Interstate 10/605 Transition Connector from SB I-605 to EB I-10 This At-Grade Freeway-to-Freeway Connection is Dangerous
• The San Bernardino Freeway (I-10) is a severely congested east-west route classified as an interstate freeway that provides commuter access to the Los Angeles Central Business District from San Gabriel Valley, Riverside and San Bernardino Counties.
• I-605 is a regional interstate facility providing north-south connectivity from the San Gabriel Valley to the City of Long Beach and Orange County via the connection to I-405, which experiences severe congestion while carrying substantial traffic volumes.
• Accident rates for the I-10/I-605 interchange as a whole exceeded state average rates by 27% over a three year period from January 2000 to December 2003.
Construct Flyover for Southbound I-605 to Eastbound I-10 Traffic
• The Project will construct the flyover connector from Southbound I-605 to the Eastbound I-10. The proposed fly-over direct connector (southbound I-605 to eastbound I-10) would replace the existing shared at-grade connector and result in the elimination of the weaving conflict.
Project Cost
• Corridor Mobility Program Request: $71,000,000 • Total Cost: $71,000,000
Project Benefits • The new connector would eliminate weaving movements on the existing shared
connector, reduce queuing on the westbound I-10 and southbound I-605 traffic and enhance the safety and operation of the interchange by reducing accidents.
Benefits Summary Benefit Cost Ratio: 0.9 Annual Vehicle Hours of Delay Saved: 400,500 Annual Delay Savings: $2.7 M Current Daily Vehicle Occupants*: 39,600 Daily Vehicle Occupants Forecast w/o Project*: 40,040 Daily Vehicle Occupants Forecast w/ Project*: 40,040
*Average Daily Traffic Data from the application is converted to “vehicle occupants” by multiplying by 1.1, the average occupancy of a vehicle in Los Angeles County today.
12
VALLEY
AMAR
PECK
RAMONA
PUENTE
SUNSET
605
60
210
39
10
PICORIVERA
WHITTIER LA PUENTE
CITY OFINDUSTRY
SOUTHEL MONTE
WESTCOVINA
ROSEMEAD EL MONTE
BALDWINPARK
TEMPLECITY
IRWINDALEAZUSAARCADIA
MONROVIA DUARTE
LosAngelesCo.
El Monte
El Monte Bus Station
Baldwin Park
PROJECT #5: I-10/605 INTERCHANGE
Project Description- Construct One Two-lane Bridge Connector Ramp
Project CostCMIA Request: $71,000,000 Total Cost: $71,000,000
Benefits Summary- B/C Ratio: 0.9- Vehicle Hours of Delay Saved: 400,500- Delay Savings: $2.7 million- Current ADT: 36,000- ADT Forecast w/o Project: 36,400- ADT Forecast w/ Project: 36,400
Rio Hondo College
El MonteAirport
West CovinaShopping Plaza
OntarioAirport
To San Bernardino Co.To Downtown Los Angeles/Santa Monica
To Orange Co.
Corridor Mobility Improvement Account Program
January 9, 2007
I-10/I-605 Connector
Existing HOV Lanes
Freeway and Major Arterials
Metrolink Station 5
1
4
2
3
I-10/I-605 Project Limits
SCAG SmartGrowth Areas
Metrolink Commuter Rail
MTA Bus Lines\Muni Lines
ITS Features
CCTV - Closed Circuit TV
CMS - Changeable Message Sign
HAR - Highway Advisory Radio
METER - Ramp Meter
Activity Centers
RWIS - Roadside Weather Information SystemTMS - Transportation Management Systems
Metro Rapid (Bus Rapid Transit)
Proposed I-10/I-605 Connector
ROSE
MEAD
BLV
D.
I-10 Extend HOVSeparate CMIA Candidate
[
N
0 1 2 3 4 Miles5
ITS
Orange
Ventrua
PacificOcean
San Bern
Los Angeles
Silver Streak (Bus Rapid Transit)(March 2007) El Monte Busway
(Express Bus Lines)
(Express Bus Lines)
(Express Bus Lines)
Metrolink Riverside Line
Metroli
nk S
an B
erna
rdino
Line
El Monte
13