROPPED UNTIL FINAL OVERHEAD ELECTRICAL INSPECTION IS COMPLETED.

10'-8" A.F.F.

FRAME TYPES

A

NEW SOLID CORE

DOOR PANEL WITH

GLASS

DOOR DETAILS

8 7/8" WRAP

AROUND METAL

DOOR FRAME WITH

WELDED CORNERS

SOLID CORE

WOOD DOOR

NEW METAL STUD &

GYPSUM BOARD WALL

8 7/8" WRAP

AROUND METAL

DOOR FRAME WITH

WELDED CORNERS

SOLID CORE

WOOD DOOR

LINE OF

EXISTING FLOOR

2

JAMB DETAIL

SCALE: 1" =1'-0"

A-002

3

SILL DETAIL

SCALE: 1" =1'-0"

A-002

HARDWARE NOTES:

ALL HARDWARE ABOVE ARE ANSI GRADE 1 AND ALL EXIT DEVICES WILL BE BASED ON VON DUPRIN OR EQUAL, AND ALL CLOSERS WILL BE BASED

ON LCN OR EQUAL.

THE CORES FOR THIS PROJECT ARE REMOVABLE CORES THAT WILL BE PROVIDED AND INSTALLED BY THE UNIVERSITY OF KENTUCKY KEY

SHOP. IT IS THE CONTRACTORS RESPONSIBILITY TO PROVIDE LOCK SETS WITH THE CORRECT CYLINDERS TO RECEIVE UNIVERSITY SPECIFIED

REMOVABLE CORES. UNIVERSITY CORES VARY FROM BUILDING TO BUILDING AND IT IS THE CONTRACTORS RESPONSIBILITY TO COORDINATE

WITH THE UNIVERSITY KEY SHOP PRIOR TO ORDERING LOCK SETS. SHOP DRAWINGS WILL BE REJECTED IMMEDIATELY IF COORDINATION WITH

THE UK KEY SHOP IS NOT ON THE SUBMITTAL. FORMAT AND KEYING WILL ALSO BE DETERMINED BY THE UNIVERSITY OF KENTUCKY KEY SHOP

PRIOR TO ORDERING THE HARD WARE FOR THIS PROJECT.

THIS DESIGN IS BASE ON MORTISED LATCHES WITH LEVERS HANDLES AND INDEPENDENT LOCK SETS, TYPICALLY OR UNLESS NOTED

OTHERWISE. ALL HARDWARE SHOULD MATCH THIS OR BE AN APPROVED EQUAL.

SEE GENERAL NOTES ON SHEET A-001 FOR UK STANDARDS AND ADDITIONAL KEYING INFORMATION.

YES1/A-002 2/A-002 3/A-002

NEW HOLLOW METAL

DOOR FRAME

1

HEAD DETAIL

SCALE: 1" =1'-0"

A-002

151K

151L

151M

151N

151G

151J

151K

151L

151M

151N

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

H.M.WD.3'-0" x 7'-0" x 1 3/4"

YES A11/A-002 2/A-002 3/A-002

3'-0" x 7'-0" x 1 3/4"

3'-0" x 7'-0" x 1 3/4"

3'-0" x 7'-0" x 1 3/4"

3'-0" x 7'-0" x 1 3/4"

H.M.

H.M.

H.M.

H.M.

1/A-002 2/A-002 3/A-002

1/A-002 2/A-002 3/A-002

1/A-002 2/A-002 3/A-002

WD.YES A

1

WD.YES A1

WD.YES A1

A

NEW METAL STUD &

GYPSUM BOARD WALL

151 EXISTING

1

1

1

1

151P3'-0" x 7'-0" x 1 3/4" H.M.

1/A-002 2/A-002 3/A-002WD.

YES A2

HW#2 - DOORS #151P

3EA HINGES A5112X654XNRP

1EA LOCKSET LEVER 1000-1 F07 X 630

1EA WALL STOP L02101

3EA SILENCERS L03011

1EA KICK PLATE J102 10”X2”LDWX630

1

1

151G2 WD.YES 1/A-002 2/A-002 3/A-00223'-0" x 7'-0" x 1 3/4"

H.M.A

DOOR TYPES

2

WAITING ROOM

10'-8" A.F.F.

151

OFFICE 10'-8" A.F.F.151F

151P

STORAGE ROOM

10'-8" A.F.F.

10'-8" A.F.F.

10'-8" A.F.F.

10'-8" A.F.F.

10'-8" A.F.F.

10'-8" A.F.F.

3, 4

3, 4

3, 4

3, 4

3, 4

3, 4

3, 4

3, 4

3, 4

2

EXISTING

151F EXISTING

06/04/20202

2

151E RECEPTION OFFICE

10'-8" A.F.F. 3, 4

EXISTING

151E

4

4

Page 6: INVITATION FOR BIDS CCK-2492-20 Taylor Educational ... · data/telecom installation for this project. Is that correct? That is correct. The electrical contractor provides rough- in

MAIN LEVEL FLOOR PLAN

Xref .\BASE PLAN MODELS\BPp-1.dwg

DRAWING NUMBER:

APPROVED BY:

PROJECT N0.:

DATE:

DRAWN BY:

CHECKED BY:

DESIGNED BY:

DATE

REVISIONS

#

BU

ILD

IN

G N

UM

BE

R:

UN

IV

ER

SIT

Y O

F K

EN

TU

CK

Y

Ph

ysic

al P

la

nt D

ivisio

n

04/2020

807002758360

0001

RO

OM

S 1

51

A

ND

1

51

F R

EN

OV

AT

IO

N P

RO

JE

CT

TA

YL

OR

E

DU

CA

TIO

N B

UIL

DIN

G

KEY PLAN

SHEET NOTES

X

GENERAL NOTES

1

DEMOLITION PLAN

SCALE: 3/16" =1'-0"

AD-110

AR

CH

IT

EC

TU

RA

L D

EM

OL

IT

IO

N P

LA

NS

- R

OO

M 1

51

AD-110

CS

STAFF

ST-W

BL

1. REMOVE EXISTING PARTITION WALL.

2. REMOVE WINDOW FRAME AND GLASS.

3. REMOVE STORAGE SHELVES. NOT USED.

4. REMOVE STORAGE ROOM.

5. EXISTING CARPET TILES. PROTECT IN PLACE.

6. EXISTING 6" VINYL BASE. PROTECT IN PLACE.

7. REMOVE AND DISPOSE OF FAN-COIL UNITS. CUT AND CAP

UTILITIES BELOW THE EXISTING FLOOR. SEE PLUMBING

DRAWINGS FOR ADDITIONAL INFORMATION.

8. EXISTING LOUVERS. PROTECT IN PLACE.

9. PROTECT EXISTING WINDOW BLINDS IN PLACE.

10. VCT FLOORING AND MASTIC TO BE REMOVED BY UNIVERSITY

ABATEMENT CONTRACTOR.

11. REMOVE AND DISPOSE OF EXISTING WINDOW BLINDS.

AREA OF WORK

FIRST FLOOR

A. CONTRACTOR SHALL SECURE SERVICES OF A CERTIFIED

SPRINKLER CONTRACTOR WHO WILL INSTALL NEW OR MODIFY

EXISTING SPRINKLER PIPING AND HEADS. VENDOR SHALL SUPPLY

CERTIFICATION THAT ALL MODIFICATIONS MEET ALL APPLICABLE

CODES.

B. ALL FINISHES DISTURBED OR DAMAGED DURING CONSTRUCTION,

THAT ARE NOT IN THE SCOPE, SHALL BE PATCHED AND FINISHED

TO MATCH THE ADJACENT FINISH.

C. ALL MATERIAL IDENTIFIED AS HAZARDOUS WILL BE ABATED BY THE

UNIVERSITY OF KENTUCKY PRIOR TO THE CONTRACTOR'S ARRIVAL

ON SITE, HOWEVER, IT WILL BE THE RESPONSIBILITY OF THE

CONTRACTOR TO REPAIR AND REFINISH ALL ABATEMENT

DAMAGED FLOORS, WALL, CEILINGS, ETC., TO THEIR ORIGINAL

FINISHED STATE. IF THE CONTRACTOR SUSPECTS ANY

ADDITIONAL MATERIAL TO BE ENVIRONMENTALLY HAZARDOUS,

STOP WORK IMMEDIATELY AND CONTACT OWNERS

REPRESENTATIVE.

D. ALL DIMENSIONS FOR EXISTING STRUCTURE ARE FROM FACE OF

WALL FINISH TO FACE OF WALL FINISH. ALL NEW CONSTRUCTION

DIMENSIONS ARE FROM FACE OF FRAMING TO FACE OF FRAMING

OR EXISTING FINISH, UNLESS NOTED OTHERWISE.

E. VERIFY ALL DIMENSIONS PRIOR TO DEMOLITION/CONSTRUCTION.

F. COORDINATE ALL ROUGH OPENINGS WITH MANUFACTURER PRIOR

TO DEMOLITION AND CONSTRUCTION.

G. REFER TO SHEET A-110 FOR DIMENSIONS AND DETAIL

INFORMATION.

H. REFER TO SHEET A-002 FOR DOOR AND FINISH SCHEDULES AND

SHEET A-001 FOR GENERAL NOTES.

I. NOT ALL DEMOLISHED COMPONENTS WILL BE THE CONTRACTORS

RESPONSIBILITY TO REMOVE. THE OWNER HAS FIRST RIGHT OF

REFUSAL FOR ALL EQUIPMENT AND COMPONENTS AND WILL BE

RESPONSIBLE THE REMOVAL OF ALL ITEMS REMAINING WITH THE

OWNER PRIOR TO THE START OF CONSTRUCTION. REMOVAL OF

ANY ITEM FOR THE OWNER WILL NEED TO BE COORDINATED WITH

THE UNIVERSITY OF KENTUCKY CONSTRUCTION MANAGER PRIOR

TO CONSTRUCTION.

J. REFER TO SHEET A-001 FOR LEGEND AND ABBREVIATION

INFORMATION.

4' 16'

SCALE: 3/16" = 1'-0"

32'8'0' 2'

5 9

151

6

8

7

1

2

3

4

7

8

5 96

8

7

8

7

151A 151B 151C 151D 151E 151F

10 11

7

7

07/07/20204

8

4

4

4

Page 7: INVITATION FOR BIDS CCK-2492-20 Taylor Educational ... · data/telecom installation for this project. Is that correct? That is correct. The electrical contractor provides rough- in

MAIN LEVEL FLOOR PLAN

Xref .\BASE PLAN MODELS\BPp-1.dwg

DRAWING NUMBER:

APPROVED BY:

PROJECT N0.:

DATE:

DRAWN BY:

CHECKED BY:

DESIGNED BY:

DATE

REVISIONS

#

BU

ILD

IN

G N

UM

BE

R:

UN

IV

ER

SIT

Y O

F K

EN

TU

CK

Y

Ph

ysic

al P

la

nt D

ivisio

n

04/2020

807002758360

0001

RO

OM

S 151 A

ND

151F

R

EN

OV

AT

IO

N P

RO

JE

CT

TA

YLO

R E

DU

CA

TIO

N B

UILD

IN

G

KEY PLAN

SHEET NOTES

X

GENERAL NOTES

AR

CH

IT

EC

TU

RA

L R

EF

LE

CT

ED

C

EILIN

G D

EM

OLIT

IO

N P

LA

N - R

OO

M 151

AD-111

CS

STAFF

ST-W

BL

1

REFLECTED CEILING DEMOLITION PLAN

SCALE: 3/16" =1'-0"

AD-111

1. REMOVE EXISTING LIGHT FIXTURES. FIXTURES TO BE TURNED

OVER TO BUILDING OPERATOR. SEE ELECTRICAL DRAWINGS FOR

ADDITIONAL INFORMATION.

2. REMOVE AND DISPOSE OF EXISTING T-BAR CEILING GRID AND

TILES.

3. REMOVE EXISTING CAN LIGHTS.

4. REMOVE PROJECTOR AND PROJECTOR MOUNT AND TURN OVER

TO UNIVERSITY'S PROJECT MANAGER.

AREA OF WORK

FIRST FLOOR

A. CONTRACTOR SHALL SECURE SERVICES OF A CERTIFIED

SPRINKLER CONTRACTOR WHO WILL INSTALL NEW OR MODIFY

EXISTING SPRINKLER PIPING AND HEADS. VENDOR SHALL SUPPLY

CERTIFICATION THAT ALL MODIFICATIONS MEET ALL APPLICABLE

CODES.

B. ALL FINISHES DISTURBED OR DAMAGED DURING CONSTRUCTION,

THAT ARE NOT IN THE SCOPE, SHALL BE PATCHED AND FINISHED

TO MATCH THE ADJACENT FINISH.

C. ALL MATERIAL IDENTIFIED AS HAZARDOUS WILL BE ABATED BY THE

UNIVERSITY OF KENTUCKY PRIOR TO THE CONTRACTOR'S ARRIVAL

ON SITE, HOWEVER, IT WILL BE THE RESPONSIBILITY OF THE

CONTRACTOR TO REPAIR AND REFINISH ALL ABATEMENT

DAMAGED FLOORS, WALL, CEILINGS, ETC., TO THEIR ORIGINAL

FINISHED STATE. IF THE CONTRACTOR SUSPECTS ANY

ADDITIONAL MATERIAL TO BE ENVIRONMENTALLY HAZARDOUS,

STOP WORK IMMEDIATELY AND CONTACT OWNERS

REPRESENTATIVE.

D. ALL DIMENSIONS FOR EXISTING STRUCTURE ARE FROM FACE OF

WALL FINISH TO FACE OF WALL FINISH. ALL NEW CONSTRUCTION

DIMENSIONS ARE FROM FACE OF FRAMING TO FACE OF FRAMING

OR EXISTING FINISH, UNLESS NOTED OTHERWISE.

E. VERIFY ALL DIMENSIONS PRIOR TO DEMOLITION/CONSTRUCTION.

F. COORDINATE ALL ROUGH OPENINGS WITH MANUFACTURER PRIOR

TO DEMOLITION AND CONSTRUCTION.

G. REFER TO SHEET A-XXX FOR DIMENSIONS AND DETAIL

INFORMATION.

H. REFER TO SHEET A-002 FOR DOOR AND FINISH SCHEDULES AND

SHEET A-001 FOR GENERAL NOTES.

I. NOT ALL DEMOLISHED COMPONENTS WILL BE THE CONTRACTORS

RESPONSIBILITY TO REMOVE. THE OWNER HAS FIRST RIGHT OF

REFUSAL FOR ALL EQUIPMENT AND COMPONENTS AND WILL BE

RESPONSIBLE THE REMOVAL OF ALL ITEMS REMAINING WITH THE

OWNER PRIOR TO THE START OF CONSTRUCTION. REMOVAL OF

ANY ITEM FOR THE OWNER WILL NEED TO BE COORDINATED WITH

THE UNIVERSITY OF KENTUCKY CONSTRUCTION MANAGER PRIOR

TO CONSTRUCTION.

J. REFER TO SHEET A-001 FOR LEGEND AND ABBREVIATION

INFORMATION.

21

151

4' 16'

SCALE: 3/16" = 1'-0"

32'8'0' 2'

21

3

4

151A 151B 151C 151D

151E

151F

07/07/20204

21

3

21

4

Page 8: INVITATION FOR BIDS CCK-2492-20 Taylor Educational ... · data/telecom installation for this project. Is that correct? That is correct. The electrical contractor provides rough- in

Xref .\BASE PLAN MODELS\BPp-1.dwg

DRAWING NUMBER:

APPROVED BY:

PROJECT N0.:

DATE:

DRAWN BY:

CHECKED BY:

DESIGNED BY:

DATE

REVISIONS

#

BU

ILD

IN

G N

UM

BE

R:

UN

IV

ER

SIT

Y O

F K

EN

TU

CK

Y

Ph

ysic

al P

la

nt D

ivisio

n

04/2020

807002758360

0001

RO

OM

S 1

51

A

ND

1

51

F R

EN

OV

AT

IO

N P

RO

JE

CT

TA

YL

OR

E

DU

CA

TIO

N B

UIL

DIN

G

SHEET NOTES

X

GENERAL NOTES

A. SEE SHEET A-001 FOR ARCHITECTURAL GENERAL NOTES AND

LEGEND.

B. SEE SHEET M-001 FOR MECHANICAL GENERAL NOTES AND LEGEND.

C. SEE SHEET E-001 FOR ELECTRICAL GENERAL NOTES AND LEGEND.

AR

CH

IT

EC

TU

RA

L F

LO

OR

P

LA

N - R

OO

M 1

51

A-110

CS

STAFF

ST-W

BL

1

NOTE & DIMENSION PLAN

SCALE: 3/16" =1'-0"

A-110

KEY PLAN

AREA OF WORK

FIRST FLOOR

4' 16'

SCALE: 3/16" = 1'-0"

32'8'0' 2'

3

151

151N 151M 151L 151K 151J

1

6

3 3

3

4 4 4

4

765

871

151

151A 151B 151C 151D 151E 151F 151G

151H

151J151K151L151M151N

1. NEW 3 5/8" METAL STUD WALL WITH 5/8" TYPE X GYPSUM BOARD

EACH SIDE WITH A LEVEL 4 FINISH, PRIMED AND PAINTED (2

COATS) AND 3" BATT INSULATION. METAL STUDS AND GYPSUM

BOARD TO EXTEND 6" ABOVE NEW CEILING.

2. INFILL OPENING WITH NEW 3 5/8" METAL STUDS AND 5/8" GYPSUM

BOARD WALL, FLUSH WITH EXISTING WALL, BOTH SIDES, WITH A

LEVEL 4 FINISH, PRIMED AND PAINTED (2 COATS). PATCH AND

FINISH OPENING WITH GYPSUM BOARD AND CORNER BEAD.

PROVIDE LEVEL 4 FINISH, PRIME AND PAINT (2 COATS). INSTALL

12" X 1" LAMINATED SERVICE COUNTER SHELF.

3. EXISTING OUTSIDE LOUVER. PROTECT IN PLACE

4. INSTALL NEW 8 GAUGE ALUMINUM PANEL BEHIND LOUVER AND

CREATE A WATERTIGHT SEAL. INFILL VOID WITH RIGID

INSULATION AND FRAME OPENING WITH 3

5

8

" METAL STUDS TO

ACCEPT ONE LAYER OF

1

2

" PLYWOOD AND INTERIOR FACING

MATERIAL TO MATCH EXISTING WALL SURFACE FLUSH. PAINT TO

MATCH.

5. PATCH, SAND AND PREPARE ALL EXISTING WALLS, TRIM, AND ANY

OTHER EXISTING PAINTED SURFACE FOR NEW PAINT, REFER TO

SHEET A-002 FOR FINISH SCHEDULE

6. NEW DOOR AND DOOR FRAME, REFER TO SHEET A-002 FOR DOOR

SCHEDULE.

7. EXISTING CARPET. PROTECT IN PLACE.

8. INSTALL NEW 6" VINYL WALL BASE.

9. PATCH/REPAIR FLOOR AS REQUIRED TO INSTALL NEW FLOORING.

10. INSTALL NEW CARPET. MATCH EXISTING.

11. INSTALL MECHOSHADES TO MATCH EXISTING IN ROOM 151.

12. INFILL OPENING WITH NEW 3 5/8" METAL STUDS AND 5/8" GYPSUM

BOARD WALL, FLUSH WITH EXISTING WALL, BOTH SIDES, WITH A

LEVEL 4 FINISH, PRIMED AND PAINTED (2 COATS).

765

2

12

4

871871

871871

871

871

5'-3

1

4

"9'-6

1

2

"9'-6

1

2

"

6 6 6 6 6

5'-9

3

4

"

9'-7"

9'-5

1

4

"

9'-7"8'-3"

13'-8

1 4

"

9'-1"

151P

151P

151G2

151G

15F

1185 9

3

4

10

07/07/20204

4

4

4

4

4

4

3'-1

3

4

"

4

Page 9: INVITATION FOR BIDS CCK-2492-20 Taylor Educational ... · data/telecom installation for this project. Is that correct? That is correct. The electrical contractor provides rough- in

MAIN LEVEL FLOOR PLAN

CD

T

Xref .\BASE PLAN MODELS\BPp-1.dwg

FA

SS

S

S

SSS

S

S

S

W

FA

DRAWING NUMBER:

APPROVED BY:

PROJECT N0.:

DATE:

DRAWN BY:

CHECKED BY:

DESIGNED BY:

DATE

REVISIONS

#

BU

ILD

IN

G N

UM

BE

R:

UN

IV

ER

SIT

Y O

F K

EN

TU

CK

Y

Ph

ysic

al P

la

nt D

ivisio

n

04/2020

807002758360

0001

RO

OM

S 151 A

ND

151F

R

EN

OV

AT

IO

N P

RO

JE

CT

TA

YLO

R E

DU

CA

TIO

N B

UILD

IN

G

SHEET NOTES

X

GENERAL NOTES

A. SEE SHEET A-001 FOR ARCHITECTURAL GENERAL NOTES AND

LEGEND.

B. SEE SHEET M-001 FOR MECHANICAL GENERAL NOTES AND LEGEND.

C. SEE SHEET E-001 FOR ELECTRICAL GENERAL NOTES AND LEGEND.

AR

CH

IT

EC

TU

RA

LR

EF

LE

CT

ED

C

EILIN

G P

LA

N - R

OO

M 151

A-111

CS

STAFF

ST-W

BL

2

REFLECTED CEILING PLAN

SCALE: 3/16" =1'-0"

A-111

KEY PLAN

AREA OF WORK

FIRST FLOOR

4' 16'

SCALE: 3/16" = 1'-0"

32'8'0' 2'

151

1. INSTALL NEW 2'X2' CEILING GRID AND NEW ACOUSTICAL CEILING

TILES AT SAME HEIGHT AS EXISTING.

2. INSTALL NEW LIGHT LED FIXTURES. REFER TO ELECTRICAL

DRAWINGS FOR ADDITIONAL INFORMATION.

151A 151B 151C 151D

151E

151F

151G

151H

151I151J151K151L151M

1 2 1 2 1 2 1 2 1 2

1 2

1 2

1 2

1 2

151M

1 2

1 2

07/07/2020

4

4

Page 10: INVITATION FOR BIDS CCK-2492-20 Taylor Educational ... · data/telecom installation for this project. Is that correct? That is correct. The electrical contractor provides rough- in

MAIN LEVEL FLOOR PLAN

CD

CD

T

CH

WR

CH

WS

HW

R

HW

S

CD

CHWR

CHWS

HWR

HWS

CD

CD

CH

WR

CH

WS

CD

CH

WR

CH

WS

CD

CH

WR

CH

WS

HW

R

HW

S

HW

R

HW

S

HW

R

HWS

HWR

CHWR

CHWS

CD

CH

WR

CH

WS

HW

S

CD

HWR

CH

WR

CH

WS

HW

R

HW

S

HW

R

DRAWING NUMBER:

APPROVED BY:

PROJECT N0.:

DATE:

DRAWN BY:

CHECKED BY:

DESIGNED BY:

DATE

REVISIONS

#

BU

ILD

IN

G N

UM

BE

R:

UN

IV

ER

SIT

Y O

F K

EN

TU

CK

Y

Ph

ysic

al P

la

nt D

ivisio

n

04/2020

807002758360

0001

RO

OM

S 151 A

ND

151F

R

EN

OV

AT

IO

N P

RO

JE

CT

TA

YLO

R E

DU

CA

TIO

N B

UILD

IN

G

SHEET NOTES

X

GENERAL NOTES

A. SEE SHEET A-001 FOR ARCHITECTURAL GENERAL NOTES AND

LEGEND.

B. SEE SHEET M-001 FOR MECHANICAL GENERAL NOTES AND LEGEND.

C. SEE SHEET E-001 FOR ELECTRICAL GENERAL NOTES AND LEGEND.

D. EXISTING HYDRONIC MAINS ARE LOCATED BELOW THE FLOOR IN

THE BASEMENT.

E. FILL ALL HOLES LEFT FROM PIPE DEMOLITION WITH CONCRETE.

SURFACE TO BE FLUSH WITH AND MATCH EXISTING SURFACE.

ME

CH

AN

IC

AL D

EM

OLIT

IO

N P

LA

NS

MD-110

BL

ER

ST-W

BL

KEY PLAN

AREA OF WORK

FIRST FLOOR

1. LOUVER TO REMAIN. SEE ARCHITECTURAL SHEETS FOR REPAIR

INFORMATION ON WALL OPENING.

2. DEMO EXISTING PIPING BACK TO MAINS AND CAP.

3. DEMO EXISTING FAN COIL UNIT. PREPARE PIPES FOR

RE-CONNECTION. ALL PIPES AND ELECTRICAL ARE LOCATED ON

THE RIGHT SIDE OF THE UNIT.

4. DEMO EXISTING WALL HUNG MINI-SPLIT UNIT. REPAIR ANY

DAMAGE TO WALL.

5. DEMO EXISTING

3

4

" CONDENSATE DRAIN PIPE BACK TO MAIN DRAIN

PIPE UNDER FLOOR AND CAP END OF REMAINING MAIN DRAIN

PIPE.

6. DEMO EXISTING REFRIGERATION PIPES UP TO EXISTING

OUTDOOR UNIT ON ROOF. SEAL HOLE WITH MATCHING MATERIAL

ON ROOF.

7. DEMO EXISTING THERMOSTAT, WIRING, AND CHANNEL STRIP.

REPAIR ANY DAMAGE TO WALL.

8. DEMO EXISTING OUTDOOR UNIT. EXISTING PLATFORM TO

REMAIN.

151

4' 16'

SCALE: 3/16" = 1'-0"

32'8'0' 2'

1

DEMOLITION PLAN

SCALE: 3/16" =1'-0"

MD-110

151F

1 1 1

1

2

2 2

1

1

4

"

1

1

2

"

5"

1

1

4

"

1

1

2

"

22

5"

1

1

2

"2"

3

4

"

1

1

4

"

3

4

"

3

4

"

1

1

4

"

3

4

"

3

4

"

1

1

4

"

3

4

"

1

1

4

"

3

4

"

1"

2

DEMOLITION PLAN - ROOF

SCALE: 3/16" =1'-0"

MD-110

151E

3

5

6

4

7

6

8

07/07/20204

4

4

4

4

Page 11: INVITATION FOR BIDS CCK-2492-20 Taylor Educational ... · data/telecom installation for this project. Is that correct? That is correct. The electrical contractor provides rough- in

MAIN LEVEL FLOOR PLAN

T

T T T T T

TT

T

CH

WR

CH

WS

HW

R

HW

S

CD

CHWR

CHWS

HWR

HWS

CD

CD

CH

WR

CH

WS

CD

CH

WR

CH

WS

CD

CH

WR

CH

WS

HW

R

HW

S

HW

R

HW

S

HW

R

HWS

HWR

CHWR

CHWS

CD

CH

WR

CH

WS

HW

S

CD

HWR

CH

WR

CH

WS

HW

R

HW

S

CHWR

CHWS

HWR

HWS

CD

HW

R

DRAWING NUMBER:

APPROVED BY:

PROJECT N0.:

DATE:

DRAWN BY:

CHECKED BY:

DESIGNED BY:

DATE

REVISIONS

#

BU

ILD

IN

G N

UM

BE

R:

UN

IV

ER

SIT

Y O

F K

EN

TU

CK

Y

Ph

ysic

al P

la

nt D

ivisio

n

04/2020

807002758360

0001

RO

OM

S 151 A

ND

151F

R

EN

OV

AT

IO

N P

RO

JE

CT

TA

YLO

R E

DU

CA

TIO

N B

UILD

IN

G

SHEET NOTES

X

GENERAL NOTES

A. SEE SHEET A-001 FOR ARCHITECTURAL GENERAL NOTES AND

LEGEND.

B. SEE SHEET M-001 FOR MECHANICAL GENERAL NOTES AND LEGEND.

C. SEE SHEET E-001 FOR ELECTRICAL GENERAL NOTES AND LEGEND.

D. EXISTING HYDRONICS PIPES ARE LOCATED BELOW THE FLOOR IN

THE BASEMENT.

E. EACH NEW FAN COIL UNIT SHALL HAVE ONLY ONE (1) NEW FLOOR

PENETRATION. ALL MECHANICAL PIPING AND ELECTRICAL CONDUIT

SHALL BE RAN THROUGH THE NEW FLOOR OPENING. SEE FLOOR

PENETRATION DETAILS ON SHEET M-400.

F. INSTALL NEW FAN COIL UNITS FLUSH AGAINST WALL.

G. INSTALL SPACER IN BETWEEN NEW FAN COIL UNITS AND WALL.

H. ENLARGE FLOOR PENETRATIONS AS NECESSARY FOR NEW

HYDRONIC PIPE ROUTING TO FAN COIL UNITS.

I. NO HYDRONIC PIPING SHALL SHALL BE VISIBLE ON EXTERIOR OF

FAN COIL UNITS.

ME

CH

AN

IC

AL N

EW

W

OR

K P

LA

NS

M-110

BL

ER

ST-W

BL

KEY PLAN

AREA OF WORK

FIRST FLOOR

1. CONNECT NEW TO EXISTING.

2. RECONNECT EXISTING

1

2

' CHILLED WATER SUPPLY AND RETURN

PIPES, EXISTING

1

2

" HOT WATER SUPPLY AND RETURN PIPES, AND

EXISTING

3

4

" CONDENSATE DRAIN PIPE TO NEW FAN COIL UNIT AND

NEW CONTROLS.

3. RECONNECT LINES TO EXISTING FAN COIL UNIT (NOT SHOWN) IN

BASEMENT OFFICE.

4' 16'

SCALE: 3/16" = 1'-0"

32'8'0' 2'

1

NEW WORK PLAN

SCALE: 3/16" =1'-0"

M-110

115F

1

1

4

"

1

1

2

"

5"

1

1

4

"

1

1

2

"5"

1

1

2

"2"

3

4

"

1

1

4

"

3

4

"

3

4

"

1

1

4

"

3

4

"

3

4

"

1

1

4

"

3

4

"

1"

151

151A 151B 151C 151D 151E

151G

151H

151J151K

151L

151M

151N

151P

3

4

"

1

2

"

1

2

"

1

2

"

3

4

"

1

2

"

3

4

"

1

2

"

1

2

"

3

4

"

1

2

"

1

2

"

3

4

"

1

2

"

1

2

"

3

4

"

1

2

"

1

2

"

1

2

"

1

2

"

3

4

"

3

4

"

1

2

"

1

2

"

FC-151P FC-151N FC-151M FC-151L FC-151K FC-151J

FC-151GFC-151F

1

1

1

1

11

1

1

1

1

FC-151E

2

07/07/20204

4

3

4

1

3

4

4

Page 12: INVITATION FOR BIDS CCK-2492-20 Taylor Educational ... · data/telecom installation for this project. Is that correct? That is correct. The electrical contractor provides rough- in

DRAWING NUMBER:

APPROVED BY:

PROJECT N0.:

DATE:

DRAWN BY:

CHECKED BY:

DESIGNED BY:

DATE

REVISIONS

#

BU

ILD

IN

G N

UM

BE

R:

UN

IV

ER

SIT

Y O

F K

EN

TU

CK

Y

Ph

ysic

al P

la

nt D

ivisio

n

04/2020

807002758360

0001

RO

OM

S 151 A

ND

151F

R

EN

OV

AT

IO

N P

RO

JE

CT

TA

YLO

R E

DU

CA

TIO

N B

UILD

IN

G

ME

CH

AN

IC

AL S

CH

ED

ULE

S A

ND

D

ET

AILS

M-400

BL

STAFF

ST-W

BL

3

PIPE PENETRATION THRU

SCALE: NONE

M-400

CONCRETE SLAB DETAIL

CORE DRILL

CAST IN PLACE

NOTES:

1. TYPICAL FOR NON-INSULATED PIPE AND CONDUIT.

2. FOR FLOOR PENETRATIONS WITH FIRE RATING GREATER

THAN (1) HOUR, USE THUNDERLINE "PYRO-PAC" SEALS

OR EQUAL.

3. WHERE PIPING IS EXPOSED AT FINISHED FLOORS, FLUSH

MOUNT SLEEVE AND PROVIDE ESCUTCHEON PLATE.

"SLIP-IN" SLEEVE SEAL AND SECURE

SLEEVE AND COLLAR

TO CONCRETE

PIPE WITH OR

WITHOUT INSULATION

SEAL ANNULAR SPACE

BETWEEN PIPE AND

SLEEVE WITH

THUNDERLINE

"LINK-SEAL" OR EQUAL

STEEL CAST IN

PLACE OF SLEEVE

NOTE: HOSE KIT MAY BE USED INSTEAD OF SEPARATE COMPONENTS

MANUAL AIR

VENT AT HIGH

POINT (TYP)

P/T PORTS

PIPING OFFSET

WITH UNION

TO ALLOW COIL

REMOVAL (TYP)

C

W

S

C

W

R

2-WAY

ELECTRONIC

CONTROL

VALVE (N.C.)

STRAINER

BALANCE VALVE

WITH READOUT

PORTS

COIL DRAIN

TERMINATED

WITH VALVE AND

HOSE ADAPTER

1

/

2

"

1

/

2

"

1

CHILLED WATER COIL PIPING DETAIL

SCALE: NONE

M-400

NOTE: HOSE KIT MAY BE USED INSTEAD OF SEPARATE COMPONENTS

MANUAL AIR

VENT AT HIGH

POINT (TYP)

P/T PORTS

PIPING OFFSET

WITH UNION

TO ALLOW COIL

REMOVAL (TYP)

H

W

S

H

W

R

3-WAY

ELECTRONIC

CONTROL

VALVE (N.O.)

STRAINER

BALANCE VALVE

WITH READOUT

PORTS

COIL DRAIN

TERMINATED

WITH VALVE AND

HOSE ADAPTER

1

/

2

"

1

/

2

"

2

HOT WATER COIL PIPING DETAIL

SCALE: NONE

M-400

FAN COIL UNIT SCHEDULE

BLOWER NOMINAL CAPACITY ELECTRICAL

COOLING HEATING

AIRFLOW POWER TOTAL SENSIBLE EWT EAT/LAT FLOW H2O P.D. TOTAL EAT/LAT FLOW H2O P.D. MCA MOP

MARK SERVICE TYPE

[CFM] [HP] [MBH] [MBH] [DEG F] [DEG F] [GPM] [FT] [MBH] [DEG F] [GPM] [FT]

VOLTS/PH

[AMPS] [AMPS]

REMARKS ACCESSORIES

FC-151E ROOM 151E 1 300 1/25 5.1 5.1 46 74/58 1.0 0.5 14.1 65/110 1.4 5.1 115/1 1.8 3.2 2-7 ALL

FC-151F ROOM 151F 1 430 1/12 7.8 7.8 46 74/57 1.6 0.5 25.3 65/121 2.5 5.7 115/1 1.8 3.21,3-7

ALL

FC-151G ROOM 151G 1 515 1/12 9.3 9.3 46 74/57 1.9 1.6 20.1 65/110 2.0 12 115/1 1.8 3.21,3-7

ALL

FC-151J ROOM 151J 1 300 1/25 5.1 5.1 46 74/58 1.0 0.5 14.1 65/110 1.4 5.1 115/1 1.8 3.2 2-7 ALL

FC-151K ROOM 151K 1 300 1/25 5.1 5.1 46 74/58 1.0 0.5 14.1 65/110 1.4 5.1 115/1 1.8 3.2 2-7 ALL

FC-151L ROOM 151L 1 300 1/25 5.1 5.1 46 74/58 1.0 0.5 14.1 65/110 1.4 5.1 115/1 1.8 3.2 2-7 ALL

FC-151M ROOM 151M 1 300 1/25 5.1 5.1 46 74/58 1.0 0.5 14.1 65/110 1.4 5.1 115/1 1.8 3.2 2-7 ALL

FC-151N ROOM 151N 1 300 1/25 5.1 5.1 46 74/58 1.0 0.5 14.1 65/110 1.4 5.1 115/1 1.8 3.2 2-7 ALL

FC-151P ROOM 151P 1 230 1/25 4.3 4.3 46 74/56 0.9 0.4 12.4 65/116 1.2 4.0 115/1 1.8 3.2 2-7 ALL

TYPE: REMARKS: ACCESSORIES:

1. VERTICAL CABINET, 4-PIPE UNIT1. BASIS OF DESIGN: DAIKIN FCVC106 1. ELECTRICAL DISCONNECT SWITCH

2. BASIS OF DESIGN: DAIKIN FCVC104

3. RIGHT-HAND PIPING CONNECTIONS

4. PROVIDE AND INSTALL 2-WAY ELECTRONIC CONTROL VALVE FOR CHILLED WATER (N.C.) AND

3-WAY ELECTRONIC VALVE (N.O.) FOR HOT WATER COIL.

5. PROVIDE VALVES (FULL-PORT BALL VALVE FOR CHILLED WATER, GATE VALVE FOR HW) ON COIL SUPPLY

AND RETURN PIPING AND STRAINERS & CIRCUIT SETTER BALANCE VALVES ON RETURN.

6. PROVIDE AND INSTALL NEW 1" MERV 8 FILTERS PRIOR TO START-UP.

7. COLOR: ANTIQUE IVORY

07/07/20204

4

Page 13: INVITATION FOR BIDS CCK-2492-20 Taylor Educational ... · data/telecom installation for this project. Is that correct? That is correct. The electrical contractor provides rough- in

MAIN LEVEL FLOOR PLAN

FA

FA

S

W

W

S

W

S

AB

AB

C

FA

DRAWING NUMBER:

APPROVED BY:

PROJECT N0.:

DATE:

DRAWN BY:

CHECKED BY:

DESIGNED BY:

DATE

REVISIONS

#

BU

ILD

IN

G N

UM

BE

R:

UN

IV

ER

SIT

Y O

F K

EN

TU

CK

Y

Ph

ysic

al P

la

nt D

ivisio

n

04/2020

807002758360

0001

RO

OM

S 151 A

ND

151F

R

EN

OV

AT

IO

N P

RO

JE

CT

TA

YLO

R E

DU

CA

TIO

N B

UILD

IN

G

SHEET NOTES

X

GENERAL NOTES

A. SEE SHEET A-001 FOR ARCHITECTURAL GENERAL NOTES AND

LEGEND.

B. SEE SHEET M-001 FOR MECHANICAL GENERAL NOTES AND LEGEND.

C. SEE SHEET E-001 FOR ELECTRICAL GENERAL NOTES AND LEGEND.

ELE

CT

RIC

AL D

EM

OLIT

IO

N P

LA

NS

- R

OO

M 151

ED-110

STAFF

STAFF

ST-W

BL

1

POWER DEMOLITION PLAN

SCALE: 3/16" =1'-0"

ED-110

2

LIGHTING DEMOLITION PLAN

SCALE: 3/16" =1'-0"

ED-110

AREA OF WORK

FIRST FLOOR

1. DISCONNECT POWER FROM FAN COIL UNIT.

2. REMOVE ALL EXISTING LIGHT FIXTURES. DEMO ALL WIRING,

WIREMOLD, AND CONDUIT BACK TO MAIN CONNECTIONS.

EXISTING LIGHTS SHALL BE TURNED OVER TO THE BUILDING

OPERATOR.

3. EXISTING SMOKE DETECTORS TO BE REMOVED. REMOVE

DETECTORS AND ASSOCIATED CONDUIT AND WIRING. DETECTOR

DEVICES MAY BE SALVAGED AND RE-USED WHERE INDICATED.

4. DISCONNECT EXISTING WIRELESS ROUTER AND SAVE FOR

REINSTALLATION.

5. REMOVE EXISTING FIRE ALARM SIGNAL FOR REINSTALLATION AT

NEW LOCATION. WORK TO BE PERFORMED BY FIRE ALARM

CONTRACTOR.

6. REMOVE EXISTING EMERGENCY EXIT SIGN. TURN OVER TO THE

BUILDING OPERATOR. DEMO WIRING AND CONDUIT.

7. DEMO LIGHT SWITCHES AND BOX. REMOVE WIRING AND

CONDUIT.

8. DEMO EXISTING DUPLEX RECEPTACLE, WIRING, AND WIREMOLD.

9. DEMO EXISTING LIGHT SWITCH. PREPARE LOCATION FOR

INSTALLATION OF NEW LIGHT SWITCH WITH DIMMER.

10. EXISTING EMERGENCY EXIT SIGN TO REMAIN.

11. DEMO EXISTING CEILING LIGHT FIXTURE IN THIS AREA.

12. SEE SHEET ED-111 FOR WORK IN CONFERENCE ROOM 151F.

13. DEMO EXISTING DUPLEX RECEPTACLE, WIRING, AND WIRE MOLD.

14. DEMO DUPLEX RECEPTACLE, WIRING AND CONDUIT TO BELOW

FLOOR AND BACK TO MAIN CONNECTION. SEAL HOLE WITH

NON-SHRINK GROUT, FLUSH WITH EXISTING SURFACE.

15. DEMO QUAD RECEPTACLES, WIRING, AND CONDUIT BACK TO MAIN

CONNECTION ABOVE CEILING.

16. DEMO EXISTING DUPLEX RECEPTACLE, WIRING, WIREMOLD, AND

CONDUIT TO BELOW FLOOR AND BACK TO MAIN CONNECTION.

SEAL HOLE WITH NON-SHRINK GROUT, FLUSH WITH EXISTING

SURFACE.

17. EXISTING ELECTRICAL PANELBOARD TO BE REPLACED. DEMO

EXISTING DUPLEX RECEPTACLE, WIRING, AND CONDUIT

CONNECTED TO EXISTING ELECTRICAL PANELBOARD.

18. EXISTING DUPLEX RECEPTACLES, AND CONDUIT TO REMAIN.

REPLACE EXISTING WIRING. SEE E-100 FOR ADDITIONAL

INFORMATION.

19. DEMO "IN USE" SIGN AND ALL ASSOCIATED CONDUIT, WIRING, AND

SWITCHES.

20. EXISTING DATA TO REMAIN.

21. DEMO EXISTING DATA PORT, WIRING AND CONDUIT TO BELOW

FLOOR AND BACK TO MAIN CONNECTION. SEAL HOLE WITH

NON-SHRINK GROUT, FLUSH WITH EXISTING SURFACE.

22. DEMO EXISTING DATA PORT, WIRING AND WIREMOLD TO ABOVE

CEILING AND BACK TO MAIN CONNECTION. REPAIR ANY DAMAGE

TO COLUMN.

23. DEMO EXISTING DATA PORT IN WALL. DEMO WIRING AND

CONDUIT BACK TO MAIN CONNECTION. CONDUIT IN WALL TO

REMAIN. COVER REMAINING HOLE WITH BLANK COVER PLATE.

151

151

4' 16'

SCALE: 3/16" = 1'-0"

32'8'0' 2'

A

B

C

A

B

C

A

B

C

A

B

C

A

B

C

A

B

C

A

B

C

A

B

C

EXISTING ELECTRIC

PANELBOARD

EXISTING ELECTRIC

PANELBOARD

1 1 1

2

3

3

3

4

4

8

KEYPLAN

5

7

6

9

10

10

12

151F

12

151F

13

14

15

15

16

17

18

18

A

11

19 4

20

20

21

23

22

23

2123

07/07/20204

4

4 4 4

4

4

4

AutoCAD SHX Text
S
AutoCAD SHX Text
S
AutoCAD SHX Text
S
AutoCAD SHX Text
S
AutoCAD SHX Text
S
AutoCAD SHX Text
S
AutoCAD SHX Text
S
Page 14: INVITATION FOR BIDS CCK-2492-20 Taylor Educational ... · data/telecom installation for this project. Is that correct? That is correct. The electrical contractor provides rough- in

MAIN LEVEL FLOOR PLAN

J

J

S

AB

S

DRAWING NUMBER:

APPROVED BY:

PROJECT N0.:

DATE:

DRAWN BY:

CHECKED BY:

DESIGNED BY:

DATE

REVISIONS

#

BU

ILD

IN

G N

UM

BE

R:

UN

IV

ER

SIT

Y O

F K

EN

TU

CK

Y

Ph

ysic

al P

la

nt D

ivisio

n

04/2020

807002758360

0001

RO

OM

S 151 A

ND

151F

R

EN

OV

AT

IO

N P

RO

JE

CT

TA

YLO

R E

DU

CA

TIO

N B

UILD

IN

G

SHEET NOTES

X

GENERAL NOTES

A. SEE SHEET A-001 FOR ARCHITECTURAL GENERAL NOTES AND

LEGEND.

B. SEE SHEET M-001 FOR MECHANICAL GENERAL NOTES AND LEGEND.

C. SEE SHEET E-001 FOR ELECTRICAL GENERAL NOTES AND LEGEND.

ELE

CT

RIC

AL D

EM

OLIT

IO

N P

LA

NS

- R

OO

M 151F

ED-111

STAFF

STAFF

ST-W

BL

1

POWER DEMOLITION PLAN

SCALE: 1/4" =1'-0"

ED-111

2

LIGHTING DEMOLITION PLAN

SCALE: 1/4" =1'-0"

ED-111

KEY PLAN

AREA OF WORK

FIRST FLOOR

1. REMOVE ALL LIGHT FIXTURES. DEMO ALL WIRING, WIREMOLD,

AND CONDUIT BACK TO MAIN CONNECTIONS. EXISTING LIGHTS

SHALL BE TURNED OVER TO THE BUILDING OPERATOR.

2. DEMO PROJECTOR.

3. DISCONNECT POWER FROM FAN COIL UNIT. PREPARE FOR

CONNECTION TO NEW FAN COIL UNIT.

4. DEMO LIGHT SWITCHES AND WIRING. REUSE LOCATION FOR NEW

LIGHT SWITCH.

5. EXISTING SMOKE DETECTORS TO BE REMOVED. REMOVE

DETECTORS AND ASSOCIATED CONDUIT AND WIRING. DETECTOR

DEVICES MAY BE SALVAGED AND RE-USED WHERE INDICATED.

6. REMOVE CLOCK RECEPTACLE AND COVER THE JUNCTION BOX

WITH A SOLID PLATE.

7. DEMO WALL LIGHT, WIRING, AND WIREMOLD.

8. RELOCATED QUAD RECEPTACLE. SEE SHEET E-111 FOR NEW

LOCATION.

9. EXISTING TO REMAIN.

10. REMOVE ALL LIGHT FIXTURES AND WIRING.

11. DISCONNECT POWER FROM MINI-SPLIT UNIT ON WALL. DEMO ALL

WIRING, CONDUIT, ETC. BACK TO BREAKERS 13 AND 15 IN PANEL

BOARD LOCATED IN ROOM 151.

12. DEMO ALL RECEPTACLES, WIREMOLD, AND JUNCTION BOXES.

DEMO ALL WIRING AND CONDUIT BACK TO BREAKER IN PANEL

BOARD IN ROOM 151. REPAIR ANY DAMAGE TO WALL.

13. DEMO DISCONNECT BOX, STAND, AND ALL ELECTRICAL TO

OUTDOOR UNIT. DEMO ALL WIRING, AND CONDUIT BACK TO

PANEL BOARD IN ROOM 151. SEAL REMAINING HOLE IN ROOF

WITH MATCHING MATERIAL.

14. OUTDOOR UNIT TO BE REMOVED BY MECHANICAL CONTRACTOR.

EXISTING PLATFORM TO REMAIN.

15. EXISTING SMOKE DETECTOR SHALL BE REMOVED AND

REINSTALLED WITH NEW CEILING.

16. REMOVE WIRING AND GROMMET. PATCH THE WALL PRIOR TO

PAINTING

4' 16'

SCALE: 3/16" = 1'-0"

32'8'0' 2'

151F

151F

B B B

A

1

2

3

4

151

151

5

6

7

7

8

99

9

9

9

151E

10

3

9

9

11

12 12

12

12

12

12

VERTICAL STRIP

4

1314

3

SCALE: 1/4" =1'-0"

ED-111

ROOF

DEMOLITION PLAN

07/07/20204

4

4

4

9

9

4

15

151E

16

AutoCAD SHX Text
S
AutoCAD SHX Text
S
AutoCAD SHX Text
S
Page 15: INVITATION FOR BIDS CCK-2492-20 Taylor Educational ... · data/telecom installation for this project. Is that correct? That is correct. The electrical contractor provides rough- in

MAIN LEVEL FLOOR PLAN

D

D

S

S

S

D

S

DRAWING NUMBER:

APPROVED BY:

PROJECT N0.:

DATE:

DRAWN BY:

CHECKED BY:

DESIGNED BY:

DATE

REVISIONS

#

BU

ILD

IN

G N

UM

BE

R:

UN

IV

ER

SIT

Y O

F K

EN

TU

CK

Y

Ph

ysic

al P

la

nt D

ivisio

n

04/2020

807002758360

0001

RO

OM

S 151 A

ND

151F

R

EN

OV

AT

IO

N P

RO

JE

CT

TA

YLO

R E

DU

CA

TIO

N B

UILD

IN

G

SHEET NOTES

X

GENERAL NOTES

A. SEE SHEET A-001 FOR ARCHITECTURAL GENERAL NOTES AND

LEGEND.

B. SEE SHEET M-001 FOR MECHANICAL GENERAL NOTES AND LEGEND.

C. SEE SHEET E-001 FOR ELECTRICAL GENERAL NOTES AND LEGEND.

D. ELECTRICAL POWER TO FAN COIL UNITS SHALL BE RUN IN SAME

HOLE AS MECHANICAL PIPING.

ELE

CT

RIC

AL F

LO

OR

P

LA

NS

- R

OO

MS

151E

, 151F

, A

ND

151G

E-111

STAFF

STAFF

ST-W

BL

1

POWER NEW WORK PLAN

SCALE: 1/4" =1'-0"

E-111

2

LIGHTING NEW WORK PLAN

SCALE: 1/4" =1'-0"

E-111

KEY PLAN

AREA OF WORK

FIRST FLOOR

1. REINSTALL EXISTING SMOKE DETECTOR.

2. NEW SMOKE DETECTOR.

3. RELOCATED EXISTING QUAD RECEPTACLE.

4. EXISTING TO REMAIN.

5. INSTALL TWO-GANG BOX FOR DATA, 18" A.F.F. RUN 1-1/4"

CONDUIT FROM BOX TO ABOVE CEILING FOR CABLING. "J" HOOKS

ALLOWED ABOVE CEILING FOR ROUTING TO COMM. ROOM.

6. RECONNECT POWER TO NEW FAN COIL UNIT.

7. INSTALL TWO-GANG BOX FOR DATA, 18" A.F.F. RUN 1-1/4"

CONDUIT FROM BOX TO ABOVE CEILING FOR CABLING. "J" HOOKS

ALLOWED ABOVE CEILING FOR ROUTING TO COMM. ROOM.

CONSULT WITH CUSTOMER FOR EXACT LOCATION BEFORE

INSTALLING.

4' 16'

SCALE: 3/16" = 1'-0"

32'8'0' 2'

A

A

A

A

1

2

151F

151G

151

151F

151G

151

A

A

A

A

P151-29

P151-28

P151-27

3

44

4

4

4

SEE PLAN 2/E-110

FOR CONTINUATION.

5

151E

1

A

A

07/07/20204

4

151E

6

4

4

5

7

4

4

4

4

4

AutoCAD SHX Text
S
AutoCAD SHX Text
S
AutoCAD SHX Text
S
AutoCAD SHX Text
S
AutoCAD SHX Text
S