Introducing The New Premium Modular Building Range We are delighted to introduce our New Premium Range Modular Building. Designed by our team and manufactured in our Limerick Factory, this Modular Building is an ideal Cost Effective, Flexible and Rapid solution for your accommodation requirements. They can be extended, adapted or relocated if necessary, ensuring it can adapt to changing needs of your business. Installation is much quicker than traditional construction, minimising disruption to the surrounding area. Features of the Premium Modular Buildings: Highly Insulated Low Energy Building. Manufactured at our Limerick Factory. Steel Framed Construction with Architectural Wall Panels giving a 30+ Year Life Expectancy. 60 Minute Fire Rating. 2,7mm Floor Ceiling Height.Fully Compliant with Building Regulations.

Upload: others

Post on 17-Sep-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Introducing The New Premium Modular Building Range · 2019. 7. 9. · Installation of Premium Modular Buildings: The building installation is completed by the Castlecabin Team on

Introducing The New Premium Modular Building Range

W e a r e d e l i g h t e d t o i n t r o d u c e o u r N e w P r e m i u m R a n g e M o d u l a r B u i l d i n g . D e s i g n e d b y o u r t e a m a n d m a n u f a c t u r e d i n o u r L i m e r i c k F a c t o r y , t h i s M o d u l a r B u i l d i n g i s a n i d e a l C o s t E f f e c t i v e , F l e x i b l e a n d R a p i d s o l u t i o n f o r y o u r a c c o m m o d a t i o n r e q u i r e m e n t s . T h e y c a n b e e x t e n d e d , a d a p t e d o r r e l o c a t e d i f n e c e s s a r y , e n s u r i n g i t c a n a d a p t t o c h a n g i n g n e e d s o f y o u r b u s i n e s s . I n s t a l l a t i o n i s m u c h q u i c k e r t h a n t r a d i t i o n a l c o n s t r u c t i o n , m i n i m i s i n g d i s r u p t i o n t o t h e s u r r o u n d i n g a r e a .

Features of the Premium Modular Buildings:

H i g h l y I n s u l a t e d L o w E n e r g y B u i l d i n g . M a n u f a c t u r e d a t o u r L i m e r i c k F a c t o r y . S t e e l F r a m e d C o n s t r u c t i o n w i t h A r c h i t e c t u r a l W a l l P a n e l s g i v i n g a 3 0 +

Y e a r L i f e E x p e c t a n c y . 6 0 M i n u t e F i r e R a t i n g . 2 , 7 m m F l o o r C e i l i n g H e i g h t . F u l l y C o m p l i a n t w i t h B u i l d i n g R e g u l a t i o n s .

Page 2: Introducing The New Premium Modular Building Range · 2019. 7. 9. · Installation of Premium Modular Buildings: The building installation is completed by the Castlecabin Team on

Installation of Premium Modular Buildings:

T h e b u i l d i n g i n s t a l l a t i o n i s c o m p l e t e d b y t h e C a s t l e c a b i n T e a m o n s i t e a n d t y p i c a l l y t a k e s 4 w o r k i n g d a y s . T h e T e a m w o r k s q u i c k l y t o m i n i m i s e d i s r u p t i o n w i t h t h e m a x i m u m e f f i c i e n c y .

Case Study: Modular Building Installed in 4 Days at Milford National School.

C a s t l e c a b i n i n s t a l l e d a M o d u l a r B u i l d i n g f o r M i l f o r d N a t i o n a l S c h o o l – o v e r t h e O c t o b e r 2 0 1 8 M i d T e r m B r e a k . T h e D e a d l i n e f o r c o m p l e t i o n w a s 4 D a y s , t h e C l a s s r o o m n e e d e d t o b e f u l l y u p a n d r u n n i n g i n t i m e f o r t h e C h i l d r e n ’ s r e t u r n t o s c h o o l . T h e b e l o w t i m e - l a p s e g i v e s a f a s c i n a t i n g i n s i g h t i n t o h o w e f f i c i e n t l y o u r t e a m w o r k e d t o m a k e s u r e t h a t t h e C h i l d r e n w a l k e d s t r a i g h t i n t o t h e i r n e w C l a s s r o o m o n t h e i r r e t u r n t o s c h o o l . h t t p s : / / w w w . y o u t u b e . c o m / w a t c h ? v = 8 d W 3 e a R b V x A

Page 3: Introducing The New Premium Modular Building Range · 2019. 7. 9. · Installation of Premium Modular Buildings: The building installation is completed by the Castlecabin Team on
Page 4: Introducing The New Premium Modular Building Range · 2019. 7. 9. · Installation of Premium Modular Buildings: The building installation is completed by the Castlecabin Team on

Interior Pictures of Milford NS Classroom (Modular Building).

Contact Castlecabin:

Phone: 061 330033

Email: [email protected]

Page 5: Introducing The New Premium Modular Building Range · 2019. 7. 9. · Installation of Premium Modular Buildings: The building installation is completed by the Castlecabin Team on
Page 6: Introducing The New Premium Modular Building Range · 2019. 7. 9. · Installation of Premium Modular Buildings: The building installation is completed by the Castlecabin Team on
Page 7: Introducing The New Premium Modular Building Range · 2019. 7. 9. · Installation of Premium Modular Buildings: The building installation is completed by the Castlecabin Team on