Interstate 5 North Coast Corridor Project Timeline 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2020 2030 July 2010 Complete Draft Environmental Document 2012 August 31st Public Review Draft Supplemental Environmental Document 2013 Final Environmental Document 2004 Public Scoping Meetings 2004 Begin Environmental Studies 2014 Begin Construction of Phase One July, August & September 2010 Public Meetings Draft EIR/EIS 2012 October 15th End of Formal Public Review and Comments Fall 2012 Public Works Plan/ Transportation Resource Enhancement Program (PWP/TREP) Release Fall 2011 Selection of Locally Preferred Alternative Spring 2013 Submittal of PWP to California Coastal Commission LEGEND Completed Task / Item Current Task / Item Future Task / Item Project Activity Future Project Activity

Upload: others

Post on 29-May-2020

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Interstate 5 North Coast Corridor Project Timeline · Project Activity Future Project Activity - Need a Title & logo - Delete the 2003 reference to connectors. That was for the 5/56

Interstate 5 North Coast CorridorProject Timeline

2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2020 2030

July 2010Complete Draft

Environmental Document

2012August 31st Public Review

Draft Supplemental Environmental Document

2013Final EnvironmentalDocument

2004Public

ScopingMeetings

2004Begin EnvironmentalStudies

2014Begin Constructionof Phase One

July, August & September 2010

Public MeetingsDraft EIR/EIS

2012October 15thEnd of Formal Public Reviewand Comments

Fall 2012Public Works Plan/Transportation Resource Enhancement Program(PWP/TREP) Release

Fall 2011Selection of Locally

Preferred Alternative

Spring 2013Submittal of PWP to California Coastal Commission

LEGEND

Completed Task / Item

Current Task / Item

Future Task / Item

Project Activity

Future Project Activity

- Need a Title & logo- Delete the 2003 reference to connectors. That was for the 5/56 project- Add Public Scoping Meetings in 2004- Add Selection of Locally Preferred alternative in Fall 2011- Delete NOD/ROD box. The public does not know what that means.- For the Final ED box delete " with preferred alternative"- Add Public Works Plans release in Fall of 2012- Add submittal of PWP to California Coastal Commission in Spring of 2013 - Change the Begin Construction ...... box to Begin Construction of Phase 1- The Public Input color needs to be �x to just the comment period times.