![Page 1: Introduction to Infectious Waste Incineration · Introduction to Infectious Waste Incineration Environmental-Friendly Energy & Cost Efficient June 27, ... Easy maintenance ... boiler](https://reader033.vdocuments.mx/reader033/viewer/2022051606/6028b168d4bd8340251b6334/html5/thumbnails/1.jpg)
Introduction to
Infectious Waste Incineration
Environmental-Friendly
Energy & Cost Efficient
June 27, 2019
![Page 2: Introduction to Infectious Waste Incineration · Introduction to Infectious Waste Incineration Environmental-Friendly Energy & Cost Efficient June 27, ... Easy maintenance ... boiler](https://reader033.vdocuments.mx/reader033/viewer/2022051606/6028b168d4bd8340251b6334/html5/thumbnails/2.jpg)
2
1 Project Overview
2 Basic Concept Flow
3 Project Construction
4 Main Facility Plan
5 Time Schedule
6
7
8
![Page 3: Introduction to Infectious Waste Incineration · Introduction to Infectious Waste Incineration Environmental-Friendly Energy & Cost Efficient June 27, ... Easy maintenance ... boiler](https://reader033.vdocuments.mx/reader033/viewer/2022051606/6028b168d4bd8340251b6334/html5/thumbnails/3.jpg)
3
1. Project Overview
Project Name
Infectious Waste Incineration
Capacity
40 ton / day (Infectious Waste Incineration)
Gross Amount of Cost
USD 5.73M (Infectious Waste Incineration)
Construction
12 months
![Page 4: Introduction to Infectious Waste Incineration · Introduction to Infectious Waste Incineration Environmental-Friendly Energy & Cost Efficient June 27, ... Easy maintenance ... boiler](https://reader033.vdocuments.mx/reader033/viewer/2022051606/6028b168d4bd8340251b6334/html5/thumbnails/4.jpg)
4
Infectious Waste
General Medical Wastes
Hazardous Medical Wastes
Quarantine Waste
1. Project Overview
![Page 5: Introduction to Infectious Waste Incineration · Introduction to Infectious Waste Incineration Environmental-Friendly Energy & Cost Efficient June 27, ... Easy maintenance ... boiler](https://reader033.vdocuments.mx/reader033/viewer/2022051606/6028b168d4bd8340251b6334/html5/thumbnails/5.jpg)
5
Electricity generation
Incineration (40 ton/day)
Infectious
Waste
BASIC CONCEPT FLOW
Landfill
![Page 6: Introduction to Infectious Waste Incineration · Introduction to Infectious Waste Incineration Environmental-Friendly Energy & Cost Efficient June 27, ... Easy maintenance ... boiler](https://reader033.vdocuments.mx/reader033/viewer/2022051606/6028b168d4bd8340251b6334/html5/thumbnails/6.jpg)
6
Infection Waste Incineration
Kind of Waste Material : Infection Waste
Waste Treatment : 40ton / day
Incineration Capacity : 40 ton / day
20 ton x 2 set
Operating System : Back up Type
Operation Time : 24 hours / day
3. Project Construction
![Page 7: Introduction to Infectious Waste Incineration · Introduction to Infectious Waste Incineration Environmental-Friendly Energy & Cost Efficient June 27, ... Easy maintenance ... boiler](https://reader033.vdocuments.mx/reader033/viewer/2022051606/6028b168d4bd8340251b6334/html5/thumbnails/7.jpg)
7
3. Project Construction
Infectious Waste Incineration
Incinerator : Stocker Type (Back up System)
Waste Heat Boiler
Anti-Pollution System
Electrical & Monitoring System
Turbine & Generator & ACC System
I . D Fan
Stack
![Page 8: Introduction to Infectious Waste Incineration · Introduction to Infectious Waste Incineration Environmental-Friendly Energy & Cost Efficient June 27, ... Easy maintenance ... boiler](https://reader033.vdocuments.mx/reader033/viewer/2022051606/6028b168d4bd8340251b6334/html5/thumbnails/8.jpg)
8
Energy from Infectious Waste
Infectious Waste-to-Energy plants , to produce steam in a boiler that is used to generate electricity
4. Main Facility Plan
![Page 9: Introduction to Infectious Waste Incineration · Introduction to Infectious Waste Incineration Environmental-Friendly Energy & Cost Efficient June 27, ... Easy maintenance ... boiler](https://reader033.vdocuments.mx/reader033/viewer/2022051606/6028b168d4bd8340251b6334/html5/thumbnails/9.jpg)
9
Infectious Waste to Energy Process
4. Main Facility Plan
![Page 10: Introduction to Infectious Waste Incineration · Introduction to Infectious Waste Incineration Environmental-Friendly Energy & Cost Efficient June 27, ... Easy maintenance ... boiler](https://reader033.vdocuments.mx/reader033/viewer/2022051606/6028b168d4bd8340251b6334/html5/thumbnails/10.jpg)
10
Lay-Out Plan & 3D View
4. Main Facility Plan
![Page 11: Introduction to Infectious Waste Incineration · Introduction to Infectious Waste Incineration Environmental-Friendly Energy & Cost Efficient June 27, ... Easy maintenance ... boiler](https://reader033.vdocuments.mx/reader033/viewer/2022051606/6028b168d4bd8340251b6334/html5/thumbnails/11.jpg)
11
Proposed Project Plan
Selection of Incinerator
Part Stocker type
Picture
Advantage
• Stable operation
• Easy maintenance
• Low construction cost
Experience • 95% of Korea WTE market
are stocker type
4. Main Facility Plan
![Page 12: Introduction to Infectious Waste Incineration · Introduction to Infectious Waste Incineration Environmental-Friendly Energy & Cost Efficient June 27, ... Easy maintenance ... boiler](https://reader033.vdocuments.mx/reader033/viewer/2022051606/6028b168d4bd8340251b6334/html5/thumbnails/12.jpg)
12
Steam turbine Generator
Diagram & Procedure
·
Heat recovery boiler
Econo -mizer
Steam Header
Steam Pre-heater
HVAC
Steam Turbine
Condensate Pump
Condensate Tank
Air cooling type Condenser
Boiler Feed Pump
Deaerator
Superheated Steam (66bar a X 450℃)
Blowdown Flash Tank
Blowdown Tank
Blowdown Cooler
Demi water Treatment Facility
Waste water Treatment Facility
Steam
Condensate
Water
Legend
4. Main Facility Plan
![Page 13: Introduction to Infectious Waste Incineration · Introduction to Infectious Waste Incineration Environmental-Friendly Energy & Cost Efficient June 27, ... Easy maintenance ... boiler](https://reader033.vdocuments.mx/reader033/viewer/2022051606/6028b168d4bd8340251b6334/html5/thumbnails/13.jpg)
13
Combustion Gas treatment Facility
Combustion Gas Treatment Schedule
Design Criteria(Sample)
Optional Selective
Catalyzer
• Removal Oxide
Nitrogen
• Restraint of Dioxin
Activity
Atomizing
bicarbonate
• Removal(SOx,
HCl)Acidity
• Removal of Dioxin
Atomizing of Active
Carbon
• Removal of Dioxin
• Removal of heavy
metal
Dust filtering
collector
• Removal of dust
• Removal of Dioxin
and heavy metal
Removal of acid gas
Air pollution material Legal criteria Design Criteria
SOx (ppm) 30 below 10 below
NOx (ppm) 70 below 70below
HCl (ppm) 15 below 10 below
Dust (mg/Sm³) 20 below 10 below
Dioxin (ng-TEQ/N㎥) 0.1below 0.01 below
4. Main Facility Plan
![Page 14: Introduction to Infectious Waste Incineration · Introduction to Infectious Waste Incineration Environmental-Friendly Energy & Cost Efficient June 27, ... Easy maintenance ... boiler](https://reader033.vdocuments.mx/reader033/viewer/2022051606/6028b168d4bd8340251b6334/html5/thumbnails/14.jpg)
14
Facility Flow & required Area
• Area : 2,310m2
• Flow-Chart
• Easy Control
• Minimize of Environmental destruction
• Seperating flow line between Facility Vehicle and Control Vehicle
Turbine generator
Boiler
Incineration
condenser
Gas treatment
Stack
Control Building
Waste carry -in
4. Main Facility Plan
![Page 15: Introduction to Infectious Waste Incineration · Introduction to Infectious Waste Incineration Environmental-Friendly Energy & Cost Efficient June 27, ... Easy maintenance ... boiler](https://reader033.vdocuments.mx/reader033/viewer/2022051606/6028b168d4bd8340251b6334/html5/thumbnails/15.jpg)
15
5. Incineration Project Time Schedule
![Page 16: Introduction to Infectious Waste Incineration · Introduction to Infectious Waste Incineration Environmental-Friendly Energy & Cost Efficient June 27, ... Easy maintenance ... boiler](https://reader033.vdocuments.mx/reader033/viewer/2022051606/6028b168d4bd8340251b6334/html5/thumbnails/16.jpg)
16
Thank You !!!
![Page 17: Introduction to Infectious Waste Incineration · Introduction to Infectious Waste Incineration Environmental-Friendly Energy & Cost Efficient June 27, ... Easy maintenance ... boiler](https://reader033.vdocuments.mx/reader033/viewer/2022051606/6028b168d4bd8340251b6334/html5/thumbnails/17.jpg)
Sri Lanka Incineration Project
Time Schedule ( Draft )
June 27, 2019
![Page 18: Introduction to Infectious Waste Incineration · Introduction to Infectious Waste Incineration Environmental-Friendly Energy & Cost Efficient June 27, ... Easy maintenance ... boiler](https://reader033.vdocuments.mx/reader033/viewer/2022051606/6028b168d4bd8340251b6334/html5/thumbnails/18.jpg)
2019 2020 Remark
7 8 9 10 11 12 1 2 3 4 5 6 12M
1. Site survey 0.5M
2. Execution plan
3. Engineering
(Approval)
2M
4. Automation ;
5. Manufacture (Inci,
Boil,Gene,Elec,Anti-)
6. Construction (Inci,
Boil,Gene,Elec, Anti-)
7. Commissioning
8. Pre-use
Inspection
9. Registered
10. Commercial
Operation
Month Item
Sri Lanka Incineration Project Time Schedule (Draft :June‘19)
Year
2M
2M
3M
1M
2M
6M
5M
2M
![Page 19: Introduction to Infectious Waste Incineration · Introduction to Infectious Waste Incineration Environmental-Friendly Energy & Cost Efficient June 27, ... Easy maintenance ... boiler](https://reader033.vdocuments.mx/reader033/viewer/2022051606/6028b168d4bd8340251b6334/html5/thumbnails/19.jpg)
Infectious Waste Incineration
Sri Lanka
June 27, 2019
![Page 20: Introduction to Infectious Waste Incineration · Introduction to Infectious Waste Incineration Environmental-Friendly Energy & Cost Efficient June 27, ... Easy maintenance ... boiler](https://reader033.vdocuments.mx/reader033/viewer/2022051606/6028b168d4bd8340251b6334/html5/thumbnails/20.jpg)
1. WARRANTY
WE WARRRANT THE PRODUCTS (MACHINERY, EQUIPMENT, MATERIAL & ENGINEERING) WE SUPPLY.AND ALSO WE WARRANT THE PRODUCTS FOR THE PERIOD OF TWENTY FOUR MONTHS(24)FROM THE DATE OF COMMISSIONING TEST.AFTER 2 YEARS, WE WILL BE CHECKING EVERYTHING IN INCINERATOR PERIODICALLY ACCORDING TO '' MAINTENANCE CONTRACTS" BETWEEN YOU AND OURS.
2. TRAINING EDUCATION
BASICALLY, TWO PEOPLE ARE NEEDED TO RUN THE WASTE PROCESS. (ONE -EQUIPMENT PART, ANOTHER- AUTOMATIC CONTROL PART.)IF YOU WANT MORE PEOPLE TO TRAIN, WE'LL BE GLAD TO.AND WE THINK 2 MONTHS FROM COMMISSIONING TEST WILL BE APPROPRIATE.
3. PAYMENT SCHEDULE
1st PAYMENT: 20% TOTAL PROJECT COST EFFECTIVE DATE OF THIS AGREEMENT
2nd PAYMENT: 40% TOTAL PROJECT COST DESIGN DOCUMENT APPROVAL
3rd PAYMENT: 30% TOTAL PROJECT COST LAST SHIPMENT OF EQUIPMENT
4th PAYMENT: 10% TOTAL PROJECT COST COMPLETION OF COMMISSIONING