Introduction of Process Modelling and Simulation of Batch Process
PTT 303/2 PROCESS MODELLING AND SIMULATIONSEM 1 (2013/2014)
![Page 2: Introduction of Process Modelling and Simulation of Batch Process PTT 303/2 PROCESS MODELLING AND SIMULATION SEM 1 (2013/2014)](https://reader035.vdocuments.mx/reader035/viewer/2022062221/56649da85503460f94a94895/html5/thumbnails/2.jpg)
Subject covered
Modeling and optimization of batch and
continuous processes
Batch Process Scheduling
Resources and inventory tracking
Cost analysis & project economic evaluation
Throughput Analysis & Debottlenecking
![Page 3: Introduction of Process Modelling and Simulation of Batch Process PTT 303/2 PROCESS MODELLING AND SIMULATION SEM 1 (2013/2014)](https://reader035.vdocuments.mx/reader035/viewer/2022062221/56649da85503460f94a94895/html5/thumbnails/3.jpg)
What is “Process Simulation”?
Q: What does the word “simulate” mean?
Building a process model Predicting how a process would actually behave Performing an experiment (on computer)
Incentives: Highly cost effective Reasonably accurate Proactive approach
![Page 4: Introduction of Process Modelling and Simulation of Batch Process PTT 303/2 PROCESS MODELLING AND SIMULATION SEM 1 (2013/2014)](https://reader035.vdocuments.mx/reader035/viewer/2022062221/56649da85503460f94a94895/html5/thumbnails/4.jpg)
Sequential modular approach Individual equipment blocks may require
iterative solution algorithms
Overall process solution is sequential & not iterative
(Turton et al., 1998)
![Page 5: Introduction of Process Modelling and Simulation of Batch Process PTT 303/2 PROCESS MODELLING AND SIMULATION SEM 1 (2013/2014)](https://reader035.vdocuments.mx/reader035/viewer/2022062221/56649da85503460f94a94895/html5/thumbnails/5.jpg)
Sequential modular approach
![Page 6: Introduction of Process Modelling and Simulation of Batch Process PTT 303/2 PROCESS MODELLING AND SIMULATION SEM 1 (2013/2014)](https://reader035.vdocuments.mx/reader035/viewer/2022062221/56649da85503460f94a94895/html5/thumbnails/6.jpg)
Objectives of simulation
ProcessThroughput
BatchSize / Batch
Cycle Time
• Raw Materials• Labor• Utilities• Capital Expenses
Product(s)
Waste
![Page 7: Introduction of Process Modelling and Simulation of Batch Process PTT 303/2 PROCESS MODELLING AND SIMULATION SEM 1 (2013/2014)](https://reader035.vdocuments.mx/reader035/viewer/2022062221/56649da85503460f94a94895/html5/thumbnails/7.jpg)
Commercial process simulators
Oil, Gas &Petrochemicals
Oleo Chemicals
Specialty Chemicals
Aspen Plus
HYSYS
Provision
Design II
SuperPro
SS Simulation
Dynamic Simulation
Batch
Solids
Pinch
Phys Prop
Sizing & Costing
Economics
Rating
Sensitivity Analysis
Optimization
![Page 8: Introduction of Process Modelling and Simulation of Batch Process PTT 303/2 PROCESS MODELLING AND SIMULATION SEM 1 (2013/2014)](https://reader035.vdocuments.mx/reader035/viewer/2022062221/56649da85503460f94a94895/html5/thumbnails/8.jpg)
SuperPro Designer (SPD)
Water PurificationWastewater TreatmentAir Pollution Control
BioPro Designer
SuperPro Designer
BatchPro Designer
EnviroPro Designer
BiotechnologyBio-Fuels
Fine ChemicalsPharmaceuticalsFood ProcessingMineral Processing
SchedulePro Scheduling and Debottlenecking of Multi-Product Facilities
![Page 9: Introduction of Process Modelling and Simulation of Batch Process PTT 303/2 PROCESS MODELLING AND SIMULATION SEM 1 (2013/2014)](https://reader035.vdocuments.mx/reader035/viewer/2022062221/56649da85503460f94a94895/html5/thumbnails/9.jpg)
Available tools
• Intuitive user interface
• Wide variety of unit operation models
• Databases for components and mixtures
• M&E Balances of Integrated Processes
• Equipment Sizing and Costing
• Project Economic Evaluation
• Process Scheduling & Cycle Time Analysis
• Throughput Analysis & Debottlenecking
• Environmental Impact
• Detailed Reports and Charts for the Above
![Page 10: Introduction of Process Modelling and Simulation of Batch Process PTT 303/2 PROCESS MODELLING AND SIMULATION SEM 1 (2013/2014)](https://reader035.vdocuments.mx/reader035/viewer/2022062221/56649da85503460f94a94895/html5/thumbnails/10.jpg)
User Interface of SuperPro Designer
![Page 11: Introduction of Process Modelling and Simulation of Batch Process PTT 303/2 PROCESS MODELLING AND SIMULATION SEM 1 (2013/2014)](https://reader035.vdocuments.mx/reader035/viewer/2022062221/56649da85503460f94a94895/html5/thumbnails/11.jpg)
Double-Click
Detailed Modeling using Unit Procedures and Operations
![Page 12: Introduction of Process Modelling and Simulation of Batch Process PTT 303/2 PROCESS MODELLING AND SIMULATION SEM 1 (2013/2014)](https://reader035.vdocuments.mx/reader035/viewer/2022062221/56649da85503460f94a94895/html5/thumbnails/12.jpg)
Operations Gantt Chart
![Page 13: Introduction of Process Modelling and Simulation of Batch Process PTT 303/2 PROCESS MODELLING AND SIMULATION SEM 1 (2013/2014)](https://reader035.vdocuments.mx/reader035/viewer/2022062221/56649da85503460f94a94895/html5/thumbnails/13.jpg)
Equipment Occupancy Chart
![Page 14: Introduction of Process Modelling and Simulation of Batch Process PTT 303/2 PROCESS MODELLING AND SIMULATION SEM 1 (2013/2014)](https://reader035.vdocuments.mx/reader035/viewer/2022062221/56649da85503460f94a94895/html5/thumbnails/14.jpg)
• How can I schedule production during the next 6-18 months?
• How can I schedule operations in an R&D facility?
• How to adjust scheduling if priorities change?
• Can I fit a new product into my facility?
Scheduling Questions
![Page 15: Introduction of Process Modelling and Simulation of Batch Process PTT 303/2 PROCESS MODELLING AND SIMULATION SEM 1 (2013/2014)](https://reader035.vdocuments.mx/reader035/viewer/2022062221/56649da85503460f94a94895/html5/thumbnails/15.jpg)
Resource Demand Chart
![Page 16: Introduction of Process Modelling and Simulation of Batch Process PTT 303/2 PROCESS MODELLING AND SIMULATION SEM 1 (2013/2014)](https://reader035.vdocuments.mx/reader035/viewer/2022062221/56649da85503460f94a94895/html5/thumbnails/16.jpg)
Labor Demand Chart
![Page 17: Introduction of Process Modelling and Simulation of Batch Process PTT 303/2 PROCESS MODELLING AND SIMULATION SEM 1 (2013/2014)](https://reader035.vdocuments.mx/reader035/viewer/2022062221/56649da85503460f94a94895/html5/thumbnails/17.jpg)
Raw Materials
Equipment
Labor
Consumables
Lab/QC/QA
Waste Trtm/Disp
Utilities
Cost Breakdown
Raw materials$0.88/g39.6%
Facility$0.54/g24.4%
Consumables$0.65/g29.1%
![Page 18: Introduction of Process Modelling and Simulation of Batch Process PTT 303/2 PROCESS MODELLING AND SIMULATION SEM 1 (2013/2014)](https://reader035.vdocuments.mx/reader035/viewer/2022062221/56649da85503460f94a94895/html5/thumbnails/18.jpg)
• What is the required capital investment for a new
plant?
• How much would it cost to make a kilo of product?
• Which process is better for making this product? A or
B?
• How can I reduce the operating cost of a process?
Cost Analysis Questions
![Page 19: Introduction of Process Modelling and Simulation of Batch Process PTT 303/2 PROCESS MODELLING AND SIMULATION SEM 1 (2013/2014)](https://reader035.vdocuments.mx/reader035/viewer/2022062221/56649da85503460f94a94895/html5/thumbnails/19.jpg)
Stream Dialog – Env. Properties Tab
INTELLIGEN, INC.
Environmental Impact Report
![Page 20: Introduction of Process Modelling and Simulation of Batch Process PTT 303/2 PROCESS MODELLING AND SIMULATION SEM 1 (2013/2014)](https://reader035.vdocuments.mx/reader035/viewer/2022062221/56649da85503460f94a94895/html5/thumbnails/20.jpg)
Bottleneck identification
![Page 21: Introduction of Process Modelling and Simulation of Batch Process PTT 303/2 PROCESS MODELLING AND SIMULATION SEM 1 (2013/2014)](https://reader035.vdocuments.mx/reader035/viewer/2022062221/56649da85503460f94a94895/html5/thumbnails/21.jpg)
• How much product can I make in this plant?
• What limits the current production level?
• What is the capital investment for increasing production?
Debottlenecking Questions
![Page 22: Introduction of Process Modelling and Simulation of Batch Process PTT 303/2 PROCESS MODELLING AND SIMULATION SEM 1 (2013/2014)](https://reader035.vdocuments.mx/reader035/viewer/2022062221/56649da85503460f94a94895/html5/thumbnails/22.jpg)
Course overview• Lab 1
Overview of process simulationFlowsheet development
• Lab 2 Unit procedures initialisation
• Lab 3Process schedulingResource & inventory tracking
• Lab 4Equipment ratingProject economic evaluation
• Lab 5 – Biochemical case study• Lab 6 – Throughput analysis & debottlenecking strategies