Introduction to Standardised Design: Approaches and Methodologies 24 June 2018 1 BB Design Forum Discussion James Bourne Stephen Workman

Upload: others

Post on 23-Sep-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Introduction to Standardised Design: Approaches and ......Kitchen Changing LRC Admin Playground* Courtyard * * * Ground Floor . ... Installation . Dean Trust Ardwick 24 June 2018 59

Introduction to Standardised Design: Approaches and Methodologies

24 June 2018 1

BB Design Forum Discussion James Bourne Stephen Workman

Page 2: Introduction to Standardised Design: Approaches and ......Kitchen Changing LRC Admin Playground* Courtyard * * * Ground Floor . ... Installation . Dean Trust Ardwick 24 June 2018 59
Page 3: Introduction to Standardised Design: Approaches and ......Kitchen Changing LRC Admin Playground* Courtyard * * * Ground Floor . ... Installation . Dean Trust Ardwick 24 June 2018 59

Symptoms The critical symptoms of failure and poor performance have been identified in this review as:

• Low Productivity

• Low Predictability

• Structural Fragmentation

• Leadership Fragmentation

• Low Margins, Adversarial Pricing Models & Financial Fragility

• A Dysfunctional Training Funding & Delivery Model

• Workforce Size & Demographics

• Lack of Collaboration & Improvement Culture

• Lack of R&D & Investment in Innovation

• Poor Industry Image

Page 4: Introduction to Standardised Design: Approaches and ......Kitchen Changing LRC Admin Playground* Courtyard * * * Ground Floor . ... Installation . Dean Trust Ardwick 24 June 2018 59
Page 5: Introduction to Standardised Design: Approaches and ......Kitchen Changing LRC Admin Playground* Courtyard * * * Ground Floor . ... Installation . Dean Trust Ardwick 24 June 2018 59

Contains sensitive information

Page 6: Introduction to Standardised Design: Approaches and ......Kitchen Changing LRC Admin Playground* Courtyard * * * Ground Floor . ... Installation . Dean Trust Ardwick 24 June 2018 59
Page 7: Introduction to Standardised Design: Approaches and ......Kitchen Changing LRC Admin Playground* Courtyard * * * Ground Floor . ... Installation . Dean Trust Ardwick 24 June 2018 59
Page 8: Introduction to Standardised Design: Approaches and ......Kitchen Changing LRC Admin Playground* Courtyard * * * Ground Floor . ... Installation . Dean Trust Ardwick 24 June 2018 59
Page 9: Introduction to Standardised Design: Approaches and ......Kitchen Changing LRC Admin Playground* Courtyard * * * Ground Floor . ... Installation . Dean Trust Ardwick 24 June 2018 59
Page 10: Introduction to Standardised Design: Approaches and ......Kitchen Changing LRC Admin Playground* Courtyard * * * Ground Floor . ... Installation . Dean Trust Ardwick 24 June 2018 59
Page 11: Introduction to Standardised Design: Approaches and ......Kitchen Changing LRC Admin Playground* Courtyard * * * Ground Floor . ... Installation . Dean Trust Ardwick 24 June 2018 59
Page 12: Introduction to Standardised Design: Approaches and ......Kitchen Changing LRC Admin Playground* Courtyard * * * Ground Floor . ... Installation . Dean Trust Ardwick 24 June 2018 59
Page 13: Introduction to Standardised Design: Approaches and ......Kitchen Changing LRC Admin Playground* Courtyard * * * Ground Floor . ... Installation . Dean Trust Ardwick 24 June 2018 59
Page 14: Introduction to Standardised Design: Approaches and ......Kitchen Changing LRC Admin Playground* Courtyard * * * Ground Floor . ... Installation . Dean Trust Ardwick 24 June 2018 59
Page 15: Introduction to Standardised Design: Approaches and ......Kitchen Changing LRC Admin Playground* Courtyard * * * Ground Floor . ... Installation . Dean Trust Ardwick 24 June 2018 59
Page 16: Introduction to Standardised Design: Approaches and ......Kitchen Changing LRC Admin Playground* Courtyard * * * Ground Floor . ... Installation . Dean Trust Ardwick 24 June 2018 59
Page 17: Introduction to Standardised Design: Approaches and ......Kitchen Changing LRC Admin Playground* Courtyard * * * Ground Floor . ... Installation . Dean Trust Ardwick 24 June 2018 59
Page 18: Introduction to Standardised Design: Approaches and ......Kitchen Changing LRC Admin Playground* Courtyard * * * Ground Floor . ... Installation . Dean Trust Ardwick 24 June 2018 59
Page 19: Introduction to Standardised Design: Approaches and ......Kitchen Changing LRC Admin Playground* Courtyard * * * Ground Floor . ... Installation . Dean Trust Ardwick 24 June 2018 59
Page 20: Introduction to Standardised Design: Approaches and ......Kitchen Changing LRC Admin Playground* Courtyard * * * Ground Floor . ... Installation . Dean Trust Ardwick 24 June 2018 59
Page 21: Introduction to Standardised Design: Approaches and ......Kitchen Changing LRC Admin Playground* Courtyard * * * Ground Floor . ... Installation . Dean Trust Ardwick 24 June 2018 59
Page 22: Introduction to Standardised Design: Approaches and ......Kitchen Changing LRC Admin Playground* Courtyard * * * Ground Floor . ... Installation . Dean Trust Ardwick 24 June 2018 59

Education

24 June 2018 22

BB Design Forum Discussion

James Bourne

Stephen Workman

Page 23: Introduction to Standardised Design: Approaches and ......Kitchen Changing LRC Admin Playground* Courtyard * * * Ground Floor . ... Installation . Dean Trust Ardwick 24 June 2018 59

‘Standardised design’

3. Kit of Parts and Complex Assemblies

1. Template

2. Volumetric and Hybrid

Page 24: Introduction to Standardised Design: Approaches and ......Kitchen Changing LRC Admin Playground* Courtyard * * * Ground Floor . ... Installation . Dean Trust Ardwick 24 June 2018 59

Why Standardise?

Historic Stigma - Modular

Quality – Increased through familiarity

Time – Reduced Site Delivery

Cost – Repetition and Volume reduce cost

Design - Efficiency & Flexibility

Technology – BIM Integration

Safety – Off Site greater control

Page 25: Introduction to Standardised Design: Approaches and ......Kitchen Changing LRC Admin Playground* Courtyard * * * Ground Floor . ... Installation . Dean Trust Ardwick 24 June 2018 59

Template

Page 26: Introduction to Standardised Design: Approaches and ......Kitchen Changing LRC Admin Playground* Courtyard * * * Ground Floor . ... Installation . Dean Trust Ardwick 24 June 2018 59

Volumetric

Page 27: Introduction to Standardised Design: Approaches and ......Kitchen Changing LRC Admin Playground* Courtyard * * * Ground Floor . ... Installation . Dean Trust Ardwick 24 June 2018 59

Hybrid Volumetric

Page 28: Introduction to Standardised Design: Approaches and ......Kitchen Changing LRC Admin Playground* Courtyard * * * Ground Floor . ... Installation . Dean Trust Ardwick 24 June 2018 59

Kit of Parts & Complex Assemblies

Page 29: Introduction to Standardised Design: Approaches and ......Kitchen Changing LRC Admin Playground* Courtyard * * * Ground Floor . ... Installation . Dean Trust Ardwick 24 June 2018 59

Complex Assemblies

Page 30: Introduction to Standardised Design: Approaches and ......Kitchen Changing LRC Admin Playground* Courtyard * * * Ground Floor . ... Installation . Dean Trust Ardwick 24 June 2018 59

PSBP Yorkshire Schools Brief: Develop a ‘smart’ school design solution which will be based on a

predefined kit of parts which make up a fixed % of any school scheme and is

of a known fixed cost (capex, energy, lifecycle & FM) and programme.

Page 31: Introduction to Standardised Design: Approaches and ......Kitchen Changing LRC Admin Playground* Courtyard * * * Ground Floor . ... Installation . Dean Trust Ardwick 24 June 2018 59
Page 32: Introduction to Standardised Design: Approaches and ......Kitchen Changing LRC Admin Playground* Courtyard * * * Ground Floor . ... Installation . Dean Trust Ardwick 24 June 2018 59

Case Study: Dean Trust Ardwick

Volumetric Secondary School

Manchester City Council

24 June 2018 32

Page 33: Introduction to Standardised Design: Approaches and ......Kitchen Changing LRC Admin Playground* Courtyard * * * Ground Floor . ... Installation . Dean Trust Ardwick 24 June 2018 59
Page 34: Introduction to Standardised Design: Approaches and ......Kitchen Changing LRC Admin Playground* Courtyard * * * Ground Floor . ... Installation . Dean Trust Ardwick 24 June 2018 59

24 June 2018 34

“We NEED to open a new build school within 12 months…”

MCC, January 2014

Page 35: Introduction to Standardised Design: Approaches and ......Kitchen Changing LRC Admin Playground* Courtyard * * * Ground Floor . ... Installation . Dean Trust Ardwick 24 June 2018 59

24 June 2018 35

Site Abnormals:

Protected Species: Bats

Footpath Diversions

Mounded Contaminated Land

Former Terraced Housing - Basements

Demolition of a 1970’s CLASP School

Demolition of a non-listed former Textile Mill

Former Tramshed Building Remains

Relocation of MCC Main IT Servers

Archaeological Dig Requirement

New Public Highway linking Residential Estate

New Arterial Road Junction and Crossing

Relocation of Mobile Phone Mast

Relocation of Public Sculpture

Boundary Wall Conditions

Existing Trees

Page 36: Introduction to Standardised Design: Approaches and ......Kitchen Changing LRC Admin Playground* Courtyard * * * Ground Floor . ... Installation . Dean Trust Ardwick 24 June 2018 59

Dean Trust Ardwick

24 June 2018 36

Page 37: Introduction to Standardised Design: Approaches and ......Kitchen Changing LRC Admin Playground* Courtyard * * * Ground Floor . ... Installation . Dean Trust Ardwick 24 June 2018 59

Dean Trust Ardwick

37

Page 38: Introduction to Standardised Design: Approaches and ......Kitchen Changing LRC Admin Playground* Courtyard * * * Ground Floor . ... Installation . Dean Trust Ardwick 24 June 2018 59

Dean Trust Ardwick

24 June 2018 38

Page 39: Introduction to Standardised Design: Approaches and ......Kitchen Changing LRC Admin Playground* Courtyard * * * Ground Floor . ... Installation . Dean Trust Ardwick 24 June 2018 59

Dean Trust Ardwick

24 June 2018 39

Food Rooms

Music

Technology

Sports Hall Hall

Dining

LRC

Admin

Page 40: Introduction to Standardised Design: Approaches and ......Kitchen Changing LRC Admin Playground* Courtyard * * * Ground Floor . ... Installation . Dean Trust Ardwick 24 June 2018 59

Dean Trust Ardwick

24 June 2018 40

161 Modules in Total

42 Roof Cassettes

Sports Hall

Main Hall

Plant Kitchen

Changing

LRC

Admin

Playground

Courtyard

*

*

*

*

Ground Floor

Page 41: Introduction to Standardised Design: Approaches and ......Kitchen Changing LRC Admin Playground* Courtyard * * * Ground Floor . ... Installation . Dean Trust Ardwick 24 June 2018 59

Dean Trust Ardwick

24 June 2018 41

Page 42: Introduction to Standardised Design: Approaches and ......Kitchen Changing LRC Admin Playground* Courtyard * * * Ground Floor . ... Installation . Dean Trust Ardwick 24 June 2018 59

Typical Ventilation Strategy

42

Breathing Building Units to Halls and Dining

Natural Ventilation

Admin, Office and

Small SEN Spaces

Mechanical Vent &

Recovery to Specialist IT,

Science, Food Rooms etc.

On Demand Extract

Ventilation to WC’s.

Extract to Small Offices

Page 43: Introduction to Standardised Design: Approaches and ......Kitchen Changing LRC Admin Playground* Courtyard * * * Ground Floor . ... Installation . Dean Trust Ardwick 24 June 2018 59

Typical Heating Strategy

24 June 2018 43

Page 44: Introduction to Standardised Design: Approaches and ......Kitchen Changing LRC Admin Playground* Courtyard * * * Ground Floor . ... Installation . Dean Trust Ardwick 24 June 2018 59

Dean Trust Ardwick

24 June 2018 44

20,000m3 of

Earth Works

Page 45: Introduction to Standardised Design: Approaches and ......Kitchen Changing LRC Admin Playground* Courtyard * * * Ground Floor . ... Installation . Dean Trust Ardwick 24 June 2018 59

Dean Trust Ardwick

24 June 2018 45

Manufacture of

Modular Steel

Frames begins in

Factory before site

enabling works

begin.

Page 46: Introduction to Standardised Design: Approaches and ......Kitchen Changing LRC Admin Playground* Courtyard * * * Ground Floor . ... Installation . Dean Trust Ardwick 24 June 2018 59

Dean Trust Ardwick

24 June 2018 46

Floor systems are

added to the

modules.

Page 47: Introduction to Standardised Design: Approaches and ......Kitchen Changing LRC Admin Playground* Courtyard * * * Ground Floor . ... Installation . Dean Trust Ardwick 24 June 2018 59

Dean Trust Ardwick

24 June 2018 47

Internal Partitions

are added based

on Atkins Fire,

Acoustic and Wall

Type Strategies at

Stage 3 Design.

Page 48: Introduction to Standardised Design: Approaches and ......Kitchen Changing LRC Admin Playground* Courtyard * * * Ground Floor . ... Installation . Dean Trust Ardwick 24 June 2018 59

Dean Trust Ardwick

24 June 2018 48

Primary Services

Runs are also

installed directly

into the modules

whilst still in the

factory.

Page 49: Introduction to Standardised Design: Approaches and ......Kitchen Changing LRC Admin Playground* Courtyard * * * Ground Floor . ... Installation . Dean Trust Ardwick 24 June 2018 59

Dean Trust Ardwick

24 June 2018 49

Modules nearing

completing in the

factory.

Feb 2016

Page 50: Introduction to Standardised Design: Approaches and ......Kitchen Changing LRC Admin Playground* Courtyard * * * Ground Floor . ... Installation . Dean Trust Ardwick 24 June 2018 59

Dean Trust Ardwick

24 June 2018 50

Completed

modules store at

the manufacturer’s

site, in

weatherproof

wrapping, awaiting

delivery to site.

Page 51: Introduction to Standardised Design: Approaches and ......Kitchen Changing LRC Admin Playground* Courtyard * * * Ground Floor . ... Installation . Dean Trust Ardwick 24 June 2018 59

Dean Trust Ardwick

24 June 2018 51

Meanwhile on site,

erection of the

steel frame for the

Hybrid Elements

such as Sports

Hall, Dining Hall

and Specialist

Spaces

Completes.

Page 52: Introduction to Standardised Design: Approaches and ......Kitchen Changing LRC Admin Playground* Courtyard * * * Ground Floor . ... Installation . Dean Trust Ardwick 24 June 2018 59

Modules arrive by

HGV and are

offloaded on site,

into the exact place

required.

2nd March 2016

Page 53: Introduction to Standardised Design: Approaches and ......Kitchen Changing LRC Admin Playground* Courtyard * * * Ground Floor . ... Installation . Dean Trust Ardwick 24 June 2018 59
Page 54: Introduction to Standardised Design: Approaches and ......Kitchen Changing LRC Admin Playground* Courtyard * * * Ground Floor . ... Installation . Dean Trust Ardwick 24 June 2018 59
Page 55: Introduction to Standardised Design: Approaches and ......Kitchen Changing LRC Admin Playground* Courtyard * * * Ground Floor . ... Installation . Dean Trust Ardwick 24 June 2018 59

The new building

takes form whilst

site enabling works

(left) and

demolition

(beyond) continue

simultaneously.

Page 56: Introduction to Standardised Design: Approaches and ......Kitchen Changing LRC Admin Playground* Courtyard * * * Ground Floor . ... Installation . Dean Trust Ardwick 24 June 2018 59

Dean Trust Ardwick

24 June 2018 56

All modules delivered and installed in 4 weeks

Page 57: Introduction to Standardised Design: Approaches and ......Kitchen Changing LRC Admin Playground* Courtyard * * * Ground Floor . ... Installation . Dean Trust Ardwick 24 June 2018 59

Dean Trust Ardwick

24 June 2018 57

Main Entrance

showing modules

clad in UV resistant

breather

membrane, sat

around Hybrid

Steel zone to

receive feature

curtain walling.

Page 58: Introduction to Standardised Design: Approaches and ......Kitchen Changing LRC Admin Playground* Courtyard * * * Ground Floor . ... Installation . Dean Trust Ardwick 24 June 2018 59

Dean Trust Ardwick

24 June 2018 58

Photos of

Rainscreen

Construction

Installation

Page 59: Introduction to Standardised Design: Approaches and ......Kitchen Changing LRC Admin Playground* Courtyard * * * Ground Floor . ... Installation . Dean Trust Ardwick 24 June 2018 59

Dean Trust Ardwick

24 June 2018 59

Photos of

Rainscreen

Construction

Installation

Page 60: Introduction to Standardised Design: Approaches and ......Kitchen Changing LRC Admin Playground* Courtyard * * * Ground Floor . ... Installation . Dean Trust Ardwick 24 June 2018 59
Page 61: Introduction to Standardised Design: Approaches and ......Kitchen Changing LRC Admin Playground* Courtyard * * * Ground Floor . ... Installation . Dean Trust Ardwick 24 June 2018 59

£12.8m Cost for 8,100m2 = £1580/m2

£11.1m Site Abnormals

£24.7m Total (August 2016)

26 Week Construction Time (From First Module On Site)

Page 62: Introduction to Standardised Design: Approaches and ......Kitchen Changing LRC Admin Playground* Courtyard * * * Ground Floor . ... Installation . Dean Trust Ardwick 24 June 2018 59

Science Room

Page 63: Introduction to Standardised Design: Approaches and ......Kitchen Changing LRC Admin Playground* Courtyard * * * Ground Floor . ... Installation . Dean Trust Ardwick 24 June 2018 59

Technology

Classroom

Page 64: Introduction to Standardised Design: Approaches and ......Kitchen Changing LRC Admin Playground* Courtyard * * * Ground Floor . ... Installation . Dean Trust Ardwick 24 June 2018 59

Dean Trust Ardwick Technology

Classroom

Resistant Materials Classroom

Page 65: Introduction to Standardised Design: Approaches and ......Kitchen Changing LRC Admin Playground* Courtyard * * * Ground Floor . ... Installation . Dean Trust Ardwick 24 June 2018 59

Dean Trust Ardwick Circulation

Page 66: Introduction to Standardised Design: Approaches and ......Kitchen Changing LRC Admin Playground* Courtyard * * * Ground Floor . ... Installation . Dean Trust Ardwick 24 June 2018 59

Dean Trust Ardwick Washrooms

Page 67: Introduction to Standardised Design: Approaches and ......Kitchen Changing LRC Admin Playground* Courtyard * * * Ground Floor . ... Installation . Dean Trust Ardwick 24 June 2018 59

Dining

Page 68: Introduction to Standardised Design: Approaches and ......Kitchen Changing LRC Admin Playground* Courtyard * * * Ground Floor . ... Installation . Dean Trust Ardwick 24 June 2018 59

Main Hall

Page 69: Introduction to Standardised Design: Approaches and ......Kitchen Changing LRC Admin Playground* Courtyard * * * Ground Floor . ... Installation . Dean Trust Ardwick 24 June 2018 59

Sports Hall

Page 70: Introduction to Standardised Design: Approaches and ......Kitchen Changing LRC Admin Playground* Courtyard * * * Ground Floor . ... Installation . Dean Trust Ardwick 24 June 2018 59

Activity Studio

Page 71: Introduction to Standardised Design: Approaches and ......Kitchen Changing LRC Admin Playground* Courtyard * * * Ground Floor . ... Installation . Dean Trust Ardwick 24 June 2018 59

Volumetric Primary Schools and

Extensions

24 June 2018 71

Page 72: Introduction to Standardised Design: Approaches and ......Kitchen Changing LRC Admin Playground* Courtyard * * * Ground Floor . ... Installation . Dean Trust Ardwick 24 June 2018 59

St Lukes Primary, Salford

24 June 2018 72

Page 73: Introduction to Standardised Design: Approaches and ......Kitchen Changing LRC Admin Playground* Courtyard * * * Ground Floor . ... Installation . Dean Trust Ardwick 24 June 2018 59

St Lukes Primary, Salford

24 June 2018 73

Page 74: Introduction to Standardised Design: Approaches and ......Kitchen Changing LRC Admin Playground* Courtyard * * * Ground Floor . ... Installation . Dean Trust Ardwick 24 June 2018 59

St Lukes Primary, Salford

24 June 2018 74

Page 75: Introduction to Standardised Design: Approaches and ......Kitchen Changing LRC Admin Playground* Courtyard * * * Ground Floor . ... Installation . Dean Trust Ardwick 24 June 2018 59

Springwell SEN School

Barnsley BSF

Page 76: Introduction to Standardised Design: Approaches and ......Kitchen Changing LRC Admin Playground* Courtyard * * * Ground Floor . ... Installation . Dean Trust Ardwick 24 June 2018 59

Horizon ALC

Barnsley BSF

Page 77: Introduction to Standardised Design: Approaches and ......Kitchen Changing LRC Admin Playground* Courtyard * * * Ground Floor . ... Installation . Dean Trust Ardwick 24 June 2018 59
Page 78: Introduction to Standardised Design: Approaches and ......Kitchen Changing LRC Admin Playground* Courtyard * * * Ground Floor . ... Installation . Dean Trust Ardwick 24 June 2018 59
Page 79: Introduction to Standardised Design: Approaches and ......Kitchen Changing LRC Admin Playground* Courtyard * * * Ground Floor . ... Installation . Dean Trust Ardwick 24 June 2018 59

Manchester PRU

24 June 2018 79

Page 80: Introduction to Standardised Design: Approaches and ......Kitchen Changing LRC Admin Playground* Courtyard * * * Ground Floor . ... Installation . Dean Trust Ardwick 24 June 2018 59

St John’s Primary School

24 June 2018 80

Page 81: Introduction to Standardised Design: Approaches and ......Kitchen Changing LRC Admin Playground* Courtyard * * * Ground Floor . ... Installation . Dean Trust Ardwick 24 June 2018 59

St John’s Primary School

24 June 2018 81

Page 82: Introduction to Standardised Design: Approaches and ......Kitchen Changing LRC Admin Playground* Courtyard * * * Ground Floor . ... Installation . Dean Trust Ardwick 24 June 2018 59

The Deans, Salford

24 June 2018 82

Page 83: Introduction to Standardised Design: Approaches and ......Kitchen Changing LRC Admin Playground* Courtyard * * * Ground Floor . ... Installation . Dean Trust Ardwick 24 June 2018 59

The Deans, Salford

24 June 2018 83

Page 84: Introduction to Standardised Design: Approaches and ......Kitchen Changing LRC Admin Playground* Courtyard * * * Ground Floor . ... Installation . Dean Trust Ardwick 24 June 2018 59

Lime Tree School

24 June 2018 84

Page 85: Introduction to Standardised Design: Approaches and ......Kitchen Changing LRC Admin Playground* Courtyard * * * Ground Floor . ... Installation . Dean Trust Ardwick 24 June 2018 59

Lime Tree School

24 June 2018 85

Page 86: Introduction to Standardised Design: Approaches and ......Kitchen Changing LRC Admin Playground* Courtyard * * * Ground Floor . ... Installation . Dean Trust Ardwick 24 June 2018 59
Page 87: Introduction to Standardised Design: Approaches and ......Kitchen Changing LRC Admin Playground* Courtyard * * * Ground Floor . ... Installation . Dean Trust Ardwick 24 June 2018 59

Human Centred Design

Post Occupany Evaluation of

Lime Tree School

24 June 2018 87

Page 88: Introduction to Standardised Design: Approaches and ......Kitchen Changing LRC Admin Playground* Courtyard * * * Ground Floor . ... Installation . Dean Trust Ardwick 24 June 2018 59

Human-Centred Design

post occupancy evaluation

Page 89: Introduction to Standardised Design: Approaches and ......Kitchen Changing LRC Admin Playground* Courtyard * * * Ground Floor . ... Installation . Dean Trust Ardwick 24 June 2018 59

Atkins Human Centred Design

defining health and wellbeing

Page 90: Introduction to Standardised Design: Approaches and ......Kitchen Changing LRC Admin Playground* Courtyard * * * Ground Floor . ... Installation . Dean Trust Ardwick 24 June 2018 59

Not this...

Page 91: Introduction to Standardised Design: Approaches and ......Kitchen Changing LRC Admin Playground* Courtyard * * * Ground Floor . ... Installation . Dean Trust Ardwick 24 June 2018 59

Lessons Learnt

• Detailed Facilities Output Specification

• Well-integrated and simple buildings

that benefit from daylight and

natural/hybrid ventilation

• A fabric first approach, where the

building fabric is the primary means of

controlling the internal environment

that perform better than ones with

complex M&E systems and bolt-on

technological features

• Multi-disciplinary integrated approach

essential from day 1, particularly

environmental engineer and architect

working together but also early advice

on ICT and Acoustics

Page 92: Introduction to Standardised Design: Approaches and ......Kitchen Changing LRC Admin Playground* Courtyard * * * Ground Floor . ... Installation . Dean Trust Ardwick 24 June 2018 59

• It is important to get the design right

at an early stage

• Providing daylight into circulation

areas and rear of classrooms

• Achieving GIFA - matching the

Schedule of Accommodation is a

challenge

• Efficiency of circulation is a big

challenge as are limitations on

space for servers and plant

• Is the indoor environment, daylight,

lighting, heating and ventilation

easily controllable locally by the

building users

• FM and environmental design

• Very few derogations, or better No

derogations

Lessons Learnt

Page 93: Introduction to Standardised Design: Approaches and ......Kitchen Changing LRC Admin Playground* Courtyard * * * Ground Floor . ... Installation . Dean Trust Ardwick 24 June 2018 59

• Standardised approaches to plant and

services, eg strategy for routing services,

risers, service cores, etc

• Standardised solutions for façade, ventilation

and lighting solutions

• However too much standardisation can

severely compromise quality so a portfolio of

solutions may work best. Flexibility of material

and forms.

• Can offsite manufacturing speed up delivery

and improve quality?

• Windows and louvers

• Plant and services

• Metering and monitoring

• Local control strategy

• FM and asset renewal strategies

• Shading devices

• Opening mechanisms

• Floor to ceiling heights

• Door panels and glazing to corridor

• Servicing of teachers wall

Lessons Learnt

Page 94: Introduction to Standardised Design: Approaches and ......Kitchen Changing LRC Admin Playground* Courtyard * * * Ground Floor . ... Installation . Dean Trust Ardwick 24 June 2018 59

Modular Housing

94

MetroHome

Page 95: Introduction to Standardised Design: Approaches and ......Kitchen Changing LRC Admin Playground* Courtyard * * * Ground Floor . ... Installation . Dean Trust Ardwick 24 June 2018 59

Metrohomes Position Paper 02 Februrary 2018

4 Number, 2 Bed, 4 Person Homes

Page 96: Introduction to Standardised Design: Approaches and ......Kitchen Changing LRC Admin Playground* Courtyard * * * Ground Floor . ... Installation . Dean Trust Ardwick 24 June 2018 59

Metrohomes Position Paper 02 Februrary 2018 96 10 Number, 3 Bed, 5 Person Homes

Page 97: Introduction to Standardised Design: Approaches and ......Kitchen Changing LRC Admin Playground* Courtyard * * * Ground Floor . ... Installation . Dean Trust Ardwick 24 June 2018 59

Metrohomes Position Paper 02 Februrary 2018

4 Apartment Buildings, 65 Flats

4 Apartment Buildings, 65 Flats

Page 98: Introduction to Standardised Design: Approaches and ......Kitchen Changing LRC Admin Playground* Courtyard * * * Ground Floor . ... Installation . Dean Trust Ardwick 24 June 2018 59

Student accommodation & High Rise

98

Page 99: Introduction to Standardised Design: Approaches and ......Kitchen Changing LRC Admin Playground* Courtyard * * * Ground Floor . ... Installation . Dean Trust Ardwick 24 June 2018 59

Apex House

24 June 2018 99

• 27 storey + basement

• 13 months construction

Page 100: Introduction to Standardised Design: Approaches and ......Kitchen Changing LRC Admin Playground* Courtyard * * * Ground Floor . ... Installation . Dean Trust Ardwick 24 June 2018 59

24 June 2018 100

Page 101: Introduction to Standardised Design: Approaches and ......Kitchen Changing LRC Admin Playground* Courtyard * * * Ground Floor . ... Installation . Dean Trust Ardwick 24 June 2018 59

24 June 2018 101

• Croydon

• 2 connected towers 44 & 38

• Residential

• Tallest Modular in the World

Page 102: Introduction to Standardised Design: Approaches and ......Kitchen Changing LRC Admin Playground* Courtyard * * * Ground Floor . ... Installation . Dean Trust Ardwick 24 June 2018 59