Name : Europort „Eagle of the Adriatic“, Shengjin, Albania
Location : Adriatic Sea , at the zone of Shengjin, Albania
Capacity of the Europort : 60 million tons of goods and 4 million passengers per year
Construction cost : 2.2 billion EURDuration of construction : 5 yearsForm of investment : Private investment
The surface is of 730 ha, out of which 89% will be in the sea and 11% or 70 ha on land .The sea surface and depth of the Adriatic Eagle Europort allow to be anchored and circulate ships of capacity form 5000 tons to 500,000 tons.
GEOGRAFIC POSITION OF THE EUROPORT SHENGJINIGEOGRAFIC POSITION OF THE EUROPORT SHENGJINI
Latitude: N 41°49`26249``Latitude: N 41°49`26249``Longitude: E 19° 33` 26607``Longitude: E 19° 33` 26607``
•Europort of Shengjin which will connect mainly the south Adriatic and east Mediteranean Aquatorium with the Central, Eastern and also Northern European countries. The importance of the Europort of Shengjin in the European scale will also be in the light of connection the Adriatic Sea with the Black Sea and to avoid the fully congested Bosporus and Dardanelle straight.
•The Europort of Shengjin will be constructed between Commune Shengjin and Velipoje, at the coastline of Renci mountain, at an uncultivated costal zone, unexploited, at a rocky hole, by putting P= 89 % of the portal structures into the sea and p=11% of the portal structures in the land.
CONNECTION WITH EUROPEAN TRANSPORT CONNECTION WITH EUROPEAN TRANSPORT CORRIDORSCORRIDORS
Trough CORRIDOR VIII EUROPORT SHENGJINI interacts with:
• Adriatic Corridor (Italian eastern coast).
• Corridor X (Salzburg/Budapest-Beograd-Nis-Skopje-Thessaloniki).
• Corridor IV(Wien-Budapest-Sofia-Plovdiv-Istanbul).
• Corridor IX (Kiev-Bucharest-Byala-Dimitrograd- Alexandroupolis).
The MAIN TRANSPORT DIRECTION connects:
BARI / BRINDISI / DURRES
/ VLORE – TIRANA – CAFASAN – SKOPJE – SOFIA - PLOVDIV -
BURGAS /VARNA
The transport connections also includes Corridors to:
•ORMENION-SVILENGRAD-BURGAS road connection to Corridors IV, IX and Trans- European Network;
• BYALA/HORNA ORIAHOVICA-PLEVEN-SOFIA connecting to Corridors IV and IX;
• CAFASAN-KAPSHTICE/KRISTALLOPIGI connecting to the Trans-European Network.
by sea ( by sea ( in in NmNm ) )
EUROPORT SHENGJINI
by by landland ( ( in in KmKm ) )
BENEFITS OF THE LOCATION OF EUROPORTBENEFITS OF THE LOCATION OF EUROPORT
Terminal operations Complete logistic support Management of the port area Management of the Free Zone
ACTIVITIES OF EURPORT SHENGJINIACTIVITIES OF EURPORT SHENGJINI
Containers General cargo Fruit & Vegetables
Vehicles Livestock Dry Bulk Liquid Bulk
EURPORT SHENGJINI is an all-purpose portEURPORT SHENGJINI is an all-purpose port
OWNERSHIP STRUCTURE OF EURPORT SHENGJINIOWNERSHIP STRUCTURE OF EURPORT SHENGJINI
• 100 % private investors
Bazen 3
Total port area 7,300,000 m2
Anchorage area (inner port) 4.3 km
Terminals 1,121,500 m2
Storage infrastructurearea 3,000,000 m2
Breakwater length 3340 m
Quay length 4.3 km Maximum legth of berrths 13,312 m
Minimum sea depth 22 m
Maximum sea depth 35 m
PANORAMA OF EUROPORT SHENGJINIPANORAMA OF EUROPORT SHENGJINI
AtlanticOcean
Mediterranean sea
Gibraltar
EUROPORT EUROPORT SHENGJINISHENGJINI
Budapest
Constanta
BurgasSkopje
ZagrebMilanBeograd
Sofia
Kiev
Suez CanalAn hinterland area of:8 countries50 million inhabitantsAverage GDP growth 4%
TiranaThesallonike
Istanbul
HHINTERLANDINTERLAND MARKETSMARKETS OFOF EUROPORT SHENGJINIEUROPORT SHENGJINI
Total turnover: 60mio tons (fully operational port) - Hinterland (Import/Export) 15 mio ton ( 25% )
- Transit 45 mio ton ( 75% )
EUROPORT SHENGJINI MARKET MASTERING
BASIC FINANCIAL BENEFITS OF INVESTMENT IN EUROPORT SHENGJINI
1. COST OF CONSTRUCTION - CONSTRUCTION fixing V = 2,200,000,000 €
2. TIME OF CONSTRUCTION A = 5 YEARS
3. DEADLINE OF RETURN REPAY T = 15 YEARS
4. PROCESSING COST of goods average in EUROPORT = € 8.70 / ton
5. PROCESSING COST of goods average in the port of Durres = 15,31 €/ ton
6. Rate Change (15, 31: K = 8.7 = 1.76 )
Vision and development orientations of Vision and development orientations of
EURPORT SHENGJINIEURPORT SHENGJINI
VisionVision: EUROPORT SHENGJINI will become leading port and logistic center for SE Europe.
VisionVision: EUROPORT SHENGJINI will become leading port and logistic center for SE Europe.
Complete logistic supportComplete logistic support (service integration with other providers) for a more competitive transport route via VIII. Corridor.
Distribution platform with wide range of value added activities .
Vision and development orientationsVision and development orientations
Corridor VIII. infrastructure upgrading and concesions in other logistic terminals.
Development of inland logistics network of services in ports hinterland and beyond.
Business developmnet in two directions:Business developmnet in two directions:
BUSINESS ENVIRONMENTBUSINESS ENVIRONMENT
Signed the EU’s Stabilisation-Association agreement.Signed the EU’s Stabilisation-Association agreement.
Trade agreement with the European Union – both “Interim” and “CEFTA”.Trade agreement with the European Union – both “Interim” and “CEFTA”.
Albania expecting to become a member of the European Union. Albania expecting to become a member of the European Union.
Banking is increasingly dominated by foreign banks, which account for about 90% of total assets.Banking is increasingly dominated by foreign banks, which account for about 90% of total assets.
Young workforce. 10% flat tax rate
10% flat tax rate.NATO membership.NATO membership.
www.worldfinance.com www.lm-europort.eu.eu
What they say about the project?What they say about the project?
What they say about the project?What they say about the project?
www.worldfinance100.com
www.worldfinance100.comEuropeanCEO