NARANG PROJECTS is a specialist contractor servicing the Firestopping need of the Middle East Market. NARANG PROJECTS is also a FM 4991. FM 4991 is a firestopping contractor standard that is determined by the level and in depth knowledge of the contractor. NARANG PROJECTS has 6 DRIs on staff, the most in the region, giving us the strength to execute multiple projects in the region. NARANG PROJECTS success was beyond belief, NARANG PROJECTS in its first year of operations earned a reputation of SPECIALIST Firestoppers by trouble shooting jobs other installers could not even complete or comprehend, and AX 415 was proof of this. The success continued with securing multiple FM 4991 projects at New Doha International Airport, State of Qatar. NARANG PROJECTS due to it engineering strength built up a reputation of a specialist contractor and started securing further business in other specialist trades. NARANG PROJECTS, steady growth and portfolio of service has expanded the service offering by partnering with Construction Specilaities to include Expansion Joint and Acrowing. NARANG PROJECTS was also the first to bring group breaking Watertight Expansion joint to the GCC by tying up with EM-SEAL. The portfolio also includes installation of Thermal Insulation.

Upload: others

Post on 20-Feb-2020

27 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: Introduction LetterIntroduction Letter Date: To Whom It May Concern, Narang Projects WLL is a Seven year old contracting company in Qatar, Specialist in Installation of Passive Firestop

NARANG PROJECTS is a specialist contractor servicing the Firestopping need of the Middle East Market. NARANG PROJECTS is also a FM 4991. FM 4991 is a firestopping contractor standard that is determined by the level and in depth knowledge of the contractor. NARANG PROJECTS has 6 DRIs on staff, the most in the region, giving us the strength to execute multiple projects in the region.

NARANG PROJECTS success was beyond belief, NARANG PROJECTS in its first year of operations earned a reputation of SPECIALIST Firestoppers by trouble shooting jobs other installers could not even complete or comprehend, and AX 415 was proof of this. The success continued with securing multiple FM 4991 projects at New Doha International Airport, State of Qatar.

NARANG PROJECTS due to it engineering strength built up a reputation of a specialist contractor and started securing further business in other specialist trades.

NARANG PROJECTS, steady growth and portfolio of service has expanded the service offering by partnering with Construction Specilaities to include Expansion Joint and Acrowing.

NARANG PROJECTS was also the first to bring group breaking Watertight Expansion joint to the GCC by tying up with EM-SEAL. The portfolio also includes installation of Thermal Insulation.

Page 2: Introduction LetterIntroduction Letter Date: To Whom It May Concern, Narang Projects WLL is a Seven year old contracting company in Qatar, Specialist in Installation of Passive Firestop

Introduction Letter

Date:

To Whom It May Concern,

Narang Projects WLL is a Seven year old contracting company in Qatar, Specialist in

Installation of Passive Firestop Systems, formed by a team of professionals Engineers & FM DRI provides international quality products to major clients in Qatar. Our Project

Division has completed many High-rise building projects, Mall projects, Stadium projects, Qatar Foundation Projects, NEW DOHA INTERNATIONAL AIRPORT Project,

PUBLIC WORKS ATHOURITY (ASHGHALL) Projects and ISF CAMP project are among the Key projects which we completed. The Firestop division of Narang Projects, Qatar has strategic association with firestop

product manufacturers and having approved applicator certificate from 3M - USA, STI - USA, HILTI - Germany, FISCHER – Germany, offering choice of products to our clients.

Our present product range includes but not limited to; (All QCDD approved products) Narang Projects WLL is a member of FCIA (Firestop Contractors International

Association), member of FM with approved & Certified FM DRI which is prerequisite for a Passive firestop contractor to be approved by QCDD. We provide Trunkey solutions in following passive Firestop Systems

1. Fire Resistive Construction Joints System.

2. Expansion Joints System.

3. Fire and Smoke Resistive Curtain Wall Joints System.

4. Firestop Through Penetration System.

Yours faithfully

For Narang Projects WLL Sanjay R Narang

Managing Director

dell
Typewritten text
January 12, 2019
Page 3: Introduction LetterIntroduction Letter Date: To Whom It May Concern, Narang Projects WLL is a Seven year old contracting company in Qatar, Specialist in Installation of Passive Firestop

FIRESTOPPING

NARANG PROJECTS is the premiere Specialist Contractor in the region

NARANG PROJECTS is the leading Firestopping contractor in the middle east. NARANG PROJECTS is a Certified Master Contractor and FM 4991 Contractor. This unique partnership with a manufacturer allows us to provide tailor made solutions for our clients and enable a seamless integration and executing of works.

What is the FM 4991 Contractor Standard?

Factory Mutual, one of the leading loss insurance companies in the world came up with a standard to help contractors identify qualified firestopping contractors. FM 4991 standard was setup to qualify contractors, and ensure firestopping systems are being installed correctly. FM 4991 qualification is based on

- Training and education of workforce

- General Knowledge of Firestopping Systems - Handling of Materials

- Design and System Selection - Quality and Inspection Control through a Designated Responsible Individual

(DRI)

Approved Firestop Contractor: Factory Mutual Approval Standard 4991

NARANG ISO 9001-2015

Page 4: Introduction LetterIntroduction Letter Date: To Whom It May Concern, Narang Projects WLL is a Seven year old contracting company in Qatar, Specialist in Installation of Passive Firestop

Firestopping services:

Head of Wall Penetrations (all MEP's) Wall Joints (vertical and horizontal) Expansion Joints (mechanical and soft) Curtain Walls (perimeter edge) Duct Wrap (grease and air) Barrier reconstruction (walls and/or openings)

Page 5: Introduction LetterIntroduction Letter Date: To Whom It May Concern, Narang Projects WLL is a Seven year old contracting company in Qatar, Specialist in Installation of Passive Firestop

Expansion Joints

Expansion Joints mechanical and soft are done to due to the continuous expansion and contraction of the building. NARANG PROJECTS is a certified installer of Construction Specialities and Em Seal.

Construction Specialities the name synonymous with state of the art Expansion Covers. NARANG PROJECTS extensive expertise allows us to determine the best profiles for the right conditions and with support from manufacturers allows us to

provide a tailor made solution for any conditions. UL tested fire rated systems using expansion joint now possible.

Architectural Covers Fire Barriers

Parking & Stadium Covers Fire Barriers

Page 6: Introduction LetterIntroduction Letter Date: To Whom It May Concern, Narang Projects WLL is a Seven year old contracting company in Qatar, Specialist in Installation of Passive Firestop

EMSEAL is the leading innovator and manufacturer of premium sealants and expansion joint systems for the commercial construction industry as well as for numerous gasketing applications in specialty market applications.

Expansion joints constitute a small percentage of a construction budget yet, along with other waterproofing-related issues, are responsible for the majority of all post-construction complaints and call-backs.

EMSEAL manufacturer of waterproof expansion joints, one of the few true watertight expansion joint solutions.

Page 7: Introduction LetterIntroduction Letter Date: To Whom It May Concern, Narang Projects WLL is a Seven year old contracting company in Qatar, Specialist in Installation of Passive Firestop

NARANG PROJECTS provides a turnkey solution tailored to your requirement for all your Firestopping needs.

Turnkey Bids: We can do a complete take off either based on Bill of Quantities or based on Drawings and provide you with a hard number. Here we will be responsible from start to finish of all firestopping works in our scope.

Supply and Supervision contractors concerned about budgets and varying timeline can reduce cost and maintain flexibility of their jobs. Here contractors purchase the material from us. We train their employees on installation techniques and then provide the supervision for correct installation. In addition to this we supply all the correct documentation uptill acceptance of Authorities Having Jurisdiction (AHJ)

Time and Material for maintenance and retro fit job. NARANG PROJECTS can provide a customize solution. Where the client has got possession of a building and has no idea as to the status of the firestopping of work. We agree on a price and material and then bill based on actual consumption.

Supply of Material contractors confident on successful installation of their jobs, can purchase of materials directly from us. We advice and consult on systems and then supply the materials only.

Maintenance Building are dynamic and are continuous evolving. As new services are pulled in and old pulled up a building needs to be kept up to standard in order to comply with standards. NARANG PROJECTS can supply service in order for continuous compliance of your building.

Consultation and 3rd Party Through are extensive knowledge of firestopping we can provide advice and consultation to Architects and Consultant in order to help advice and consult on projects.

Page 8: Introduction LetterIntroduction Letter Date: To Whom It May Concern, Narang Projects WLL is a Seven year old contracting company in Qatar, Specialist in Installation of Passive Firestop

Experience is important... ...Our experience is important to you!

HERE'S WERE EXPERIENCE COUNTS...

New Doha International Airport (NDIA) Main Terminal Building

Client

: New Doha International Airport Steering Committee

Main Contractor

: Sky Oryx Joint Venture

Package

: CP-18 (Main Passenger Terminal)

Scope of Work

: Firestopping for MEP & Constructional Joints

Page 9: Introduction LetterIntroduction Letter Date: To Whom It May Concern, Narang Projects WLL is a Seven year old contracting company in Qatar, Specialist in Installation of Passive Firestop

NDIA - Airline Engineering Facility

Client : New Doha International Airport Steering Committee

Main Contractor : Gulf Contracting Co. WLL.

Package : CP-20 (Airline Engineering Facility) Scope of Work : Firestopping for MEP & Constructional Joints

NDIA - Aircraft Maintenance Hangar

Client Main Contractor Package Scope of Work

: New Doha International Airport Steering Committee : ADCC JV : CP-26 (Aircraft Maintenance Hangar) : Firestopping for MEP & Constructional Joints

Page 10: Introduction LetterIntroduction Letter Date: To Whom It May Concern, Narang Projects WLL is a Seven year old contracting company in Qatar, Specialist in Installation of Passive Firestop

NDIA - Cargo Handling Facility

Client : New Doha International Airport Steering Committee

Main Contractor : ADCC JV Package : CP-11 (Cargo Handling Facility)

Scope of Work : Firestopping for MEP & Constructional Joints

NDIA - Airline Catering Facility

Client Main Contractor Package Scope of Work

: New Doha International Airport Steering Committee : Muhinnah Engineering : CP-21 (Airline Catering Facility) : Firestopping for MEP & Constructional Joints

Page 11: Introduction LetterIntroduction Letter Date: To Whom It May Concern, Narang Projects WLL is a Seven year old contracting company in Qatar, Specialist in Installation of Passive Firestop

Al Sadd Sports Club Multipurpose Hall – Package 2

Client : Qatar Olympic Committee Main Contractor : AKTOR

Package : Al Sadd Sports Club Multipurpose Hall Package -2 Scope of Work : Firestopping for MEP & Constructional Joints

Doubletree Hilton Hotel

Client Main Contractor Package Scope of Work

: Urbacon (UCC) : Khayyat Contracting & Trading : Doubletree Hilton Hotel : Firestopping for MEP & Constructional Joints

Page 12: Introduction LetterIntroduction Letter Date: To Whom It May Concern, Narang Projects WLL is a Seven year old contracting company in Qatar, Specialist in Installation of Passive Firestop

Anantara Doha Island Resort (Banana Island Resort Doha)

Client : Urbacon Trading & Contracting (UCC) Main Contractor : Khayyat Contracting & Trading (KCT)

Package : Anantara Doha Island (Banana Island Resort Doha) Scope of Work : Firestopping for MEP & Constructional Joints

Tawar Mall

Client Main Contractor Package Scope of Work

: Tawar Mall : KITTCO Contracting : Tawar Mall : Firestopping for Head of wall & Expansion Joints

Page 13: Introduction LetterIntroduction Letter Date: To Whom It May Concern, Narang Projects WLL is a Seven year old contracting company in Qatar, Specialist in Installation of Passive Firestop

Doha Festival City

Client : Doha Festival City Main Contractor : ALEC Gulf Contracting JV

Package : Doha Festival City Mall Scope of Work : Firestopping for MEP & Head of Wall Joints

ISF- Camp (Internal Security Force)

Client Main Contractor Package Scope of Work

: Internal Security Force Qatar : Aktor Al Jaber JV : ISF Camp - Duhail : Firestopping for MEP & Head of Wall Joints

Page 14: Introduction LetterIntroduction Letter Date: To Whom It May Concern, Narang Projects WLL is a Seven year old contracting company in Qatar, Specialist in Installation of Passive Firestop

Villaggio Mall Extention

Client : Villaggio Mall

Main Contractor : Voltas & Al Safwa Group

Package : Villggio Mall Scope of Work : Firestopping for MEP & Head of Wall Joints

Lusail Multipurpose Hall

Client Main Contractor Package Scope of Work

: Olympic Steering Committee : CCC-TCC-JV : Lusail Multipurpose Hall : Firestopping for MEP & Head of Wall Joints

Page 15: Introduction LetterIntroduction Letter Date: To Whom It May Concern, Narang Projects WLL is a Seven year old contracting company in Qatar, Specialist in Installation of Passive Firestop

Lusail Fox Hills Residences

Client : Lusail Real Estate Development Company Main Contractor : IBA Contracting

Package : Fox Hills Residential Buildings Scope of Work : Firestopping for MEP & Head of Wall Joints

VIVA BAHRIYA TOWERS (Pearl Qatar)

Client Main Contractor Package Scope of Work

: United Development Company (UDC) : Redco Construction Al Mana & Man Enterprises : Viva Bahriya Towers VB12 - VB13 & VB14 & VB15 : Firestopping for MEP & Head of Wall Joints

Page 16: Introduction LetterIntroduction Letter Date: To Whom It May Concern, Narang Projects WLL is a Seven year old contracting company in Qatar, Specialist in Installation of Passive Firestop

VENDOME MALL

Client Main Contractor Package Scope of Work

: Vendome Mall : VAFE-JV : Place Vendome Mall : Firestopping for MEP Services.

AL NAJDA HOTEL

Client Urban Con

Main Contractor Urbancon Trading and Contracting

Package Al Najdha hotel

Scope of Work Fire stopping on Joints and Mep Services

Page 17: Introduction LetterIntroduction Letter Date: To Whom It May Concern, Narang Projects WLL is a Seven year old contracting company in Qatar, Specialist in Installation of Passive Firestop

FITNESS CENTER

Client: Katara

Main Contractor: MIDMAC

Package: KATARA (KP/A261/12)-Construction,

Completion and Maintenance of Fitness Center

Facility.

Scope of Work: Fire stopping on Joints and Mep Services

HOLIDAY INN

Client: Hotel Holiday Inn

Main Contractor: MAN Enterprise

Package: Holiday INN

Scope of Work: Fire stopping on Joints and Mep Services

Page 18: Introduction LetterIntroduction Letter Date: To Whom It May Concern, Narang Projects WLL is a Seven year old contracting company in Qatar, Specialist in Installation of Passive Firestop

QATAR UNIVERSITY NEW PHARMACY COLLEGE

Client: Qatar University

Main Contractor: Shapoorji Palonji Qatar

Package: New Pharmacy College

Scope of Work: Fire stopping on Joints and Mep Services

SHAZA KEMPENSKI

Client: Shaza

Main Contractor: Trinity

Package: Shaza Kempenski

Scope of Work: Fire stopping on Joints and Mep Services

Page 19: Introduction LetterIntroduction Letter Date: To Whom It May Concern, Narang Projects WLL is a Seven year old contracting company in Qatar, Specialist in Installation of Passive Firestop

AL SAMRIYA TOWER (2B+G+35)

Client: Sh.Faisal Bin Qassim Al Thani

Main Contractor: Al Habtoor Engineering Enterprises

Package: Shaza Kempenski

Scope of Work: Fire stopping on Joints and Mep Services

MARINA COM 20

Client: COM 20

Main Contractor: Red-Co Construction Almana

Package: Tower Office, Com 20 (3B+G+27)

Scope of Work: Fire stopping on Joints and Mep Services

Page 20: Introduction LetterIntroduction Letter Date: To Whom It May Concern, Narang Projects WLL is a Seven year old contracting company in Qatar, Specialist in Installation of Passive Firestop

OXYGEN PARK

Client: Qatar Foundation

Main Contractor: MAN Enterprise

Package: QF Oxygen Park

Scope of Work: Fire stopping on Joints and Mep Services

QATAR FOUNDATION-WEST SIDE CAR PARK

Client: Qatar Foundation

Main Contractor: MAN Enterprise

Package: Qatar Foundation West Car Park

Scope of Work: Fire stopping on Joints and Mep Services

Page 21: Introduction LetterIntroduction Letter Date: To Whom It May Concern, Narang Projects WLL is a Seven year old contracting company in Qatar, Specialist in Installation of Passive Firestop

SEERO FI AL ARDH CAROUSEL

Client: Qatar Foundation

Main Contractor: RedCo Almana

Package: Seero Fi al Ardh Carousel

Scope of Work: Fire stopping on Joints and Mep Services

AL KHALIJI HEADQUARTERS,MIX 40

Client: Al Khaliji

Main Contractor: RedCo Almana

Package: AL KHALIJI HEADQUARTERS

(3B+GF+26F)MARINA MIX 40 Scope of Work: Fire stopping on Joints and Mep Services

Page 22: Introduction LetterIntroduction Letter Date: To Whom It May Concern, Narang Projects WLL is a Seven year old contracting company in Qatar, Specialist in Installation of Passive Firestop

ENERGY CITY QATAR

Client: Energy City Qatar

Main Contractor: Zublin International

Package: Energy City Qatar Parcel H01 (ECQ_H01)

Scope of Work: Fire stopping on Joints and Mep Services

LUSAIL RAILWAY TRANSIT

Client: Qatar Rail Company

Main Contractor: AlJaber Engineering/ QDVC

Package: Lusail Light Rail Transit System

Scope of Work: Fire stopping on Joints and MEP Services

Page 23: Introduction LetterIntroduction Letter Date: To Whom It May Concern, Narang Projects WLL is a Seven year old contracting company in Qatar, Specialist in Installation of Passive Firestop

IBA TOWER

Client: IBA Corporation

Main Contractor: IBA Contracting Co.

Package: IBA Tower 17 & 19

Scope of Work: Fire stopping on Joints and Mep Services

FALCON TOWER

Client: Gulf Falcon

Main Contractor: SEG International

Package: Podium-1 Curved Partition, Falcon Tower

Scope of Work: Fire stopping on Joints and Mep Services

Page 24: Introduction LetterIntroduction Letter Date: To Whom It May Concern, Narang Projects WLL is a Seven year old contracting company in Qatar, Specialist in Installation of Passive Firestop

QATAR UNIVERSITY HEALTH CENTER

Client: Qatar University

Main Contractor: Shapoorji Palonji Qatar

Package: Health Center, Qatar University

Scope of Work: Fire stopping on Joints and Mep Services

QATAR HANDBALL STADIUM

Client: Private Engineering Office

Main Contractor: REDCO Almana

Package: Qatar Handball Association Complex

(Duhail Sports Hall)

Scope of Work: Fire stopping on Joints and Mep Services

Page 25: Introduction LetterIntroduction Letter Date: To Whom It May Concern, Narang Projects WLL is a Seven year old contracting company in Qatar, Specialist in Installation of Passive Firestop

QATAR ACADEMY-ALKHOR

Client: Qatar Foundation

Main Contractor: HBK Contracting Company

Package: Qatar Academy-Alkhor

Scope of Work: Fire stopping on Joints and Mep Services

SHERATON DOHA-RENOVATION

Client: Sheraton Hotel

Main Contractor: UrbaCon Trading and Contracing

Package: Sheraton Renovation Project

Scope of Work: Fire stopping on Joints and Mep Services

Page 26: Introduction LetterIntroduction Letter Date: To Whom It May Concern, Narang Projects WLL is a Seven year old contracting company in Qatar, Specialist in Installation of Passive Firestop

SAMRYA VILLAGE

Client: Samrya

Main Contractor: Al Samrya

Package: Samrya Village

Scope of Work: Fire stopping on Joints and Mep Services

RUMAILA HOSPITAL EXTENSION

Client: Hamad Medical Corporation

Main Contractor: Amar Construction

Package: Construction of TB( Communicable

Disease) Unit at Rumaliah

Scope of Work: Fire stopping on Joints and Mep Services

Page 27: Introduction LetterIntroduction Letter Date: To Whom It May Concern, Narang Projects WLL is a Seven year old contracting company in Qatar, Specialist in Installation of Passive Firestop

ABRAJ QUARTIER PANORAMA RESIDENCE

&SUITES

Client: First Qatar Real Estate Development Co.

Main Contractor: Radiant Engineering

Package: Abraj Quartier Panorama Residence and

suites AQ7

Scope of Work: Fire stopping on Joints and Mep Services