![Page 1: Introduction to Market Transformation · h. Complexity of Distribution or Installer Network i. Communication Infrastructure in Place 3. Stakeholder Circumstances a. Number of Stakeholder](https://reader034.vdocuments.mx/reader034/viewer/2022042923/5f73059b5dad9c1ed50df5eb/html5/thumbnails/1.jpg)
Introduction to Market
Transformation
2013 National Symposium on Market
Transformation
Joanne Morin
Deputy Director
March 24, 2013
Washington, DC
![Page 2: Introduction to Market Transformation · h. Complexity of Distribution or Installer Network i. Communication Infrastructure in Place 3. Stakeholder Circumstances a. Number of Stakeholder](https://reader034.vdocuments.mx/reader034/viewer/2022042923/5f73059b5dad9c1ed50df5eb/html5/thumbnails/2.jpg)
2
Presenters
Joanne Morin
Deputy Director
Consortium for Energy Efficiency
David Cohan
Senior Manager, Codes and Standards
Northwest Energy Efficiency Alliance (NEEA)
Ken Tiedemann
Evaluation Principal, Evaluation
BC Hydro
![Page 3: Introduction to Market Transformation · h. Complexity of Distribution or Installer Network i. Communication Infrastructure in Place 3. Stakeholder Circumstances a. Number of Stakeholder](https://reader034.vdocuments.mx/reader034/viewer/2022042923/5f73059b5dad9c1ed50df5eb/html5/thumbnails/3.jpg)
3
Schedule
Time Presenter Topic
1:00 – 1:45 Joanne Introduction to MT
1:45 – 2:30 Dave Breakout Exercise
2:30-2:45 Break
2:45-3:30 Dave NEEA Examples
3:30-3:45 Break
3:45-4:45 Ken Evaluation,
Measurement &
Verification
![Page 4: Introduction to Market Transformation · h. Complexity of Distribution or Installer Network i. Communication Infrastructure in Place 3. Stakeholder Circumstances a. Number of Stakeholder](https://reader034.vdocuments.mx/reader034/viewer/2022042923/5f73059b5dad9c1ed50df5eb/html5/thumbnails/4.jpg)
4
History of Energy Efficiency Programs
Characteristics of Market Transformation
Development of Programs
Examples
![Page 5: Introduction to Market Transformation · h. Complexity of Distribution or Installer Network i. Communication Infrastructure in Place 3. Stakeholder Circumstances a. Number of Stakeholder](https://reader034.vdocuments.mx/reader034/viewer/2022042923/5f73059b5dad9c1ed50df5eb/html5/thumbnails/5.jpg)
5
CEE Members
![Page 6: Introduction to Market Transformation · h. Complexity of Distribution or Installer Network i. Communication Infrastructure in Place 3. Stakeholder Circumstances a. Number of Stakeholder](https://reader034.vdocuments.mx/reader034/viewer/2022042923/5f73059b5dad9c1ed50df5eb/html5/thumbnails/6.jpg)
6
Membership is limited for credibility
Efficiency Program Administrators—utilities and nonutilities with ratepayer funded programs
Public Stakeholders—such as DOE national labs, state and provincial energy offices, government energy research agencies, regional and national efficiency organizations
NO Organizations with private interests, for example, manufacturers, consultants, program contractors
![Page 7: Introduction to Market Transformation · h. Complexity of Distribution or Installer Network i. Communication Infrastructure in Place 3. Stakeholder Circumstances a. Number of Stakeholder](https://reader034.vdocuments.mx/reader034/viewer/2022042923/5f73059b5dad9c1ed50df5eb/html5/thumbnails/7.jpg)
7
CEE members direct 80% of energy
efficiency expenditures
Source: CEE 2012 Annual Industry Report
![Page 8: Introduction to Market Transformation · h. Complexity of Distribution or Installer Network i. Communication Infrastructure in Place 3. Stakeholder Circumstances a. Number of Stakeholder](https://reader034.vdocuments.mx/reader034/viewer/2022042923/5f73059b5dad9c1ed50df5eb/html5/thumbnails/8.jpg)
8
![Page 9: Introduction to Market Transformation · h. Complexity of Distribution or Installer Network i. Communication Infrastructure in Place 3. Stakeholder Circumstances a. Number of Stakeholder](https://reader034.vdocuments.mx/reader034/viewer/2022042923/5f73059b5dad9c1ed50df5eb/html5/thumbnails/9.jpg)
9
Working Together, Accelerating Efficiency
Credibility• Performance claim
• Savings benefit
Momentum• Binational market
• Market position
Leverage• Brand platforms
• Trade associations
![Page 10: Introduction to Market Transformation · h. Complexity of Distribution or Installer Network i. Communication Infrastructure in Place 3. Stakeholder Circumstances a. Number of Stakeholder](https://reader034.vdocuments.mx/reader034/viewer/2022042923/5f73059b5dad9c1ed50df5eb/html5/thumbnails/10.jpg)
10
History of Energy Efficiency Programs
Characteristics of Market Transformation
Development of Programs
Examples
![Page 11: Introduction to Market Transformation · h. Complexity of Distribution or Installer Network i. Communication Infrastructure in Place 3. Stakeholder Circumstances a. Number of Stakeholder](https://reader034.vdocuments.mx/reader034/viewer/2022042923/5f73059b5dad9c1ed50df5eb/html5/thumbnails/11.jpg)
11
Origins of EE Programs
1970s:
• Energy crisis and OPEC oil
embargo
• “Conservation”
1980s to early 90s: IRP
Mid-1990s:
• Deregulation
• Some abandon IRP
• Establish system benefits charge
![Page 12: Introduction to Market Transformation · h. Complexity of Distribution or Installer Network i. Communication Infrastructure in Place 3. Stakeholder Circumstances a. Number of Stakeholder](https://reader034.vdocuments.mx/reader034/viewer/2022042923/5f73059b5dad9c1ed50df5eb/html5/thumbnails/12.jpg)
12
More Recent Pressures on EE
Programs
2000s
• Restructuring
• Enron
• Reliability issues
• Increased focus on systems benefits
• Renewed emphasis on IRP and resource procurement
Most recently
• Climate change policies
• Renewable integration
• “Smart” capabilities
![Page 13: Introduction to Market Transformation · h. Complexity of Distribution or Installer Network i. Communication Infrastructure in Place 3. Stakeholder Circumstances a. Number of Stakeholder](https://reader034.vdocuments.mx/reader034/viewer/2022042923/5f73059b5dad9c1ed50df5eb/html5/thumbnails/13.jpg)
13
Demand Side Management
Programs (DSM)
Part of integrated resource planning (IRP)
Paid directly through rates or system benefit
charges
Goal – to yield the lowest system cost
Reduce energy and power demand
Avoid costly construction and operation of
new plants
![Page 14: Introduction to Market Transformation · h. Complexity of Distribution or Installer Network i. Communication Infrastructure in Place 3. Stakeholder Circumstances a. Number of Stakeholder](https://reader034.vdocuments.mx/reader034/viewer/2022042923/5f73059b5dad9c1ed50df5eb/html5/thumbnails/14.jpg)
14
Primary Design of Demand Side
Management Programs
Focused on short-term savings
Predominantly through financial
incentives
Influenced single transactions
Temporary shifts in market share
![Page 15: Introduction to Market Transformation · h. Complexity of Distribution or Installer Network i. Communication Infrastructure in Place 3. Stakeholder Circumstances a. Number of Stakeholder](https://reader034.vdocuments.mx/reader034/viewer/2022042923/5f73059b5dad9c1ed50df5eb/html5/thumbnails/15.jpg)
15
Market Transformation
Utility Industry Restructuring presumed markets would replace IRP = no more DSM
Increased pressure to reduce costs
More market-based would reduce utility program costs
Market Transformation partly replaced Resource Acquisition as the Public Benefit objective
![Page 16: Introduction to Market Transformation · h. Complexity of Distribution or Installer Network i. Communication Infrastructure in Place 3. Stakeholder Circumstances a. Number of Stakeholder](https://reader034.vdocuments.mx/reader034/viewer/2022042923/5f73059b5dad9c1ed50df5eb/html5/thumbnails/16.jpg)
16
Today’s Context for Market
Transformation
Paradigm shift occurred with Reliability Crisis
IRP hasn’t gone away – distribution utility requirement
Procurement of resources including efficiency
Policies like CA efficiency first in “loading order”
“All cost-effective efficiency” – Climate Change
Sustainability is more valued and efficiency is recognized as the foundation of climate change policy
![Page 17: Introduction to Market Transformation · h. Complexity of Distribution or Installer Network i. Communication Infrastructure in Place 3. Stakeholder Circumstances a. Number of Stakeholder](https://reader034.vdocuments.mx/reader034/viewer/2022042923/5f73059b5dad9c1ed50df5eb/html5/thumbnails/17.jpg)
17
History of Energy Efficiency Programs
Characteristics of Market Transformation
Development of Programs
Examples
![Page 18: Introduction to Market Transformation · h. Complexity of Distribution or Installer Network i. Communication Infrastructure in Place 3. Stakeholder Circumstances a. Number of Stakeholder](https://reader034.vdocuments.mx/reader034/viewer/2022042923/5f73059b5dad9c1ed50df5eb/html5/thumbnails/18.jpg)
18
What Market Transformation efforts
have you already responded to?
![Page 19: Introduction to Market Transformation · h. Complexity of Distribution or Installer Network i. Communication Infrastructure in Place 3. Stakeholder Circumstances a. Number of Stakeholder](https://reader034.vdocuments.mx/reader034/viewer/2022042923/5f73059b5dad9c1ed50df5eb/html5/thumbnails/19.jpg)
19
So What is Market Transformation?
Policy objective?
Program strategy?
Economic concept?
Marketing Strategy
![Page 20: Introduction to Market Transformation · h. Complexity of Distribution or Installer Network i. Communication Infrastructure in Place 3. Stakeholder Circumstances a. Number of Stakeholder](https://reader034.vdocuments.mx/reader034/viewer/2022042923/5f73059b5dad9c1ed50df5eb/html5/thumbnails/20.jpg)
20
Definition of Market Transformation
Strategic interventions that attempt to
cause lasting changes in the structure
or function of a market or the behavior
of market participants, resulting in an
increase in the adoption of energy
efficient products, services, or
practices.
![Page 21: Introduction to Market Transformation · h. Complexity of Distribution or Installer Network i. Communication Infrastructure in Place 3. Stakeholder Circumstances a. Number of Stakeholder](https://reader034.vdocuments.mx/reader034/viewer/2022042923/5f73059b5dad9c1ed50df5eb/html5/thumbnails/21.jpg)
21
Motivations for Market Transformation
Thoughtful, more focused and integrated method of
intervention that leverages market opportunities
and focuses on key barriers
Will lead to greater savings and more sustainable
changes
Won’t have to use public funds to support
programs in the future
Privatization—moves things to the private market;
less government interference
“Transformed market” vs. strategy
![Page 22: Introduction to Market Transformation · h. Complexity of Distribution or Installer Network i. Communication Infrastructure in Place 3. Stakeholder Circumstances a. Number of Stakeholder](https://reader034.vdocuments.mx/reader034/viewer/2022042923/5f73059b5dad9c1ed50df5eb/html5/thumbnails/22.jpg)
22
Characteristics of MT
Strategic interventions in the market
Long-term objectives
Tactical short-term objectives
Approaches will vary due to differences in
markets
Need to recognize product life cycles and
where you are in the life cycles
![Page 23: Introduction to Market Transformation · h. Complexity of Distribution or Installer Network i. Communication Infrastructure in Place 3. Stakeholder Circumstances a. Number of Stakeholder](https://reader034.vdocuments.mx/reader034/viewer/2022042923/5f73059b5dad9c1ed50df5eb/html5/thumbnails/23.jpg)
23
Understanding Consumer Behavior
is Key
Key is to appeal to attributes that consumer
values
![Page 24: Introduction to Market Transformation · h. Complexity of Distribution or Installer Network i. Communication Infrastructure in Place 3. Stakeholder Circumstances a. Number of Stakeholder](https://reader034.vdocuments.mx/reader034/viewer/2022042923/5f73059b5dad9c1ed50df5eb/html5/thumbnails/24.jpg)
24
MT Can Do No Harm?
Early CFL promotion through DSM
programs
Flickering, color, slow start up
Bad early experiences delayed uptake of
later superior products
Update of CFLs still not dominant
![Page 25: Introduction to Market Transformation · h. Complexity of Distribution or Installer Network i. Communication Infrastructure in Place 3. Stakeholder Circumstances a. Number of Stakeholder](https://reader034.vdocuments.mx/reader034/viewer/2022042923/5f73059b5dad9c1ed50df5eb/html5/thumbnails/25.jpg)
25
Benefits of MT over DSM
Ensuring self-sustaining results
Lower costs – financial incentives phased out
Spillover effects – other actions influenced
Markets are more powerful
Provides a strategic model and framework for
justifying intervention
![Page 26: Introduction to Market Transformation · h. Complexity of Distribution or Installer Network i. Communication Infrastructure in Place 3. Stakeholder Circumstances a. Number of Stakeholder](https://reader034.vdocuments.mx/reader034/viewer/2022042923/5f73059b5dad9c1ed50df5eb/html5/thumbnails/26.jpg)
26
End of Rebates?
Initial intervention may require financial
incentives
Concept is that over time the market is
changed – “bribe” is not necessary
May be true in some circumstances
But a sustained effort in some manner may
also be necessary
![Page 27: Introduction to Market Transformation · h. Complexity of Distribution or Installer Network i. Communication Infrastructure in Place 3. Stakeholder Circumstances a. Number of Stakeholder](https://reader034.vdocuments.mx/reader034/viewer/2022042923/5f73059b5dad9c1ed50df5eb/html5/thumbnails/27.jpg)
27
Outcome – Market Changes and Effects
Increase in the quality, availability,
specification, and installation of electronic
ballasts and T8 lamps
Increase in the stocking and sales of premium
efficiency motors
Increase in retail shelf space and improvement
in product quality for compact fluorescent
lamps and fixtures
Increase in the specification and installation of
high efficiency HVAC systems
![Page 28: Introduction to Market Transformation · h. Complexity of Distribution or Installer Network i. Communication Infrastructure in Place 3. Stakeholder Circumstances a. Number of Stakeholder](https://reader034.vdocuments.mx/reader034/viewer/2022042923/5f73059b5dad9c1ed50df5eb/html5/thumbnails/28.jpg)
28
History of Energy Efficiency Programs
Characteristics of Market Transformation
Development of Programs
Examples
![Page 29: Introduction to Market Transformation · h. Complexity of Distribution or Installer Network i. Communication Infrastructure in Place 3. Stakeholder Circumstances a. Number of Stakeholder](https://reader034.vdocuments.mx/reader034/viewer/2022042923/5f73059b5dad9c1ed50df5eb/html5/thumbnails/29.jpg)
29
The Practice: Key Elements of Market
Transformation for Programs
Address market barriers and opportunities
Seek to affect lasting changes
Set long-term goals with near-term objectives
Work with existing market channels
Build on market trends
Track market changes and progress
Coordinate efforts to leverage maximum effect
![Page 30: Introduction to Market Transformation · h. Complexity of Distribution or Installer Network i. Communication Infrastructure in Place 3. Stakeholder Circumstances a. Number of Stakeholder](https://reader034.vdocuments.mx/reader034/viewer/2022042923/5f73059b5dad9c1ed50df5eb/html5/thumbnails/30.jpg)
30
Specify Market Barriers to be Addressed
There are many reasons why energy efficient
products and services are not standard practice:
Low energy prices
Lack of product availability
Customer confusion and lack of awareness
Vendor and institutional practices
Split incentives
First cost orientation
Design programs to overcome particular barriers
![Page 31: Introduction to Market Transformation · h. Complexity of Distribution or Installer Network i. Communication Infrastructure in Place 3. Stakeholder Circumstances a. Number of Stakeholder](https://reader034.vdocuments.mx/reader034/viewer/2022042923/5f73059b5dad9c1ed50df5eb/html5/thumbnails/31.jpg)
31
Take Advantage of
Market Opportunities
Manufacturers looking
for green, sustainable
business strategies
Whole supply chain engaged on efficiency
Public’s attention to climate change and
sustainability
Policy makers increasingly turning to energy
efficiency
iStockphoto
![Page 32: Introduction to Market Transformation · h. Complexity of Distribution or Installer Network i. Communication Infrastructure in Place 3. Stakeholder Circumstances a. Number of Stakeholder](https://reader034.vdocuments.mx/reader034/viewer/2022042923/5f73059b5dad9c1ed50df5eb/html5/thumbnails/32.jpg)
32
Seek Lasting Change
Program goals should incorporate market changes
Market changes need to be credited to efficiency programs
Test sustainability of the market changes
When appropriate, lock in market changes through:• Industry standards and practices
• Building energy codes
• Appliance and equipment minimum standards
![Page 33: Introduction to Market Transformation · h. Complexity of Distribution or Installer Network i. Communication Infrastructure in Place 3. Stakeholder Circumstances a. Number of Stakeholder](https://reader034.vdocuments.mx/reader034/viewer/2022042923/5f73059b5dad9c1ed50df5eb/html5/thumbnails/33.jpg)
33
Set Long-term Goals and Short-term
Objectives
Establish multiyear goal for large,
systemic change
Set near-term objectives tied to long-term
goal, based on intervention logic and the
story
Identify and track market indicators
![Page 34: Introduction to Market Transformation · h. Complexity of Distribution or Installer Network i. Communication Infrastructure in Place 3. Stakeholder Circumstances a. Number of Stakeholder](https://reader034.vdocuments.mx/reader034/viewer/2022042923/5f73059b5dad9c1ed50df5eb/html5/thumbnails/34.jpg)
34
Work Through Existing Market Channels
iStockphoto
![Page 35: Introduction to Market Transformation · h. Complexity of Distribution or Installer Network i. Communication Infrastructure in Place 3. Stakeholder Circumstances a. Number of Stakeholder](https://reader034.vdocuments.mx/reader034/viewer/2022042923/5f73059b5dad9c1ed50df5eb/html5/thumbnails/35.jpg)
35
Build on Market Trends
Conduct market research to identify:
Current status and penetration of energy
efficient products, services, and practices
Customer values and needs
Product innovations
Market leaders
![Page 36: Introduction to Market Transformation · h. Complexity of Distribution or Installer Network i. Communication Infrastructure in Place 3. Stakeholder Circumstances a. Number of Stakeholder](https://reader034.vdocuments.mx/reader034/viewer/2022042923/5f73059b5dad9c1ed50df5eb/html5/thumbnails/36.jpg)
36
Coordinate or Leverage Efforts
Work with others
Adopt national programs
Establish common goals and
objectives
Conduct joint market research and
evaluation
![Page 37: Introduction to Market Transformation · h. Complexity of Distribution or Installer Network i. Communication Infrastructure in Place 3. Stakeholder Circumstances a. Number of Stakeholder](https://reader034.vdocuments.mx/reader034/viewer/2022042923/5f73059b5dad9c1ed50df5eb/html5/thumbnails/37.jpg)
37
The Cycle of Program Planning,
Implementation, and
Evaluation
Adapted by CEE from Pierre Landry,
SCE, and Demand-Side Management,
Vol. 4: Commercial Markets and
Programs, EPRI, 1987.
1. Program Objectives
· Policies
· Operational
· Load shape
4. Program Monitoring &
Evaluation
· Process & impact
evaluation
· Feedback on objectives
· Redesign of programs
3. Program Implementation
· Experiments
· Pilot programs
· Full-scale programs
· Evaluation data collection
2. Program Design & Selection;
Evaluation Planning
· End uses
· Technologies
· Marketing techniques
· Customer issues
· Utility issues
· Benefit/cost
· Logic modeling & evaluation
planning
Resource
Planning
Policy
Objectives
![Page 38: Introduction to Market Transformation · h. Complexity of Distribution or Installer Network i. Communication Infrastructure in Place 3. Stakeholder Circumstances a. Number of Stakeholder](https://reader034.vdocuments.mx/reader034/viewer/2022042923/5f73059b5dad9c1ed50df5eb/html5/thumbnails/38.jpg)
38
Sample Considerations for Program
Administrators
1. Desired Outcomes
2. Time Horizon
3. Assets Availablea. Financial
b. Endorsement
c. Technical Expertise
d. Business or Market Expertise
e. Communication Infrastructure
f. Service Areas Coverage
g. Relationship with Market Stakeholders
4. Tolerance for Failure
5. Restrictionsa. Legal
b. Regulatory
c. Management
d. Political
6. Level of Flexibility
![Page 39: Introduction to Market Transformation · h. Complexity of Distribution or Installer Network i. Communication Infrastructure in Place 3. Stakeholder Circumstances a. Number of Stakeholder](https://reader034.vdocuments.mx/reader034/viewer/2022042923/5f73059b5dad9c1ed50df5eb/html5/thumbnails/39.jpg)
39
Market Considerations
(to name a few)
1. Magnitude of Savings Potential
2. Feasibility of Savingsa. Number of End Users
b. End User Responsible for Purchase
c. Useful Life of Equipment or Measure
d. Price Sensitivity
e. Product Performance
f. Energy Performance Significantly Different and Noticeable
g. Savings Accrues to End User or Decision Maker
h. Complexity of Distribution or Installer Network
i. Communication Infrastructure in Place
3. Stakeholder Circumstancesa. Number of Stakeholder Industries
b. Presence of Dominant Stakeholder (s)
c. Motivations
d. Business Sophistication or Marketing Capabilities
4. Defining Industry Characteristicsa. Commodity Goods
b. Seeking Differentiation
c. Duration of Product Cycles
![Page 40: Introduction to Market Transformation · h. Complexity of Distribution or Installer Network i. Communication Infrastructure in Place 3. Stakeholder Circumstances a. Number of Stakeholder](https://reader034.vdocuments.mx/reader034/viewer/2022042923/5f73059b5dad9c1ed50df5eb/html5/thumbnails/40.jpg)
40
The Role of Program Logic
A blueprint or map for programs
• identifies goals and anticipated progress
Provides description of:
• Relationship between program activities and effects
• Identifies market barriers and opportunities
• Targets
![Page 41: Introduction to Market Transformation · h. Complexity of Distribution or Installer Network i. Communication Infrastructure in Place 3. Stakeholder Circumstances a. Number of Stakeholder](https://reader034.vdocuments.mx/reader034/viewer/2022042923/5f73059b5dad9c1ed50df5eb/html5/thumbnails/41.jpg)
41
Phase 3 Motor Decisions MatterSM Logic
Model
CEE
Sponsoring utilities
Sponsoring energy conservation organizations
Sponsoring motorsmanufacturers
Develop tools and resources, including the website,
to support motors management
Highlight motormanagement as a
business opportunity toend-use customers
Calendar
Incorporation of salesand marketing efforts
Refinement ofcampaign message
and products
PresidentCFO
Plant ManagerMaintenance ManagerOperations Manager
Line ManagersEquipment Managers
Target Audience
CEE, NEMA, EASAmembers
Sponsors activelyengage in campaign
activities
Increased awarenessamong customers oftools and resourcesneeded to manage
motors more effectively
Increase incustomers receiving
help developingmotor management
plans
Industrial & commercialcustomers make increased
connection betweeneffective motor management
& business performance Industrial & commercial customersincreasingly use lifecycle costing
methods to determine whether motors should be repaired or replaced
before they fail, and when to install premium efficiency motors
Increased demand forNEMA premium-efficiencymotors as percentage of
all motors purchased
Increased demand forbest practice motor repairservices as percentage
of all motor repairservices
Short-term outcomes
Resources & Partners
Activities Outputs Short-term Intermediate-term Long-term
Outcomes
Utilities provide incentivesto customers or to vendors
to provide motor management services
Sponsoringgovernment agencies
Supporting sponsor cooperation at local level
Facilitating information exchange among sponsors
Supporting sponsor integration of campaign message
Maintaining consistency of concept and credibility of
message at the national level
Dissemination by CEEof business message at
national level
WebsiteDissemination by
sponsors of businessmessage
Increased awarenessamong customers of how to develop and
implement motor management plan
Increased awareness among sponsoring organizations and their trade allies of benefits of premium-efficiency motors and
more evaluative motor management
Increased awareness among sponsoring organizations and
their trade allies of tools and resourcesneeded to manage motors
more effectively
Increased awarenessamong customers ofbenefits of premium-efficiency motors and
more evaluativemotor management
Increased awareness among sponsoring organizations and
their trade allies of how to develop and implement motor
management plan
Increase in number of organizations offeringmotor management
services
Increase interest in motor system optimization
Campaignmaterials
Provide networking opportunityamong stakeholders
Provide sales or marketdata to CEE
Provide feedbackon program
Educate sales and marketing staff and/or
members about motor managementas a business opportunity
Trade Allies
Industrial & commercial customersdevelop motor management plans
at increased pace
Sponsors promote motor management to
their customers
Campaign provides support,networking opportunities,information exchange, education, National PR
exposure, and consistency and clarity of message
Participate incampaign administration
Information is readily availableand promoted
Increase use of adjustablespeed drives and appropriate
applications
Increase in number of customersimplementing 1 or more of
the following motor strategies:1. Creation of a motor survey and
tracking program.2. Development of guidelines for
proactive repair/replace decisions.3. Preparation for motor failure by
creating a spares inventory.4. Development of a purchasing
specification.5. Development of a repair
specification.6. Development and implementation
of a predictive and preventivemaintenance program.
Sponsoring tradeassociations:
NEMA (motors manufacturer)
EASA (motors sales and servce)
CDA (other)
Phase 3Business Plan:-Diverse extensive sponsor
coalition-Campaign message, identity
External Influences:--Motor availability--Business decisions based on short-term factors--Need to return equipment to service as soon as possible--Economic climate for industrial & commercial customers (business cycle)--Cost of electricity
Encourage customers towork through local motorprofessionals to develop
motor management plans
Sponsors support each other in promoting motor
management in the market
Phase 3 MDM Logic Model
![Page 42: Introduction to Market Transformation · h. Complexity of Distribution or Installer Network i. Communication Infrastructure in Place 3. Stakeholder Circumstances a. Number of Stakeholder](https://reader034.vdocuments.mx/reader034/viewer/2022042923/5f73059b5dad9c1ed50df5eb/html5/thumbnails/42.jpg)
42
Partners /
Activities
![Page 43: Introduction to Market Transformation · h. Complexity of Distribution or Installer Network i. Communication Infrastructure in Place 3. Stakeholder Circumstances a. Number of Stakeholder](https://reader034.vdocuments.mx/reader034/viewer/2022042923/5f73059b5dad9c1ed50df5eb/html5/thumbnails/43.jpg)
43
Outputs
![Page 44: Introduction to Market Transformation · h. Complexity of Distribution or Installer Network i. Communication Infrastructure in Place 3. Stakeholder Circumstances a. Number of Stakeholder](https://reader034.vdocuments.mx/reader034/viewer/2022042923/5f73059b5dad9c1ed50df5eb/html5/thumbnails/44.jpg)
44
Outcomes
Short-term
![Page 45: Introduction to Market Transformation · h. Complexity of Distribution or Installer Network i. Communication Infrastructure in Place 3. Stakeholder Circumstances a. Number of Stakeholder](https://reader034.vdocuments.mx/reader034/viewer/2022042923/5f73059b5dad9c1ed50df5eb/html5/thumbnails/45.jpg)
45
Outcomes
Long-term
![Page 46: Introduction to Market Transformation · h. Complexity of Distribution or Installer Network i. Communication Infrastructure in Place 3. Stakeholder Circumstances a. Number of Stakeholder](https://reader034.vdocuments.mx/reader034/viewer/2022042923/5f73059b5dad9c1ed50df5eb/html5/thumbnails/46.jpg)
46
If it were your money
(and it often is),
how would you evaluate that your
money was well spent?
![Page 47: Introduction to Market Transformation · h. Complexity of Distribution or Installer Network i. Communication Infrastructure in Place 3. Stakeholder Circumstances a. Number of Stakeholder](https://reader034.vdocuments.mx/reader034/viewer/2022042923/5f73059b5dad9c1ed50df5eb/html5/thumbnails/47.jpg)
47
Evaluation, Measurement &
Verification (EM&V)
Demonstrate the value of the programs
Transparent and consistent assessment
Determine energy savings
Evaluate causes and effects
Compare benefits and costs
How well is program designed? Implemented?
Understand and improve program performance
![Page 48: Introduction to Market Transformation · h. Complexity of Distribution or Installer Network i. Communication Infrastructure in Place 3. Stakeholder Circumstances a. Number of Stakeholder](https://reader034.vdocuments.mx/reader034/viewer/2022042923/5f73059b5dad9c1ed50df5eb/html5/thumbnails/48.jpg)
48
Estimation of Market Effects
Ultimate indicator of intervention
market effects is still energy savings
Market tracking and performance
indicators are even more important
under market transformation
Impact evaluation has a different focus
for market transformation than for
resource acquisition
![Page 49: Introduction to Market Transformation · h. Complexity of Distribution or Installer Network i. Communication Infrastructure in Place 3. Stakeholder Circumstances a. Number of Stakeholder](https://reader034.vdocuments.mx/reader034/viewer/2022042923/5f73059b5dad9c1ed50df5eb/html5/thumbnails/49.jpg)
49
History of Energy Efficiency Programs
Characteristics of Market Transformation
Development of Programs
Examples
![Page 50: Introduction to Market Transformation · h. Complexity of Distribution or Installer Network i. Communication Infrastructure in Place 3. Stakeholder Circumstances a. Number of Stakeholder](https://reader034.vdocuments.mx/reader034/viewer/2022042923/5f73059b5dad9c1ed50df5eb/html5/thumbnails/50.jpg)
50
Examples of Market Transformation
Commercial lighting, 1985-1998•T8, electronic ballasts become
standard practice
![Page 51: Introduction to Market Transformation · h. Complexity of Distribution or Installer Network i. Communication Infrastructure in Place 3. Stakeholder Circumstances a. Number of Stakeholder](https://reader034.vdocuments.mx/reader034/viewer/2022042923/5f73059b5dad9c1ed50df5eb/html5/thumbnails/51.jpg)
51
Examples of Market Transformation
Resource efficient clothes
washers, 1989-2001
• Proven market acceptance
basis for future standard
Super efficient refrigerator
program 1992-2000Proof of technology leads
to higher efficiency
![Page 52: Introduction to Market Transformation · h. Complexity of Distribution or Installer Network i. Communication Infrastructure in Place 3. Stakeholder Circumstances a. Number of Stakeholder](https://reader034.vdocuments.mx/reader034/viewer/2022042923/5f73059b5dad9c1ed50df5eb/html5/thumbnails/52.jpg)
52
Types of MT Programs
Golden CarrotTM
Bulk Procurement
Design Charrette
Design Competition
Common Program Components
Joint Campaigns or Branding
Equipment Directories
Conferences, Summits, Venues for Focused Interaction
![Page 53: Introduction to Market Transformation · h. Complexity of Distribution or Installer Network i. Communication Infrastructure in Place 3. Stakeholder Circumstances a. Number of Stakeholder](https://reader034.vdocuments.mx/reader034/viewer/2022042923/5f73059b5dad9c1ed50df5eb/html5/thumbnails/53.jpg)
53
Examples of EE Platforms to
Achieve Scale
Lighting for Tomorrow
CEE Initiatives and Qualifying
Products Lists
![Page 54: Introduction to Market Transformation · h. Complexity of Distribution or Installer Network i. Communication Infrastructure in Place 3. Stakeholder Circumstances a. Number of Stakeholder](https://reader034.vdocuments.mx/reader034/viewer/2022042923/5f73059b5dad9c1ed50df5eb/html5/thumbnails/54.jpg)
54
CEE members develop market initiatives
with impact in the United States and Canada
Premium Efficiency Motors
Distribution Transformers Municipal Water and Wastewater
Strategic Energy Management
Whole House
Consumer ElectronicsAppliances
LightingHVAC
Gas Water Heating
Unitary Air-conditioning
and Heat Pumps
Lighting Systems
Kitchens
Clothes Washers
Data Centers
and Servers
Building PerformanceGas Boiler Systems
Gas Water Heating
CEE serves members by supporting
these initiatives
Swimming Pools
![Page 55: Introduction to Market Transformation · h. Complexity of Distribution or Installer Network i. Communication Infrastructure in Place 3. Stakeholder Circumstances a. Number of Stakeholder](https://reader034.vdocuments.mx/reader034/viewer/2022042923/5f73059b5dad9c1ed50df5eb/html5/thumbnails/55.jpg)
55
Energy Efficiency Needs a Brand!
Brands:
Differentiate
Message to the heart
and mind
Project credibility
Strike emotional chord
Create loyalty
![Page 56: Introduction to Market Transformation · h. Complexity of Distribution or Installer Network i. Communication Infrastructure in Place 3. Stakeholder Circumstances a. Number of Stakeholder](https://reader034.vdocuments.mx/reader034/viewer/2022042923/5f73059b5dad9c1ed50df5eb/html5/thumbnails/56.jpg)
56
ENERGY STAR® Influence
![Page 57: Introduction to Market Transformation · h. Complexity of Distribution or Installer Network i. Communication Infrastructure in Place 3. Stakeholder Circumstances a. Number of Stakeholder](https://reader034.vdocuments.mx/reader034/viewer/2022042923/5f73059b5dad9c1ed50df5eb/html5/thumbnails/57.jpg)
57
The Take Aways
Market transformation is a strategic approach to create lasting improvements in energy efficiency
Focus on markets and work with market participants; identify strategic intervention points
Leverage your efforts and resources
Coordination and working together are key
Planning, market assessment, tracking, and evaluation are critical
Set long-term goals and short-term objectives
Match strategies to opportunities or barriers