![Page 2: Interstate 435 and Front Street Interchange Improvements This presentation will probably involve audience discussion, which will create action items. Use](https://reader030.vdocuments.mx/reader030/viewer/2022032803/56649e265503460f94b167a8/html5/thumbnails/2.jpg)
Project Location
![Page 3: Interstate 435 and Front Street Interchange Improvements This presentation will probably involve audience discussion, which will create action items. Use](https://reader030.vdocuments.mx/reader030/viewer/2022032803/56649e265503460f94b167a8/html5/thumbnails/3.jpg)
Purpose and Need for this project
To provide safety improvements at the northbound and southbound exits from I-435, within the interchange on Front Street and the entrance ramp onto southbound I-435.
![Page 4: Interstate 435 and Front Street Interchange Improvements This presentation will probably involve audience discussion, which will create action items. Use](https://reader030.vdocuments.mx/reader030/viewer/2022032803/56649e265503460f94b167a8/html5/thumbnails/4.jpg)
Project Scope
![Page 5: Interstate 435 and Front Street Interchange Improvements This presentation will probably involve audience discussion, which will create action items. Use](https://reader030.vdocuments.mx/reader030/viewer/2022032803/56649e265503460f94b167a8/html5/thumbnails/5.jpg)
Initial Concepts We Reviewed
Single Point (SPUI)
Half-Cloverleaf
Roundabout
Tight Urban Diamond (TUDI)
![Page 6: Interstate 435 and Front Street Interchange Improvements This presentation will probably involve audience discussion, which will create action items. Use](https://reader030.vdocuments.mx/reader030/viewer/2022032803/56649e265503460f94b167a8/html5/thumbnails/6.jpg)
Single Point (SPUI)
![Page 7: Interstate 435 and Front Street Interchange Improvements This presentation will probably involve audience discussion, which will create action items. Use](https://reader030.vdocuments.mx/reader030/viewer/2022032803/56649e265503460f94b167a8/html5/thumbnails/7.jpg)
Problems with a Single Point design
Required extensive reconstruction of I-435.
Costs for additional right-of-way and construction were very high, about$31 million.*
We had concerns about how long it would take trucks to clear such a large intersection.
*Based on 2002 estimates.
![Page 8: Interstate 435 and Front Street Interchange Improvements This presentation will probably involve audience discussion, which will create action items. Use](https://reader030.vdocuments.mx/reader030/viewer/2022032803/56649e265503460f94b167a8/html5/thumbnails/8.jpg)
Half-Cloverleaf
![Page 9: Interstate 435 and Front Street Interchange Improvements This presentation will probably involve audience discussion, which will create action items. Use](https://reader030.vdocuments.mx/reader030/viewer/2022032803/56649e265503460f94b167a8/html5/thumbnails/9.jpg)
Problems with a Half- Cloverleaf design
Required large amounts of new R/W.
Costs for additional right-of-way and construction were very high, about$37 million.*
We had concerns about the trucks being able to accelerate from the loop ramps onto the freeway.
*Based on 2002 estimates.
![Page 10: Interstate 435 and Front Street Interchange Improvements This presentation will probably involve audience discussion, which will create action items. Use](https://reader030.vdocuments.mx/reader030/viewer/2022032803/56649e265503460f94b167a8/html5/thumbnails/10.jpg)
Roundabout
![Page 11: Interstate 435 and Front Street Interchange Improvements This presentation will probably involve audience discussion, which will create action items. Use](https://reader030.vdocuments.mx/reader030/viewer/2022032803/56649e265503460f94b167a8/html5/thumbnails/11.jpg)
Problems with a Roundabout design
Did not perform as well as other alternatives.
We had concerns about the operation of the trucks in the roundabout (two trucks likely would not enter a roundabout at the same time, reducing capacity).
Costs for additional right-of-way and construction, about $10 million.*
*Based on 2002 estimates.
![Page 12: Interstate 435 and Front Street Interchange Improvements This presentation will probably involve audience discussion, which will create action items. Use](https://reader030.vdocuments.mx/reader030/viewer/2022032803/56649e265503460f94b167a8/html5/thumbnails/12.jpg)
Tight Urban Diamond (TUDI)
![Page 13: Interstate 435 and Front Street Interchange Improvements This presentation will probably involve audience discussion, which will create action items. Use](https://reader030.vdocuments.mx/reader030/viewer/2022032803/56649e265503460f94b167a8/html5/thumbnails/13.jpg)
Problems with a Tight Urban Diamond design
Required considerable reconstruction of I-435.
Did not work as well as the SPUI or half-cloverleaf.
Costs for additional right-of-way and construction were high, about$28 million.*
*Based on 2002 estimates.
![Page 14: Interstate 435 and Front Street Interchange Improvements This presentation will probably involve audience discussion, which will create action items. Use](https://reader030.vdocuments.mx/reader030/viewer/2022032803/56649e265503460f94b167a8/html5/thumbnails/14.jpg)
Initial Design
![Page 15: Interstate 435 and Front Street Interchange Improvements This presentation will probably involve audience discussion, which will create action items. Use](https://reader030.vdocuments.mx/reader030/viewer/2022032803/56649e265503460f94b167a8/html5/thumbnails/15.jpg)
Initial Design
The existing interchange is very similar to a TUDI, with I-435 over Front Street.
The initial preliminary design included:Adding lanes to the off ramps with
double and triple left turn lanes.Adding lanes to Front Street
between Universal and Corrington with traffic lanes behind the bridge piers.
![Page 16: Interstate 435 and Front Street Interchange Improvements This presentation will probably involve audience discussion, which will create action items. Use](https://reader030.vdocuments.mx/reader030/viewer/2022032803/56649e265503460f94b167a8/html5/thumbnails/16.jpg)
Problems with the initial design
The life of the capacity improvements were limited. This design would probably fail within 10 to 15 years.
The Levels of Service were D, E and F.Costs for additional right-of-way and
construction were still somewhat high, about $11 to $12 million.*
This design has 45 conflict points within the entire interchange.
*Based on 2005 estimates.
![Page 17: Interstate 435 and Front Street Interchange Improvements This presentation will probably involve audience discussion, which will create action items. Use](https://reader030.vdocuments.mx/reader030/viewer/2022032803/56649e265503460f94b167a8/html5/thumbnails/17.jpg)
Conflict Point Diagram - TUDI
![Page 18: Interstate 435 and Front Street Interchange Improvements This presentation will probably involve audience discussion, which will create action items. Use](https://reader030.vdocuments.mx/reader030/viewer/2022032803/56649e265503460f94b167a8/html5/thumbnails/18.jpg)
Problems with the initial designTriple left turn lanes were needed for the
northbound to westbound movement. This is not desirable with 11% trucks during peak hour. (Off peak has about 30% trucks.)
Seven lanes were needed under the bridges, requiring construction of lanes and retaining walls behind the bridge piers in existing sand fills. This would be difficult to build.
The trucks required large turning radii to achieve capacity improvement. This limited vehicle storage between the signals.
![Page 19: Interstate 435 and Front Street Interchange Improvements This presentation will probably involve audience discussion, which will create action items. Use](https://reader030.vdocuments.mx/reader030/viewer/2022032803/56649e265503460f94b167a8/html5/thumbnails/19.jpg)
A Practical Design Solution
A Diverging Diamond Interchange or DDI
![Page 20: Interstate 435 and Front Street Interchange Improvements This presentation will probably involve audience discussion, which will create action items. Use](https://reader030.vdocuments.mx/reader030/viewer/2022032803/56649e265503460f94b167a8/html5/thumbnails/20.jpg)
Diverging Diamond Design
Link to DDI overhead videoLink to one of the drive thru videos
![Page 21: Interstate 435 and Front Street Interchange Improvements This presentation will probably involve audience discussion, which will create action items. Use](https://reader030.vdocuments.mx/reader030/viewer/2022032803/56649e265503460f94b167a8/html5/thumbnails/21.jpg)
Advantages of using a DDI at this Location
The DDI doubles the capacity of the left turn lanes and eliminates the need for the triple left turn. The double left turn should be safer than a triple with high truck volumes.
Levels of Service are A, B and C.This design reduces the number of
lanes required under the bridge to four, eliminating the need to build retaining walls.
![Page 22: Interstate 435 and Front Street Interchange Improvements This presentation will probably involve audience discussion, which will create action items. Use](https://reader030.vdocuments.mx/reader030/viewer/2022032803/56649e265503460f94b167a8/html5/thumbnails/22.jpg)
AdvantagesThis also reduces the number of lanes
needed on Front Street beyond the interchange.
This DDI design has more storage room between the ramp signals.
(550’ vs 350’)
This design will also provide better sight distance. Drivers on the ramps don’t have to look through bridge columns to see on-coming traffic.
![Page 23: Interstate 435 and Front Street Interchange Improvements This presentation will probably involve audience discussion, which will create action items. Use](https://reader030.vdocuments.mx/reader030/viewer/2022032803/56649e265503460f94b167a8/html5/thumbnails/23.jpg)
AdvantagesIt incorporates roadway features which
calm traffic and reduce speeds while maintaining capacity. This should result in fewer and less severe crashes.
Although wrong way entry into opposing lanes is possible, wrong way entry onto the ramps and the interstate will be almost eliminated.
The DDI has 21 conflict points compared to 45 with the initial design.
![Page 24: Interstate 435 and Front Street Interchange Improvements This presentation will probably involve audience discussion, which will create action items. Use](https://reader030.vdocuments.mx/reader030/viewer/2022032803/56649e265503460f94b167a8/html5/thumbnails/24.jpg)
Conflict Point Diagram - DDI
![Page 25: Interstate 435 and Front Street Interchange Improvements This presentation will probably involve audience discussion, which will create action items. Use](https://reader030.vdocuments.mx/reader030/viewer/2022032803/56649e265503460f94b167a8/html5/thumbnails/25.jpg)
AdvantagesThe smaller ramp intersections
mean vehicles will have shorter clearance times resulting in less exposure and safer conditions.
The DDI design has reduced the cost of the project.
![Page 26: Interstate 435 and Front Street Interchange Improvements This presentation will probably involve audience discussion, which will create action items. Use](https://reader030.vdocuments.mx/reader030/viewer/2022032803/56649e265503460f94b167a8/html5/thumbnails/26.jpg)
Estimated Costs* Initial DDI Construction
MoDOT $ 6,763,000 $4,097,000Kansas City $ 103,000 $ 71,000
Right of WayMoDOT $ 1,823,000 $ 625,000Kansas City $ 2,045,000 $ 667,000
Utility Relocations MoDOT $ 600,000 $ 312,000
Total Costs $11,334,000 $5,772,000*Based on 2005 estimates.
![Page 27: Interstate 435 and Front Street Interchange Improvements This presentation will probably involve audience discussion, which will create action items. Use](https://reader030.vdocuments.mx/reader030/viewer/2022032803/56649e265503460f94b167a8/html5/thumbnails/27.jpg)
Disadvantages of a DDIDriver expectations.We need more extensive public
involvement.Pedestrians have to cross free-flowing
ramps (or the crossings need to be signalized as at this location).
There is very limited accident history available.
We need additional signing, lighting and pavement markings.
![Page 28: Interstate 435 and Front Street Interchange Improvements This presentation will probably involve audience discussion, which will create action items. Use](https://reader030.vdocuments.mx/reader030/viewer/2022032803/56649e265503460f94b167a8/html5/thumbnails/28.jpg)
DDI One construction season
Length of Construction
Two construction seasons
TUDI
![Page 29: Interstate 435 and Front Street Interchange Improvements This presentation will probably involve audience discussion, which will create action items. Use](https://reader030.vdocuments.mx/reader030/viewer/2022032803/56649e265503460f94b167a8/html5/thumbnails/29.jpg)
ConclusionThe DDI will improve safety and
capacity of the existing interchange, at less cost and with a shorter construction schedule.
It will also provide valuable information on function and safety that will allow MoDOT and FHWA to determine if use of the DDI design at other locations is feasible.