introducing abb integrated solution for district energy · 2021. 2. 25. · abb at a glance...

13
FEBRUARY 24 TH , 2021 Introducing ABB Integrated Solution for District Energy Driving the green energy transition

Upload: others

Post on 20-Apr-2021

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Introducing ABB Integrated Solution for District Energy · 2021. 2. 25. · ABB at a glance February 23, 2021 Source: Annual Report 2019 published financial results Slide 2 *As of

—FEBRUARY 24TH, 2021

Introducing ABB Integrated Solution for District EnergyDriving the green energy transition

Page 2: Introducing ABB Integrated Solution for District Energy · 2021. 2. 25. · ABB at a glance February 23, 2021 Source: Annual Report 2019 published financial results Slide 2 *As of

—ABB at a glance

February 23, 2021Source: Annual Report 2019 published financial results*As of July 1, 2020Slide 2

Facts and figures

Pioneering technology

_What

Offering

_For whom

Customers

_Where

Geographies

Revenue ∼$28 bn Countries ∼100 Employees ∼110,000*

Products Systems Services & software

Buildings Industry Transport & infrastructure

Asia, Middle East and Africa

Globally

Americas Europe

Page 3: Introducing ABB Integrated Solution for District Energy · 2021. 2. 25. · ABB at a glance February 23, 2021 Source: Annual Report 2019 published financial results Slide 2 *As of

—ABB experience and competences

February 23, 2021 Slide 3

District energy and electrical

Transmission

BESS

Genset

Protection, control and synconization

Harmonic filterHeat pumpsBoilers, CHPs, Aux. Pumps

AC/DC UPS

VSDs

LV switchboard

ABB Control System

IEC-61850 integration

Page 4: Introducing ABB Integrated Solution for District Energy · 2021. 2. 25. · ABB at a glance February 23, 2021 Source: Annual Report 2019 published financial results Slide 2 *As of

—Electrical integration

February 23, 2021 3BSE068147 en NSlide 4

Complete system with electrical solutions, instrumentation and control

Page 5: Introducing ABB Integrated Solution for District Energy · 2021. 2. 25. · ABB at a glance February 23, 2021 Source: Annual Report 2019 published financial results Slide 2 *As of

• Design, engineering and project management, EIC

• Transformers

• Cables

• MV and LV switchboards

• Motors and drives

• Process instrumentation

• Managing electrical installation works

• Test and commissioning

• Local after sales support and service

ABB full scope project package

February 23, 2021 Slide 5

New energy solutions – heat pumps, power-to-X, storage…

Page 6: Introducing ABB Integrated Solution for District Energy · 2021. 2. 25. · ABB at a glance February 23, 2021 Source: Annual Report 2019 published financial results Slide 2 *As of

—Integrated control and optimization

February 23, 2021 Slide 6

One cockpit approach

NETWORK CUSTOMERSCONTROL PRODUCTION

ABB Ability™ digital platform – applications supported for the future

Data integration across the value chain

Page 7: Introducing ABB Integrated Solution for District Energy · 2021. 2. 25. · ABB at a glance February 23, 2021 Source: Annual Report 2019 published financial results Slide 2 *As of

• Integrated solution – electrical and heating

• Minimum of interfaces – reducing project risk

• Experience with high level energy plant solutions

• High availability of electric supply

• Low harmonic impact from “the power train”

• Seamless DH control – optimizing the operation

• Experience and competences in Denmark

• Local ABB lifetime support

Summary

February 23, 2021 3BSE062589 en HSlide 7

Integrated solution provides cost reductions and built-in knowledge and experience

Page 8: Introducing ABB Integrated Solution for District Energy · 2021. 2. 25. · ABB at a glance February 23, 2021 Source: Annual Report 2019 published financial results Slide 2 *As of

—Main power supply for heat pump and chiller plants

February 23, 2021 Slide 8

Taking a closer look at ABB portfolio

Transformers

• 60 kV or 10 kV

• 10 kV to 6 kV (to 4/ 3.3 kV)

ABB LV and MV drives

• 0.75 kW to 36 MW

• 200 V to 3.3 kV

ABB LV and MV motors

• up to 28.5 MW

• up to 13.8 kV

Page 9: Introducing ABB Integrated Solution for District Energy · 2021. 2. 25. · ABB at a glance February 23, 2021 Source: Annual Report 2019 published financial results Slide 2 *As of

—ABB LV and MV AC drives

February 23, 2021 Slide 9

Product portfolio for Infrastructure and HVACR segment

Low Voltage Drives Medium Voltage Drives

ACS880

– 1.5 to 5 200 kWat 230 to 690 V output

– Diode or active front end (ultra-low harmonic)

– Optional regen front end for 4Q operation

– Full functional safety– Best in class motor

control, high performance

ACS2000

– 250 to 3 700 kWat 4.0 to 6.9 kV output

– Installation flexibility, using external or built-in transformers

– 12 pulse rectifier or optional active front end for 4Q operation

– Small footprint– High reliability– Highest personal safety

ACS580

– 200 to 6 300 kWat 3.3 to 11kV output

– Low harmonic footprint, using high-pulse integrated transformers

– All-compatible user interface

ACS1000

– 315 to 5 000 kWat 2.3 to 4.16 kV output

– Installation flexibility, using external or built-in transformers

– Lor harmonics with 12 or 24 pulse rectifier

– Flexibility to configure for specific needs

– Small footprint– High reliability– Highest personal safety

ACS5000

– 2 000 to 36 000 kW (higher on request)at 6.0 to 13.8 kV output

– Installation flexibility, using external or integrated transformers

– 36-pulse diode rectifier– Small footprint– High reliability– Highest personal safety

ACH580

– 0.75 to 500 kWat 230 to 690 V output

– Diode or active front end (ultra-low harmonic)

– Full functional safety– HVAC control program

Page 10: Introducing ABB Integrated Solution for District Energy · 2021. 2. 25. · ABB at a glance February 23, 2021 Source: Annual Report 2019 published financial results Slide 2 *As of

—Specifying variable speed technology for district heating

February 23, 2021 Slide 10

Effect on capital investments with ABB ultra-low harmonic drives

GeneratorGenerator supplying 6-pulse drives to be derated by 50%. Avoided if using AFE drives.

50%size down

with AFE

CablingOversizing depends on the harmonics content in the grid.

TDD Oversize10% 1.0050% 1.1270% 1.22

10% size

down with AFE

Transformer6-pulse drives need transformer oversize by 1.35 x motor kVA. With AFE drives, the factor is 1.1.

20% size

down with AFE

Switchgears / breakersHarmonic currents may lead to a step up in the switchgear size or result in an extra busbar per phase in the circuit breaker.

~10-30% size

down with AFE

Page 11: Introducing ABB Integrated Solution for District Energy · 2021. 2. 25. · ABB at a glance February 23, 2021 Source: Annual Report 2019 published financial results Slide 2 *As of

—Digitalizing powertrains in district energy

February 23, 2021 Slide 11

ABB motors, drives and services

Drives • save 20 to 60% energy in pumping• reduce mechanical and electrical

setress extending system lifetime• decrease project investment costs• increase process reliability

Motors • up to 30% improved part load efficiency

with ABB SynRM technology

ABB AbilityTM digital services • get real time information on district heating applications’ performance• eliminate downtime with predictive maintenance• optimize energy consumption to maximize operating cost savings

Page 12: Introducing ABB Integrated Solution for District Energy · 2021. 2. 25. · ABB at a glance February 23, 2021 Source: Annual Report 2019 published financial results Slide 2 *As of

—Thank you for listening! Questions?

February 23, 2021 Slide 12

Page 13: Introducing ABB Integrated Solution for District Energy · 2021. 2. 25. · ABB at a glance February 23, 2021 Source: Annual Report 2019 published financial results Slide 2 *As of