  • INTERSTATE HIGHWAYS Summer 2017 Oregon Highway ProjectsInterstate 51. Interstate 5 Pacific Highway Construct new Siskiyou rest

    area and welcome center. MP 12. No delays. Completion: 9/2018.

    2. Interstate 5 Pacific Highway Install cable barrier, guardrail and signs in several locations, MP 19 to 154. Lane and shoulder closures. Minimal delays. Completion: 1/2018.

    3. Interstate 5 Pacific Highway Make improvements at OR 42 junction (Exit 119). Lane closures and congestion, minor delays. Completion: Fall 2017.

    4. Interstate 5 Pacific Highway and OR 569 Randy Pap Beltline Intersection improvements, including new eastbound Beltline lane from Coburg Road to I-5, a new on-ramp, soundwall, and completion of a multi-use path, MP 195.5. Minimal delays. Completion: Winter 2017.

    5. Interstate 5 Pacific Highway Replace existing pavement between North Albany to North Jefferson, MP 234.6 to 245. Day and night work. Expect lane closures and reduced speeds in the work area. Completion: Fall 2017.

    6. Interstate 5 Pacific Highway Replace the existing pavement between the Willamette River (Boone) Bridge and Woodburn Interchange, MP 271.5 to 283. Grinding, paving, installing durable striping, pavement markers and shoulder rumble strips. Night work, 9 p.m. to 5 a.m. with lane closures. Delays up to 20 minutes. Completion: 9/2017.

    Interstate 827. Interstate 82 McNary Highway Repair impact panels, gap

    seal at various locations between I-84 and Columbia River, MP 0.0 to 11. Lane closures, flaggers, reduced speeds, minor delays. Completion: 11/2017.

    Interstate 848. Interstate 84 Columbia River Highway Historic Columbia

    River Highway State Trail connection from Wyeth to Lindsey Creek, MP 51 to 54.5. Periodic lane closures, possible minor delays. Completion: Fall 2018. www.HistoricHighway.org.

    9. Interstate 84 Vietnam Veterans Memorial Highway Remove and replace culvert on Threemile Creek under I-84, restore creek channel, MP 87. Shoulder closures only, minimal delays. Completion: 7/2017.

    10. Interstate 84 Old Oregon Trail Highway Shoulder paving along eastbound lanes west of Pendleton, MP 198 to 203. Lane closures, flaggers, reduced speeds, minor delays. Completion: 11/2017.

    11. Interstate 84 Old Oregon Trail Highway Pavement repairs along eastbound and westbound lanes near Spring Creek, MP 233 to 245. Lane closures, flaggers, reduced speeds, minor delays. Completion: 11/2017.

    12. Interstate 84 Old Oregon Trail Highway Eastbound and westbound Exit 283 Wolf Creek Lane Interchange Bridge work, MP 284.3. Eastbound and westbound lane closures, reduced speeds, minor delays. Completion: 12/2017.

    13. Interstate 84 Old Oregon Trail Highway Pavement resurfacing and repairs between Encina (10 miles east of Baker City) and Pleasant Valley, and between Nelson Point and Lime MP 313.6 to 318. 4; MP 330 to 342. Lane closures, reduced speeds, flaggers, traffic pattern changes, minor delays. Completion: 11/2017.

    14. Interstate 84 Old Oregon Trail Highway Install Variable Message Signs (readerboards), freeway ramp gates and roadway weather sensors at various locations in Malheur County, MP 356 to 378. Occasional lane closures, flaggers and minor delays. Completion: 11/2017.

    U.S. Highways15. U.S. 20 Corvallis-Newport Highway Complete west end

    curve portion of the Pioneer-Mountain Eddyville Project, MP 15.8 to 31.8. Most work will occur off of the existing roadway. Delays of up to 20 minutes. Longer delays and additional lane restrictions could occur due to blasting. Completion: Fall 2017.

    16. U.S. 20 Corvallis-Newport Highway Pave between Burnt Woods and Philomath and replace guardrails. MP 28 to 50. Mostly night work except for work on bridges. Expect single lane closure using flaggers and pilot cars. Delays up to 20 minutes. Completion: Fall 2017.

    17. U.S. 20 McKenzie-Bend Highway Construct a roundabout at the intersection of U.S. 20 and Barclay Drive/McKinney Butte, MP 100/0. Delays of less than 20 minutes, one lane open each direction. Completion: 6/2017.

    18. U.S. 20 McKenzie-Bend Highway Repaving, adding intersection improvements and rumble strips from OR 126 Junction to Deschutes River Bridge, MP 0.0 to 15. Night work, delays up to 20 minutes. Completion: 8/2017.

    19. U.S. 20 Central Oregon Highway Pavement repairs and resurfacing four miles east of Burns to Warm Springs Road, MP 134.5 to 171.1.

    Pavement repairs between Stinkingwater Pass and Warm Springs Road (east of Burns), MP 162 to 171. Pavement grind/inlay four miles east of Burns, MP 134.1 to 134.5. Chip seal four miles east of Burns to Warm Springs Road, MP 134.5 to 171.1. Chip seal applied after repair work is completed.

    Lane closures, day/nighttime flaggers, pilot cars, loose rock on the roadway; delays up to 20 minutes. Completion: 11/2017.

    20. U.S. 20 Central Oregon Highway Chip seal between Harper and Vale, MP 223.1 to 245.7. Lane closures, reduced speeds, day/nighttime flaggers, pilot cars, loose rock on the roadway, delays up to 20 minutes. Completion: 10/2017.

    21. U.S. 20 Central Oregon Highway Pavement grind/inlay at Malheur River bridges in Vale, MP 246.6 to 246.9. Lane closures, flaggers, delays up to 20 minutes. Completion: 10/2017.

    22. U.S. 20 Central Oregon Highway Owyhee Waste Way culvert repair, MP 261.7. Lane closures, flaggers, minor delays. Completion: 11/2017.

    23. U.S. 26 Mount Hood Highway Install ODOT RealTime signs from east of Rhododendron to the Wapinitia Junction, MP 47.8 to 71. Occasional night lane closures and a few full-night closures for sign structures. Completion: Fall 2017. www.ODOTRealTime.org.

    24. U.S. 26 NW Warm Springs Highway Repave, improve intersections from Gumwood Lane to Earl Street in Madras, MP 111 to 116. Night work, up to 20 minute delay. Completion: 8/2017.

    25. U.S. 30 Historic Columbia River Highway Mosier Creek (MP 57), Dry Canyon Creek (MP 64) and Chenoweth Creek Bridges (MP 72), bridge repair and replacement. Remove pavement, install a waterproofing membrane and place new asphalt across bridges. Make concrete repairs. Replace bridge joint seals and fix drainage issues. Completion: 12/2017.

    Chenoweth Bridge: Three week full closure for rapid replacement July 15 August 25, otherwise up to 20 minute delay. Dry Canyon Creek Bridge: Potential delays up to one hour through summer, otherwise up to 20 minute delays. Mosier Creek Bridge: Up to one hour closure for four weeks after July 24, otherwise up to 20 minute delay.

    26. U.S. 30 Westgate Avenue, Pendleton Resurfacing between Airport Road and SW 18th Street, MP 0.7 to 2.5. Lane closures, flaggers, pilot cars, up to 20 minute delays. Completion: 8/2017.

    27. U.S. 95 Idaho-Oregon-Nevada Highway Chip seal between Jordan Creek and Burns Junction, MP 25.6 to 66.2. Lane closures, reduced speeds, day/nighttime flaggers, pilot cars, loose rock on the roadway, delays up to 20 minutes. Completion: 10/2017.

    28. U.S. 97 The Dalles-California Highway Realign highway over railroad tracks and reconnect Burgess Road at Wickiup Junction in La Pine, MP 165 to 166. Up to 20 minute delays. Completion: 9/2017.

    29. U.S. 97 The Dalles-California Highway Link River Bridge, northbound connection, bridge deck replacement, MP 275. Daytime work with minor delays, full eight week closure of the bridge, detours. Completion: 11/2017.

    30.U.S. 101 Oregon Coast Highway Columbia River Astoria-Megler Bridge painting, MP 2.8 to 3.3. Daytime lane closures with up to 20 minute delays, Mondays to Saturdays. No lane closures during holiday weekends or special, identified events. Completion: 9/2018.

    31. U.S. 101 (BUS) Warrenton-Astoria Highway Old Youngs Bay and Lewis and Clark River Bridges. Repairs and painting; new doors and windows at the historic buildings located at Old Youngs Bay Bridge, MP 6.9. Daytime lane closures Sunday through Thursday with delays less than 20 minutes, periodic nighttime closures. Traffic using U.S. 101 will detour around the closures using the Lewis and Clark River and New Youngs Bay Bridges. Visit TripCheck.com for scheduled closures. Completion: 11/2017.

    32. U.S. 101 Oregon Coast Highway Manzanita Avenue to Neahkahnie Creek. Highway relocated and realigned; enhanced turning lane movements into downtown Manzanita, MP 43 to 43.3. Nighttime, single lane closures, with delays of up to 20 minutes. Completion: 11/2017.

    33. U.S. 101 Oregon Coast Highway Rockaway Beach to Bay City Section Replacement Project. Addition of concrete ramps and sidewalks in Rockaway Beach (MP 50.6 to MP 51.1) and Bay City (MP 60.1 to MP 60.4). Single lane closures with delays of 20 minutes. Completion: 9/2017.

    34. U.S. 101 Oregon Coast Highway Traffic improvements in downtown Tillamook at OR 6 include extending the couplet north, widening travel lanes and building a new wide, higher slough bridge with bike lanes and sidewalks, MP 64.3 to 65.7. Day and night slowdowns with occasional lane closures. Completion: 10/2018. www.oregonjta.org/region2/tillamook-home.

    35. U.S. 101 Oregon Coast Highway Replace Siuslaw River Bridge railings, repair damaged concrete, install cathodic protection, MP 190.8 to 191.2. Occasional single lane closures, minor delays. Completion: Spring 2019.

    36. U.S. 101 Oregon Coast Highway Umpqua River Bridge repairs, MP 211. Sidewalk closures, intermittent lane closures, minimal delays. Completion: Fall 2017.

    37. U.S. 101 Oregon Coast Highway Culvert replacements, MP 215 to 217. Intermittent lane closures and delays. Completion: Fall 2017.

    38. U.S. 101 Oregon Coast Highway McCullough Bridge rehabilitation, MP 233 to 234. Sidewalk closures, intermittent nighttime lane closures, minor delays. Completion: 2018.

    39. U.S. 101 Oregon Coast Highway Reinhart Creek Bridge painting, 10 miles south of Port Orford, MP 311. Lane closures with flaggers, delays. Completion: Summer 2017.

    40. U.S. 101 Oregon Coast Highway Thomas Creek Bridge painting, five miles north of Brookings, MP 347. Lane closures with traffic signal, delays. Completion: 2019.

    41. U.S. 395 Pendleton - John Day Highway Crack seal repairs along several sections between Battle Mountain and Long Creek, M.P. 36B to 40B, 63B to 66B and 83B to 90B Lane restrictions, flaggers, delays up to 20 minutes. Completion: 7/2017.

    42. U.S. 730 Columbia River Highway Resurfacing between Southshore Drive and Diagonal Road, MP 180.5 to 191. Lane closures, flaggers, pilot cars, up to 20 minute delays. Completion: 7/2017.

    Oregon Highways43. OR 8 Tualatin Valley Highway Widen OR 8 and OR 47

    to add dedicated right-turn lanes and bike lanes at the intersection. Sidewalk improvements, OR 8 MP 17.8. Day and night lane closures and periodic short-term closures. Completion: Winter 2017.

    44. OR 18/OR 219/OR 99W Salmon River Highway Newberg Dundee Bypass Phase 1. New road on new alignment, includes large drainage ponds, nine new bridges, retaining walls, landslide correction measures, traffic signals and sign structures, city water line, curb and gutter, sidewalk, pavement markings and landscaping. Most work is off the highways, but the local road (including OR 99W Pacific Highway West, MP 21.8 to 22.4 and MP 26.3 to 27.1; OR 219 Hillsboro Silverton Highway, MP 20 to 22 and Springbrook Road in Newberg) will be impacted. A portion of Springbrook Road will be closed to through traffic. Construction will take place mostly during the daytime, but also during some nights. Flaggers will control two-way traffic. Delays less than 20 minutes. Completion: 12/2017.

    45. OR 19 John Day Highway Pavement crack seal project along two highway sections between Spray and Picture Gorge/U.S. 26, MP 102 to 108 and 119 to 122. Lane restrictions, flaggers, delays up to 20 minutes. Completion: 7/2017.

    46. OR 22 Willamina Salem Highway Center Street Bridge repairs in Salem. Nighttime traffic will be controlled with lane closures, Sunday through Thursday, between 7 p.m.

    and 6 a.m. Up to 20 minute delays. Completion: 8/2017.47. OR 34 Corvallis-Lebanon Highway Install median barrier,

    intersection illumination and warning improvements. Various locations between Corvallis and Lebanon. Night work with single lane closures, minimal delays. Completion: Spring 2018.

    48. OR 35 Mount Hood Highway Install ODOT RealTime signs from U.S. 26 to Parkdale, MP 57.1 to 83.5. Occasional night lane closures and a few full-night closures for sign bridges. Completion: Fall 2017. www.ODOTRealTime.org.

    49. OR 36 Mapleton-Junction City Highway Paving between Mapleton and Blachly, MP 0 to 26.9. Expect lane closures and up to 20 minute delays. Completion: Fall 2017.

    50. OR 38 Umpqua Highway Repair and replace culverts, MP 1 to 34. Lane closures and minor delays. Completion: 2018.

    51. OR 42 Coos Bay-Roseburg Highway Replace culvert at Gray Creek, MP 17. Lane closures, minor delays. Completion: Fall 2017.

    52. OR 53 Necanicum Highway Replace culvert at Joe Creek, add guardrails and widen shoulders, MP 0.6. Around- the-clock single lane closures. Delays up to 20 minutes. Completion: 9/2017.

    53. OR 58 Willamette Highway Paving and other improvements from Black Canyon to Middle Fork Willamette River, MP 27.3 to 33.2. Nighttime lane closures, delays up to 20 minutes. Completion: Fall 2017.

    54. OR 58 Crescent Lake Highway Repaving Crescent Lake Highway to The Dalles California Highway, MP 70 to 86.4. Up to 20 minute delays. Completion: 11/2017.

    55. Oregon 62 Expressway Crater Lake Highway Build new expressway, MP 0.7 to 1.7 and 5.4 to 5.8. Minimal impacts to traffic. Completion: 12/2018.

    56. Oregon 66 Greensprings Highway Guardrail installation, MP 10. Delays up to 20 minutes. Completion: 9/2017.

    57. OR 82 Wallowa Lake Highway ADA sidewalk upgrades, pavement resurfacing between Adams Avenue (U.S. 30) and Riddle Road, MP 0 to 1.5. Lane restrictions, flaggers, delay up to 20 minutes. Completion: 11/2017.

    58. OR 86 Baker-Copperfield Highway Guardrail upgrades between Flagstaff Hill and Richland, MP 4.9 to 31.3. Lane closures, flaggers, delays up to 20 minutes. Completion: 11/2017.

    59. Oregon 99 Rogue Valley Highway Paving and restriping, utility work from Rapp Road to Ashland City Limits, MP 14.6 to 17.9. Up to 20 minutes delays at night. Completion: 2018.

    60. OR 99W Pacific Highway West Dundee. New curbs, sidewalks, driveways, underground utilities, pedestrian lighting, and landscaping for 10 blocks, 2nd Street to 11th Street. Nighttime single lane closures for a block or two , no left turns. Two lanes in each direction open during the day. Flaggers used as needed. Completion: 9/2017.

    61. OR 99W Pacific Highway West Removing culvert, constructing new bridge north of Rickreall in Polk County at Crowley Creek, MP 54.0 to MP 54.8. Single lane closures with flaggers controlling traffic. Delays up to 20 minutes. Completion: 11/2017.

    62. OR 99W Pacific Highway West Replace existing Lake Slough Bridge, MP 103.6 to 103.8. Single lane closures using flaggers or temporary signal. Delays up to 20 minutes. Completion: Fall 2017.

    63. OR 138E North Umpqua Highway Downtown Roseburg project realigns streets, adds turn lanes and makes bike/pedestrian improvements. Lane closures, congestion and minor delays. Completion: Summer 2017. www.roseburg138.com.

    64. OR 140 Greensprings Interchange Repaving Klamath Falls/Malin Highway, MP 0.0 to 6.0. Night work, delays up to 20 minutes. Completion: 10/2017.

    65. OR 140 Klamath Falls-Lakeview Highway Repaving Antelope Creek to Odegaard Road, MP 83 to 85. Daytime work, delays up to 20 minutes. Completion: 10/2017.

    66. OR 201 Olds Ferry Highway Install Variable Message Signs and roadway weather sensors at several locations between I-84 junctions at Exit 356 and Exit 374 in Malheur County. Occasional lane closures, flaggers and minor delays. Completion: 11/2017.

    67. OR 207 Hermiston Highway (11th St.) Traffic signal upgrades at Orchard Avenue and Elm Avenue intersections, MP 8 to 8.5. Lane restrictions, flaggers, delays up to 20 minutes. Completion: 11/2017.

    68. OR 207 Hermiston Highway Pavement crack seal project between Hartley Avenue and MP 10, (MP 8.5A to 10A). Lane restrictions, flaggers, delays up to 20 minutes. Completion: 7/2017.

    69. OR 213 Cascade Highway Chip seal project between Silverton and Mount Angel, MP 24.7 to 28.5. Day time traffic will be controlled by flaggers and/or pilot cars. Up to 20 minute delays. Completion: 8/2017.

    70. OR 218 12th Street (Hood River) Repair culvert that carries Indian Creek under 12th Street, MP 1. Possible closures. Completion: Fall 2017.

    71. OR 221 Salem-Dayton Highway Chip seal project from OR 18 to near Hopewell, MP 0.7 to 10.9. Daytime traffic will be controlled by flaggers and/or pilot cars. Up to 20 minute delays. Completion: 8/2017.

    72. OR 223 Kings Valley Highway Chip seal project from OR 22 to Dallas, MP 0 to 1.8. Daytime traffic will be controlled by flaggers and/or pilot cars. Up to 20 minute delays. Completion: 8/2017.

    73. Oregon 230 West Diamond Lake Highway Paving and restriping, MP 16 to 20. Delays up to 20 minutes, 7 a.m. - 7 p.m. Completion: 9/2017.

    74. OR 233 Amity-Dayton Highway Chip seal in the city limits of Dayton, MP 7.4 to 9.2. Daytime traffic will be controlled by flaggers and/or pilot cars. Up to 20 minute delays. Completion: 9/2017.

    75. Oregon 238 Jacksonville Highway Paving and restriping, MP 30 to 33. Expect up to 20 minute delays, 7 a.m.- 7 p.m. Completion: 9/2017.

    76. OR 245 Dooley Mountain Highway Shoulder restoration, pavement overlay between Unity Reservoir and Bridgeport, MP 7 to 21.2. Lane closures, reduced speeds, flaggers, delays up to 20 minutes. Completion: 7/2017.

    77. OR 335 Havana - Helix Highway Pavement resurfacing between OR 334 and OR 11, MP 9.8 to 3.5. Lane closures, flaggers, pilot cars, up to 20 minute delays. Completion: 7/2017.

    78. OR 414 Pine Creek Highway Flood mitigation, culvert upgrades between Halfway and junction of OR 86, MP 0.5. Road closures with detour via Fairgrounds Road, delays up to 20 minutes. Completion: 11/2016.

    79. OR 540 Cape Arago Highway Rebuild a one-mile section of Empire Boulevard in Coos Bay, MP 3 to 4. Lane closures, detours and minor delays. Completion: Summer 2017.

    80. OR 540 Cape Arago Highway Replace culvert near Bastendorff Beach, MP 10. Lane closures, minor delays. Completion: Fall 2017.

    Other Projects81. South Central Oregon Chip Seals. A. U.S. 97 MP 169.7 to 183.3; B. OR 31 MP 86.0 to 100.0 C. OR 140 MP 0.3 to 61.8 Daytime work, up to 20 minutes delay. Completion: 9/2017.82. Beaver Hill Road (Coos County) Realign road to avoid slide

    area. Closed until fall. Detour in place. Completion: 12/2017.83. Birch Creek Road (Umatilla Co./Milton-Freewater) - Replace

    Birch Creek Road Bridge near Milton-Freewater. Detours, flaggers, up to 20 minute delays. Completion: 11/2017.