Problem •Loose connections on the steering gear position transmitter caused a failure of the control system and loss of steering, leading to collision.

•Loose parts of a switch fuse became detached, fell onto bus-bars causing an arc which resulted in a main switchboard fire, complete loss of electrical power and propulsion.

• A switchboard fire on a tanker caused by overheating of loose contacts on a motor starter

•To identify potential overheating of electrical equipment, owners are advised to use ‘thermal-imaging techniques as a means of verifying the security of electrical connections and pin point problem areas at an early stage.

Summary

This Marine Guidance Notice is to draw attention to incidents involving electrical equipment,maintenance responsibilities and the use of thermographic imaging as a maintenance tool.

Source: MGN 132 (M+F) This M Notice supersedes M 1163

Electrical Equipment

Page 3: Intro to InfraMarine

Value Proposition

•Identify potential overheating of electrical equipment and eliminating any possibility of catastrophe

•Provide Application training on board.

•Train key personnel to implement and monitor outcome.

•Improving the vessel KPIs.

How to solve the problem with marginal cost?

Page 4: Intro to InfraMarine

Infrared thermography and airborne ultrasound on

• Mechanical • Electrical • Hydraulics • Fluid systems• Refractory • Steam trap• UPS backup and emergency batteries

Techniques used

Page 5: Intro to InfraMarine

Paradigm shift

Page 6: Intro to InfraMarine

Phased Approach to Performance Optimization

Page 7: Intro to InfraMarine

Electromagnetic spectrum

Page 8: Intro to InfraMarine

480V MCC breaker with damaged cable

Breaker Problem

Page 9: Intro to InfraMarine

Connection Issues

480V MCC contactor with connection problem

Page 10: Intro to InfraMarine

UPS battery bank showing a terminal problem

UPS battery Condition

Page 11: Intro to InfraMarine

Misalignment

Motors showing signs of misalignment problems

Page 12: Intro to InfraMarine

Closed valveOpen or passing valve

Valve problems

Page 13: Intro to InfraMarine

Internal build up may cause fluid flow restrictions

Internal build up may cause pipe blockages

Internal Build up

Page 14: Intro to InfraMarine

Good steam trap No steam in left steam trap. Right steam trap failed in open position

Steam system gain

Page 15: Intro to InfraMarine

Source: UE ultrasound

Airborne Ultrasound Action Levels

Page 16: Intro to InfraMarine

Source: UE ultrasound

Over Lubrication Prevented

Over lubrication Bare wire

Page 17: Intro to InfraMarine

Saving potential

Page 18: Intro to InfraMarine

P-F Curve the final Picture

Page 19: Intro to InfraMarine

Insurance viewpoint

P & I Claims

The issue of seafarer shortage and of quality of sea staff continues to be a major worry. There are significant concerns that in some cases, crews today appears to be less well trained, & less experienced.

Recently seen a number of incidents where incompetence / negligence has led to disaster. Most of the claims, that we handle on behalf of members, have the same factor at their root – human error.

Improved training, more respect for seafaring as a career, are some of the issues which need to be addressed.

Despite the recession, there is certainly no oversupply of experienced crews – and there is still a tendency for people to be promoted very quickly.

Loss Prevention

The key to best practice in loss prevention is to base the process of risk assessment on good quality information

Source: North of England P& I Club Management Report 2010

Page 20: Intro to InfraMarine

What Qualification do I bring ?

• Valid Chief Engineer license with Oil and Chemical DC endorsements.

• Over 30 Years of experience, with recent 5 years from Stolt tankers.

• Level III Certified Infrared Thermography, from FLIR in Boston USA.

• 8 years Experience with (PdM)1 inspections from a top Canadian Inc.

• A high resolution Infrared Camera ready for use.

• Certified to train and implement the written practice and monitor outcome

• Make it as part of your SEEMP ( Shipboard Energy Efficiency Management Plan )

1 : (PdM) predictive maintenance

Background

Page 21: Intro to InfraMarine

What do I offer?

• Train in Thermal Imaging and perform a complete inspection of all electrical equipment with a ship specific written procedure and monitor outcomes•Back up support 24/7 to Company and Fleet for successful program implementation

What is the key benefit ?

•Reduced operating cost•Improved safety and reliability •Develop in house talent enhancing SEEMP

How much time will it take?

•Maximum 3 days on board

What is the motivation for doing it?

• Passionate to make a difference by improving safety and quality on board ship

Email to [email protected] For details visit www.inframarine.com

The Proposal

Page 22: Intro to InfraMarine

Do we have your attention ?

Page 23: Intro to InfraMarine

Our Promise

Page 24: Intro to InfraMarine

Thank you