investment opportunitiesin public infrastructureand public
TRANSCRIPT
Investment Opportunities in Public
infrastructure and Public Service
Infrastructure – ProInversion
2014- 2015
Updated to August 26
CALLED
THE AMAZON WATERWAY
Implementation of works and actions to improve navigability
and passenger and cargo transit on the Amazonas, Marañón,
Huallaga and Ucayali rivers.
�Dredging on critical areas (Malos Pasos) and on the access
to the Port of Iquitos.
�GPS information system on the navigation route.
�Installation of level measuring stations with data
transmission capabilities.
�Monitoring system.
�Cleaning system.
� Estimated investment (VAT not included): US$ 69.4
million
� Type of concession: Co-financed
� Concession period: 20 years.
Estimated date of award: III Q 2014
Loreto
Ucayali
LINES 3 AND 4 OF THE BASIC NETWORK OF THE METRO OF LIMA AND CALLAO
Concession, through two independent bids, of two
lines of the network of the metro of Lima and Callao
for the design, financing, construction, equipment,
operation and maintenance of 62 Km of this
transportation system, which serves a city of more
than 10 million inhabitants.
� Estimated Investment: Under evaluation
� Type of concession : Co-financed
� Concession period : 35 years
Line 3 Line 4
32 Km 30 Km
2015 2015Estimated date of award
Approximated length
TO BE CALLED
Lima and Callao
TO BE CALLED
Project oriented to the transportation of passengers and cargo,
including the execution of the following works along 128 Km of the
existing railway:
� Railway upgrade
� Changes to the route in critical sectors
� Purchase of rolling stock
� Reinforcement of 15 railway bridges
� Extension of 38 tunnels for standard gauge rolling stock (1,435
mm)
� Upgrades to signaling and telecommunication systems
� Draining works
The project includes interoperability with Ferrocarril Central (railway
service with a standard gauge of 25 ton per axle) for the connection of
high Andes regions with the port of Callao and the Santa Anita market.
�Estimated investment: Under evaluation
�Type of concession: Co-financed
�Concession period: 30 years
Estimated date of award: II Q 2015.
HUANCAYO - HUANCAVELICA RAILWAY
Junín
Central Railway
Huancayo – Huancavelica Railway
South Railway
Huancavelica
PERIPHERAL RING ROAD
Unsolicited proposal for the construction,
financing, operation and maintenance of a new
urban highway approx. 33 Km long ( from Av.
Elmer Faucett to Av. Circunvalación), intended to
improve vehicle traffic between North and East
Lima districts and other areas in the city.
•Estimated Investment: Studies in progress
•Type of concession : Co-financed
Estimated date of award: III Q 2015
( if no interested third parties participate)
Ring road
UNDER EVALUATION
Lima and Callao
FAST MONORAIL MASS TRANSPORTATION SYSTEM - AREQUIPA
An unsolicited proposal for the design,
construction, electromagnetic equipment,
systems, rolling stock, financing, operation
and maintenance of a 14 Km fast mass
transportation system (on elevated track) in
the Arequipa Metropolitan Area.
�Estimated Investment: Studies in progress
�Type of concession : Co-financed
Estimated date of award: III Q 2015.
UNDER EVALUATION
Arequipa
Execution of upgrade and rehabilitation works
(117 Km), initial periodic maintenance (310 Km);
and subsequent maintenance and operation of
the 965 Km highway, in order to reach and
maintain established service levels on the entire
route.
� Estimated Investment: To be adjusted,
according to studies conducted and
arrangements between the Ministry and MEF.
� Type of concession : Co-financed
� Concession period: 25 years
Estimated date of award: III Q 2015
LONGITUDINAL DE LA SIERRA HIGHWAY, SECTION 4
TO BE CALLED
Initial periodic maintenance, operation and
maintenance of 422 Km of road, in order to maintain
established service levels.
� Estimated Investment: The ministry is currently
updating restoration and maintenance costs.
�Type of concession : Co-financed
�Concession period: 25 years
Estimated date of award: IV Q 2015
LONGITUDINAL DE LA SIERRA HIGHWAY, SECTION 5
TO BE CALLED
Unsolicited proposal for the concession of the
construction, operation and maintenance of
infrastructure works on the South Panamericana
Highway, Ica-Dv. Quilca section, with an approximate
length of 518 Km.
� Estimated Investment: Under evaluation
� Concession period : Self-sustained
Estimated date of award: 2015
PANAMERICANA SUR HIGHWAY : ICA- DV. QUILCA SECTION
UNDER EVALUATION
Ica
Arequipa
AZÁNGARO–JULIACA–PUNO 220 kV TRANSMISSION LINE
Concession for the design, financing, construction,
operation and maintenance of a 110 Km
transmission line, 120 MVA of capacity, intended to
eliminate congestion in the current system and
increase the reliability of the National
Interconnected System.
�Estimated investment (VAT not included): US$
68.9 million
� Concession period : Self-sustained
�Concession period: 30 years plus the construction
period (about 24 months).
Estimated date of award: IV Q 2014
Puno
CALLED
220/60 kV NUEVA LURÍN SUBSTATION and 220 kV AND 60 kV CONNECTION LINES
Concession for the design, financing, construction,
operation and maintenance of the 220/60 kV Nueva
Lurín Substation, that will be connected to the Chilca-San
Juan line (220 kV) and to existing substations Lurín and
La Pradera (60 kV). This will enable to increase the
electricity supply required to meet the increasing
demand in the south of Lima.
•Estimated Investment: US$ 49.6 million
• Type of concession: Self-sustained
•Concession period: 30 years plus the construction
period (about 24 months).
Estimated date of award: IV Q 2014
South Lima
CALLED
Contract for the purchase of 1,200 Mw of power in
years 2020 and 2021, to be generated by new
hydroelectric power generation projects that will be
incorporated to the national network (National Inter-
Connected Power System (SEIN by its initials in
Spanish)).
� Estimated Investment: Under evaluation
� Type of concession : Self-sustained
Estimated date of award: II Q 2015
ELECTRICITY SUPPLY FROM NEW HYDROELECTRIC POWER STATIONS
TO BE CALLED
Nationwide
Concession for the design, financing, construction,
operation and maintenance of the first stage of the
new Carapongo substation (located in the east of
Metropolitan Lima).
The new substation facilities will include Protection,
Control, Measurement and Communication Systems
related to the transmission lines and power
substations that supply electricity to Lima.
�Estimated investment: US$ 31.3 million
�Type of concession : Self-sustained
Estimated date of award: II Q 2015
TO BE CALLED
CARAPONGO SUBSTATION AND CONNECTIONS TO ASSOCIATED LINES
Lima
Metropolitan Lima
NEW CORPAC 220 kV SUBSTATION AND 220 kV INDUSTRIAL TRANSMISSION LINES - CORPAC
Concession for the design, financing, construction, operation
and maintenance of the following projects:
�New Córpac Substation (underground)
�220 kV Industrial Transmission Lines - Corpac (underground)
The upgraded electricity supply facilities will serve to meet the
increasing demand in the districts of Ate, Cercado de Lima, La
Victoria, Miraflores, San Isidro, San Borja (particularly in
commercial and financial areas in the latter three districts) and
San Luis.
•Estimated investment (VAT not included): US$ 148 million
�Type of concession : Self-sustained
�Concession period: 30 years plus the construction period
(about 25 months).
Estimated date of award: II Q 2015
Industrial Substations
Industrial TLs - Córpac
Lima
San Borja
Ate
New Córpac
Substation
CALLED
LNG SUPPLY SYSTEM FOR THE DOMESTIC MARKET
CALLEDConcession to make available a natural gas supply system
to be used in emergency situations (failure in NG
production in the forest, or in its transportation from the
Peruvian forest to the coast). The system comprises
back-up storage capacity for 130,000 m3 and facilities for
the regasification and shipping of 400 MMSCFD of NG, in
order to guarantee the supply of fuel to users in Lima
and Callao for up to seven days.
� Estimated investment (VAT not included): US$ 250
million
� Type of concession : Self-sustained
� Concession period: 20 years plus the construction
period (30 months).
Estimated date of award: IV Q 2014
QUILLABAMBA THERMAL POWER STATION
Concession for the design, financing,
construction, operation and financing of a 200
Mw thermal power station to be located in
Quillabamba (department of Cusco), and
commissioned in 2017, which will be
interconnected to the national network (SEIN).
Gasoducto del Sur
� Estimated investment: Under evaluation
� Type of concession: Self sustained
Estimated date of award: II Q 2015
TO BE CALLED
CTQuillabamba
Camisea
South Gas pipeline
MAIN WORKS AND CONDUCTION OF DRINKING WATER SUPPLY FOR LIMA
TO BE ANNOUNCEDConcession for the design, financing, construction, operation and
maintenance of the following infrastructure projects in the
departments of Lima and Junín:
� Re-enlargement of the Pomacocha and Huallacocha Bajo dams
(about 90 million m2)
� Trans-Andean tunnel (about 10 Km)
� New drinking water plant (5 m3/s)
� South branch pipeline (about 26 Km), including six reservoirs
(total storage volume: 24,000 m3) and works for the
interconnection with the current drinking water supply system.
The concession also includes the operation and maintenance of the
following facilities:
� Current drinking water plant (5 m3/s)
� North branch pipeline (27.1 Km), including four compensation
reservoirs (total storage volume: 23,000 m3 )
� Estimated investment (VAT not included): US$ 400 million
� Modality: Self-sustained
� Period: 30 years
Estimated date of award: I Q 2015
CALLED
REGULATION WORKS OF THE CHILLÓN RIVER
Concession for the design, financing, construction,
operation and maintenance of the following infrastructure
projects, intended to ensure drinking water supply to the
districts of North Lima.
� Jacaybamba dam (about 28 million m3) located in the
province of Canta, northeast of Lima.
� Pipeline (about 30 Km) for an average flow rate of
about 1.5 m3/s, from the projected water intake on the
Chillon River to the current Chillon drinking water
plant.
� Estimated investment (VAT not included): US$ 70
million
� Type of concession: Self-sustained
� Concession period: 20 to 30 years
Estimated date of award: I Q 2015
TO BE ANNOUNCEDTO BE ANNOUNCEDTO BE CALLED
Concession of the design, construction, equipment,
operation and maintenance of complementary services
(blue-collar services) in high-complexity hospitals in the
Peruvian Social Security System (ESSALUD): a new one in
the city of Lima (Instituto de Salud del Niño y Adolescente)
and two in provinces (Piura and Chimbote)
� Estimated Investment: Studies in progress
Estimated date of award: II Q 2015
TO BE CALLED
THREE NEW HIGH-COMPLEXITY HOSPITALS FOR LIMA AND TWO PROVINCES IN THE NORTH OF PERU
SOLID WASTE MANAGEMENT IN HEALTH FACILITIES UNDER THE MINISTRY OF HEALTH IN METROPOLITAN LIMA
An unsolicited proposal that comprises the construction,
operation and maintenance of a modern solid waste
treatment plant (hazardous bio-contaminated/hazardous
special/common) for the project’s integral management.
� Estimated Investment: Pre-investment Studies in
progress
� Type of concession: Co-financed
Estimated date of award: 2016
UNDER EVALUATION
Lima and Callao
CHOQUEQUIRAO CABLEWAY
Concession for the design, financing, construction,
equipment, operation and maintenance of a cableway,
as an access route, from Kiuñala (Apurímac) to
Choquequirao Archaeological Park, including the
arriving and exit stations.
�Estimated investment (VAT not included): US$ 52
million
� Type of concession: Co-financed
�Concession period: 20-25 years
Estimated date of award: I Q 2015.
CALLED
Apurímac
Cusco
An unsolicited proposal for the provision of electronic
personal surveillance services to alleviate overcrowding in
correctional facilities in Peru through the use of electronic
shackles for tried and sentenced inmates allowed having
access to this benefit.
�Estimated Investment: Under evaluation
� Type of concession : Self-sustained
Estimated date of award: II Q 2015
ELECTRONIC SHACKLES
UNDER EVALUATION
Lima and Callao
Re-location of four correctional facilities that are currently in
the urban areas of Metropolitan Lima and the department of
Cusco. The project is intended to promote the participation of
the private sector in the construction of new replacement
correctional facilities in more appropriate areas, under high-
quality safety standards
1.Chorrillos Women’s Facility (ordinary) and annex.
2. Lurigancho
3. Miguel Castro Castro.
4. Cusco and Cusco Women’s Facility
•Estimated investment: Under evaluation
Estimated date of award: II Q 2015
TO BE CALLED
RE-LOCATION OF CORRECTIONAL FACILITIES
Lima and Cusco
An unsolicited proposal for the construction of a shopping
center, houses, warehouses and parking lots on the current
location of the San Jorge Prison (Historic center of Lima).
Additionally, it includes the construction and equipping of a
new correctional facility where the San Jorge inmates will be
transferred.
�Estimated investment: Under evaluation
�Type of concession: Self-sustained
Estimated date of award: III Q 2015
UNDER EVALUATION
CORRECTIONAL INFRASTRUCTURE AND URBAN RENEWAL: “TINKUY PLAZA PROJECT”
Lima
BROADBAND INTERNET ACCESS FOR FOUR PERUVIAN REGIONS
Concession, through four independent bids, to
implement broadband internet access in four
Peruvian regions (Apurímac, Ayacucho,
Huancavelica, Lambayeque). The project involves
the implementation of a high-capacity fiber optic
network and an access network (microwaves).
Region Location Required fiber
length
Estimated date of
award
Ayacucho Central-Southern
highlands
1,900 Km Q 4 2015
Apurímac Southern highlands 1,400 Km Q 4 2015
Huancavelica Central-Southern
highlands
1,330 km Q 4 2015
Lambayeque Northern coast 570 Km Q 4 2015
� Estimated investment : Under evaluation
� Type of concession: self sustained
1
2
3
4
700 MHZ 4G BAND
Concession of three 698–806 MHz band blocks
to provide nationwide 4G broadband internet
access services. The band is initially expected
to be channeled in 15 MHz + 15 MHz blocks
� Estimated investment: under evaluation
� Type of concession: Self sustained
Estimated date of award: I Q 2015
HUAYDAY AMBARA PROSPECT
La Libertad
Location of the
Project
Mining concession with a total surface of 2,992
ha, high exploration potential due to its coal
mantles (“clean anthracite”), with an estimated
reserve of 1.8 million MT.
� Estimated investment (VAT not included): US$
8 million
Estimated date of award: IV Q 2014
CALLED
INTEGRAL WATER-MINING-AGRICULTURE PROJECT TO ADDRESS THE CHALLENGE OF INFORMAL MINING IN PIURA
Location of the ore enrichment plant
Informal mining area of
operation
The project will be conducted in two stages:
� 1st Stage: Design, financing, construction, operation and
maintenance of an Ore Enrichment Plant in Talara,
where the gold-bearing ore extracted by miners
operating in the Piura region (formalized or in process of
formalization) will be processed.
� 2nd Stage: Promotion of a project portfolio for
development in agriculture and other sectors, aiming at
solving the problem of water (household and agricultural
use) in the influence area of formalized mining
operations.
� Estimated investment (VAT not included): US$ 12
million
Estimated date of award: IV Q 2014
Piura