Introduction of BRI’s study on BIM based building confirmation and inspection and its’ outcomes Masaki MUTO, Dr. Eng. Chief Research Engineer Dept. of Production Engineering, BRI IRCC Meeting Tokyo, Nov. 2016 1

Upload: others

Post on 16-May-2020

6 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Introduction of BRI’s study on BIM based building ... page/Workshops/Documents... · 1+ BIM e-published application forms and drawings with BIM certification Footprint of BIM certification

Introduction of BRI’s study on BIM based

building confirmation and inspection and its’

outcomes

Masaki MUTO, Dr. Eng.

Chief Research EngineerDept. of Production Engineering, BRI

IRCC Meeting Tokyo, Nov. 2016

1

Page 2: Introduction of BRI’s study on BIM based building ... page/Workshops/Documents... · 1+ BIM e-published application forms and drawings with BIM certification Footprint of BIM certification

2

Topics

1. BRI R&D project on computerization of building

confirmation and inspection with BIM technology

(FY 2011-2014)

• Backgrounds of R&D

• Outputs of R&D

- Definition of development step

- BRI Step2+ Prototype

2. Outcomes of BRI R&D Project

Page 3: Introduction of BRI’s study on BIM based building ... page/Workshops/Documents... · 1+ BIM e-published application forms and drawings with BIM certification Footprint of BIM certification

1. BRI R&D project on computerization

of building confirmation and inspection

with BIM technology

(FY 2011-2014)

3

Page 4: Introduction of BRI’s study on BIM based building ... page/Workshops/Documents... · 1+ BIM e-published application forms and drawings with BIM certification Footprint of BIM certification

Backgrounds of R&D

4

Page 5: Introduction of BRI’s study on BIM based building ... page/Workshops/Documents... · 1+ BIM e-published application forms and drawings with BIM certification Footprint of BIM certification

Typical Procedure of Paper based building certification

各階平面図

断面図

配置図

仕上表

Confirmationbody

Applicant

高さ、道路幅員・・・

各室の用途、床面積・・・

居室の天井高さ・・・

令129条規定部分・・・○○××㊞

confirmation by paper based

documents

Application drawings and its contents

CAD

Client

(Representation)

Architect

(Substitution)

確認申請書

○○××㊞

Application form

設計概要、設計者・・・

Certificate of building conformity

Architect’s seal is needed.

Client’s seal is needed.archive application

documents

The mismatching

sometimes arises

between documents.

5

Page 6: Introduction of BRI’s study on BIM based building ... page/Workshops/Documents... · 1+ BIM e-published application forms and drawings with BIM certification Footprint of BIM certification

Typical Procedure of Paper based building certification

各階平面図

断面図

配置図

仕上表

Confirmationbody

Applicant

高さ、道路幅員・・・

各室の用途、床面積・・・

居室の天井高さ・・・

令129条規定部分・・・○○××㊞

confirmation by paper based

documents

Application drawings and its contents

CAD

Client

(Representation)

Architect

(Substitution)

確認申請書

○○××㊞

Application form

設計概要、設計者・・・

Certificate of building conformity

Architect’s seal is needed.

Client’s seal is needed.archive application

documents

The mismatching

sometimes arises

between documents.

Needs for improvement of compatibility

Needs for digital archiving

6

Page 7: Introduction of BRI’s study on BIM based building ... page/Workshops/Documents... · 1+ BIM e-published application forms and drawings with BIM certification Footprint of BIM certification

Outputs of R&D

7

Page 8: Introduction of BRI’s study on BIM based building ... page/Workshops/Documents... · 1+ BIM e-published application forms and drawings with BIM certification Footprint of BIM certification

Definition of development step

8

Page 9: Introduction of BRI’s study on BIM based building ... page/Workshops/Documents... · 1+ BIM e-published application forms and drawings with BIM certification Footprint of BIM certification

各階平面図

断面図

配置図

仕上表

Confirmationbody

Applicant

高さ、道路幅員・・・

各室の用途、床面積・・・

居室の天井高さ・・・

令129条規定部分・・・○○××㊞

Ste

p 1

Co

nven

tion

al

confirmation by paper based

documents

Photo scanned image

e-documents contents data

Application documents and its contents

3D Building model

BIM model data(unified)

electronic signature replaced with sealing

do

cu

me

nt fo

rma

ts / w

ork

flow

definition of Property sets and model view

CAD

BIM

PDF

PDF

DXF etc

CAD

XML etc.

Viewer

method of compatibility reservation

IFC XML etc.

Perspective of development stepS

tep

2S

tep

3

confirmation by

Scanned image

confirmation by

e-documents w/

contents data

confirmation by

BIM model data9

Page 10: Introduction of BRI’s study on BIM based building ... page/Workshops/Documents... · 1+ BIM e-published application forms and drawings with BIM certification Footprint of BIM certification

Step Level of developmentAdditional Contents from

conventional application

Certain about

Compatibility

In-

service*

0 CAD

BIM

Conventional application- 〇

0+ CAD

BIM

Added Some data contents

with Step0 paper docs.

CVS/XML form data of

application’s by data media- 〇

(1993~)

1 CAD

BIM

Just scanned or e-

published application forms

and drawings

(same as conventional

application) - ○(2015.1~)

1+ BIM e-published application

forms and drawings with

BIM certification

Footprint of BIM

certification for each view

of e-documents○ -

2 CAD

BIM

Added Some data contents

with Step1 docs.

CVS/XML form data of

application’s- ○

(2015.1~)

2+ BIM Added essential IFC model

data with Step1 docs.

IFC Model data incl. form

data○○ -

3- BIM Available partial auto code

checking

IFC Model data compatible

with partial ACC○○ -

3 BIM Available full auto code

checking

IFC Model data compatible

with full ACC○○○ -

Detail of development steps

10

Page 11: Introduction of BRI’s study on BIM based building ... page/Workshops/Documents... · 1+ BIM e-published application forms and drawings with BIM certification Footprint of BIM certification

What is expected to BIM/IFC on each step?

Step Conformation body expects…

How does jury check the documents?

1+ Compatibility amongapplication forms and drawing.

Jury check 2D drawing and forms manually with attention for lack of expression legally needed.

2+ Addition to 1+,to find lack of expression legally needed on application docs.

Jury check 2D drawing withoutattention for lack of expression legally needed.

3-3

Addition to 2+,to check building codes semi/full automatically.

Jury evaluate adequacy of code checking results.

11

Page 12: Introduction of BRI’s study on BIM based building ... page/Workshops/Documents... · 1+ BIM e-published application forms and drawings with BIM certification Footprint of BIM certification

BRI Step2+ Prototype

12

Page 13: Introduction of BRI’s study on BIM based building ... page/Workshops/Documents... · 1+ BIM e-published application forms and drawings with BIM certification Footprint of BIM certification

Definition of IFC based Model for

Step2+

13

BIM

CAD各階平面図

断面図

配置図

仕上表○○××㊞

IFC, PDF…

Contents: Plan, Specification, Performance-based requirements,

incl. addendum, amendment, annotation in checking process

CAD/BIM supplement

software for applicant

-making application

data

+Tables

+2D drawings

+3D model

-Self Checking

function

ASP services system

-Electrical Signature

attempt for

+PDF

-Workflow design

-Communications

support

-History Archive

Confirmation tools

-Checking function

-Applicant docs. Viewer

+tables

+2D drawing required

regally

+3D model for

reference 2D Drawing

-Editing annotations

/comments

Image of Prototype System

Page 14: Introduction of BRI’s study on BIM based building ... page/Workshops/Documents... · 1+ BIM e-published application forms and drawings with BIM certification Footprint of BIM certification

14

Definition of Property sets for application documents

vv v

vv

v v

vv

v

vv

v vv v

v

v

v

Value (ifc_Text)

v

v

<Application Form #2>

<1st page>

<Place of submission>

<Application date>

<Year>

<Month>

<Day>

<Name of applicant>

<Name of architect>

v

value(ifc_Integer)

value(ifc_Integer)

value(ifc_Integer)

Value (ifc_Text)

Value (ifc_Text)

Value (ifc_Text)

Value (ifc_Text)

value(ifc_Integer)

Value (ifc_Text)

Value (ifc_Text)

Value (ifc_BooLean)

value(ifc_Integer)

Value (ifc_Text)

Value (ifc_BooLean)

value(ifc_Integer)

Value (ifc_Text)

IfcPropertySet

>IfcComplexPropertyIfcPropertySingleValue

Making of data

structure

description value

Definition of IfcPropertySets

Page 15: Introduction of BRI’s study on BIM based building ... page/Workshops/Documents... · 1+ BIM e-published application forms and drawings with BIM certification Footprint of BIM certification

15

図書コード:010003

図書の種類 明示すべき事項図面番号等

付近見取図 方位、道路及び目標となる地物

縮尺及び方位

敷地境界線、敷地内における建築物の位置及び申請に

係る建築物と他の建築物との別

擁壁の設置その他安全上適当な措置

配置図

土地の高低、敷地と敷地の接する道の境界部分との高

低差及び申請に係る建築物の各部分の高さ

敷地の接する道路の位置、幅員及び種類

下水管、下水溝又はためますその他これらに類する施

設の位置及び排出経路又は処理経路

縮尺及び方位

間取、各室の用途及び床面積

壁及び筋かいの位置及び種類

通し柱及び開口部の位置

延焼のおそれのある部分の外壁の位置及び構造

申請に係る建築物が建築基準法(昭和25年法律第201

号。以下「法」という。)第3条第2項の規定により

法第28条の2(建築基準法施行令(昭和25年政令第

338号。以下「令」という。)第137条の4の2に規

定する基準に係る部分に限る。)の規定の適用を受け

ない建築物である場合であつて当該建築物について増

築、改築、大規模の修繕又は大規模の模様替(以下こ

の項において「増築等」という。)をしようとすると

きにあつては、当該増築等に係る部分以外の部分につ

いて行う令第137条の4の3第3号に規定する措置

床面積求積図 床面積の求積に必要な建築物の各部分の寸法及び算式

縮尺

開口部の位置

延焼のおそれのある部分の外壁及び軒裏の構造(法第

62条第1項本文に規定する建築物のうち、耐火建築

物及び準耐火建築物以外のものについては、縮尺、開

口部の位置及び構造並びに外壁及び軒裏の構造)

縮尺

地盤面

各階の床及び天井(天井のない場合は、屋根)の高

さ、軒及びひさしの出並びに建築物の各部分の高さ

建築物が周囲の地面と接する各位置の高さ

地盤面を算定するための算式

基礎伏図

各階床伏図

小屋伏図

構造詳細図

(い)

(ろ) (は)

※令第1条第5号に係る認定書の写し(準不燃材料)

※令第1条第6号に係る認定書の写し(難燃材料)

※令第109条の3第2号ハに係る認定書の写し

(ロ準耐ー2の床・床直下の天井)

※令第109条の3第1号に係る認定書の写し(ロ準耐-1)

原則、全ての建築物

※法第2条第7号に係る認定書の写し(耐火構造)

※法第2条第9号に係る認定書の写し(不燃材料)

縮尺並びに構造耐力上主要な部分の材料の種別及び寸

※法第2条第8号に係る認定書の写し(防火構造)

各階平面図

二面以上の立面図

二面以上の断面図

※法第2条第7号の2に係る認定書の写し(準耐火構造)

※法第2条第9号の2ロに係る認定書の写し(防火設備)

地盤面算定表

010000

03

01

02

01

0203

0405

06

01

010203

0405

06

0100000304

「全ての建築物の各階平面図」で明示すべき、「開口部の位置」

<01000003

> <03>

The object which must specify an building

certification item on application drawings

is stored in IfcProperty (=“Pset_BSLJ_確認

申請チェックリスト”) as the information

which contents must be described.

Definition of Property sets for description on drawings

04

0502

03

0101

Page 16: Introduction of BRI’s study on BIM based building ... page/Workshops/Documents... · 1+ BIM e-published application forms and drawings with BIM certification Footprint of BIM certification

16

Definition of IFC based model for Step2+

♯1F Plan

origin

N

1階平面図

#1F Plan

#A

A’

Se

ctio

n

A

A’

倉庫

出力表示の座標は、出力側で維持

Page 17: Introduction of BRI’s study on BIM based building ... page/Workshops/Documents... · 1+ BIM e-published application forms and drawings with BIM certification Footprint of BIM certification

17

Screen shots of ASP service system for all steps

Page 18: Introduction of BRI’s study on BIM based building ... page/Workshops/Documents... · 1+ BIM e-published application forms and drawings with BIM certification Footprint of BIM certification

Screen shots of Confirmation tools

18

Page 19: Introduction of BRI’s study on BIM based building ... page/Workshops/Documents... · 1+ BIM e-published application forms and drawings with BIM certification Footprint of BIM certification

19

Screen shots of Inspection tools

Page 20: Introduction of BRI’s study on BIM based building ... page/Workshops/Documents... · 1+ BIM e-published application forms and drawings with BIM certification Footprint of BIM certification

2. Outcomes of BRI R&D Project

20

Page 21: Introduction of BRI’s study on BIM based building ... page/Workshops/Documents... · 1+ BIM e-published application forms and drawings with BIM certification Footprint of BIM certification

Outcomes of BRI Research Project

• The 1st achievement of BIM building certification• Building certification by accepting BIM model file has kicked off!

• “Jyutaku seino hyouka center,” the designated confirmation and

inspection body executed building certification by accepting BIM

model as the 1st achievement in Japan.

• bSJapan Regulatory WG• Regulatory WG under the Architectural & Cross Domain Group is

settled by buildingSMART Japan.

21

Page 22: Introduction of BRI’s study on BIM based building ... page/Workshops/Documents... · 1+ BIM e-published application forms and drawings with BIM certification Footprint of BIM certification

The 1st achievement of BIM building certification

FREEDOM ARCHITECTS DESIGNApplicant:

Confirmation body:

BIM software/solution bender:

Freedom Architects design, the applicant and Jyutaku seino hyouka center, the

designated confirmation and inspection body developed a “Revit based” BIM

building certification solution in collaboration with Otsuka Corp. and Autodesk.

In Aug. 2016, 2 building certification was issued using by this solution, These 4

companies jointly issued a press release announcing the outline at Sep. 1st, and

Freedom Architects design made the speech at Autodesk University Japan 2016

about the detail at Set. 6th.

Jyutaku seino hyouka center, KK

22

Page 23: Introduction of BRI’s study on BIM based building ... page/Workshops/Documents... · 1+ BIM e-published application forms and drawings with BIM certification Footprint of BIM certification

The 1st achievement of BIM building certification

Application Format

2D/3D Drawings Regally

Required

Drawings

=“View”

There is no inconsistency between drawings as long as they are issued from BIM DATA.

23

Page 24: Introduction of BRI’s study on BIM based building ... page/Workshops/Documents... · 1+ BIM e-published application forms and drawings with BIM certification Footprint of BIM certification

The 1st achievement of BIM building certification

Site Map Site Plan Floor Area Calculation figure

Floor Plan Elevation Section

6 essential drawings and calculation figure issued from BIM model data by Revit

24

Page 25: Introduction of BRI’s study on BIM based building ... page/Workshops/Documents... · 1+ BIM e-published application forms and drawings with BIM certification Footprint of BIM certification

Supplemental

Information that regally

required put on semi-

automatically using by

“Revit Template”.

The 1st achievement of BIM building certification

Regally Required DrawingsBIM model with 2D drawings view

Freedom architect design, Otsuka corp. and Autodesk streamlined the workflow of

making regally required drawings.

25

Page 26: Introduction of BRI’s study on BIM based building ... page/Workshops/Documents... · 1+ BIM e-published application forms and drawings with BIM certification Footprint of BIM certification

The 1st achievement of BIM building certification

Applicant Confirmation Body

Jutaku seino hyouka center, KK, Otsuka corp. and Autodesk streamlined the workflow of

consistency check by accepting BIM model file.

Conventional

e-submission

(BRI Step 1)

BIM building certification

(BRI Step 1+)

Drawings

generated by BIM

but unknown

about its

consistency…

Issue drawings

Issue drawingsw/ Supplemental

Information

w/ Supplemental

Information

26

Page 27: Introduction of BRI’s study on BIM based building ... page/Workshops/Documents... · 1+ BIM e-published application forms and drawings with BIM certification Footprint of BIM certification

The 1st achievement of BIM building certificationScheme of whole building certification on this case (with BRI Step 1+ Concept)

Certification phase

→Conventional way

Applicant Confirmation Body

Pre-check phase

→Step 1+

Fixed Design

27

Page 28: Introduction of BRI’s study on BIM based building ... page/Workshops/Documents... · 1+ BIM e-published application forms and drawings with BIM certification Footprint of BIM certification

Step Level of developmentAdditional Contents from

conventional application

Certain about

Compatibility

In-

service*

0 CAD

BIM

Conventional application- 〇

0+ CAD

BIM

Added Some data contents

with Step0 paper docs.

CVS/XML form data of

application’s by data media- 〇

(1993~)

1 CAD

BIM

Just scanned or e-

published application forms

and drawings

(same as conventional

application) - ○(2015.1~)

1+ BIM e-published application

forms and drawings with

BIM certification

Footprint of BIM

certification for each view

of e-documents○

△(2016.8~)

2 CAD

BIM

Added Some data contents

with Step1 docs.

CVS/XML form data of

application’s- ○

(2015.1~)

2+ BIM Added essential IFC model

data with Step1 docs.

IFC Model data incl. form

data○○ -

3- BIM Available partial auto code

checking

IFC Model data compatible

with partial ACC○○ -

3 BIM Available full auto code

checking

IFC Model data compatible

with full ACC○○○ -

Detail of development steps

(* 〇:in general, △:as trial) 28

Page 29: Introduction of BRI’s study on BIM based building ... page/Workshops/Documents... · 1+ BIM e-published application forms and drawings with BIM certification Footprint of BIM certification

bSJapan Regulatory WG

• bSJ Reg. WG has three missions as follows;

• Inspection of MVD certification for BCC IFC inspection

• Study on BIM use technology in a Building confirmation and

inspection in practical affair

• Corresponding to bSI RR’s projects in bSJ

• Convener and Participants• Convener:

Masaki MUTO / Building Research Institute

• Constitution of participants:

confirmation body, architectural design office, general contractor,

home builder, software solution vendor and interested individuals

29

Page 30: Introduction of BRI’s study on BIM based building ... page/Workshops/Documents... · 1+ BIM e-published application forms and drawings with BIM certification Footprint of BIM certification

30

Hans Lif, bSI RR WG1 co-chairs

(bS Nordic/RAMBOLL)

bSI RR’s e-submission common guideline projects

bSI Jeju summit

Page 31: Introduction of BRI’s study on BIM based building ... page/Workshops/Documents... · 1+ BIM e-published application forms and drawings with BIM certification Footprint of BIM certification

Project Stage Pre-design design Procurement ConstructionHand

over

Post

contruction

UK

RIBA

Inception

and

planning

Outline

Proposal

Scheme

designDetail design

Production InformationTender action & contract

award

Project PlanningComple

tionFeed back

Bill of quantities Operation on Site

USA

AIAProgram

ming

Prelimin

ary

design

Schemati

c design

Design

developm

ent

Construction documentsBidding negotiation &

contract award

General administration complet

ion and

closeou

t

facility

operationEvaluation of work on site

JapanResearch and

Planning

調査企画

Basic design

基本設計

Detailed design

実施設計

optional service

Detailed design during

constructionpost

constructionconstruction supervision

Korea Concept Design

Schemat

ic

Design

Design Development Construction Documents

Construction

Administration Post Design

ManagementConstruction

Management

China

Schematic

design

Investment

planning

方案設計

Preliminary

Design

Development

Design

初歩設計

Working Drawing

Construction preparationCooperate Construction

Accept

anceAfter-sales

serviceCollati

on

Comparison of design process

Concept approval Building approval

?

construction approval

LOD xxxLOD yyy

Page 32: Introduction of BRI’s study on BIM based building ... page/Workshops/Documents... · 1+ BIM e-published application forms and drawings with BIM certification Footprint of BIM certification

-Difference of maturity of information by approval phases

Application form

Drawings

Concept approval

Map

Common understanding about building permit /

confirmation procedure

<

Building approval Construction approval

To be build As build

→Archive

Increase

maturity of

information

inspection

=

=

Page 33: Introduction of BRI’s study on BIM based building ... page/Workshops/Documents... · 1+ BIM e-published application forms and drawings with BIM certification Footprint of BIM certification

Representation of procedure and information delivery

to develop common understanding

Classification of information delivery could be classified from the kind

of information format as legal requirement and its treatment during

the procedure of BCC.

Page 34: Introduction of BRI’s study on BIM based building ... page/Workshops/Documents... · 1+ BIM e-published application forms and drawings with BIM certification Footprint of BIM certification

Proposal for the questionnaire for international

comparison of information deliveryThe questionnaire is to clear the facts about;

• Which approval is needed in each country?

• After which design process is it applied for the approval?

• What documents or drawings are needed legally on paper based,

paperless and BIM based submission?

• What expressive elements are specified for each document or

drawing?

• Which building code does each expressive element correspond

to?

• What type is the criterion for adaptation of building code?

(e.g. existence, text, numbers, numerical value or

spatial/geometrical relation of targets, or results of calculation,

simulation or analysis)

Page 35: Introduction of BRI’s study on BIM based building ... page/Workshops/Documents... · 1+ BIM e-published application forms and drawings with BIM certification Footprint of BIM certification

Draft of the questionnaire format

documents or

drawings are

needed legally

specified expressive

elements

paperless

document

file format

essential or as

needed from

building code of

criterion

type

map Orientation, Scale

Road

Landscape

pdf essential geometrical

site plan Orientation, Scale

Site boundary

Waste Water Piping…

pdf essential geometrical

floor plan Room type

Location of opening

Location of structural

elements…

pdf essential spatial

floor area

calculation figure

Size of floor space

Calculation formula

pdf essential spatial

numerical

Japan/Building Approval after detail design

sample

sample

sample

sample

Page 36: Introduction of BRI’s study on BIM based building ... page/Workshops/Documents... · 1+ BIM e-published application forms and drawings with BIM certification Footprint of BIM certification

Draft of Common Scale <Proposal>

Level of

Development

Conformation body

expects…

Work object IFC expression of

legal issue

1

<Manual

checking w/o

IFC>

a. Compatibility among

application forms and

drawing.

b. to recognize

complicated shape

easily by 3D view

a. 2D drawing

issued from BIM

model

b. 3D view of BIM

model

(n/a)

2

<Manual

checking w/

IFC>

to find lack of expression

legally needed on

application docs.

2D drawing and

Model Data

Indication of legal

objects

3<Hybrid>

3+<ACC>

to check building codes

semi/full automatically.

a. Number of targets

b. Numerical value of

targets

c. Spatial / Geometrical

relation of targets

d. Simulation / Analysis

<Hybrid>

2D drawing and

Model Data

<ACC>

Model Data

Value of legal objects

a. Object Type

b. Numerical Value

c. Code checking

Rule

d. Exporting to

external program

Page 37: Introduction of BRI’s study on BIM based building ... page/Workshops/Documents... · 1+ BIM e-published application forms and drawings with BIM certification Footprint of BIM certification

Thank you for your attention!