  • 8/2/2019 Introduction to Project Planning and Scheduling

    1/23

    REVIEW OF PLANNING ANDREVIEW OF PLANNING AND

    SCHEDULINGSCHEDULING

    ENGR 281ENGR 281

  • 8/2/2019 Introduction to Project Planning and Scheduling

    2/23

    OUTLINEOUTLINE

    BASIS FOR PLANNING & SCHEDULINGBASIS FOR PLANNING & SCHEDULING

    PROCEDUREPROCEDURE

    METHODSMETHODSGANNT CHARTGANNT CHART

    CRITICAL PATHCRITICAL PATH

    USES FOR SCHEDULEUSES FOR SCHEDULE

  • 8/2/2019 Introduction to Project Planning and Scheduling

    3/23

    PLANNING & SCHEDULINGPLANNING & SCHEDULING

    FUNDAMENTAL ENGINEERINGFUNDAMENTAL ENGINEERING

    FIRST DO THE PROBLEM ANALYSISFIRST DO THE PROBLEM ANALYSIS

    THEN DEVELOP A SOLUTION TO THETHEN DEVELOP A SOLUTION TO THEDEFINED NEEDSDEFINED NEEDS

    SPECIFY OBJECTIVESSPECIFY OBJECTIVES

    DETERMINE ACTIVITIES & RESOURCESDETERMINE ACTIVITIES & RESOURCES

    PRESENT RESULTS IN A SCHEMATIC THATPRESENT RESULTS IN A SCHEMATIC THATCAN BE USED BY THE TEAMCAN BE USED BY THE TEAM

  • 8/2/2019 Introduction to Project Planning and Scheduling

    4/23

    OBJECTIVES FOR PLANNING ANDOBJECTIVES FOR PLANNING AND

    SCHEDULINGSCHEDULING EFFECTIVE TIMEEFFECTIVE TIME

    MANAGEMENTMANAGEMENT

    OPTIMZE SEQUENCE OFOPTIMZE SEQUENCE OFEVENTSEVENTS

    DEFINE NECESSARYDEFINE NECESSARYRESOURCESRESOURCES

    monthITOR PROJECTmonthITOR PROJECTPROGRESSPROGRESS

  • 8/2/2019 Introduction to Project Planning and Scheduling

    5/23

    PROJECT/THESIS PLANNINGPROJECT/THESIS PLANNING

    PROBLEM DEFINITIONPROBLEM DEFINITION -- SPECIFYSPECIFYHYPOTHESIS AND OVERALL OBJECTIVESHYPOTHESIS AND OVERALL OBJECTIVES

    DEVELOP SOLUTIONSDEVELOP SOLUTIONS -- DETERMINEDETERMINEMETHODS TO TEST HYPOTHESISMETHODS TO TEST HYPOTHESIS

    TRANSFER INFORMATION TO A SCHEDULETRANSFER INFORMATION TO A SCHEDULE DETERMINE HIERARCHYDETERMINE HIERARCHY

    DEFINE RESOURCE REQUIREMENTSDEFINE RESOURCE REQUIREMENTS

    MONITOR PROGRESS OF PROJECT/THESISMONITOR PROGRESS OF PROJECT/THESIS

  • 8/2/2019 Introduction to Project Planning and Scheduling

    6/23

    PRIMARY COMPONENTS IN APRIMARY COMPONENTS IN A

    PROJECT/THESIS SCHEDULEPROJECT/THESIS SCHEDULE ACTIVITIESACTIVITIES

    SPECIFIC FUNCTIONSPECIFIC FUNCTION

    FINITE DURATIONFINITE DURATION

    DETERMINE LINKAGEDETERMINE LINKAGE

    SPECIFY RESOURCE REQUIREMENTSSPECIFY RESOURCE REQUIREMENTS

    MILESTONESMILESTONES TARGET DELIVERABLESTARGET DELIVERABLES

    0 DURATION0 DURATION

  • 8/2/2019 Introduction to Project Planning and Scheduling

    7/23

    EXAMPLE FOR CLASS ACTIVITYEXAMPLE FOR CLASS ACTIVITY

    DEVELOP ADEVELOP APLAN TO GETPLAN TO GET

    A NEWA NEW

    PRODUCT TOPRODUCT TOMARKETMARKET

    USE THE DATAUSE THE DATAPROVIDED INPROVIDED INTHIS CHARTTHIS CHARTTO CREAT ATO CREAT AGANNT CHARTGANNT CHART

    ACT. NO.

    ACTIVITY

    DESCRIPTION DURATION PREDECESSORS

    1

    Decide to

    Investigate New

    Product 0 days

    2 New Product Design 6 months 1

    3 Market Analysis 2 months 1

    4

    Design Production

    System 3 months 2

    5AssembleProduction System 3 months 4

    6

    Produce Initial

    Samples 1.5 months 5

    7 Product Testing 3 months 6

    8

    Develop Sales

    Brochure 2 months 2,3

    9

    Detailed Cost

    Analysis 1 month 4

    10 Train Sales Staff 2 months 3,8

    11

    Develop Final

    Pricing 1 month 10,9

    12

    Corporate Project

    Report 1 month 3,9,7

    13

    Initial Sales

    Contacts 2 months 11,6,7

    14

    Receive Initial

    Orders 0 days 13

  • 8/2/2019 Introduction to Project Planning and Scheduling

    8/23

    TYPICAL GANNT CHARTTYPICAL GANNT CHART

  • 8/2/2019 Introduction to Project Planning and Scheduling

    9/23

    CPM (CRITICAL PATH METHOD)CPM (CRITICAL PATH METHOD)

    USES NODES FOR EVENTS (ACTIVITIESUSES NODES FOR EVENTS (ACTIVITIESAND MILESTONES)AND MILESTONES)

    ACTIVITIES ARE CONNECTED WITHACTIVITIES ARE CONNECTED WITHARROWSARROWS

    CRITICAL PATH IS DEFINED TOCRITICAL PATH IS DEFINED TODETERMINE MINIMUM TIME TODETERMINE MINIMUM TIME TOCOMPLETE PROJECTCOMPLETE PROJECT

  • 8/2/2019 Introduction to Project Planning and Scheduling

    10/23

    CRITICAL PATHCRITICAL PATH

    SEQUENCE OF EVENTS WITH ZEROSEQUENCE OF EVENTS WITH ZEROFLOATFLOAT

    CONTROLS MINIMUM TIME TO COMPLETIONCONTROLS MINIMUM TIME TO COMPLETIONNONNON--CPM ACTIVITIES HAVE FLOAT AND CANCPM ACTIVITIES HAVE FLOAT AND CAN

    PARALLEL CPM ACTIVITIESPARALLEL CPM ACTIVITIES

    CAN BE USED TO OPTIMIZE USE OFCAN BE USED TO OPTIMIZE USE OF

    RESOURCES AND TIME FOR THERESOURCES AND TIME FOR THEPROJECTPROJECT

  • 8/2/2019 Introduction to Project Planning and Scheduling

    11/23

    TRANSFER THE DATA TO ATRANSFER THE DATA TO ANETWORK DIAGRAMNETWORK DIAGRAM

    NOTE EACH ACTIVITY AND MILESTONE ARE NODESNOTE EACH ACTIVITY AND MILESTONE ARE NODES START/FINISH AND DURATION ARE LISTED ON EACHSTART/FINISH AND DURATION ARE LISTED ON EACH

    NODE SYMBOLNODE SYMBOL

  • 8/2/2019 Introduction to Project Planning and Scheduling

    12/23

    TYPICAL NETWORK DIAGRAMTYPICAL NETWORK DIAGRAM

  • 8/2/2019 Introduction to Project Planning and Scheduling

    13/23

  • 8/2/2019 Introduction to Project Planning and Scheduling

    14/23

    FOR EXAMPLEFOR EXAMPLE

    CPM ACTIVITYCPM ACTIVITY

    NONNON--CPM ACTIVITYCPM ACTIVITY

    LATE START ASSUMESLATE START ASSUMESALL SUBSEQUENTALL SUBSEQUENT

    ACTIVITIES USE ZERO FLOATACTIVITIES USE ZERO FLOAT

    ACTIVITY 1 New Product Design

    DURATION 6 months

    EARLY START 1-Feb-10

    LATE START 1-Feb-10

    ACTIVITY 8 Develop Sales Brochure

    DURATION 2 months

    EARLY START 19-Jul-10

    LATE START 20-Dec-10

  • 8/2/2019 Introduction to Project Planning and Scheduling

    15/23

    RESOURCE ALLOCATIONRESOURCE ALLOCATION

    ANALYSIS OF A SCHEDULE ALLOWSANALYSIS OF A SCHEDULE ALLOWSCOORDINATION TO ASSURECOORDINATION TO ASSUREEFFECTIVE USE OF RESOURCESEFFECTIVE USE OF RESOURCES

    ELIMINATE PEAKS, VALLEYS DUE TOELIMINATE PEAKS, VALLEYS DUE TOMOBILIZATION ANDMOBILIZATION ANDDEMOBILIZATION OF RESOURCESDEMOBILIZATION OF RESOURCES

  • 8/2/2019 Introduction to Project Planning and Scheduling

    16/23

    RESOURCE ALLOCATIONRESOURCE ALLOCATIONExampleExample

    HIGH ALLOCATION AT STARTREDUCTION/INCREASE SEQUENCE DAYS 3,4, AND 5

  • 8/2/2019 Introduction to Project Planning and Scheduling

    17/23

    RESOURCE ALLOCATIONRESOURCE ALLOCATIONExampleExample

    BY REARRANGING JOB SEQUENCE THE FOLLOWING IS POSSIBLEBY REARRANGING JOB SEQUENCE THE FOLLOWING IS POSSIBLE

    1. NOTE THE MAXIMUM REQUIREMENT IS REDUCED1. NOTE THE MAXIMUM REQUIREMENT IS REDUCED

    2. THERE IS A SINGLE INCREASE/REDUCTION SEQUENCE2. THERE IS A SINGLE INCREASE/REDUCTION SEQUENCE

  • 8/2/2019 Introduction to Project Planning and Scheduling

    18/23

    EXAMPLE OPTIONSEXAMPLE OPTIONS ASSUMING THATASSUMING THAT

    ADDITONAL FUNDSADDITONAL FUNDSWERE AVAILABLEWERE AVAILABLE

    AND THEY COULDAND THEY COULDREDUCE THEREDUCE THEDURATION OF EACHDURATION OF EACH

    ACTIVITY ASACTIVITY ASNOTED, DETERMINENOTED, DETERMINEHOW THEY SHOULDHOW THEY SHOULDBE ALLOCATED ANDBE ALLOCATED ANDTHE IMPACTTHE IMPACT

    ACT.

    NO.

    ACTIVITY DESCRIPTION ORIGINAL

    DURATION

    % IMPACT

    ADDITIONALFUNDS

    1

    Decide to Investigate New

    Product 0 days 0

    2 New Product Design 6 months 20

    3 Market Analysis 2 months 75

    4 Design Production System 3 months 25

    5

    Assemble Production

    System 3 months 15

    6 Produce Initial Samples 1.5 months 10

    7 Product Testing 3 months 15

    8 Develop Sales Brochure 2 months 75

    9 Detailed Cost Analysis 1 month 50

    10 Train Sales Staff 2 months 20

    11 Develop Final Pricing 1 month 75

    12 Corporate Project Report 1 month 50

    13 Initial Sales Contacts 2 months 10

    14 Receive Initial Orders 0 days 0

  • 8/2/2019 Introduction to Project Planning and Scheduling

    19/23

    CHECK OPTIONSCHECK OPTIONS INITIALLY IGNORE NONINITIALLY IGNORE NON--CPM ACTIVITIESCPM ACTIVITIES

    CHECK IMPACT BY USING FUNDS ON CRITICAL PATH ITEMS ONECHECK IMPACT BY USING FUNDS ON CRITICAL PATH ITEMS ONEAT A TIMEAT A TIME ORIGINAL END DATE IS 01JUL11ORIGINAL END DATE IS 01JUL11

    THE ANALYSIS INDICATES THE MONEY SHOULD GO IN ACTIVITY 2THE ANALYSIS INDICATES THE MONEY SHOULD GO IN ACTIVITY 2

    ACT.

    NO.

    ACTIVITY DESCRIPTION ORIGINAL

    DURATION

    (month)

    % IMPACT

    ADDITIONAL

    FUNDS

    ADJUSTED

    DURATION

    (month)

    NEW END

    DATE

    2 New Product Design 6 20 4.8 30-May-11

    4

    Design Production

    System 3 25 2.25 10-Jun-11

    5

    Assemble Production

    System 3 15 2.55 20-Jun-11

    6 Produce Initial Samples 1.5 10 1.35 28-Jun-11

    7 Product Testing 3 15 2.55 20-Jun-1113 Initial Sales Contacts 2 10 1.8 27-Jun-11

  • 8/2/2019 Introduction to Project Planning and Scheduling

    20/23

    SCHEDULE USE DURINGSCHEDULE USE DURINGCOMPLETION OF PROJECTSCOMPLETION OF PROJECTS

    AGENDA FOR MEETINGS WITHAGENDA FOR MEETINGS WITHTEAM & COMMITTEETEAM & COMMITTEE

    FREQUENT TRACKING OFFREQUENT TRACKING OFPROGRESS SO EFFORT CAN BEPROGRESS SO EFFORT CAN BEOPTIMIZEDOPTIMIZED

    TYPICAL CONTROL GANNTTYPICAL CONTROL GANNTFOLLOWSFOLLOWS

  • 8/2/2019 Introduction to Project Planning and Scheduling

    21/23

    CONTROL OF PROJECTSCONTROL OF PROJECTSID Task Name Duration Start Finish

    1 Decide on Appropriate Project 4 d ays Mon 16-02-04 Thu 19-02-04

    2 Check previous work in our lab 3 days Mon 16-02-04 Wed 18-02-04

    3 Check prev ious work in ot her labs 3 day s Mon 16-02-04 Wed 18-02-04

    4 Select a project 1 day Thu 19-02-04 Thu 19-02-04

    5 Determine Project Activities 5 days Fri 20-02-04 Thu 26-02-04

    6 Complete Design 2 days Fri 20-02-04 Mon 23-02-04

    7 Det ermine N ecessary H ardware and

    Materials

    1 day Tue 24-02-04 Tue 24-02-04

    8 Locate Assembly Help 3 days Tue 24-02-04 Thu 26-02-04

    9 Locate Materials Preparation Help 3 days Tue 24-02-04 Thu 26-02-04

    10 Locate Demonstration Assistance 3 days Tue 24-02-04 Thu 26-02-04

    11 Obtain Hardware 3 days Wed 25-02-04 Fri 27-02-04

    12 Locate Existing Equipment 2 days Wed 25-02-04 Thu 26-02-04

    13 Prepare Equipment P.O.'s 1 day Wed 25-02-04 Wed 25-02-04

    14 Prepare Materials P.O.'s 2 days Wed 25-02-04 Thu 26-02-04

    15 Approv al and Receipt 1 day Fri 27-02-04 Fri 27-02-04

    16 Assemble Apparatus 3 days Fri 27-02-04 Tue 02-03-04

    17 Assemble Av ailable Equipment 1 day Fri 27-02-04 Fri 27-02-04

    18 Assemble New Equipment 2 day s Mon 01-03-04 Tue 02-03-04

    19 Prepare Materials 2 days Mon 01-03-04 Tue 02-03-04

    20 Receiv e and check ordered materials 1 day Mon 01-03-04 Mon 01-03-04

    21 Prepare Test batches 1 day Tue 02-03-04 Tue 02-03-04

    22 Develop Software 3.5 days Fri 27-02-04 Wed 03-03-04

    23 Prepare Display Boards 2 days Fri 27-02-04 Mon 01-03-04

    24 Develop Presentation 0.5 day Fri 27-02-04 Fri 27-02-04

    25 Rehearse Presentation 0.5 day Wed 03-03-04 Wed 03-03-04

    26 Presentation 3 days Wed 03-03-04 Fri 05-03-04

    27 Prepare Materials 1 day Wed 03-03-04 Wed 03-03-04

    28 Final Test 1 day Thu 04-03-04 Thu 04-03-04

    29 Presentation 0.75 days Fri 05-03-04 Fri 05-03-04

    30 Clean-up 0.25 day s Fri 05-03-04 Fri 05- 03-04

    31 Collect Award 0 days Fri 05-03-04 Fri 05-03-04

    6-02 18-02

    -02 18-02

    19-02 19-02

    20-02 23-02

    24-02 24-02

    24-02 26-0

    24-02 26-0

    24-02 26-0

    25-02 26-0

    25-02 25-02

    25-02 26-0

    27-02

    27-02

    27-02

    27-02 2

    S M T W T F S S M T W T F

    15 Feb '04 22 Feb '04

  • 8/2/2019 Introduction to Project Planning and Scheduling

    22/23

    PRIMARY SOFTWARE PACKAGESPRIMARY SOFTWARE PACKAGES

    MICROSOFT PROJECTMICROSOFT PROJECT((http://www.microsoft.com/project/en/uhttp://www.microsoft.com/project/en/us/default.aspxs/default.aspx))

    PRIMAVERA PROJECT PLANNERPRIMAVERA PROJECT PLANNER((http://www.oracle.com/us/corporate/achttp://www.oracle.com/us/corporate/ac

    quisitions/primavera/index.html )quisitions/primavera/index.html ) http://www.umsl.edu/~rbanis/252/ovrhehttp://www.umsl.edu/~rbanis/252/ovrhe

    ads/pptshows/project.pptads/pptshows/project.ppt

  • 8/2/2019 Introduction to Project Planning and Scheduling

    23/23

    SUMMARYSUMMARY

    PLANNING & SCHEDULING AREPLANNING & SCHEDULING AREVALUABLE COMMUNICATION ANDVALUABLE COMMUNICATION ANDMANAGEMENT TOOLS FOR PROJECTSMANAGEMENT TOOLS FOR PROJECTS

    PROVIDE AN AGENDA FOR THE PROJECTPROVIDE AN AGENDA FOR THE PROJECT

    PROVIDE MEASURE OF PROGRESSPROVIDE MEASURE OF PROGRESS

    PROVIDE BASES FOR OPTIMIZATIONPROVIDE BASES FOR OPTIMIZATION