introduction introduction presentation about the participation of the company fest engineering ltd....

15
Introduction Introduction Presentation about the participatio of the company FEST Engineering Ltd on the project „Salechard“

Upload: logan-truby

Post on 29-Mar-2015

219 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: Introduction Introduction Presentation about the participation of the company FEST Engineering Ltd. on the project Salechard

IntroductionIntroductionPresentation about the participation

of the company FEST Engineering Ltd. on the project „Salechard“

Page 2: Introduction Introduction Presentation about the participation of the company FEST Engineering Ltd. on the project Salechard

Basic details about project

Name of the project: TEC Polyarnaja, Selechard, The Russian Federation

Purchaser: Fans, a.s.

Assignment:

Strength - dilatational analysis of steam pipeline DN 5800

Create a project and production documentation of the main supporting steel structures

Stress analysis of condensate and siphon tanks with SO02-Skid and SO01

Beginning of works: April 2012

End of works: June 2013

Page 3: Introduction Introduction Presentation about the participation of the company FEST Engineering Ltd. on the project Salechard

The list of work

Stress analysis of the steam (determining the wall thickness of steam pipeline in the places storage and outside these storage, determining a fixed point and sliding storage in dependence on the connection to the steam turbine and the steam chamber)

Calculation of forces acting in the places storage of steam piping on supporting steel structure (determining the shifts in these places)

Strength - dilatational analysis of process piping, which is stored on its own steam pipeline and then on the supporting steel structures + determining the geometry and store these piping (cca. 50 pc.)

Proposal store the steam pipeline on the main supporting steel structures and determining responses to the iron-concrete foundation of the substructure

Create a project of the main supporting steel structuresfrom primal studies through to final production documentation. This part of the project specifically related to object of steel supports OH1÷OH6, main supporting steel structure of steam chamber SO03, technological object SO02-Skid and all auxiliary steel structures located in this objects or directly on the steam pipeline

Static analysis for all already mentioned main and auxiliary steel structure

Stress analysis of condensate and siphon tanks with SO02-Skid and SO01

Projection and production documentation of condensate and siphon tanks with SO02-Skid and SO01

Stress analysis of the steam chamber stored on the steel structure SO01

Creating the overall disposition of the steam piping DN including supporting steel structures and determination the borders of supply

Page 4: Introduction Introduction Presentation about the participation of the company FEST Engineering Ltd. on the project Salechard

Stress analysis of the steam pipeline

determining the wall thickness of steam pipeline in the places storage and outside these storage

determining a fixed point and sliding storage in dependence on the connection to the steam turbine and the steam chamber

Page 5: Introduction Introduction Presentation about the participation of the company FEST Engineering Ltd. on the project Salechard

Calculation of forces acting in the places storage of steam piping on supporting

steel structure determining the shifts in these places

Page 6: Introduction Introduction Presentation about the participation of the company FEST Engineering Ltd. on the project Salechard

Strength - dilatational analysis of process piping

Which is stored on its own steam pipeline and then on the supporting steel structures + determining the geometry and store these piping (cca. 50 pc.)

Page 7: Introduction Introduction Presentation about the participation of the company FEST Engineering Ltd. on the project Salechard

Proposal store the steam pipeline

on the main supporting steel structures

determining responses to the iron-concrete foundation of the substructure

Page 8: Introduction Introduction Presentation about the participation of the company FEST Engineering Ltd. on the project Salechard

Create a project of the main supporting steel structures

from primal studies through to final production documentation

This part of the project specifically related to object of steel supports OH1÷OH6, main supporting steel structure of steam chamber SO03, technological object SO02-Skid and all auxiliary steel structures located in this objects or directly on the steam pipeline

Page 9: Introduction Introduction Presentation about the participation of the company FEST Engineering Ltd. on the project Salechard

Create a project of the main supporting steel structures

Page 10: Introduction Introduction Presentation about the participation of the company FEST Engineering Ltd. on the project Salechard

Static analysis

For all already mentioned main and auxiliary steel structure

Page 11: Introduction Introduction Presentation about the participation of the company FEST Engineering Ltd. on the project Salechard

Stress analysis of condensate and siphon tanks with SO02-Skid and SO01

Page 12: Introduction Introduction Presentation about the participation of the company FEST Engineering Ltd. on the project Salechard

Projection and production documentation of condensate and siphon

tanks with SO02-Skid and SO01

Page 13: Introduction Introduction Presentation about the participation of the company FEST Engineering Ltd. on the project Salechard

Stress analysis of the steam chamber stored on the steel structure SO01

Page 14: Introduction Introduction Presentation about the participation of the company FEST Engineering Ltd. on the project Salechard

Creating the overall disposition of the steam piping DN 5800

including supporting steel structures and determination the borders of supply

Page 15: Introduction Introduction Presentation about the participation of the company FEST Engineering Ltd. on the project Salechard

Office

Pardubická 244535 01 PřeloučCzech Republic

Telephone: +420 466 052 521Fax: +420 466 263 286E-mail: [email protected]

ID: 29060851VAT ID: CZ683143887

Head Office

FEST Engineering Ltd.6 Bexley Square Salford, Manchester, M3 6BZGreat Britain

Branch manager

Ing. Jiří Košťál