Investment Opportunities in Public

infrastructure and Public Service

Infrastructure – ProInversion

2014- 2015

Updated to August 26

TRANSPORT

INFRASTRUCTURE

CALLED

THE AMAZON WATERWAY

Implementation of works and actions to improve navigability

and passenger and cargo transit on the Amazonas, Marañón,

Huallaga and Ucayali rivers.

�Dredging on critical areas (Malos Pasos) and on the access

to the Port of Iquitos.

�GPS information system on the navigation route.

�Installation of level measuring stations with data

transmission capabilities.

�Monitoring system.

�Cleaning system.

� Estimated investment (VAT not included): US$ 69.4

million

� Type of concession: Co-financed

� Concession period: 20 years.

Estimated date of award: III Q 2014

Loreto

Ucayali

LINES 3 AND 4 OF THE BASIC NETWORK OF THE METRO OF LIMA AND CALLAO

Concession, through two independent bids, of two

lines of the network of the metro of Lima and Callao

for the design, financing, construction, equipment,

operation and maintenance of 62 Km of this

transportation system, which serves a city of more

than 10 million inhabitants.

� Estimated Investment: Under evaluation

� Type of concession : Co-financed

� Concession period : 35 years

Line 3 Line 4

32 Km 30 Km

2015 2015Estimated date of award

Approximated length

TO BE CALLED

Lima and Callao

TO BE CALLED

Project oriented to the transportation of passengers and cargo,

including the execution of the following works along 128 Km of the

existing railway:

� Railway upgrade

� Changes to the route in critical sectors

� Purchase of rolling stock

� Reinforcement of 15 railway bridges

� Extension of 38 tunnels for standard gauge rolling stock (1,435

mm)

� Upgrades to signaling and telecommunication systems

� Draining works

The project includes interoperability with Ferrocarril Central (railway

service with a standard gauge of 25 ton per axle) for the connection of

high Andes regions with the port of Callao and the Santa Anita market.

�Estimated investment: Under evaluation

�Type of concession: Co-financed

�Concession period: 30 years

Estimated date of award: II Q 2015.

HUANCAYO - HUANCAVELICA RAILWAY

Junín

Central Railway

Huancayo – Huancavelica Railway

South Railway

Huancavelica

PERIPHERAL RING ROAD

Unsolicited proposal for the construction,

financing, operation and maintenance of a new

urban highway approx. 33 Km long ( from Av.

Elmer Faucett to Av. Circunvalación), intended to

improve vehicle traffic between North and East

Lima districts and other areas in the city.

•Estimated Investment: Studies in progress

•Type of concession : Co-financed

Estimated date of award: III Q 2015

( if no interested third parties participate)

Ring road

UNDER EVALUATION

Lima and Callao

FAST MONORAIL MASS TRANSPORTATION SYSTEM - AREQUIPA

An unsolicited proposal for the design,

construction, electromagnetic equipment,

systems, rolling stock, financing, operation

and maintenance of a 14 Km fast mass

transportation system (on elevated track) in

the Arequipa Metropolitan Area.

�Estimated Investment: Studies in progress

�Type of concession : Co-financed

Estimated date of award: III Q 2015.

UNDER EVALUATION

Arequipa

Execution of upgrade and rehabilitation works

(117 Km), initial periodic maintenance (310 Km);

and subsequent maintenance and operation of

the 965 Km highway, in order to reach and

maintain established service levels on the entire

route.

� Estimated Investment: To be adjusted,

according to studies conducted and

arrangements between the Ministry and MEF.

� Type of concession : Co-financed

� Concession period: 25 years

Estimated date of award: III Q 2015

LONGITUDINAL DE LA SIERRA HIGHWAY, SECTION 4

TO BE CALLED

Initial periodic maintenance, operation and

maintenance of 422 Km of road, in order to maintain

established service levels.

� Estimated Investment: The ministry is currently

updating restoration and maintenance costs.

�Type of concession : Co-financed

�Concession period: 25 years

Estimated date of award: IV Q 2015

LONGITUDINAL DE LA SIERRA HIGHWAY, SECTION 5

TO BE CALLED

Unsolicited proposal for the concession of the

construction, operation and maintenance of

infrastructure works on the South Panamericana

Highway, Ica-Dv. Quilca section, with an approximate

length of 518 Km.

� Estimated Investment: Under evaluation

� Concession period : Self-sustained

Estimated date of award: 2015

PANAMERICANA SUR HIGHWAY : ICA- DV. QUILCA SECTION

UNDER EVALUATION

Ica

Arequipa

ENERGY

AZÁNGARO–JULIACA–PUNO 220 kV TRANSMISSION LINE

Concession for the design, financing, construction,

operation and maintenance of a 110 Km

transmission line, 120 MVA of capacity, intended to

eliminate congestion in the current system and

increase the reliability of the National

Interconnected System.

�Estimated investment (VAT not included): US$

68.9 million

� Concession period : Self-sustained

�Concession period: 30 years plus the construction

period (about 24 months).

Estimated date of award: IV Q 2014

Puno

CALLED

220/60 kV NUEVA LURÍN SUBSTATION and 220 kV AND 60 kV CONNECTION LINES

Concession for the design, financing, construction,

operation and maintenance of the 220/60 kV Nueva

Lurín Substation, that will be connected to the Chilca-San

Juan line (220 kV) and to existing substations Lurín and

La Pradera (60 kV). This will enable to increase the

electricity supply required to meet the increasing

demand in the south of Lima.

•Estimated Investment: US$ 49.6 million

• Type of concession: Self-sustained

•Concession period: 30 years plus the construction

period (about 24 months).

Estimated date of award: IV Q 2014

South Lima

CALLED

Contract for the purchase of 1,200 Mw of power in

years 2020 and 2021, to be generated by new

hydroelectric power generation projects that will be

incorporated to the national network (National Inter-

Connected Power System (SEIN by its initials in

Spanish)).

� Estimated Investment: Under evaluation

� Type of concession : Self-sustained

Estimated date of award: II Q 2015

ELECTRICITY SUPPLY FROM NEW HYDROELECTRIC POWER STATIONS

TO BE CALLED

Nationwide

Concession for the design, financing, construction,

operation and maintenance of the first stage of the

new Carapongo substation (located in the east of

Metropolitan Lima).

The new substation facilities will include Protection,

Control, Measurement and Communication Systems

related to the transmission lines and power

substations that supply electricity to Lima.

�Estimated investment: US$ 31.3 million

�Type of concession : Self-sustained

Estimated date of award: II Q 2015

TO BE CALLED

CARAPONGO SUBSTATION AND CONNECTIONS TO ASSOCIATED LINES

Lima

Metropolitan Lima

NEW CORPAC 220 kV SUBSTATION AND 220 kV INDUSTRIAL TRANSMISSION LINES - CORPAC

Concession for the design, financing, construction, operation

and maintenance of the following projects:

�New Córpac Substation (underground)

�220 kV Industrial Transmission Lines - Corpac (underground)

The upgraded electricity supply facilities will serve to meet the

increasing demand in the districts of Ate, Cercado de Lima, La

Victoria, Miraflores, San Isidro, San Borja (particularly in

commercial and financial areas in the latter three districts) and

San Luis.

•Estimated investment (VAT not included): US$ 148 million

�Type of concession : Self-sustained

�Concession period: 30 years plus the construction period

(about 25 months).

Estimated date of award: II Q 2015

Industrial Substations

Industrial TLs - Córpac

Lima

San Borja

Ate

New Córpac

Substation

CALLED

HYDROCARBONS

LNG SUPPLY SYSTEM FOR THE DOMESTIC MARKET

CALLEDConcession to make available a natural gas supply system

to be used in emergency situations (failure in NG

production in the forest, or in its transportation from the

Peruvian forest to the coast). The system comprises

back-up storage capacity for 130,000 m3 and facilities for

the regasification and shipping of 400 MMSCFD of NG, in

order to guarantee the supply of fuel to users in Lima

and Callao for up to seven days.

� Estimated investment (VAT not included): US$ 250

million

� Type of concession : Self-sustained

� Concession period: 20 years plus the construction

period (30 months).

Estimated date of award: IV Q 2014

QUILLABAMBA THERMAL POWER STATION

Concession for the design, financing,

construction, operation and financing of a 200

Mw thermal power station to be located in

Quillabamba (department of Cusco), and

commissioned in 2017, which will be

interconnected to the national network (SEIN).

Gasoducto del Sur

� Estimated investment: Under evaluation

� Type of concession: Self sustained

Estimated date of award: II Q 2015

TO BE CALLED

CTQuillabamba

Camisea

South Gas pipeline

SANITATION

AND HEALTH

MAIN WORKS AND CONDUCTION OF DRINKING WATER SUPPLY FOR LIMA

TO BE ANNOUNCEDConcession for the design, financing, construction, operation and

maintenance of the following infrastructure projects in the

departments of Lima and Junín:

� Re-enlargement of the Pomacocha and Huallacocha Bajo dams

(about 90 million m2)

� Trans-Andean tunnel (about 10 Km)

� New drinking water plant (5 m3/s)

� South branch pipeline (about 26 Km), including six reservoirs

(total storage volume: 24,000 m3) and works for the

interconnection with the current drinking water supply system.

The concession also includes the operation and maintenance of the

following facilities:

� Current drinking water plant (5 m3/s)

� North branch pipeline (27.1 Km), including four compensation

reservoirs (total storage volume: 23,000 m3 )

� Estimated investment (VAT not included): US$ 400 million

� Modality: Self-sustained

� Period: 30 years

Estimated date of award: I Q 2015

CALLED

REGULATION WORKS OF THE CHILLÓN RIVER

Concession for the design, financing, construction,

operation and maintenance of the following infrastructure

projects, intended to ensure drinking water supply to the

districts of North Lima.

� Jacaybamba dam (about 28 million m3) located in the

province of Canta, northeast of Lima.

� Pipeline (about 30 Km) for an average flow rate of

about 1.5 m3/s, from the projected water intake on the

Chillon River to the current Chillon drinking water

plant.

� Estimated investment (VAT not included): US$ 70

million

� Type of concession: Self-sustained

� Concession period: 20 to 30 years

Estimated date of award: I Q 2015

TO BE ANNOUNCEDTO BE ANNOUNCEDTO BE CALLED

Concession of the design, construction, equipment,

operation and maintenance of complementary services

(blue-collar services) in high-complexity hospitals in the

Peruvian Social Security System (ESSALUD): a new one in

the city of Lima (Instituto de Salud del Niño y Adolescente)

and two in provinces (Piura and Chimbote)

� Estimated Investment: Studies in progress

Estimated date of award: II Q 2015

TO BE CALLED

THREE NEW HIGH-COMPLEXITY HOSPITALS FOR LIMA AND TWO PROVINCES IN THE NORTH OF PERU

SOLID WASTE MANAGEMENT IN HEALTH FACILITIES UNDER THE MINISTRY OF HEALTH IN METROPOLITAN LIMA

An unsolicited proposal that comprises the construction,

operation and maintenance of a modern solid waste

treatment plant (hazardous bio-contaminated/hazardous

special/common) for the project’s integral management.

� Estimated Investment: Pre-investment Studies in

progress

� Type of concession: Co-financed

Estimated date of award: 2016

UNDER EVALUATION

Lima and Callao

TOURISM

CHOQUEQUIRAO CABLEWAY

Concession for the design, financing, construction,

equipment, operation and maintenance of a cableway,

as an access route, from Kiuñala (Apurímac) to

Choquequirao Archaeological Park, including the

arriving and exit stations.

�Estimated investment (VAT not included): US$ 52

million

� Type of concession: Co-financed

�Concession period: 20-25 years

Estimated date of award: I Q 2015.

CALLED

Apurímac

Cusco

CORRECTIONAL

SYSTEM

An unsolicited proposal for the provision of electronic

personal surveillance services to alleviate overcrowding in

correctional facilities in Peru through the use of electronic

shackles for tried and sentenced inmates allowed having

access to this benefit.

�Estimated Investment: Under evaluation

� Type of concession : Self-sustained

Estimated date of award: II Q 2015

ELECTRONIC SHACKLES

UNDER EVALUATION

Lima and Callao

Re-location of four correctional facilities that are currently in

the urban areas of Metropolitan Lima and the department of

Cusco. The project is intended to promote the participation of

the private sector in the construction of new replacement

correctional facilities in more appropriate areas, under high-

quality safety standards

1.Chorrillos Women’s Facility (ordinary) and annex.

2. Lurigancho

3. Miguel Castro Castro.

4. Cusco and Cusco Women’s Facility

•Estimated investment: Under evaluation

Estimated date of award: II Q 2015

TO BE CALLED

RE-LOCATION OF CORRECTIONAL FACILITIES

Lima and Cusco

An unsolicited proposal for the construction of a shopping

center, houses, warehouses and parking lots on the current

location of the San Jorge Prison (Historic center of Lima).

Additionally, it includes the construction and equipping of a

new correctional facility where the San Jorge inmates will be

transferred.

�Estimated investment: Under evaluation

�Type of concession: Self-sustained

Estimated date of award: III Q 2015

UNDER EVALUATION

CORRECTIONAL INFRASTRUCTURE AND URBAN RENEWAL: “TINKUY PLAZA PROJECT”

Lima

BROADBAND INTERNET ACCESS FOR FOUR PERUVIAN REGIONS

Concession, through four independent bids, to

implement broadband internet access in four

Peruvian regions (Apurímac, Ayacucho,

Huancavelica, Lambayeque). The project involves

the implementation of a high-capacity fiber optic

network and an access network (microwaves).

Region Location Required fiber

length

Estimated date of

award

Ayacucho Central-Southern

highlands

1,900 Km Q 4 2015

Apurímac Southern highlands 1,400 Km Q 4 2015

Huancavelica Central-Southern

highlands

1,330 km Q 4 2015

Lambayeque Northern coast 570 Km Q 4 2015

� Estimated investment : Under evaluation

� Type of concession: self sustained

1

2

3

4

700 MHZ 4G BAND

Concession of three 698–806 MHz band blocks

to provide nationwide 4G broadband internet

access services. The band is initially expected

to be channeled in 15 MHz + 15 MHz blocks

� Estimated investment: under evaluation

� Type of concession: Self sustained

Estimated date of award: I Q 2015

MINING

HUAYDAY AMBARA PROSPECT

La Libertad

Location of the

Project

Mining concession with a total surface of 2,992

ha, high exploration potential due to its coal

mantles (“clean anthracite”), with an estimated

reserve of 1.8 million MT.

� Estimated investment (VAT not included): US$

8 million

Estimated date of award: IV Q 2014

CALLED

INTEGRAL WATER-MINING-AGRICULTURE PROJECT TO ADDRESS THE CHALLENGE OF INFORMAL MINING IN PIURA

Location of the ore enrichment plant

Informal mining area of

operation

The project will be conducted in two stages:

� 1st Stage: Design, financing, construction, operation and

maintenance of an Ore Enrichment Plant in Talara,

where the gold-bearing ore extracted by miners

operating in the Piura region (formalized or in process of

formalization) will be processed.

� 2nd Stage: Promotion of a project portfolio for

development in agriculture and other sectors, aiming at

solving the problem of water (household and agricultural

use) in the influence area of formalized mining

operations.

� Estimated investment (VAT not included): US$ 12

million

Estimated date of award: IV Q 2014

Piura

CALLED

www.proinversion.gob.pe