investing in kazakhstan - opportunities in aktobe region

101
Investment projects on the territory of Aktobe region, Republic of Kazakhstan For potential investors, creditors, strategic partners

Upload: embassy-of-kazakhstan-in-the-usa

Post on 13-Apr-2017

978 views

Category:

Business


0 download

TRANSCRIPT

Page 1: Investing in Kazakhstan - Opportunities in Aktobe Region

Investment projects on the territory of Aktobe

region, Republic of Kazakhstan

For potential investors, creditors, strategic

partners

Page 2: Investing in Kazakhstan - Opportunities in Aktobe Region

Investment projects of mining, manufacturing and

oil industries

Page 3: Investing in Kazakhstan - Opportunities in Aktobe Region

Project initiator: LLP "JP" Aktobe-Temir-VS "

The shareholders of the project initiator: Gemini

Mining B.V. (Virgin Islands)

Product: steel and cast iron

Raw material: mining rights to the field "Velihovskoe"

450 million. tons of proven iron ore reserves

Sales market: RK, (LLP "ARBZ") and export

The planned annual production: 1.0 mln. tons of steel /

cast iron

Project location: Kargaly district

The total cost of the project: 1.2 bln. USD

The amount of investment: 600 million. USD

Type of required investment: loan or equity financing,

leasing, off-take contract

The estimated duration of the project: 2018-2024

years

The current status of the project: developed

preliminary Feasibility Study

Investor service center: 8-701-036-40-40, 8-777-036-40-40, 8-705-820-07-17, e-mail: [email protected] 3

Possible state support:

1. Investment Preferences (exemption from customs

duties, land grants, preferential treatment of tax);

2. Simplification of foreign labor recruitment;

3. Concessional lending institutions development;

4. Support of the project through the investor

services center ("one window").

Production of steel and cast iron

Page 4: Investing in Kazakhstan - Opportunities in Aktobe Region

Project initiator: LLP «Aktobe steel production»

The shareholders of the project initiator:

-- 90.1% - resident of the Republic of Kazakhstan

-- 9.9% - JSC NC "SEC" Aktobe "

Product: production of concentrate from phosphorous iron ore to

produce cast iron

Raw material: iron ore deposit "Kok Bulak"

Sales market: The Russian Federation, China, Europe

The planned annual production: 8.0 mln. tons of iron ore

concentrate

The total cost of the project: 111 million. USD

The amount of investment: 78 mln. USD

Type of required investment: loan or equity financing, leasing,

off-take contract

The estimated duration of the project:

2017 - 2019 years

The current status of the project: Feasibility study and package

of documents are ready. In 2016 mining of iron ore begins

Production of iron ore concentrate

Investor service center: 8-701-036-40-40, 8-777-036-40-40, 8-705-820-07-17, e-mail: [email protected]

4

Possible state support:

1. Investment Preferences (exemption from customs duties,

land grants, preferential treatment of tax);

2. Simplification of foreign labor recruitment;

3. Concessional lending institutions development;

4.Support of the project through the investor services center

("one window").

Page 5: Investing in Kazakhstan - Opportunities in Aktobe Region

Project initiator: LLP "Badamshinsky nickel plant"

The shareholders of the project initiator: resident of the

Republic of Kazakhstan

Product: nickel, cobalt, iron, manganese, chromium, copper,

aluminum, quartz sand

Raw material: Shirpakainskoe deposit of silicate nickel-cobalt ores

Sales market: Китай, Россия, Европа

The planned annual production:

1.nickel oxide concentrate - 3054 tons / year

2.cobalt oxide concentrate - 123 tons / year

Project location: Badamsha village

The total cost of the project: 125 million. USD

The amount of investment: 125 million. USD

Type of required investment: loan or equity financing, leasing,

off-take contract

The estimated duration of the project: 2016-2017 years

The current status of the project: documentation is ready, project

participants are determined

Production of nickel-cobalt concentrate

Investor service center: 8-701-036-40-40, 8-777-036-40-40, 8-705-820-07-17, e-mail: [email protected]

5

Possible state support:

1. Investment Preferences (exemption from customs duties,

land grants, preferential treatment of tax);;

2. Simplification of foreign labor recruitment;

3. Concessional lending institutions development;

4.Support of the project through the investor services center

("one window").

Page 6: Investing in Kazakhstan - Opportunities in Aktobe Region

Project initiator: LLP “Koytas "

Shareholders of the project initiator: JSC "Kazzinc"

Product: nickel, ferronickel

Raw material: Silicate nickel ore deposits c Kempirsai with

proven reserves of 12 million. tons with the prospect of up to

100 mln. Tons

Sales market: 100% export

The planned annual production:

500 thousand tons

Project location: Kargalinsky district

The total cost of the project: 70 mln. USD

The amount of investment: 70 mln. USD

The amount of investment: loan financing, leasing

The estimated duration of the project: 2015-2019 years

The current status of the project: the amount of nickel ores

are confirmed at 7 fields, feasibility study is ready

Organization of nickel production (ferronickel)

6

Investor service center: 8-701-036-40-40, 8-777-036-40-40, 8-705-820-07-17, e-mail: [email protected]

Possible state support:

1. Investment Preferences (exemption from customs

duties, land grants, preferential treatment of tax);;

2. Simplification of foreign labor recruitment;

3. Concessional lending institutions development;

4.Support of the project through the investor services

center ("one window").

Page 7: Investing in Kazakhstan - Opportunities in Aktobe Region

Project initiator: LLP «KazCopper»

The shareholders of the project initiator: U.S. Megatech Inc.

(Great Britain)

Product: cathode copper containing 99.9%

Raw material:

1.The oxide ore (own field)

2.Sulfuric acid (Kazzinc)

3.Thinner SHELLSOL D90 (Shell Chemicals Europe BV)

4.The extractant LIX-984N (BASF SE (Germany))

5.Guar Guarfloc 66 (BASF Central Asia LLP)

6.Other reagents (RK)

Sales market: EU

The planned annual production: it is planned to increase the

production of copper cathode from 7 to 10 thousand tons

Project location: Aitikebi district

The total cost of the project: 30 mln. USD

The amount of investment: 30 mln. USD

Type of required investment: loan or equity financing, leasing,

off-take contract

The estimated duration of the project: 2016-2017 years

The current status of the project: currently we are producing 7

thousand. tons of copper cathode per year

Expansion of the copper cathode production

Possible state support:

1. Investment Preferences (exemption from customs

duties, land grants, preferential treatment of tax);;

2. Simplification of foreign labor recruitment;

3. Concessional lending institutions development;

4.Support of the project through the investor services

center ("one window").

Investor service center: 8-701-036-40-40, 8-777-036-40-40, 8-705-820-07-17, e-mail: [email protected]

7

Page 8: Investing in Kazakhstan - Opportunities in Aktobe Region

Project initiator: LLP "EKSPO enginring"

The shareholders of the project initiator: resident of the Republic

of Kazakhstan

Product:

1) ilmenite

2) rutile

3) zircon

Raw material: mining rights on "Shokash“ of titanium-zirconium

ores

(reserves - 10.3 mln. tons)

Sales market: Kazakhstan, the Russian Federation

The planned annual production: 0.7 million. M³ of ore

Project location: Martuk District

The total cost of the project: 40 mln. USD

The amount of investment: 40 mln. USD

Type of required investment: loan financing, leasing, off-take

contract

The estimated duration of the project: 2016-2017 years

The current status of the project: feasibility study is ready

Mining and processing of titanium-zirconium ores

Investor service center: 8-701-036-40-40, 8-777-036-40-40, 8-705-820-07-17, e-mail: [email protected]

8

Possible state support:

1. Exemption from customs duties and land grants;

2. Simplification of foreign labor recruitment;

3. Concessional lending institutions development;

4.Support of the project through the investor services

center ("one window").

Page 9: Investing in Kazakhstan - Opportunities in Aktobe Region

Project initiator: LLP "Voskhod-Chrome" (operating

company)

The shareholders of the project initiator: Yildirim group

(Turkey)

Product: chrome ore

Raw material: own chrome deposit

Sales market: CIS countries, export

The planned annual production: production expansion

up to 1 400 thousand tons

Project location: Chromtau district

The total cost of the project: 50 mln. USD

Type of required investment: loan and equity financing,

leasing, off-take contract

The estimated duration of the project: 2016-2017

years

The current status of the project: annual mining up to

1.0 mln. tons of ore

Expansion of chrome ore production

Possible state support:

1. Exemption from customs duties and land grants;

2. Simplification of foreign labor recruitment;

3. Concessional lending institutions development;

4.Support of the project through the investor services

center ("one window").

9

Investor service center: 8-701-036-40-40, 8-777-036-40-40, 8-705-820-07-17, e-mail: [email protected]

Page 10: Investing in Kazakhstan - Opportunities in Aktobe Region

Project initiator: LLP "Kazakhstan Minerals Technology"

Акционер инициатора проекта: ILuka Resources Ltd (Australia)

Product: ore of titanium and zirconium

Raw material: "Aschisay" deposits of titanium and zirconium:

ore sand - 55,710 thousand m³

ilmenite - 1600 tons

rutile - 600 tons

Zircon - 400 tons

Sales market: Ust-Kamenogorsk Titanium-Magnesium plant,

Kazakhstan - 100%.

The planned annual production:

Concentrates of -

- Ilmenite (TiO2-54%) 141 442.7 tons

- Rutile (TiO2-94%) 25 579.9 tons

- Zirconium (Z2O2-65%) 58 924.5 tons

The total cost of the project: 17,4 mln. USD

The amount of investment: 17,4 mln. USD

Type of required investment: loan and equity financing

The estimated duration of the project: 2016-2018 years

Project location: Temir District, 120 km. from the city of Aktobe. 45

km from the nearest railroad station

The current status of the project: all design work on geological

exploration are completed, subsoil use contract until 2038

Mining of titanium-zirconium deposit "Aschisay"

10

Investor service center: 8-701-036-40-40, 8-777-036-40-40, 8-705-820-07-17, e-mail: [email protected]

Possible state support:

1. Exemption from customs duties and land grants;

2. Simplification of foreign labor recruitment;

3. Concessional lending institutions development;

4.Support of the project through the investor

services center ("one window").

Page 11: Investing in Kazakhstan - Opportunities in Aktobe Region

Project initiator: JSC "Koktas-Aktobe"

The shareholders of the project initiator: residents of the

Republic of Kazakhstan (JSC "Koktas-Aktobe")

Product: enriched kaolin

Raw material: own deposit of kaolin (more than 50 million. tons)

Sales market: Russia, China

The planned annual production: 50 thousand tons

Project location: Kandyagash district (1 hour drive from the city of

Aktobe)

The total cost of the project: 20 mln. USD

The amount of investment: 20 mln. USD

Type of required investment: loan or equity financing, leasing,

off-take contract

The estimated duration of the project: 2018 year

The current status of the project: feasibility study ready

Wet enrichment of kaolin

11

Investor service center: 8-701-036-40-40, 8-777-036-40-40, 8-705-820-07-17, e-mail: [email protected]

Possible state support:

1. Investment Preferences (exemption from customs

duties, land grants, preferential treatment of tax);;

2. Simplification of foreign labor recruitment;

3. Concessional lending institutions development;

4.Support of the project through the investor services

center ("one window").

Page 12: Investing in Kazakhstan - Opportunities in Aktobe Region

Project initiator: ТОО «Chilisai Chemical»

Акционер инициатора проекта: Sunkar Resources Plc (Virgin

Islands)

Product: complex water-soluble nitrogen-phosphorus fertilizer -

diammonium phosphate (DAP), monoammonium phosphate

(MAP)

Raw material: own deposits of phosphorite and natural gas

Sales market: Kazakhstan, China, European countries

The planned annual production: 1.6 mln. tons of DAP / MAP

Project location: Mugalzhar District

The total cost of the project: 600 million. USD

The amount of investment: 600 million. USD

Type of required investment: loan or equity financing, leasing,

off-take contract

The estimated duration of the project:

Phase I in 2017 - 860 thousand tons of DAP / MAP;

Stage II in 2022 - 1 600 000 tons of DAP / MAP

The current status of the project: about 1.5 million US dollars

invested for research and development, feasibility study ready

(SNC-Lavalin).

Complex mineral fertilizers

Type - DAP / MAP

Investor service center: 8-701-036-40-40, 8-777-036-40-40, 8-705-820-07-17, e-mail: [email protected]

12

Possible state support:

1. Investment Preferences (exemption from customs

duties, land grants, preferential treatment of tax);;

2. Simplification of foreign labor recruitment;

3. Concessional lending institutions development;

4.Support of the project through the investor services

center ("one window").

Page 13: Investing in Kazakhstan - Opportunities in Aktobe Region

Recycling of stale slags refined ferrochrome

Project initiator: JSC "TNK" Kazchrome "

The shareholders of the project initiator: ERG (Eurasian

Group)

Product: stale slags, refined ferrochrome (an industrial by-

product)

Sales market: 95% for export - China, Japan, EU, US, South

Korea

The planned annual production:

1.Stockpiled slag - 500 thous. tons

2.Refined ferrochrome - 10 thous. tons

Project location: Aktobe

The total cost of the project: will be presented after the

completion of R & D, (design and estimate documentation)

Type of required investment: loan (100%) or equity

financing, leasing

The estimated duration of the project: 2015-2018 years

The current status of the project: laboratory studies are

conducted with positive results, the technology and

preliminary Feasibility Study is developed

Investor service center: 8-701-036-40-40, 8-777-036-40-40, 8-705-820-07-17, e-mail: [email protected]

13

Possible state support:

1. Investment Preferences (exemption from customs

duties, land grants, preferential treatment of tax);;

2. Simplification of foreign labor recruitment;

3. Concessional lending institutions development;

4.Support of the project through the investor services

center ("one window").

Page 14: Investing in Kazakhstan - Opportunities in Aktobe Region

Medium-carbon ferrochrome

Project initiator: JSC "TNK" Kazchrome "

The shareholders of the project initiator: ERG (Eurasian

Group)

Product: medium-carbon ferrochrome

Raw material: 1) high carbon ferrochrome liquid, 2) different

kinds of gases, and 3) a deoxidizer

Sales market/услуги: 95% for export - China, Japan, EU, US,

South Korea

The planned annual production: 65 thousand tons

Project location: Aktobe city

The total cost of the project: 110 mln. USD

The amount of investment: 28 mln. USD

Type of required investment: loan or equity financing, leasing

Период реализации проекта: 2015-2018 years

The current status of the project: technical and economic

evaluation of the two variants of medium-carbon ferrochrome

production technology is carried out

14

Investor service center: 8-701-036-40-40, 8-777-036-40-40, 8-705-820-07-17, e-mail: [email protected]

Possible state support:

1. Investment Preferences (exemption from customs

duties, land grants, preferential treatment of tax);;

2. Simplification of foreign labor recruitment;

3. Concessional lending institutions development;

4.Support of the project through the investor services

center ("one window").

Page 15: Investing in Kazakhstan - Opportunities in Aktobe Region

Project initiator: LLP "Urikhtau Operating"

Акционер инициатора проекта: JSC "NC" KazMunayGas "

Product: oil, condensate, sales gas, liquefied petroleum gas

(propane-butane)

Raw material: production wells at the gas condensate field

Urikhtau

The planned annual production: oil production - 150.4

thousand tons, gas - 800 million m3, condensate - 510.3

thousand tons

Sales market: allegedly 88% for export, 12% of kazakh oil

refinery plants.

Project location: oil and gas deposit "Urikhtau" (250 km from

Aktobe)

The total cost of the project: need discussion with investor

Type of required investment: loan financing

The estimated duration of the project: design and

development of the deposit - through 2038. The design capacity

- 2019-2020 years

The current status of the project: the construction of

infrastructure, contract for combined exploration and production

of hydrocarbons in the field "Urikhtau“ until 05/12/2038

Exploration and production of hydrocarbons

Investor service center: 8-701-036-40-40, 8-777-036-40-40, 8-705-820-07-17, e-mail: [email protected]

15

Possible state support:

1. Simplification of foreign labor recruitment;

2. Concessional lending institutions development;

3.Support of the project through the investor services

center ("one window").

Page 16: Investing in Kazakhstan - Opportunities in Aktobe Region

Project initiator: LLP «Vertex Holding»

The shareholders of the project initiator: resident of

the Republic of Kazakhstan

Product: iron ore concentrate

Raw material: own deposit Benkala

The planned annual production:

1.0 mln. tons of iron ore

600 ths. tons of iron ore concentrate

Project location: Aytekebi district

The total cost of the project: 4,3 mln. USD

The amount of investment: 2,5 mln. USD

Type of required investment: loan and equity financing,

leasing

The estimated duration of the project: 2017

The current status of the project: Feasibility studies is

ready. About 227 thousand tons of ore was mined up to

these days.

Construction of the infrastructure

Production of iron ore concentrate

Investor service center: 8-701-036-40-40, 8-777-036-40-40, 8-705-820-07-17, e-mail: [email protected] 16

Possible state support:

1. Simplification of foreign labor recruitment;

2. Concessional lending institutions development;

3.Support of the project through the investor services

center ("one window").

Page 17: Investing in Kazakhstan - Opportunities in Aktobe Region

Initiator of the project: Research and Production

Association "Nitrohim Group" (current production)

Prospective participants in the project: LLP Paris CA-

KAZ (Switzerland), JSC "Chemoprojekt Nitrogen" (Czech

Republic) - co-investors, EPC contract

Product: nitric acid

Markets served: Domestic market - 50%, export - 50%

The planned annual production: of 480 th. Tons / year

(600 tons / hour)

Project location: Aktobe

The total cost of the project: 60 mln. USD

The amount of investment: 51 mln. USD

Type of required investments: debt and equity

financing, leasing, off-take contract

The estimated duration of the project: 2015-2019

The current status of the project: 15% of own

investment to the project is planned. Feasibility study is

developed.

Nitric acid production

Possible state support:

1. Exemption from customs duties and land grants;

2. Simplification of foreign labor recruitment;

3. Concessional lending institutions development;

4.Support of the project through the investor services

center ("one window").

Investor service center: 8-701-036-40-40, 8-777-036-40-40, 8-705-820-07-17, e-mail: [email protected]

Page 18: Investing in Kazakhstan - Opportunities in Aktobe Region

Initiator of the project: Research and Production

Association "Nitrohim Group" (current production)

Participants of the project:

- JSC "Chemoprojekt Nitrogen" (Czech Republic) -

soinvestirovanie; "SAFIHEM project Group" (Czech

Republic) - the design and supply of equipment

Product description: ammonium nitrate

Sources of raw materials: nitric acid, natural gas

Markets served: Kazakhstan 50%, exports 50%

Estimated annual production: 500 thous. Tons per

year.

Project location: Alga District

Total cost of the project: 48 mln. USD

The amount of investment: 41 mln. USD

Type of required investments: debt and equity

financing, leasing, off-take contract

The estimated duration of the project: 2015-2019

The current status of the project: 15% of own

investment to the project is planned. Feasibility study is

developed.

Production of ammonium nitrate

Possible state support:

1. Exemption from customs duties and land grants;

2. Simplification of foreign labor recruitment;

3. Concessional lending institutions development;

4.Support of the project through the investor services

center ("one window").

Investor service center: 8-701-036-40-40, 8-777-036-40-40, 8-705-820-07-17, e-mail: [email protected]

Page 19: Investing in Kazakhstan - Opportunities in Aktobe Region

Investment projects in energy, industry and

construction sectors

Page 20: Investing in Kazakhstan - Opportunities in Aktobe Region

Utilization power plant

Project initiator: JSC "TNK" Kazchrome "

The shareholders of the project initiator: ERG (Eurasian

Group)

Product: electricity for operating needs of Aktobe ferroalloys

plant

Raw material: ferroalloy gas

Sales market: for operating needs of Aktobe ferroalloys plant

The planned annual production: 46,4 MW

Project location: Aktobe city

The total cost of the project: 110 mln. USD

The amount of investment: 110 mln. USD

Type of required investment: loan and equity financing,

leasing

The estimated duration of the project: 2016-2017 years

The current status of the project: Feasibility study of the

project is ready.

Investor service center: 8-701-036-40-40, 8-777-036-40-40, 8-705-820-07-17, e-mail: [email protected]

20

Possible state support:

1. Exemption from customs duties and land grants;

2. Simplification of foreign labor recruitment;

3. Concessional lending institutions development;

4.Support of the project through the investor services center

("one window").

Page 21: Investing in Kazakhstan - Opportunities in Aktobe Region

Project initiator: LLP «Arm Wind»

Product: electricity

The planned annual production: 200 thousand. MW / h

Project location: Badamsha district

The total cost of the project: 125 mln. USD

The amount of investment: 87,5 mln. USD

Type of required investment: loan and equity financing, leasing

The estimated duration of the project: the fourth quarter of 2017 (48

MW)

The current status of the project: an in-depth study of the region’s

potential by the project company DNV GL (Germany) is performed

(technical solution, location etc.) Feasibility study of the project is ready

Possible state support for wind farms:

1. Exemption from customs duties and land grants, the 15-year rate of 19

Tenge / 1 kWh;

2. Simplification of foreign labor recruitment;

3. Concessional lending institutions development;

4.Support of the project through the investor services center ("one

window").

Wind farm

Investor service center: 8-701-036-40-40, 8-777-036-40-40, 8-705-820-07-17, e-mail: [email protected]

21

Project initiator: LLP "Kimpersay Energy»

Product: electricity

The planned annual production: 200 MW (expansion up to 300

MW)

Project location: Kimpersay district

The total cost of the project: 400 mln. USD

Type of required investment: loan and equity financing, leasing

The estimated duration of the project: 2016-2018 years

The current status of the project: completed geological

engineering works

Page 22: Investing in Kazakhstan - Opportunities in Aktobe Region

Project initiator: «RenTeh BV» Dutch company

The shareholders of the project initiator:

1.«RenTeh BV» (initiator of the investor);

2.Energia (investor)

3.DB Technologies BV (equipment supplier)

Product: Recycling of solid waste, electricity

Raw material: MSW waste (200 000 tons) collected from

Aktobe city

Sales market: Aktobe city

The planned annual production:

processing 200,000 tons of solid waste from the biogas plant

capacity of 12 MW per hour

Project location: Aktobe city

The total cost of the project: 71 mln. USD

The amount of investment: 71 mln. USD

Type of required investment: loan and equity financing in the

national currency of Kazakhstan (Tenge)

The estimated duration of the project: 2016-2018 years

The current status of the project: a memorandum with the

akimat of Aktobe region is signed. 3 hectares of land plot rented,

Processing of municipal solid waste

Investor service center: 8-701-036-40-40, 8-777-036-40-40, 8-705-820-07-17, e-mail: [email protected]

22

Possible state support:

1. Exemption from customs duties and land grants;

2. Simplification of foreign labor recruitment;

3. Concessional lending institutions development;

4.Support of the project through the investor services

center ("one window").

Page 23: Investing in Kazakhstan - Opportunities in Aktobe Region

Project initiator: LLP "OksiBild"

Shareholders of the project initiator: resident of the

Republic of Kazakhstan

Product: plaster, plasterboard, gypsum dry mixtures

based on cement

Raw material: deposit of sand in Kargaly district.

The planned annual production: gypsum - 105 thous.

tons.

dry mix cement-based - 96 ths. tons.

drywall - 3.6 mln. m2

Sales market: Kazakhstan, the CIS countries

Project location: Aktobe city

The total cost of the project: 4,2 billion Tenge

The amount of investment: 2,9 billion Tenge

Type of required investment: loan and equity

financing, leasing

The estimated duration of the project: 2016-2017

years

The current status of the project: business plan is

developed. The supplier of the equipment PARGET

MAKINA (Turkey) and KNAUF (Germany)

Production of dry construction mixtures

23

Investor service center: 8-701-036-40-40, 8-777-036-40-40, 8-705-820-07-17, e-mail: [email protected]

Possible state support:

1. Exemption from customs duties and land grants;

2. Simplification of foreign labor recruitment;

3. Concessional lending institutions development;

4.Support of the project through the investor

services center ("one window").

Page 24: Investing in Kazakhstan - Opportunities in Aktobe Region

Project initiator: LLP «ASBI SAT GROUP» has a current

production

The shareholders of the project initiator: Plan S.r.l. (Italy)

Product: Reinforced concrete sleepers for railways

Raw material: Cement - Volsk (Russia)

Wire - Karaganda region

Rubble and sand - Aktobe region

The planned annual production: 550 thousand - 600 thousand

units.

Sales market: JSC "NC" Kazakhstan Temir Zholy"

Project location: Aktobe region

The total cost of the project: 8 mln. USD

The amount of investment: 2,5 mln. USD

Type of required investment: loan financing, leasing

The estimated duration of the project: 2015-2018 years

The current status of the project: existing enterprises. Signed

a contract for the supply of equipment

Production of concrete products

24

Investor service center: 8-701-036-40-40, 8-777-036-40-40, 8-705-820-07-17, e-mail: [email protected]

Possible state support:

1. Simplification of foreign labor recruitment;

2. Concessional lending institutions development;

3.Support of the project through the investor services

center ("one window").

Page 25: Investing in Kazakhstan - Opportunities in Aktobe Region

Project initiator: TOO "Ainek"

The shareholders of the project initiator: LLP «Samruk-Kazyna

Invest"

Product: bottle (0,5 and 0,7 litters), jar (0.5 and 1 and 3 litters)

Raw material: Mugalzhar deposit of quartz sand, more than 600

million tons of tailings deposits of nickel-cobalt ores

The planned annual production: 91.8 thousand tons per year

Sales market: Kazakhstan, the Russian Federation

Project location: Aktobe city

The total cost of the project: 100 mln. USD

The amount of investment: 70 mln. USD

Type of required investment: loan or equity financing, leasing, off-

take contract

The estimated duration of the project: 2016-2018 years

The current status of the project: business plan and feasibility

study is ready project

Manufacturing of glass containers

Investor service center: 8-701-036-40-40, 8-777-036-40-40, 8-705-820-07-17, e-mail: [email protected]

25

Possible state support:

1. Investment Preferences (exemption from customs

duties, land grants, preferential treatment of tax);;

2. Simplification of foreign labor recruitment;

3. Concessional lending institutions development;

4.Support of the project through the investor services

center ("one window").

Page 26: Investing in Kazakhstan - Opportunities in Aktobe Region

Project initiator: LLP “Eco Trade Aktobe"

Product: Pulp and paper for corrugating, cardboard, corrugated

cardboard and packaging

Sales market: Russia and CIS countries

The planned annual production:

corrugated cardboard - 42 thous. tons

corrugated - 6 th. Tons

Project location: Chromtau district

The total cost of the project: 52,3 mln. USD

The amount of investment: до 50 mln. USD

Type of required investment: loan or equity financing, leasing

The current status of the project: feasibility study and business

plan is ready, technology is determined, contracts with partners from

China for the supply of equipment is signed, about 100 hectares of

land plot in the area Chromtau privately owned

Construction of the pulp and paper factory

26

Possible state support:

1. Investment Preferences (exemption from customs

duties, land grants, preferential treatment of tax);;

2. Simplification of foreign labor recruitment;

3. Concessional lending institutions development;

4.Support of the project through the investor services

center ("one window").

Investor service center: 8-701-036-40-40, 8-777-036-40-40, 8-705-820-07-17, e-mail: [email protected]

Page 27: Investing in Kazakhstan - Opportunities in Aktobe Region

Investment projects in the service and

infrastructure sectors

Page 28: Investing in Kazakhstan - Opportunities in Aktobe Region

Project initiator: TOO "Dastan" is operating company

with construction and hotel businesses

Brief description of the hotel: 4-star hotel rooms,

restaurant, gym, conference hall and a SPA

The planned annual capacity: 32 thousand beds

Project location: Aktobe city

The total cost of the project: 20 mln. USD

The amount of investment: 14 mln. USD

Type of required investment: loan and equity financing,

leasing

The estimated duration of the project: 2016

The current status of the project: operating business.

Possible state support:

1.Support of the project through the investor services

center ("one window").

Hotel

Investor service center: 8-701-036-40-40, 8-777-036-40-40, 8-705-820-07-17, e-mail: [email protected]

28

Page 29: Investing in Kazakhstan - Opportunities in Aktobe Region

Hotel "Sheraton"

Project initiator: LLP “Accept Contraction»

The shareholders of the project initiator: resident of the

Republic of Kazakhstan

Brief description of the hotel: floors - 9; rooms - 177; total

area - 21 600 m2; services - restaurants, bars, rental of

conference rooms, spa, fitness center, swimming pool, night

club

The planned annual capacity: 65 thousand beds

Project location: Aktobe city

The total cost of the project: 9 bln. Tenge

The amount of investment: 9 bln. Tenge

Offer for investors: up to 100% shares of the hotel, long-

term lease

The current status of the complex: имеется соглашение с

компанией Starwood (владелец сетей гостиниц

«Sheraton»), готовность объекта - 95%, остались

отделочные работы

Possible state support:

1. Support of the project through the investor services

center ("one window").

Investor service center: 8-701-036-40-40, 8-777-036-40-40, 8-705-820-07-17, e-mail: [email protected]

29

Page 30: Investing in Kazakhstan - Opportunities in Aktobe Region

Trade and entertainment complex

Project initiator: LLP «Center Grand»

The shareholders of the project initiator: resident of the

Republic of Kazakhstan

Brief description of the complex: TEC "Zhibek Zholy" 8

storey building with retail and entertainment area

Planned annual occupancy: rental premises - 4700 sq.m.

Project location: Aktobe city

The total cost of the project: 1 276 mln. Tenge

The amount of investment: 957 mln. Tenge

Offer for investors: loan and equity financing, leasing

The current status of the complex: at the design stage, we

have privately owned land

Possible state support:

1. Support of the project through the investor services

center ("one window").

Investor service center: 8-701-036-40-40, 8-777-036-40-40, 8-705-820-07-17, e-mail: [email protected]

30

Page 31: Investing in Kazakhstan - Opportunities in Aktobe Region

Project initiator: LLP «Center Grand»

The shareholders of the project initiator: resident of

the Republic of Kazakhstan

Product: construction of residential area - 53 block

sections

The planned annual production:

The total built-up area - 164 of 180 m2

The area of commercial premises – 3463 m2

Project location: в центре города Актобе, р-н обл

ГАИ

The total cost of the project: 14,7 млрд. тенге

The amount of investment: 11,1 млрд. тенге

Type of required investment: borrowed funds

The estimated duration of the project: 2016-2017

years

The current status of the project: на стадии

проектирования

Housing area

Investor service center: 8-701-036-40-40, 8-777-036-40-40, 8-705-820-07-17, e-mail: [email protected]

31

Possible state support:

1. Support of the project through the investor services

center ("one window").

Page 32: Investing in Kazakhstan - Opportunities in Aktobe Region

Project initiator: LLP "Akpan" has an operating

recreation center

Brief description of the center: 33 hectares of privately

owned land plot, a restaurant with 300 seats, a hotel

complex with 50 rooms, a mini zoo, a leisure complex,

beach etc.

The planned annual amount of visitors: 60 thousand

people

Project location: Aktobe city

The total cost of the project: 6,7 mln. USD

The total cost of the project: 5,1 mln. USD

Type of required investment: loan and equity financing,

leasing

The estimated duration of the project: 2016

The current status of the project: an operating

recreation center

Recreation center «Green Land»

Investor service center: 8-701-036-40-40, 8-777-036-40-40, 8-705-820-07-17, e-mail: [email protected]

Possible state support:

1. Support of the project through the investor

services center ("one window").

32

Page 33: Investing in Kazakhstan - Opportunities in Aktobe Region

Project initiator: akimat of Aktobe region

The essence of the project: construction of 140 km. gas pipeline

Место реализации: Aytekebi district

Prospective participants in the project: JSC "KazTransGas"

(investor)

Capacity: пропускная способность газопровода 20 000 м3 /час

The total cost of the project: not determined

The estimated duration of the project: 2016-2018 years

Sales market: settlements, 2 industrial enterprises - JSC

«KazCopper», LLP «Vertex Holding»

Type of required investment: project financing

Possible state support:

1. Simplification of foreign labor recruitment;

2. Concessional lending institutions development;

3.Support of the project through the investor services center ("one

window").

Construction of gas pipeline

33

Investor service center: 8-701-036-40-40, 8-777-036-40-40, 8-705-820-07-17, e-mail: [email protected]

Page 34: Investing in Kazakhstan - Opportunities in Aktobe Region

Investment projects in agribusiness sector

34

Page 35: Investing in Kazakhstan - Opportunities in Aktobe Region

Project initiator: LLP "APK Zapad"

Product: chilled and frozen broiler meat

Sales market: western region of the Republic of Kazakhstan, Aktobe

region

The planned annual production: 5 000 tons

Project location: Alga district

The total cost of the project: 3,5 bln. Tenge

The amount of investment: 2,5 bln. Tenge

Type of required investment: loan financing, leasing

The estimated duration of the project: 2016

The current status of the project: we have 240 ha. of privately

owned land plot

Poultry meat (broiler)

35

Possible state support:

1. Subsidies for the production of poultry meat in

the amount of 17% to 21% of the price per kg;

2. Subsidizing part of the expenditures for animal

feed - up to 45%;

3. Subsidizing part of the costs for purchasing the

breeding eggs and chicks - up to 50% of the price,

or not more than 303 Tenge for chicken;

4. Concessional lending institutions development;

5.Support of the project through the investor

services center ("one window").

Investor service center: 8-701-036-40-40, 8-777-036-40-40, 8-705-820-07-17, e-mail: [email protected]

Page 36: Investing in Kazakhstan - Opportunities in Aktobe Region

Project initiator: "Zhantizer“ farm

Product: chilled and frozen lamb meat

Sales market: western region of the Republic of Kazakhstan,

Aktobe region, Russia

The planned annual production: 5 thousand tons

Project location: Chromtau

The total cost of the project: 10,8 mln. USD

The amount of investment: 10,8 mln. USD

Type of required investment: loan or equity financing, leasing

The estimated duration of the project: 2016

Current situation in this business: there are no lamb

processing factories in Aktobe region. The demand of the

region in meat of lamb is 10 000 tons per year, the amount of

sheep in the region is more than 1.2 million

The construction of slaughterhouse for deep processing of meat lamb

36

Possible state support:

1. Subsidies for the production of more than

$ 1.5 for 1 kg;

2. Subsidizing up to 50% of the costs for animal

feed;

3. Subsidizing part of the costs for the purchase

of breeding sheep from abroad;

4. Concessional lending from development

institutions;

5. Support of the project through the investor

services center ("one window").

Investor service center: 8-701-036-40-40, 8-777-036-40-40, 8-705-820-07-17, e-mail: [email protected]

Page 37: Investing in Kazakhstan - Opportunities in Aktobe Region

Agribusiness projects

Investor service center: 8-701-036-40-40, 8-777-036-40-40, 8-705-820-07-17, e-mail: [email protected]

37

Project initiator: "Zhana-turmys“ farm

Required facilities:

1. Dairy farm for 600 heads with the processing capacity of (50 ha.

of privately owned land plot)

2. feedlots and meat processing plant - 12.9 mln. USD

3. Feed mill - 4.4 million. USD (raw materials - wheat 4-5 grades,

barley etc.)

4. Logistics center - 7.4 million USD (15 ha. Of privately owned

land plot)

5. Small cattle and horse breeding - 2.2 mln. USD

6. roadside service - 0.7 mln. USD

7. crushed stone plant\

Project location: Kosistek district (65 km. From Aktobe city),

The total cost of the project: 37 mln. USD

The amount of investment: 37 mln. USD

Type of required investment: loan and equity financing, leasing

The current status of the project: operating farm with more

than13 thousand ha. Privately owned land,

Possible state support:

1. Subsidies for production costs on purchase of animal feed and

breeding of biological assets;

2. Concessional lending by institutions of development;

3.Support of the project through the investor services center ("one

window").

Page 38: Investing in Kazakhstan - Opportunities in Aktobe Region

Project initiator: LLP «Milk-A History," operating

production

Product: Fermented milk Product «Tandem", "Baked

milk", "Kefir", "varenets", "Kefir", "Snow", "butter", "curd"

Sales market: Kazakhstan, the Russian Federation

The planned annual production:

Tandem 0.5 liters. - 1.08 million units.

Tandem 1 liter. - 2.645 million units.

Tandem 1.5 liters. - 3.96 million units

Project location: Aktobe city

The total cost of the project and the amount of

investment: 80 thousand. euros for the modernization

of existing production

Type of required investment: loan financing

The estimated duration of the project: 2016

Production expansion of dairy products

Investor service center: 8-701-036-40-40, 8-777-036-40-40, 8-705-820-07-17, e-mail: [email protected]

38

Possible state support:

1. Subsidies for 1 kg. of sold product more

than $ 0.16;

2. Subsidizing up to 45% of the costs for

animal feed;

3. Subsidizing up to 50% of the costs for

purchasing of breeding stock ;

4. Concessional lending from institutions of

development;

5.Support of the project through the investor

services center ("one window").

Page 39: Investing in Kazakhstan - Opportunities in Aktobe Region

Project initiator: TOO "Tandem“ operating meat plant

Product: boiled-smoked products, delicacy of lamb, beef and horse

meat standard "Halal"

Sales market: Kazakhstan and Russia

The planned annual production:

1.According to a slaughterhouse 1.0 thous. tons

2.On the basis of fattening 0,633 th. tons

Project location: Aktobe city

The total cost of the project: 8,6 mln. USD

The amount of investment: 8,6 mln. USD

Type of required investment: loan or sale up to 70% of the share

capital to complete the project with the feedlots

The current status of the project:

Stage 1 - construction of slaughterhouse is completed – we are

offering the investor to refinance debt of the company in the amount of

1 mln. USD, with the assignment of up to 70% in the authorized

capital

Stage 2 - developing a business plan for the fattening of 2000 heads

of cattle and 1,000 head of breeding stock with acreage to an existing

meat processing plant - 3.5 mln. USD.

Expansion of plant for the production of sausages

Investor service center: 8-701-036-40-40, 8-777-036-40-40, 8-705-820-07-17, e-mail: [email protected]

39

Possible state support:

1. Concessional lending institutions development;

2.Support of the project through the investor services

center ("one window").

Page 40: Investing in Kazakhstan - Opportunities in Aktobe Region

Project initiator: LLP "Aktepa" existing farm

Product: beef supreme and first category

Sales market: meat processing plant located in the 700 m. from the

farm

The planned annual production: in 2016 it is planned to produce 7

000 tons of beef

Project location: Alga district, 55.9 thousand ha. of rented land for 49

years

The total cost of the project: 1,9 billion Tenge

Type of required investment: loan (100%) financing

Possible state support:

1. Subsidies for the production of more than $ 1.5 per 1 kg .;

2. Subsidizing part of the costs of animal feed - up to 50% for breeding

cattle - more than 30 US dollars per cattle;

3. Subsidizing part of the costs for the purchase of breeding cattle

from abroad;

4. Concessional lending from institutions of development;

5.Support of the project through the investor services center ("one

window").

Breeding cattle beef

Investor service center: 8-701-036-40-40, 8-777-036-40-40, 8-705-820-07-17, e-mail: [email protected]

40

Page 41: Investing in Kazakhstan - Opportunities in Aktobe Region

Project initiator: LLP «Sambrero»

Product: up to 2 000 m2 for small wholesale warehouse for fruits

and vegetables

Sales market: Aktobe city

The planned annual production: 24 million Tenge

Project location: Aktobe city

The total cost of the project и The amount of investment: 150

million Tenge

Type of required investment: loan and equity financing, leasing

The current status of the project: on the stage of developing

design documents

Construction of vegetable stores

Investor service center: 8-701-036-40-40, 8-777-036-40-40, 8-705-820-07-17, e-mail: [email protected]

41

Possible state support:

1. Up to 30% subsidies for the construction costs;

2. Concessional lending from institutions of development;

3.Support of the project through the investor services

center ("one window").

Page 42: Investing in Kazakhstan - Opportunities in Aktobe Region

Project initiator: "A.S.Ar.Az.G“ farm

Product: semi-finished leather chrome tanning «Wet-blue»

The planned annual production: processing of hides of

cattle 2 160 tons or 3,5 mln. USD

Project location: Martuk district

The total cost of the project и The amount of

investment:150 mln. Tenge

Type of required investment: loan financing

The estimated duration of the project: 2016

The current status of the project: small scale operating

production

Possible state support:

1._subsidies for the construction costs

2. Concessional lending institutions development;

3.Support of the project through the investor services center ("one

window").

Expansion of the plant for processing cattle hides

Investor service center: 8-701-036-40-40, 8-777-036-40-40, 8-705-820-07-17, e-mail: [email protected]

42

Page 43: Investing in Kazakhstan - Opportunities in Aktobe Region

Project initiator: LLP "Ramadan" current production

Product: all grades flour, pasta, cereals, bakery, confectionery,

Doughnuts products, eggs, chicken, minced chicken operating production

Sales market: the western region of Kazakhstan. To cooperate on the

supply of flour to Turkmenistan, Uzbekistan, Tajikistan, Kyrgyzstan and

Afghanistan

The planned annual production:

1. Mill -150 tons per day

2. Mini-mill capacity - 40 tons

3. Bakery - 30 tons per day. It allows you to provide about 70% of the

needs of the city in bakery products

4. Doughnuts Capacityyu 1 ton of products per day.

5. Poultry farm contains more than 450 thousand poultry. Every year it

produces more than 100 million. eggs

Project location: Aktobe city

The total cost of the project: need discussion with investor

Type of required investment: long-term lease, a strategic partner

The current status of the project: operating production facility - 12

thousand ha. of arable land

Investor service center: 8-701-036-40-40, 8-777-036-40-40, 8-705-820-07-17, e-mail: [email protected]

Expansion of bakery production

43

Possible state support:

1._ Subsidizing for production costs, purchase of animal feed,

breeding of biological assets;

2. Concessional lending institutions development;

3.Support of the project through the investor services center

("one window").

Page 44: Investing in Kazakhstan - Opportunities in Aktobe Region

Projects under the scheme of

Public-Private Partnership

Page 45: Investing in Kazakhstan - Opportunities in Aktobe Region

Project Initiator: akimat of Aktobe region

Project: a kindergarten in the district Zarechny-2

Capacity: 150 seats

The total cost of the project: 359 million. Tenge

Project implementation period: 2016

Project: a kindergarten in the district Zarechny-3

Capacity: 150 seats

The total cost of the project: 291 million. Tenge

Project implementation period: 2016

Project: Kindergarten in district Batis

Capacity: 320 seats

The total cost of the project: 587 million. Tenge

Project implementation period: 2016-2017 years

Project: a kindergarten in the village Clear

Capacity: 320 seats

The total cost of the project: 562 million. Tenge

Project implementation period: 2016-2017 years

PPP - kindergartens in the city of Aktobe

45

Possible state support:

- subsidizing the interest rate of bank loan;

- guaranteed state order;

- Co-financing of concession projects (25%).

Investor service center: 8-701-036-40-40, 8-777-036-40-40, 8-705-820-07-17, e-mail: [email protected]

Page 46: Investing in Kazakhstan - Opportunities in Aktobe Region

Project Initiator: akimat of Aktobe region

Project: preschool institution in g.Alga

Capacity: 320 seats

The total cost of the project: 521 million. Tenge

Project implementation period: 2016-2017 years

Project: preschool institution in district Shubarkuduk

Capacity: 280 seats

The total cost of the project: 496 million. Tenge

Project implementation period: 2016-2017 years

Project: preschool institution in district Emba

Capacity: 320 seats

The total cost of the project: 531 million. Tenge

Project implementation period: 2016-2017 years

PPP – preschool kindergartens

46

Possible state support:

- subsidizing the interest rate of bank loan;

- guaranteed state order;

- Co-financing of concession projects (25%).

Investor service center: 8-701-036-40-40, 8-777-036-40-40, 8-705-820-07-17, e-mail: [email protected]

Page 47: Investing in Kazakhstan - Opportunities in Aktobe Region

Project Initiator: akimat of Aktobe region

Project: Construction of urban clinics in the residential

area "Nur-Aktobe"

Capacity: 500 visits per shift

The total cost of the project: 1457 million Tenge

Project implementation period: 2016-2017years

Project: Construction of urban clinics in the residential

area Batys-2

Capacity: 500 visits per shift

The total cost of the project: 1 661 million Tenge

Project implementation period: 2016-2017 years

PPP - clinics

47

Possible state support:

- subsidizing the interest rate of bank loan;

- guaranteed state order;

- Co-financing of concession projects (25%).

Investor service center: 8-701-036-40-40, 8-777-036-40-40, 8-705-820-07-17, e-mail: [email protected]

Page 48: Investing in Kazakhstan - Opportunities in Aktobe Region

Project initiator: akimat of Aktobe region

Проект: modernization of wastewater treatment plants

(WWTP)

Location: Aktobe city

Capacity: 100 thousand. M3 / day

The total cost of the project : 17 bln. Tenge

The estimated duration of the project: 2016-2018 years

The current status of the project: complex wastewater

treatment plant was put into operation in 1981. The

capacity of facilities - 103 thous. m³ / day. The actual

average flow of sewage - 65 thous. M³ / day

PPP - modernization of sewage treatment plants

48

Possible state support:

- compensation the investment and

operating costs;

- return expenditure within the investment of

own funds of the concessionaire (15% of

the investment);

- guarantee the acquisition of services at a

certain price.

Investor service center: 8-701-036-40-40, 8-777-036-40-40, 8-705-820-07-17, e-mail: [email protected]

Page 49: Investing in Kazakhstan - Opportunities in Aktobe Region

Project initiator: akimat of Aktobe region

Project: Installation and operation of LED lamps in the streets of the

city of Aktobe

Capacity: network length of 223 km, 7098 lamps

The total cost of the project: up to 900.0 mln. Tenge

The estimated duration of the project: 2016

Possible state support:

- compensation the investment and operating costs;

- return expenditure within the investment of own funds of the

concessionaire (15% of the investment);

- guarantee the acquisition of services at a certain price.

PPP - the modernization of street lighting

49

Investor service center: 8-701-036-40-40, 8-777-036-40-40, 8-705-820-07-17, e-mail: [email protected]

Page 50: Investing in Kazakhstan - Opportunities in Aktobe Region

Enterprises for Privatization

Page 51: Investing in Kazakhstan - Opportunities in Aktobe Region

Project initiator: Akimat of the Aktobe region

The shareholders of the project initiator:

JSC "Alatau Zharyk Kompaniyasy"

(100% subsidiary of JSC "Samruk-Energo")

The essence of the project: the transfer to the trust

management of JSC "Aktobe CHP". Implementation of

up to 50% of shares

Capacity: thermal energy - 878 Gcal / h; electric

power - 88 MW

Рынок сбыта: Aktobe city

The total cost of the project: during 2013 the share

capital was 3.8 bln. Tenge with the profit of 1.0 bln.

Tenge.

Необходимые инвестиции: requires assessment

Сырье: associated petroleum gas from Aktobe region

Место реализации: Aktobe city

Type of required investment: the redemption of up

to 100% of the share capital.

Possible state support:

1.Guaranteed sales of thermal energy;

2.Management fee, reimbursement of operating

expenses, and others.

Concession JSC "Aktobe CHP"

Investor service center: 8-701-036-40-40, 8-777-036-40-40, 8-705-820-07-17, e-mail: [email protected]

51

Page 52: Investing in Kazakhstan - Opportunities in Aktobe Region

Project initiator: LLP "Passenger motor company"

The shareholders of the project initiator: akimat of the

region

The volume of services rendered: more than 30% of

passenger transportation Aktobe

Project location: Aktobe city

The carrying value of the property: 5 bln. Tenge

Type of required investment: asset management

company, the investment in a fleet of buses, upgrading

facilities and more.

The estimated duration of the project: 2016

The current status of the project: we have 97 buses. In

order to encourage the transfer of buses on gas in 2016

two methane stations will be opened in the city

Possible state support:

1. Public-private partnership;

2. Preferential lease financing purchases of buses;

3. Keeping the state's share to 50% of the equity of

the project initiator.

Urban passenger transport

Investor service center: 8-701-036-40-40, 8-777-036-40-40, 8-705-820-07-17, e-mail: [email protected]

52

Page 53: Investing in Kazakhstan - Opportunities in Aktobe Region

Not operating enterprises

offered for redemption or sharing

Page 54: Investing in Kazakhstan - Opportunities in Aktobe Region

Owner: JSC "Ceramics"

Products that can be produced at the plant: Ceramic tiles

Land plot: 13.7 hectares

Production area: shopping area - 0.13 ha

Production and storage facilities - 37 500 sq.m.

Infrastructure: railroad branch with access roads and ramps,

gas, electricity, sewerage and water supply

Raw material: they have their own deposit

Project location: Khromtau (95 km from the city of Aktobe)

Sales market: Kazakhstan and Russia

Potential annual production:

1.0 mln. M2 of ceramic tiles

The main suppliers of the equipment:

Italian company «SACMI», «SMAC».

The offer to the investor: the full sale of the enterprise or co-

production

Ceramic tile

Investor service center: 8-701-036-40-40, 8-777-036-40-40, 8-705-820-07-17, e-mail: [email protected]

54

Page 55: Investing in Kazakhstan - Opportunities in Aktobe Region

Owner: Group of Companies "RIFMA Group”

Products that can be sold in the enterprise: full-featured FMCG-

hypermarket or supermarket variant on the 1st floor and boutique

area.

Land plot: 0,5 ha.

Production area: shopping area - 4500 square meters. Industrial

space - 800 square meters.

Warehouses - 800 m².

Infrastructure: parking for 70 cars, gas, electricity, sewerage and

water supply, telephone and Internet.

Project location: in the center of Aktobe city

Sales market: local population

Major equipment suppliers: Modern-Expo (shelving and cash

register equipment), Iceberg (refrigeration)

Offers for investors: For sale fully equipped buildings FMCG

hypermarket with total area of 6492 m2 (2009 GP), long-term

rental, or financing of working capital network of hypermarkets

"Olzhay" - 3 million. $

Hypermarket

Investor service center: 8-701-036-40-40, 8-777-036-40-40, 8-705-820-07-17, e-mail: [email protected]

55

Page 56: Investing in Kazakhstan - Opportunities in Aktobe Region

Project initiator: JSC "Investment Fund of

Kazakhstan"

Products that can be manufactured at the company:

ячеистый бетон

Land plot: 8,8 ha

Production area: privately owned land

Infrastructure: railroad branch with access roads and

ramps, gas, electricity, sewerage, water supply

Project location: Aktobe city, р-н Промзона

Sales market: РК, РФ Potential annual production: 170 thousand. M3 of

AAC

Shareholders of the company:

JSC "Investment Fund of Kazakhstan" - 48%

LLP "Zhiger" - 52%

Major equipment suppliers: The company «MASA -

HENKE» (Germany)

The total cost of the project: 30 mln. $

Offers for investors: complete sale of the enterprise or

a co-production

Cellular concrete blocks

Investor service center: 8-701-036-40-40, 8-777-036-40-40, 8-705-820-07-17, e-mail: [email protected]

56

Page 57: Investing in Kazakhstan - Opportunities in Aktobe Region

Owner: JSC "NC" SEC "Aktobe"

Land plot: 0,56 ha

Production area: there is an additional workshop with

metal-cutting equipment, 6 valve blocks

Production area - 4500 m2.

Own private warehouses

Infrastructure: There is infrastructure to the border of

the land.

Project location: Aktobe city

Offers for investors: buy / lease of land and industrial

facilities

Owner: LLP “Akruno”

Land plot: long-term lease of land of 7 hectares.

Completeness of the facility: 100% (7 thousand m2)

Encumbrances (mortgage): NO

Production area: 7 thousand m2

Infrastructure: rail road branch, gas, electricity,

sewerage, water supply

Project location: Aktobe, industrial zone

Sales market: internal market

Major equipment suppliers: equipment is absent

Offers for investors: rent, joint venture, equity

Industrial premises

Investor service center: 8-701-036-40-40, 8-777-036-40-40, 8-705-820-07-17, e-mail: [email protected]

57

Page 58: Investing in Kazakhstan - Opportunities in Aktobe Region

Knitted products

Owner: TOO "Edemi"

Products that can be manufactured at the company:

jerseys (T-shirts, sports suits, underwear knitted underwear,

etc.)

Land plot: 3,5 ga

Production area: building 149m x 24m, the area of 17

thousand m2. Operating since 1966

Infrastructure: railroad branch, medium-pressure gas is

introduced into the territory of the production base, electricity

and sewer urban water in sufficient quantities

Raw material: must be purchased outside of the Republic of

Kazakhstan.

Project location: Aktobe city

Sales market: internal market

Major equipment suppliers: Spain, Czech Republic, Japan,

USA

Offers for investors: long-term lease or a joint production

Investor service center: 8-701-036-40-40, 8-777-036-40-40, 8-705-820-07-17, e-mail: [email protected]

58

Page 59: Investing in Kazakhstan - Opportunities in Aktobe Region

Project initiator: JSC "Kazkommertsbank"

Company: LLP "Hobas Pipes Kazakhstan" Since 2010,

the plant is not operating.

Products that can be manufactured at the company:

Multifunctional pipe diameter of 30-140 cm and fittings

made of fiberglass reinforced polyester (CC GRP -

Centrifugal cast glassfiber reinforced polyster, technology

HOBAS Engeeniring Austria)

Innovation, unique enterprise: the pipe from DN200 to

DN 1400 mm

Project Capacity output: 120 km of pipes of different

diameters in a year.

Available equipment: feeder with 2 interchangeable

trunks (A11 and A21).

Land plot: 2 plots of land with total area of 3.1932 ha

(2.4899 ha and 0.7033 ha), the form of ownership - private

Completeness of the facility: 100%

Production area: 7 753.2 sq.m.

Infrastructure: · Communication - central (city), an

autonomous gas heating system, PABX system, fire

alarm, video surveillance, computer network.

The industrial complex has all the necessary

infrastructure, including transport (access to roads and

railways).

The area is fenced and asphalted

Raw material: polyester resin, reinforcement of

chopped glass fibers, silica sand and calcium carbonate

(ground crystalline marble).

Encumbrances (mortgage): No

Notes: The plant is disconnected from all

communications (except for electricity).

Offers for investors: total sales

Production of pipes

Investor service center: 8-701-036-40-40, 8-777-036-40-40, 8-705-820-07-17, e-mail: [email protected]

59

Page 60: Investing in Kazakhstan - Opportunities in Aktobe Region

Infrastructure: · There w / e access roads, power lines

from the transformer substation, gas boiler with hot

water and steam boilers, borehole with a tank of 500 m3

of water.

Raw material: gravel, CBC - Aktobe city

cement fittings - Karaganda

Encumbrances (mortgage): YES

Offers for investors: credit for 5 years, other variants

Owner: LLP "JBI-30"

Company: LLP "JBI-30"

Products that can be manufactured at the company:

JBI-Fundam pillows, blocks, lintels, panels: floors, road /

air field / channel electric poles, blocks and bricks SCC,

block plans to release sulfatostokogo of cement from 400

to 800, lime.

Innovation, unique businesses: sulphate resistant

cement brands from M400 to M800 on the basis of

industrial production waste

Available equipment: For the production of concrete

products have 100% of the equipment according to the

technological process

Land plot: 10 ha, long-term lease

Completeness of the facility: 100%

Production area: 4000 m2, built in 1985-1992,

satisfactory condition

Production of construction materials

Investor service center: 8-701-036-40-40, 8-777-036-40-40, 8-705-820-07-17, e-mail: [email protected]

60

Page 61: Investing in Kazakhstan - Opportunities in Aktobe Region

Owner: LLP "Aktaza"

Company: LLP "Aktaza"

Cost of the project: 4,0 mln. USD

Land plot: 2,5 ha. on the rights of private property

Completeness of the facility: 100%

Production area:

production plant - 2500 m2

ABK - 3000 m2

Warehouses - 800 m2

Infrastructure: · gas, electricity (60kW), sewerage, water

tehniicheskaya (well)

Offers for investors: total sales

Production premises

Investor service center: 8-701-036-40-40, 8-777-036-40-40, 8-705-820-07-17, e-mail: [email protected]

61

Page 62: Investing in Kazakhstan - Opportunities in Aktobe Region

Meat and milk factory

Owner: TOO "Algabas"

Products that can be manufactured at the company:

ice cream and frozen foods

Land plot: 2,0 ha of privately owned land plot

Production area: 2000 m2, built in 1980-2000

Infrastructure: gas, water, electricity, sewerage

Raw material, materials, components: agricultural-

forming region

Project location: Aktobe city

Sales market: domestic market

Offers for investors:

- total sales

- Joint ownership

- long term rental

- Other

Investor service center: 8-701-036-40-40, 8-777-036-40-40, 8-705-820-07-17, e-mail: [email protected]

62

Page 63: Investing in Kazakhstan - Opportunities in Aktobe Region

Investment project

small and medium business

Page 64: Investing in Kazakhstan - Opportunities in Aktobe Region

Project initiator: LLP “Spectehnika"

The shareholders of the project initiator: LLP

"Spectehnika"

Product:

1. Grader 2. Shovels, rubber-tired

All these types of equipment has concluded an agreement on

the transfer of technical conditions of the copyright holders. In

Aktobe region is no analog output.

Sales market: government agencies, mining companies and

enterprises of Aktobe region, the share of exports is 15%

The planned annual production output: 50 units per year

Project location: industrial zone "Aktobe"

The total cost of the project: 1,3 mln. USD

The amount of investment: 1,3 mln. USD

Type of required investment: loan and equity financing,

leasing

The estimated duration of the project: 2016

Assembling special equipment

with the production of component parts

The current status of the project: operating

business

Possible state support:

1. Land plot with finished industrial infrastructure in

the industrial zone "Aktobe";

2. Subsidizing the interest rate on the loan;

3. Support of the project through the investor

services center ("one window").

64

Investor service center: 8-701-036-40-40, 8-777-036-40-40, 8-705-820-07-17, e-mail: [email protected]

Page 65: Investing in Kazakhstan - Opportunities in Aktobe Region

Project initiator: LLP «TALAN Technology»

The shareholders of the project initiator: resident of the

RK

Product: collapsible floor coverings

Sales market: Kazakhstan

The planned annual production output: 60 thousand sq.

Meters of tiles

Project location: industrial zone "Aktobe"

The total cost of the project: 3,2 mln. USD

The amount of investment: 3,2 mln. USD

Type of required investment: loan and equity financing,

leasing, leasing

The estimated duration of the project: 2016

The current status of the project: at the stage of obtaining

permits for construction, installation and start of construction

is expected in late 2015

Manufacture of rubber products and coatings

65

Investor service center: 8-701-036-40-40, 8-777-036-40-40, 8-705-820-07-17, e-mail: [email protected]

Possible state support:

1. Land plot with finished industrial infrastructure in

the industrial zone "Aktobe";

2. Subsidizing the interest rate on the loan;

3. Support of the project through the investor

services center ("one window").

Page 66: Investing in Kazakhstan - Opportunities in Aktobe Region

Project initiator: LLP "Akras Metal"

Shareholders of the initiator of the project: resident of the

RK

Product: Welded circular cross section and profile

Markets for products: RK

Estimated annual production: 35 thousand. Tonnes

Project location: Aktobe

The total cost of the project: 400 mln. Tenge (1.3 million.

Dollars. USA)

Minimum investment: 400 mln. Tenge (1.3 million.

Dollars. USA)

Type the necessary investment: a concessional loan, a

strategic partner

The estimated duration of the project: The project is

ready, it required working capital

Current Status: The project is working on their own and

credit means of Halyk Bank of Kazakhstan 50/50%

Manufacture of steel tubes

66

Центр обслуживания инвесторов: 8-701-036-40-40, 8-777-036-40-40, 8-705-820-07-17, e-mail: [email protected]

Possible state support:

1. Land plot with industrial infrastructure in the

industrial zone "Aktobe";

2. Subsidizing the interest rate on the loan;

3. Support of the project through the investor

services center ("one window").

Page 67: Investing in Kazakhstan - Opportunities in Aktobe Region

Project initiator: LLP «Alem Power»

The shareholders of the project initiator: resident of the

RK

Product: Lithium-ion batteries, stationary and portable

generators with integrated drive

Sales market: the CIS countries and abroad

The planned annual production of products: the lithium-

ion battery 190 000 pcs.,

Generators: 120 000 units.

Project location: industrial zone "Aktobe"

The total cost of the project: 8,1 mln. USD

The amount of investment: 3,2 mln. USD

Type of required investment: loan and equity financing,

leasing, leasing

The estimated duration of the project: 2016

The current status of the project: completed R & D,

produced prototypes., Developed a business plan

Lithium Batteries

67

Investor service center: 8-701-036-40-40, 8-777-036-40-40, 8-705-820-07-17, e-mail: [email protected]

Possible state support:

1. Land plot with industrial infrastructure in the

industrial zone "Aktobe";

2. Subsidizing the interest rate on the loan;

3. Support of the project through the investor

services center ("one window").

Page 68: Investing in Kazakhstan - Opportunities in Aktobe Region

Project initiator: LLP "Tengri AB"

The shareholders of the project initiator: resident of the

RK

Product: restoration of cultivated oil

Sales market: Aktobe region

Planned annual processing volume: up to 1 000 tons

Project location: industrial zone "Aktobe"

The total cost of the project: 1,8 mln. USD

The amount of investment: 1,8 mln. USD

Type of required investment: loan and equity financing,

leasing, leasing

The estimated duration of the project: 2016

The current status of the project: a feasibility study on the

development stage, the project is innovative

Regeneration of waste oils

68

Investor service center: 8-701-036-40-40, 8-777-036-40-40, 8-705-820-07-17, e-mail: [email protected]

Possible state support:

1. Land plot with industrial infrastructure in the

industrial zone "Aktobe";

2. Subsidizing the interest rate on the loan;

3. Support of the project through the investor

services center ("one window").

Page 69: Investing in Kazakhstan - Opportunities in Aktobe Region

Project initiator: LLP "Aktobe Topsy"

The shareholders of the project initiator: resident of the

RK

Product: stekloobmyvayuschee agent, antifreeze agents

Sales market: Aktobe region

Planned annual processing volume: up to 3 000 tons

Project location: industrial zone "Aktobe"

The total cost of the project: 1 mln. USD

The amount of investment: 1 mln. USD

Type of required investment: loan and equity financing,

leasing, leasing

The estimated duration of the project: 2016

The current status of the project: a feasibility study on the

development stage

Antifreeze, chemical reagents

69

Investor service center: 8-701-036-40-40, 8-777-036-40-40, 8-705-820-07-17, e-mail: [email protected]

Possible state support:

1. Land plot with industrial infrastructure in the

industrial zone "Aktobe";

2. Subsidizing the interest rate on the loan;

3. Support of the project through the investor

services center ("one window").

Page 70: Investing in Kazakhstan - Opportunities in Aktobe Region

Project initiator: LLP "Ulan Kompaniyasy"

The shareholders of the project initiator:

LLP "Adilet Gasyr"

LLP "SRI" Batysekoproekt "

Product: metal, concrete products, concrete, asphalt,

bridge cranes

Raw material: metal - Kazakhstan, cement - Russia,

bulk materials - Local

Sales market: the Republic of Kazakhstan, the Russian

Federation

The planned annual production:

Metal - 500 thous. tons

Reinforced concrete - 100 thousand cubic meters.

Ready-mixed concrete - 438 thousand cubic meters.

Asphalt concrete - 219 thousand. tons

Project location: industrial zone "Aktobe"

The total cost of the project: 2 284 mln. Tenge

The amount of investment: 2 284 mln. Tenge

Type of required investment: loan or equity financing,

leasing

The estimated duration of the project: 2016

The current status of the project: equipment was

purchased for 0.5 bln. Tenge,

Provided state support:

1. The infrastructure of the industrial zone

2. Credit Program "Ondiris-2"

3. Support of the project through the investor

services center ("one window").

Possible state support:

1. Land plot with industrial infrastructure in the

industrial zone "Aktobe";

2. Subsidizing the interest rate on the loan;

3. Support of the project through the investor

services center ("one window").

Construction materials and overhead cranes

Investor service center: 8-701-036-40-40, 8-777-036-40-40, 8-705-820-07-17, e-mail: [email protected]

70

Page 71: Investing in Kazakhstan - Opportunities in Aktobe Region

Project initiator: LLP «HSE Consulting Group»

(operating production)

The shareholders of the project initiator: residents of

the Republic of Kazakhstan

Product: parts of sectional centrifugal pumps,

asynchronous motors, drive sucker rod pumps

Raw material: metal rolling of the Republic of

Kazakhstan

Sales market: oil and gas, industrial, agricultural sectors

The planned annual production:

100 thousand units of products

Project location: rented plant in Aktobe city with all the

infrastructure

The total cost of the project: 400 thous. USD

Type of required investment: loan, equity participation

The estimated duration of the project: 12 months

The current status of the project: the main hall with a

small range of products is put into operation. Major

equipment suppliers Company «DEG»

The modernization of metal products plant

Investor service center: 8-701-036-40-40, 8-777-036-40-40, 8-705-820-07-17, e-mail: [email protected]

71

Possible state support:

1. Subsidizing the interest rate on the loan;

2. Support of the project through the investor services

center ("one window").

Page 72: Investing in Kazakhstan - Opportunities in Aktobe Region

Project initiator: LLP "JBI-30" (current production)

The shareholders of the project initiator: resident of the

Republic of Kazakhstan

Product: sulphate cement brand of M400 to M800 on the basis

of industrial waste production (blast furnace slag)

Raw material: slag disposal Karaganda metallurgical plant, lime

plants of Aktobe region

The planned annual production:

25,920 tons of cement

5200 tons of lime

Sales market: the Republic of Kazakhstan, the CIS countries

Project location: Shalkar city

The total cost of the project: 595 million Tenge

Type of required investment: loan and equity financing,

leasing, leasing, refinancing the existing loan

The estimated duration of the project: 2016

The current status of the project: all required infrustructure is

built

Cement and lime production

Investor service center: 8-701-036-40-40, 8-777-036-40-40, 8-705-820-07-17, e-mail: [email protected]

72

Possible state support:

1.Support of the project through the investor

services center ("one window").

Page 73: Investing in Kazakhstan - Opportunities in Aktobe Region

Project initiator: IE "Nurgaliyev KE" operating

enterprises

Product: bricks, concrete blocks, paving stones

The planned annual production:

From 500 thousand. units up to 6 million. units

Project location: the city Alga

The total cost of the project: 292 million. Tenge

Type of required investment: loan or equity

financing, leasing

The current status of the project: operating

enterprises with all necessary infrastructure

Manufacture of bricks

Investor service center: 8-701-036-40-40, 8-777-036-40-40, 8-705-820-07-17, e-mail: [email protected]

73

Possible state support:

1. Support of the project through the investor services

center ("one window").

Page 74: Investing in Kazakhstan - Opportunities in Aktobe Region

Project initiator: LLP «Accent Logistics»

Product: Reconstruction of transport logistic center to

shopping area

Area: 5017 m2

Project location: Aktobe city

The total cost of the project: 341 million. Tenge

The amount of investment: 256 million. Tenge

Type of required investment: loan financing

The estimated duration of the project: II quarter of 2016

The current status of the project: operating TLC with indoor

railroad deadlock 434 m., parking for 500 cars, the complex

includes three terminals of "A" grade with area of -16 700 sq

m, with a capacity of -20 500 pallets

Reconstruction of transport logistic center

Investor service center: 8-701-036-40-40, 8-777-036-40-40, 8-705-820-07-17, e-mail: [email protected]

74

Page 75: Investing in Kazakhstan - Opportunities in Aktobe Region

Owner: LLP "MTS Tractor"

Product: Tractor "Uralets" (160, 180, 220), mini

tractor «JINMA» (164, 200, 204, 240, 244, 354),

mounted potato, Potato-row sprayer, plow and other

depleted.

The planned annual production: 500 pieces of

equipment

Project location: Aktobe city

The total cost of the project: 0,7 mln. USD

The amount of investment: 0,7 mln. USD

Type of required investment: loan and equity

financing, leasing, leasing

The estimated duration of the project:

II quarter of 2016

The current status of the project: the design phase

We have 0.56 hectares of land plot, additional

workshop with metal-cutting equipment, 6 valve

blocks

Production area - 4500 m2 (private warehouses)

Metal fabrication and assembly of mini tractors

75

Investor service center: 8-701-036-40-40, 8-777-036-40-40, 8-705-820-07-17, e-mail: [email protected]

Page 76: Investing in Kazakhstan - Opportunities in Aktobe Region

Project initiator: LLP "Center-BVR" LLP "Samruk Service 2011"

The shareholders of the project initiator: resident of the Republic of

Kazakhstan

Product: patronize emulsion explosives.

Replaces TNT (explosives safer option).

Raw material: ammonium nitrate LLP "KazAzot" diesel of

"KazMunay-Gas", emulsifier - Corporation «Lubrizol» France

Sales market: Kazakhstan

The planned annual production: 5 th. Tons

Project location: Khromtau (80 km to the Aktobe city)

The total cost of the project and The amount of investment: 600

million. Tenge

Type of required investment: loan or equity financing

The current status of the project: feasibility study and detailed

design of auxiliary facilities ready

Possible state support:

1.Support of the project through the investor services center ("one

window").

Emulsion explosives

76

Investor service center: 8-701-036-40-40, 8-777-036-40-40, 8-705-820-07-17, e-mail: [email protected]

Page 77: Investing in Kazakhstan - Opportunities in Aktobe Region

Project initiator: LLP "Center-BVR" LLP "Samruk Service 2011"

Shareholders of the project initiator:

TOO Paris CA-KAZ (Switzerland)

TOO NPP explosion Institute of Technology

Product: Emulsion matrix is a viscous plastic mass

Raw material: ammonium nitrate from LLP "KazAzot"

diesel from JSC "KazMunay-Gas"

emulsifier from Corporation «Lubrizol» France

Sales market: Kazakhstan

The planned annual production: 15 000 - 20 000 tonnes

Project location: Khromtau (80 km to the Aktobe city)

The total cost of the project and The amount of investment: 1,7 mln.

USD.

Type of required investment: debt or equity financing

Commissioning - 2016

The current status of the project: feasibility study and detailed

design of auxiliary facilities ready

Possible state support:

1.Support of the project through the investor services center ("one

window").

Basic components for emulsion explosives

77

Investor service center: 8-701-036-40-40, 8-777-036-40-40, 8-705-820-07-17, e-mail: [email protected]

Page 78: Investing in Kazakhstan - Opportunities in Aktobe Region

Household chemicals

Project initiator: LLP "Burtas"

current production

The shareholders of the project initiator: resident of

the Republic of Kazakhstan

Product: hydroxide and sodium hypochlorite (most

frequently used chemical elements)

Raw material: salt - Araltuz (Kyzylorda region)

Russolo (Russia)

Sales market:

Petrochemicals - deposits of Aktobe region

household chemicals - RK

The planned annual production:

3000 tons of sodium hydroxide

3000 tons of sodium gopohlorida

Project location: n. Sazdy (80 km. From the Aktobe city)

The total cost of the project and amount of

investment: 400 thousand. USD

Type of required investment: loan (100%) or

equity financing

The estimated duration of the project: 12

months

The current status of the project: operating at

low power

78

Investor service center: 8-701-036-40-40, 8-777-036-40-40, 8-705-820-07-17, e-mail: [email protected]

Page 79: Investing in Kazakhstan - Opportunities in Aktobe Region

Prospective projects

Page 80: Investing in Kazakhstan - Opportunities in Aktobe Region

Project initiator: Akimat of the Aktobe region

Products: soda ash

Capacity: up to 400 000 tons per year.

Raw material base: there is rock salt, limestone, gas, electricity, water

Import - ammonia, sodium

Market: сhemical and oil and gas companies of Aktobe region annually consume

up to 140 000 tons of these products.

Advantages: availability of raw materials, low gas prices, convenient transport

logistics in the region, the absence of analogous production in Kazakhstan

Possible measures of state support: provision of land, co-financing of equity

capital

Production of soda ash

Investor service center: 8-701-036-40-40, 8-777-036-40-40, 8-705-820-07-17, e-mail: [email protected]

80

Page 81: Investing in Kazakhstan - Opportunities in Aktobe Region

1. Name of the project: «Construction of a mining and processing plant for the

extraction and processing of lime first grade»

2. Raw material base: available

3. Potential market: in Kazakhstan today is not mined lime first grade are

expected to import replacement products

4. Production Release: lime with high activity, receiving concomitant calcium

carbonate

5. Current situation: has explored a rich deposit of lime with high added value

6. Advantages: no similar production, it would be the first mining company

7. Possible measures of state support: investment subsidy - up to 30%

return of investment for construction, installation and equipment, free attraction

of foreign labor, co-financed the project, support of the project through the

Investors Service Centre ("single window"), the direct negotiations for the right

of subsoil use (without competition), building infrastructure

Production of lime

Investor service center: 8-701-036-40-40, 8-777-036-40-40, 8-705-820-07-17, e-mail: [email protected]

81

Page 82: Investing in Kazakhstan - Opportunities in Aktobe Region

1. Project: «Production of ceramic tiles»

2. Raw material: availability of raw materials for the production of ceramic tiles

(clay, quartz, carbonate deposits)

3. Potential demand market: Aktobe region, Kazakhstan, Russia

4. Product: ceramic tiles

5. Current situation: there is a ready industrial infrastructure, a rich deposit

explored by clay, quartz, feldspar and carbonate

6. Advantages: optimal location of Aktobe region, the development of transport

and logistics network (road and railway)

7. Possible measures of state support: providing the company with industrial

infrastructure, co-financing the project, support of the project through the

Investor Service Center ("single window"), the direct negotiations for the right

of subsoil use (without auction)

Production of ceramic tiles

Investor service center: 8-701-036-40-40, 8-777-036-40-40, 8-705-820-07-17, e-mail: [email protected]

82

Page 83: Investing in Kazakhstan - Opportunities in Aktobe Region

Recycling tires for the production of crumb rubber

1. Project: «Construction of the plant for processing used tires and other rubber

products and the production of rubber crumb»

2. Raw material: raw material in the production of crumb rubber is worn out car tires

with metal and textile cord, tire diameter up to 1.2 m., the waste rubber products

3. Potential demand market: developers; manufacturers of sports flooring;

manufacturers pavements based modifier with crumb rubber; manufacturers of rubber

products, companies serving the oil industry

4. Product: processing up to 3,000 tonsof tires per year and produce up to 1,800 tons

of crumb rubber. 8349 million. tenge (330 thousand. USD) - the acquisition of the line

and deployment costs of production

5. Current situation: ready industrial infrastructure, a rich deposit explored by clay,

quartz, feldspar and carbonate

6. Advantages: a large number of vehicles

7. Possible measures of state support: co-financing of the project, investment

preferences, support for the project through the investor service center ("single

window“)

83 Investor service center: 8-701-036-40-40, 8-777-036-40-40, 8-705-820-07-17, e-mail: [email protected]

Page 84: Investing in Kazakhstan - Opportunities in Aktobe Region

1. Project: «Construction of CHP» «Construction of gas turbine power plant»

2. Raw material:

- natural gas,

- lignite (calorie to 7000 Kcal/kg and ash content of 21%-38%, proven reserves

of 2,5 bln. tons)

3. Potential demand market: the population and enterprises of Aktobe

4. Product: thermal energy and electricity

5. Demand:

- shortage of electricity up to 300 MW

- construction in Aktobe 13 districts with the heat load within 650 Gcal/h

6. Possible measures of state support: heat energy consumption guarantee,

investment preferences, support for the project through the investor service

center ("one window“)

Production of electricity and heat

Investor service center: 8-701-036-40-40, 8-777-036-40-40, 8-705-820-07-17, e-mail: [email protected]

84

Page 85: Investing in Kazakhstan - Opportunities in Aktobe Region

Renewable energy

1. Project: «Establishment the centers of wind energy and solar energy»

2. Raw material: the large average annual duration of sunshine in comparison

with other regions (about 2 000-3 000 hours), constant windy flows

3. Potential demand market: Aktobe and Aktobe region

4. Product: electricity generated from renewable energy sources

5. Current situation: the market of renewable energy is studied in detail, there

are vacant land to accommodate renewable energy

6. Advantages: increased consumption of electricity, fixed tariff approved by

the Government of Kazakhstan, the long term operation of the equipment, the

green economy

7. Possible measures of state support: provision of land, enabling

connection to the power grid, co-financing the project, support for the project

through the investor service center ("single window")

Investor service center: 8-701-036-40-40, 8-777-036-40-40, 8-705-820-07-17, e-mail: [email protected]

85

Page 86: Investing in Kazakhstan - Opportunities in Aktobe Region

1. Project: «Construction of transport and logistic centers»

2. Места размещения бизнеса: Aktobe, along the international highway "Western

Europe-Western China "

3. Potential demand market: Aktobe and Orenburg region (Russia)

4. Size of the potential market: more than 10 thous. cars and trucks per day

5. Current situation: the length of the highway through on territory of the country is

2787 km, the length of the Aktobe region is 628 km. Highway "WE-WC" functions

6. Advantages: international highway, a huge potential to increase the flow of cars

and trucks

7. Possible measures of state support: interest rate subsidies, settlement

infrastructure, service support for project

Construction of transport and logistic centers

Investor service center: 8-701-036-40-40, 8-777-036-40-40, 8-705-820-07-17, e-mail: [email protected]

86

Page 87: Investing in Kazakhstan - Opportunities in Aktobe Region

1. Project: «Construction of the campsites, service centers

along the highway “Western Europe - Western China“ and

other international highways»

2. Business placements: - international highway "Western

Europe-Western China" (the length by Aktobe region - 628

km.)

a) from Martuk District to Khromtau District - 5 facilities

(category A or B);

b) Irgiz region - 4 projects (category B or C).

c) Aktobe, Atyrau (from 2016) Category A - hotel, restaurant/café, around the clock bar, shop, public restrooms warm, gas

station, parking lot paved, car service, tourist bureaus, medical center

Category B - bed and breakfast, restaurant/cafe, shop, public restrooms warm, public showers,

gas station, parking lot paved, car service, tourist information point, a medical center

Category C - store point of public power, public toilets are warm, public showers, gas station,

parking lot paved, workshop or overpass

- international route "Shymkent-Samara" (684 km.);

-republican highway "Aktobe - Atyrau" (319 km.).

- 3. Size of the potential market: more than 10 thous. cars

and trucks per day;

4. Current situation: the length of the highway through on

territory of the country is 2787 km, the length of the Aktobe

region is 628 km. Highway "WE-WC" functions

5. Advantages: international highway, a huge potential to

increase the flow of cars and trucks

Construction campsites

along the highway "Western Europe - Western China"

Possible measures of state support:

1. Provision of land

2. Camsites of the category «A» settlement

infrastructure

3. Co-financing of the project category «A»

4. Subsidized interest rate of bank loan

5. Loans guaranteed

6. Support the project through the investor service

center («single window»)

Investor service center: 8-701-036-40-40, 8-777-036-40-40, 8-705-820-07-17, e-mail: [email protected]

87

Page 88: Investing in Kazakhstan - Opportunities in Aktobe Region

1. Project: «The construction of hotel complexes in the city of Aktobe with

recreational and entertainment complex for middle and upper price segment»

2. Business placements: Aktobe city

3. Potential customers: business leaders and business people from Kazakhstan,

Russia, Turkey, China, Europe and the US

4. The potential size of the market in Aktobe: the average occupancy rate of hotel

rooms is about 30-35%

5. Current situation: the number of non-resident visitors arriving in Kazakhstan is

growing by an average of 20% annually, since 2010, 2013 y. figure increased by

almost 70%, reaching 6,8 million people, Kazakhstan`s key visitors - businessmen,

investors and business people

6. Advantages: the prospect growth of Aktobe agglomeration (the center of the

western part of Kazakhstan) to 1,3 million. man until 2020, industrial and

manufacturing center of Kazakhstan, the presence of large companies with foreign

capital (year-round flow of foreigners and business customers)

Hotels 4*-5*

7. Possible measures of state support: providing the land for free charge, subsidization of interest rate, settlement

infrastructure, service support for project etc.

Investor service center: 8-701-036-40-40, 8-777-036-40-40, 8-705-820-07-17, e-mail: [email protected]

88

Page 89: Investing in Kazakhstan - Opportunities in Aktobe Region

1. Project: «The center of deep processing of wool and leather the small cattle

and cattle»

2. Raw material: 1 140 thous. sheeps;

443 thous. cattles;

164 thous. goats (on 01.08.15y.)

3. Potential demand market: Aktobe and western regions, the nearby cities of

Russia

4. Потенциальный объем рынка в РК: more than 6 bln. tenge (equivalent

20 million.USD)

5. Current situation: Aktobe region and in the nearby regions of Kazakhstan

no have production of light industry, cattle hides and wool of small cattles are

not processed in a sufficient amount, also the region continental climate in

hides of cattle is a thick, small cattle wool generally rude, which great value in

Italy and China

6. Advantages: no enterprises for processing of wool and hides in the region

and a reliable raw material base (livestock and food supply), a wide range of

products

Deep processing of wool and leather the small cattle and cattle

7. Possible measures of state support: subsidization of lending rate, support for the project through the investor

service centre ("single window"), building infrastructure etc.

Investor service center: 8-701-036-40-40, 8-777-036-40-40, 8-705-820-07-17, e-mail: [email protected]

89

Page 90: Investing in Kazakhstan - Opportunities in Aktobe Region

1. Project: «Creating of universal meat plant for deep processing of meat cattle and

small cattle»

2. Raw material: 1 140 thous. sheeps;

443 thous. cattles;

164 thous. goats (on 01.08.15y.)

3. Potential demand market: Aktobe region, western and northern regions, the

nearby cities of Russia

4. Size of the potential market: Kazakhstan produces more than 970 tho. tons of

meat, that shows a man of 57 kg., at a rate of 67 kg of meat person/year currently.

The potential volume of the meat market of Kazakhstan is 170 tho. tons of meat per

year, also Russian market

5. Current situation: in region process more than 63,9 thous. tons of meat, and no

focus on deep processing of meat cattle and small cattle in the territory of Aktobe

region and in the nearby western regions of Kazakhstan, the potential market is

guaranteed (the population of Russia), and there are 3 large and 5 medium feedlots

with a total capacity of 17 000 skotomest

6. Advantages: non-availability of large meat plants in the western region, a reliable

raw material base (livestock), optimal access to the Russian market (7 Russia cities

millionaires in a radius of 1 000 km.) in road/rail transport

Center for deep processing of meat cattle and small cattle

7. Possible measures of state support: subsidization of lending rate and meat production by the program "Agribusiness

2020", support for the project through the investor service centre("single window"), building infrastructure etc.

Investor service center: 8-701-036-40-40, 8-777-036-40-40, 8-705-820-07-17, e-mail: [email protected]

90

Page 91: Investing in Kazakhstan - Opportunities in Aktobe Region

1. Project: «Construction of poultry meat»

2. Raw material: region has sufficient agricultural land to grow feed for the birds

(grain forage, wheat, barley), number of birds is 1 296 tho. (01.08.15y)

3. Potential demand market: Aktobe region, western and northern regions, the

nearby cities of Russia

4. Size of the potential market: consumption of poultry meat in Kazakhstan is more

than 278,6 thous. tons per year, where about 51% is imported (the main

suppliers: Brazil, USA, Ukraine), the demand for poultry meat (import

substitution) in Kazakhstan more than 143 thousand. tonnes. per year

5. Current situation: the main producers of poultry meat located in - Almaty, East-

Kazakhstan and Karaganda region, the western region of the country is partly a

net importer

6. Advantages: the western region of Kazakhstan not have chicken meat plants, an

additional raw materials base, optimal access to the Russian market (7 cities

millionaires Russia is in a radius of 1 000 km.) by road/rail transports

7. Possible measures of state support: investment preferences, subsidies for

operating and capital expenditures, service support of the project, infrastructure

building, etc

Construction of poultry meat

Investor service center: 8-701-036-40-40, 8-777-036-40-40, 8-705-820-07-17, e-mail: [email protected]

91

Page 92: Investing in Kazakhstan - Opportunities in Aktobe Region

1. Project: «Creation of the center for preparation of feed for poultry»

2. Raw material: region has sufficient agricultural land to grow feed for the birds

(grain forage, wheat, barley), the sown area of 513 hectares (321 hectares of crops,

oilseeds - 34 thousand hectares and others)

3. Potential demand market: RK

4. Size of the potential market: annual demand for grain forage: wheat - 573 ths.

tons, barley - 58 thousand. tons, corn - 64 ths. tons

5. Current situation: field fodder production for birds in general is absent, private

households share in animals and birds about 90%, forage production is based mainly

on hay for the winter with natural grasslands and pastures located near villages

6. Advantages: absence of feed for poultry databases, undeveloped pastures

7. Possible measures of state support: subsidize credit rates; costs of drip

irrigation, cultivation and production of feed grain on the program "Agribusiness

2020", the provision of farmland, support for the project through the investor service

center ("one window"), infrastructure building etc.

Creation of the center for preparation of feed for poultry

Investor service center: 8-701-036-40-40, 8-777-036-40-40, 8-705-820-07-17, e-mail: [email protected]

92

Page 93: Investing in Kazakhstan - Opportunities in Aktobe Region

1. Project: «Creation of dairy farms on deep processing of milk»

2. Raw material: 443 thos. cattle

3. Potential demand market: regions needs in dairy products is more than 215

thousand. tons per year, to ensure its own production amounts to 43%, and

own dairy products are not provided with the western regions of Kazakhstan

4. Current situation: more than 80% of milk produced in Kazakhstan -

production of private farms, Kazakhstan`s need in milk and dairy products is

more than 5 753 thous. tons per year, where the share of imports is 78%, local

production is only 22%

5. Advantages: sufficient food supply, pasture and the number of cattles,

convenient transport logistics

6. Possible measures of state support: subsidizing the cost of processing

enterprises to purchase raw materials. "Agribusiness 2020" - subsidizing the

difference between the price at which manufacturers can profitably sell raw milk

and the price at which processors can be profitable to buy. From the RB will be

allocated 60 billion. KZT up to 2020y.

Centres for deep processing of milk

Investor service center: 8-701-036-40-40, 8-777-036-40-40, 8-705-820-07-17, e-mail: [email protected]

93

Page 94: Investing in Kazakhstan - Opportunities in Aktobe Region

Growing sturgeon

1. Project: «Growing of sturgeon in the installation of a

closed water supply» - sturgeon: 60 tons/year, caviar: 2 tons /

year at approximately cost of 3.5 mln. USD

2. Raw material: the cheapest gas in the necessary volume,

availability heat from urban CHP, operating production

facilities (ARBZ - 35Gkall)

3. Potential demand market: RK, Russia

4. Size of the potential market: population need in the meat

of fish per person is 14,6 kg or approximately 272 th. tons per

year, imports more than 30 mln. USD (frozen and canned fish

)

5. Current situation: Aktobe region imported to 80% of the

breed fish

6. Advantages: the absence of a local producer, the

presence of heat and water, government support, the transit

potential of the region, etc.

7. Possible measures of state support: investment

preferences, subsidies for operating and capital expenditures,

service support of the project, etc.

94

Investor service center: 8-701-036-40-40, 8-777-036-40-40, 8-705-820-07-17, e-mail: [email protected]

Page 95: Investing in Kazakhstan - Opportunities in Aktobe Region

1. Project: «Construction of the greenhouse complex for year-round cultivation of

flowers (creating a winter garden)»

2. Raw material: the cheapest gas in the necessary volume, availability heat from

urban CHP, operating production facilities (ARBZ - 35Gkall)

3. Potential demand market: Aktobe and western regions of the country (Atyrau,

Aktau), the cities of Russia (7 cities millionaires Russia is in a radius of 1 000 km)

4. Size of the potential market: flower market`s volume is more than 100 mln. USD

per year, and kazakhstan flower companies provide market only 30-35%, shortage

covers imports (about 65-70 mln. USD per year)

5. Current situation: the city and the whole region don’t have flower greenhouses.

The main buyers of flowers in the country are residents of Almaty and Astana, which

account for about 70-80% of total sales, in the long term growth is expected in

Aktobe, Atyrau and Aktau

6. Advantages: the gas in necessary volume at reduced prices (compared with other

regions), free heat from the CHPs, most average duration of sunshine days per year

in the country (about 2 000-3 000 hours)

7. Possible measures of state support: provision of land in the form of in-kind

grant. Interest rate subsidies, fertilizers up to 50% reimbursement of costs for

equipment, subsidies for the cultivation of land, service support of the project.

Subsidized by using drip irrigation or rain, etc

The greenhouse complex on the cultivation of vegetables and fruits

Investor service center: 8-701-036-40-40, 8-777-036-40-40, 8-705-820-07-17, e-mail: [email protected]

95

Page 96: Investing in Kazakhstan - Opportunities in Aktobe Region

1. Project: «Construction of the greenhouse complex for year-round cultivation of

tomatoes, cucumbers, fruit»

2. Raw material: the cheapest gas in the necessary volume, availability heat from

urban CHP, operating production facilities (ARBZ - 35Gkall)

3. Potential demand market: Aktobe region and western regions of the country

(Atyrau, Aktau, Uralsk)

4. Size of the potential market: in country volume imports of vegetables in 2014

amounted to 500,7 ths. tons, or in terms of money 246 mln. USD, also the provision

of our own vegetables is about 30%

5. Current situation: areas with a minimum gross collection of vegetables and

potatoes are Mangistau, Atyrau, Aktobe region. Greenhouses area in Aktobe is 9.7

hectares

6. Advantages: the gas in necessary volume at reduced prices (compared with other

regions), free heat from the CHPs, most average duration of sunshine days per year

in the country (about 2 000-3 000 hours)

The greenhouse complex on the cultivation of vegetables and fruits

7. Possible measures of state support: provision of land in the form of in-kind grant.

Interest rate subsidies, fertilizers up to 50% reimbursement of costs for equipment,

subsidies for the cultivation of land, service support of the project. Subsidized by using drip

irrigation or rain, etc

Investor service center: 8-701-036-40-40, 8-777-036-40-40, 8-705-820-07-17, e-mail: [email protected]

96

Page 97: Investing in Kazakhstan - Opportunities in Aktobe Region

Production of canned

fruits and vegetables 1. Project: «Production of canned fruits and vegetables by

technological preparation of raw materials, bookmarks in a

container and its seal with the subsequent heat treatment»

2. Raw material: Aktobe regions resource potential is up to 1

mln. tons of fruits and vegetables per year

3. Potential demand market: Aktobe region and western regions

of the country (Atyrau, Aktau, Uralsk)

4. Size of the potential market: the share of imports in

Kazakhstan is more than 45% of the total market share, which

indicates good prospects for the development of domestic

production

5. Investment offer: with an investment of 10 mln. USD

(approximately) – possible capacity of production to 50 000

tonsof finished products/year

6. Advantages: the transit potential of the region, own production

deficiency in the western regions of the country, population

growth

7. Possible measures of state support: provision of land in the

form of in-kind grant. Interest rate subsidies, reimbursement of

costs for equipment, support of the project through the investor

service center ("single window"), investment preferences and

etc.

97

Investor service center: 8-701-036-40-40, 8-777-036-40-40, 8-705-820-07-17, e-mail: [email protected]

Page 98: Investing in Kazakhstan - Opportunities in Aktobe Region

Production of fruit and vegetable juices 1. Project: «Processing vegetables and fruit juice

concentrates and pouring juice» (pumpkin, carrots, tomatoes,

apples, pears, etc.)

2. Raw material: Aktobe regions resource potential is up to 1

mln. tons of fruits and vegetables per year

3. Potential demand market: Aktobe region and western

regions of the country (Atyrau, Aktau, Uralsk)

4. Size of the potential market: the share of imports in

Kazakhstan amounts to 40% of the total market share, which

indicates good prospects for the development of domestic

production

5. Investment offer: with an investment of 15 million. USD

(approximately) – possible capacity of production to 20 000

tons of concentrates of carrot, pumpkin, tomato, apple juice,

a variety of natural juices and juice drinks

6. Advantages: the transit potential of the region, own

production deficiency in the western regions of the country,

population growth

7. Possible measures of state support: provision of land in

the form of in-kind grant. Interest rate subsidies,

reimbursement of costs for equipment, support of the project

through the investor service center ("single window"),

investment preferences and etc.

98

Investor service center: 8-701-036-40-40, 8-777-036-40-40, 8-705-820-07-17, e-mail: [email protected]

Page 99: Investing in Kazakhstan - Opportunities in Aktobe Region

Construction of vegetable stores

1. Project: «Construction of modern vegetable stores, ensure

reliability and a long shelf life fresh vegetables»

2. Raw material: Aktobe regions resource potential is up to 1 mln.

tons of fruits and vegetables per year

3. Potential demand market: population and processors of

Kazakhstan and neighboring countries

4. Size of the potential market: imports of vegetables in the country

is over 501 ths. tons per year, which require modern and upgraded

storage in winter and summer

5. Current situation: Kazakhstan has more than 395 vegetable

stores, the total storage capacity of which is 267 tho.. tons, but due to

lack of storage capacity, Kazakhstan imports fruits and vegetables

during the winter and spring, and vegetable stores are mostly located

in the southern regions of the country

6. Advantages: extensive state support (subsidies CAPEX costs up

to 30%), lack of competition and the storage not only in Aktobe

region, but also in other Western regions of the country

7. Possible measures of state support: provision of land in the

form of in-kind grant. Interest rate subsidies, reimbursement of costs

for equipment, support of the project through the investor service

center ("single window"), investment preferences and etc.

Investor service center: 8-701-036-40-40, 8-777-036-40-40, 8-705-820-07-17, e-mail: [email protected]

99

Page 100: Investing in Kazakhstan - Opportunities in Aktobe Region

Production of baby food

1. Project: «Production of baby food in eco friendly

containers»

2. Raw material: Aktobe regions resource potential is up to 1

mln. tons of fruits and vegetables per year

3. Potential demand market: Kazakhstan and CIS countries

4. Size of the potential market: the baby food market

capacity is more than 30 mln. USD pear year. Demand of

Kazakhstan in baby food completely covered by imports from

foreign countries

5. Investment offer: with an investment of 15 million. USD

(approximately) – possible capacity of production - 17 800

tons of raw material processing or 12 283 tons of final

products per year

6. Advantages: the transit potential of the region, own

production deficiency in the country, population growth

7. Possible measures of state support: provision of land in

the form of in-kind grant. Interest rate subsidies,

reimbursement of costs for equipment, support of the project

through the Investor Service Center ("single window"),

investment preferences and etc.

100

Investor service center: 8-701-036-40-40, 8-777-036-40-40, 8-705-820-07-17, e-mail: [email protected]

Page 101: Investing in Kazakhstan - Opportunities in Aktobe Region

Production of dried &

deep frozen fruits and vegetables 1. Project: «Production of deepfreezing dried fruits & vegetables»

(dried fruits, candied fruits, range of dried vegetables, cutting frozen

vegetables, berries and frozen fruit, etc.)

2. Raw material: Aktobe regions resource potential per year is up to 1

mln. tons of fruits and vegetables.

Potential suppliers of raw materials are also the South-Kazakhstan

region, as well as the next CIS countries: Kyrgyzstan, Uzbekistan and

Tajikistan

3. Potential demand market: Aktobe and western regions Kazakhstan

(Atyrau, Aktau, Uralsk)

4. Size of the potential market: Kazakhstan and CIS countries

5. Investment proposal: with an investment of 10 million. USD

(approximately) the possible production capacity to 40 000 tons of

range final products per year

6. Advantages: the transit potential of the region, deficiency in the

production of western regions, population growth. Most of these

products come from southern regions of Kazakhstan

7. Possible measures of state support: provision of land in the form

of land grant. Interest rate subsidies, fertilizers up to 50%

reimbursement of costs for equipment, subsidies for the cultivation of

land, service support of the project. Subsidized by using drip irrigation

or rain, etc.

101

Investor service center: 8-701-036-40-40, 8-777-036-40-40, 8-705-820-07-17, e-mail: [email protected]