internships - svec tirupati · internships s.no company name date from date to no of students 1....
TRANSCRIPT
INTERNSHIPS
S.No Company Name Date From Date To No of
Students
1. BHEL. RAMACHANDRA PURAM, HYDERABAD 18/06/2018 30/06/2018 6
2. BHEL. RAMACHANDRA PURAM, HYDERABAD 18/06/2018 02/07/2018 3
3. BSNL OFFICE, TIRUPATI 18/06/2018 02/07/2018 3
4. SRI DAMODARAM SANJEEVAIAH THERMAL POWER STATION, NELATUR VILLAGE,NELLORE
18/06/2018 30/06/2018 15
5. TECHNICAL TRAINING INSTITUTE, VIZAG STEEL PLANT,VISAKHAPTNAM
18/06/2018 30/06/2018 10
6. TECHNICAL TRAINING INSTITUTE, VIZAG STEEL PLANT,VISAKHAPTNAM
18/06/2018 02/07/2018 10
7. TECHNICAL TRAINING INSTITUTE, VIZAG STEEL PLANT,VISAKHAPTNAM
18/06/2018 01/07/2018 8
8. TECHNICAL TRAINING INSTITUTE, VIZAG STEEL PLANT,VISAKHAPTNAM
18/06/2018 02/07/2018 5
9. DEPUTY DIRECTOR (T/F),PSTI, BANGLAORE-70 18/06/2018 23/06/2018 6
10. SHIRIDI SAI ELECTRICALS, INDUSTRIAL ESTATE, KADAPA-516004.
18/06/2018 23/06/2018 1
11. SUPRAJA TECHNOLOGIES, ANANTAPUR 14/06/2018 01/07/2018 2
12. AP GENCO 11/6/2018 25/6/2018 4
13. ALSTOM 11/6/2018 23/6/2018 3
14. ALL INDIA RADIO STATION, ANNAMAIAH CIRCLE, TIRUPATI - 517 501
11/6/2018 17/06/2018 1
15. OPERATION & MAINTENANCE CIRCLE, APGENCO, SRBPH, SRISAILAM PROJECT
11/6/2018 26/06/2018 5
16. TIRUMALA TIRUPATI DEVASTHANAM, TIRUPATI. 06/06/2018 27/06/2018 8
17. SATISH DHAWAN SPACE CENTER 6/4/2018 6/4/2018 1
18. CONSOLIDATED CONSTRUCTION CONSORTIUM LIMITED (CCCL), RANGAMPETA, TIRUPATI.
06/06/2018 27/06/2018 6
19. MANTHA ASSOCIATES, HYDERABAD. 06/06/2018 27/06/2018 5
20. VR2 INFRA SOLUTIONS, HYDERABAD. 06/06/2018 27/06/2018 3
21. BSCPL INFRASTRUCTURE LTD., HYDERABAD. 06/06/2018 27/06/2018 5
22. BANGALORE INTERNATIONAL AIRPORT LIMITED, BANGALORE.
06/6/2018 27/06/2018 3
23. BUREAU VERITAS INDIA PRIVATE LIMITED, MANGALORE. 06/6/2018 27/06/2018 4
S.No Company Name Date From Date To No of
Students
24. INDIAN INSTITUTE OF TECHNOLOGY, INDORE. 06/06/2018 27/06/2018 2
25. ENTIRZ ENGINEERING AND CONSTRUCTIONS PRIVATE LIMITED, THAZHAMBUR, CHENNAI.
06/06/2018 27/06/2018 4
26. BCV DEVELOPERS PRIVATE LIMITED, BANGALORE. 06/06/2018 27/06/2018 8
27. SARATHY GEOTECH & ENGINEERING SERVICES PVT. LTD. BANGALORE.
06/06/2018 27/06/2018 2
28. APSSDC- SVEC 06/06/2018 23/06/2018 38
29. SRISAILAM LEFT BANK POWER HOUSE, SRISAILAM, TELANGANA-518101
06/06/2018 16/06/2018 9
30. RAYALASEEMA THERMAL POWER PROJECT (RTPP),VV REDDY NAGAR, KALLAMALLA, YERRAGUNTLA-516312
07/06/2018 14/06/2018 8
31. RAYALASEEMA THERMAL POWER PROJECT (RTPP),VV REDDY NAGAR, KALLAMALLA, YERRAGUNTLA-516312
07/06/2018 24/06/2018 6
32. RAYALASEEMA THERMAL POWER PROJECT (RTPP),VV REDDY NAGAR, KALLAMALLA, YERRAGUNTLA-516312
07/06/2018 21/06/2018 2
33. VERZEO EDUTECH PVT.Ltd 5/6/2018 30/6/2018 1
34. BHARATHI CEMENT CORPORATION LTD 5/6/2018 30/6/2018 7
35. ONGC 5/6/2018 30/6/2018 1
36. TECHNICAL TRAINING INSTITUTE, VIZAG STEEL PLANT,VISAKHAPTNAM
05/06/2018 19/06/2018 19
37. VIZAG STEEL PLANT, VIZAG 05/06/2018 30/06/2018 5
38. RAYALASEEMA THERMAL POWER PROJECT (RTPP),VV REDDY NAGAR, KALLAMALLA, YERRAGUNTLA-516312
05/6/2018 19/06/2018 9
39. TIRUMALA MILK PRODUCTS, NARASARAOPET 05/6/2018 30/06/2018 5
40. MINISTRY OF ELECTRONICS AND INFORMATION TECHNOLOGY, GOVERNMENT OF INDIA, NEW DELHI
02/6/2018 30/06/2018 3
41. RAYALASEEMA THERMAL POWER PROJECT (RTPP),VV REDDY NAGAR, KALLAMALLA, YERRAGUNTLA-516312
02/06/2018 30/06/2018 3
42. APSSDC, AMARAVATI 01/06/2018 31/07/2018 6
43. MAQ SOFTWARE, HYDERABAD 26/03/2018 30/06/2018 1
44. MAQ SOFTWARE HYDERABAD 26/03/2018 30/06/2018 1
45. INTERNSHALA, GURUGRAM 19/03/2018 19/03/2018 1
46. MAQ SOFTWARE HYDERABAD 19/03/2018 29/06/2018 1
S.No Company Name Date From Date To No of
Students
47. PRODUCTABLE SOLUTIONS 19/02/2018 30/05/2018 1
48. APSSDC 15/2/2018 17/2/2018 49
49. BITONIC TECHNOLOGY LABS PRIVATE LTD., BANGALORE 26/02/2018 15/05/2018 1
50. ANKALAN WEB SOLUTIONS PVT.LTD 19/02/2018 25/03/2018 1
51. THOUGHTCLAN TECHNOLOGIES PVT., LTD. BANGALORE 05/02/2018 05/05/2018 1
52. FP TECH SCIENCE PVT.LTD,BANGALORE 05/02/2018 05/04/2018 1
53. THOUGHTCLAN TECHNOLOGIES PVT., LTD. BANGALORE 05/02/2018 05/05/2018 1
54. TRAVEL TRIPPER, HYDERABAD 22/01/2018 15/05/2018 1
55. HASHEDIN TECHNOLOGIES PVT LTD., BANGALORE 15/01/2018 31/07/2018 1
56. SASNEE TECHNOLOGIES PVT LTD., BANGALORE 25/01/2018 25/06/2018 1
57. HASHEDIN TECHNOLOGIES PVT LTD., BANGALORE 15/01/2018 31/07/2018 1
58. PRODUCT LABS SOLUTIONS HYDERABAD 24/01/2018 13/04/2018 1
59. INTERN & JOB INTERNATIONAL, HYDERABAD 29/01/2018 13/04/2018 4
60. RICHARD KING CHATRAGADDA, HYDERABAD 24/01/2018 13/04/2018 1
61. HAPPIEST MIND TECHNOLOGIES PVT LTD., BANGALORE 24/01/2018 24/04/2018 1
62. O.C TANNER, HYDERABAD 22/01/2018 22/03/2018 1
63. YELLOW MESSENGER ,HYDERABAD 22/01/2018 22/03/2018 1
64. SATISH DHAWAN SPACE CENTRE SRIHARI KOTA PSR NELLORE
21/01/2018 25/03/2018 2
65. DATAISM TECHNOLOGIES, TIRUPATHI 01/01/2018 15/04/2018 1
66. SIEMENS LABORATARIES, SVEC 04/1/2018 11/01/2018 27
67. DATAISM TECHNOLOGIES PVT. LTD, TIRUPATI CHITTOOR 22/01/2018 14/04/2018 4
68. HASHEDIN TECHNOLOGIES PVT., LTD, BANGALORE 22/01/2018 14/04/2018 1
69. MAHATHI SOFTWARE PVT.LTD,VISAKHAPATNAM 22/01/2018 3/03/2018 1
70. SIEMENS LABORATARIES, SVEC 17/01/2018 25/01/2018 27
71. VAIZVA TECH PVT LTD 22/01/2018 22/07/2018 2
72. NIT SURATKAL 22/01/2018 30/03/2018 4
73. SASNEE TECHNOLOGIES PVT.LTD,BANGALORE 22/01/2018 23/03/2018 1
S.No Company Name Date From Date To No of
Students
74. INTERN & JOB INTERNATIONAL,HYDERABAD 22/01/2018 23/03/2018 4
75. DATAISM TECHNOLOGIES PVT. LTD, TIRUPATI CHITTOOR 22/01/2018 23/03/2018 1
76. HAPPIEST MINDS TECHNOLOGIES PVT.LTD, BANGALORE 24/01/2018 20/03/2018 1
77. OC TANNER INDIA PVT LTD, HYDERABAD 22/01/2018 22/03/2018 1
78. TCS,HYDERABAD 24/01/2018 13/04/2018 1
79. SATISH DHAWAN SPACE CENTER SHAR 21/01/2018 25/03/2018 2
80. ENSAAR GLOBAL PVT., LTD. HYDERABAD 22/01/2018 22/05/2018 1
81. HASHEDIN TECHNOLOGIES PVT.LTD, BANGALORE 22/01/2018 31/07/2018 1
82. CEI INDIA PVT., LTD. CHENNAI 14/12/2017 30/03/2018 1
83. SKILL DEVELOPMENT CENTER, AMARA RAJA BATTERIES
PVT LTD.,KARAKAMBADI 20/12/2018 28/12/2018 1
84. CARRIAGE REPAIR SHOP,TIRUPATI. 19/12/2017 29/12/2017 5
85. HELICOPTER DIVISION,HAL,BANGALORE 18/12/2017 23/12/2017 3
86. BHARAT HEAVY ELECTRICALS LIMITED 18/12/2017 30/12/2017 15
87. ELECTRICAL MAINTENANCE,OIL AND NATURAL GAS
COMMISSION,RAJAHMUNDRY,EAST GODAVARI (DT). 18/12/2017 22/12/2017 3
88. SKILL DEVELOPMENT CENTER, AMARA RAJA BATTERIES
PVT LTD., 18/12/2017 28/12/2017 4
89. RAYALASEEMA THERMAL POWER PROJECT (RTPP), 19/12/2017 30/12/2017 3
90. RAYALASEEMA THERMAL POWER PROJECT (RTPP), 15/12/2017 31/12/2017 11
91. 400/220 KV
SUBSTATION,URAVAKONDA(M),ANANTAPURAM (DT) 18/12/2017 26/12/2017 3
92. BHARAT HEAVY ELECTRICALS LIMITED 15/12/2017 31/12/2017 2
93. MUTHUKUR(M)SRI DAMODARAM SANJEEVAIAH THERMAL
POWER STATION, 16/12/2017 30/12/2017 9
94. RAYALASEEMA THERMAL POWER PROJECT (RTPP) 16/12/2017 22/12/2017 4
95. BHARAT HEAVY ELECTRICALS LIMITED,
RAMACHANDRAPURAM,HYDERABAD 16/12/2017 30/12/2017 21
96. TECHNICAL TRAINING INSTITUTE, VIZAG STEEL
PLANT,VISAKHAPTNAM 16/12/2017 30/12/2017 3
97. THE SUPERINTENDED ENGINEER,O & M, A P TRANSCO
NILAYAM, NEAR APSARA CIRCLE,KADAPA 20/12/2017 23/12/2017 3
98. GOLD FIELDS 20/12/2017 23/12/2017 1
S.No Company Name Date From Date To No of
Students
99. SATISH DHAWAN SPACE CENTRE, SRIHARI KOTA,PSR
NELLORE 14/12/2017 28/12/2017 4
100. RAYALASEEMA THERMAL POWER PROJECT (RTPP), VV
REDDY NAGAR, KALLAMALLA,YERRAGUNTLA 15/12/2017 26/12/2017 4
101. LEARNING AND DEVELOPMENT CENTRE, NLC INDIA LTD,
NEYVELI 18/12/2017 31/12/2017 4
102. BHARAT HEAVY ELECTRICALS LIMITED,
RAMACHANDRAPURAM, HYDERABAD 18/12/2017 30/12/2017 1
103. K-LITE INDUSTRIES,AMBATTUR INDUSTRIAL ESTATE,
AMBATTUR, CHENNAI. 21/12/2017 04/01/2018 1
104. GOLD FIELDS 12/12/2017 6/12/2017 1
105. GOLD FIELDS 12/12/2017 23/12/2017 1
106. APSSDC 1/12/2017 10/3/2018 13
107. APSSDC 1/12/2017 17/3/2018 15
108. APSSDC 4/10/2017 51/2018 31
109. ZNO MESFET AND ITS APPLICATION FOR HYDROGEN SENSING
22/10/2017 30/07/2018 1
110. AIGAN/GAN BASED HYDROGEN SENSORS USING HEMT
STRUCTURES 3/09/2017 30/07/2018 1
111. SIEMENS LABORATARIES, SVEC 16/08/2017 26/08/2017 30
112. IIS TECHNOLOGIES 14/6/2017 7/7/2017 2
113. APSSDC TRAINING, GUNTUR 12/06/2017 17/06/2017 24
114. APSSDC TRAINING, VIJAYAWADA 26/06/2017 01/07/2017 57
115. RAYALASEEMA THERMAL POWER PROJECT (RTPP),
VV REDDY NAGAR, KALLAMALLA, YERRAGUNTLA. 27/06/2017 01/07/2017 09
116. 3I TECHSO TECHNOLOGIES, 74, 5TH AVE, V BLOCK,
ANNA NAGAR, CHENNAI, TAMILNADU. 27/06/2017 01/07/2017 05
117. CARRIAGE REPAIR SHOP, RENIGUNTA. 27/06/2017 01/07/2017 02
118. EE PUBLIC HEALTH, NELLORE 14/06/2017 05/07/2017 01
119. V K BUILDINGS AND SERVICES 14/06/2017 05/07/2017 01
120. ROADS AND BUILDINGS DEPARTMENT, KADAPA 14/06/2017 05/07/2017 01
121. TIRUMALA TIRUPATI DEVASTHANAMS (TTD), TIRUPATI 14/06/2017 05/07/2017 06
122. ULTRA TECH CEMENT LIMITED TADIPATRI 14/06/2017 05/07/2017 02
123. AMARA RAJA INFRA PRIVATE LIMITED, RENIGUNTA 14/06/2017 05/07/2017 02
124. HETERO DRUGS, TUNI, RAJAMANDRI 14/06/2017 05/07/2017 04
125. SLC & SB CIRCLE, NELLORE 14/06/2017 05/07/2017 02
126. KELLER GROUND ENGINEERING INDIA PVT. LTD., 14/06/2017 05/07/2017 01
S.No Company Name Date From Date To No of
Students
CHENNAI
127. ENGINEERING PROJECTS (INDIA) LTD.
(A GOVERNMENT OF INDIA ENTERPRISE), CHENNAI 14/06/2017 05/07/2017 04
128. TGP CIRCLE, NANDYALA 14/06/2017 05/07/2017 04
129. SARATHY GEOTECH & ENGINEERING SERVICES PVT.
LTD., BANGALORE 14/06/2017 05/07/2017 02
130. STARWORTH INFRASTRUCTURE & CONSTRUCTION LTD.,
BANGALORE. 14/06/2017 05/07/2017 15
131. NAGARJUNA CONSTRUCTION COMPANY LIMITED,
HYDERABAD. 14/06/2017 05/07/2017 04
132. STUP CONSULTANTS, BANGALORE. 14/06/2017 05/07/2017 15
133. SATYAVANI PROJECTS AND CONSULTANTS PRIVATE
LIMITED (SVPCPL), HYDERABAD 14/06/2017 05/07/2017 12
134. MY HOME CONSTRUCTIONS PVT. LTD., HYDERABAD 14/06/2017 05/07/2017 15
135. DR NARLA TATA RAO THERMAL POWER STATION (VTPS),
IBRAHIMPATNAM, KRISHNA (DIST). 14/06/2017 02/07/2017 08
136.
SRI DAMODARAM SANJEEVAIAH THERMAL POWER
STATION, APSPDCL, NELATUR(V),MUTHUKUR(M)
S. P. S. R. NELLORE(DIST).
14/06/2017 02/07/2017 08
137. RAYALASEEMA THERMAL POWER PROJECT (RTPP),
VV REDDY NAGAR, KALLAMALLA,YERRAGUNTLA 14/06/2017 02/07/2017 13
138. BHARAT HEAVY ELECTRICALS LIMTED,
RAMACHANDRAPURAM, HYDERABAD. 14/06/2017 02/07/2017 06
139. MANDAL PRAJA PARISHAD,
YERRAGUNTLA (M),Y. S. R. KADAPA(DIST). 14/06/2017 02/07/2017 03
140. SATISH DHAWAN SPACE CENTRE, SRIHARI KOTA
PSR NELLORE. 14/06/2017 02/07/2017 03
141. CABS (DRDO), BELUR, YEMALUR (P), BANGALORE. 14/06/2017 02/07/2017 01
142. SIEMENS PVT LTD, HYDERABAD 13/06/2017 17/06/2017 07
143. SIEMENS PVT LTD, HYDERABAD 24/06/2017 03/07/2017 30
144. WIPRO 14/06/2017 02/07/2017 90
145. NPTI-PSTI, BANGALORE. 01/03/2017 03/03/2017 30
146. ACCENTURE LTD 13/6/2017 30/6/2017 1
147. ADI TECHNOLOGIES, BANGALORE. 09/02/2017 09/04/2017 01
148. CGI 20/1/2017 18/3/2017 4
149. CGI 15/1/2017 8/6/2017 9
150. ADITI 15/1/2017 8/6/2017 1
151. CGI 16/1/2017 8/6/2017 14
152. CGI 5/1/2017 5/2/2017 23
153. ROBER BOSCH ENGINEERING LTD 5/1/2017 5/2/2017 4
S.No Company Name Date From Date To No of
Students
154. EFFTRONICS SYTEM PVT LTD 5/1/2017 5/2/2017 2
155. CGI 01/01/2017 09/04/2017 12
156. CARRIAGE REPAIR SHOP, RENIGUNTA - 517 520. 02/01/2017 17/01/2017 01
157. BHEL, R&D, BALA NAGAR, HYDERABAD. 02/01/2017 03/02/2017 02
158. SRIKALAHASTHI PIPES LIMITED , SRIKALAHASTHI, AP. 02/01/2017 01/02/2017 01
159. SRIKALAHASTHI PIPES LIMITED , SRIKALAHASTHI, AP. 02/01/2017 31/01/2017 01
160. BHEL, BANGALORE. 08/01/2017 17/01/2017 02
161. BOSCH, KONAPPANA AGRAHARA, KARNATAKA. 16/01/2017 21/01/2017 02
162. BOSCH, KONAPPANA AGRAHARA, KARNATAKA. 16/01/2017 20/01/2017 12
163. BHEL, BANGALORE. 16/01/2017 21/01/2017 03
164. AEROTRIX, BANGALORE. 16/01/2017 21/01/2017 01
165. IISC, BANGALORE. 20/01/2017 22/01/2017 05
166. BOSCH-CIL-SEZ, KEERTHANAM VILLAGE, COIMABATORE. 23/01/2017 15/05/2017 02
167. NPTI-PSTI, BANGALORE. 06/01/2017 08/01/2017 01
168. NPTI-PSTI, BANGALORE. 27/01/2017 29/01/2017 01
169. NAGARJUNA STEEL WORKS PVT. LTD. 19/12/2016 18/01/2017 01
170. BHEL, R&D, BALA NAGAR, HYDERABAD. 19/12/2016 30/12/2016 04
171. TVS BRAKES INDIA LIMITED. 22/12/2016 24/12/2016 01
172. BOSCH, KONAPPANA AGRAHARA, KARNATAKA. 26/12/2016 30/12/2016 17
173. PRIYA CEMENT, KURNOOL. 26/12/2016 10/01/2017 01
174. BSNL, ANANTAPUR. 26/12/2016 31/12/2016 01
175. MAHALAXMI INDUSTRIES 16/12/2016 15/4/2017 17
176. AMAZON 29/2/2016 19/8/2016 2
177. ANNAND COMPANY 16/12/2016 15/4/2017 5
178. VI MIRCRO SYSTEM 16/12/2016 15/4/2017 17
179. RV MACHINTE TOOLS 16/12/2016 15/4/2017 10
180. NATIONAL ATMOSPHERIC RESEARCH LABORATORY 26/9/2016 22/5/2017 3
181. AMPHENOL INTERCONNECT INDIA PVT LTD 26/92016 22/5/2017 1
182. GOOGLE 1/8/2016 31/8/2016 1
183. AMAZON 22/2/2016 19/8/2016 1
184. EZENITH –BANGALORE. 16/07/2016 20/07/2016 01
185. PLR CONSTRUCTIONS 01/07/2016 20/07/2016 05
186. TTD TRANSPORT DEPARTMENT, TIRUPATI. 27/06/2016 02/07/2016 06
187. ELECTRIC LOCO SHED, ARAKKONAM. 22/06/2016 27/06/2016 05
188. MEENAKSHI ENERGY POWER PLANT, TIRUPATI, AP. 18/06/2016 28/06/2016 01
189. MAHINDRA MOTORS, ANANTHAPUR,AP. 16/06/2016 30/06/2016 01
190. BHEL, VIZAG,AP. 16/06/2016 30/06/2016 04
191. ELECTRIC LOCO SHED, ARAKKONAM. 16/06/2016 21/06/2016 10
192. HINDUSTAN COCA COLA BEVERAGE PVT LTD., 10/06/2016 24/06/2016 32
193. APSPDCL, SPM SECTION, RENIGUNTA. 08/06/2016 08/07/2016 05
S.No Company Name Date From Date To No of
Students
194. SRIKALAHASTHI PIPES LIMITED,
SRIKALAHASTHI MANDAL, AP. 07/06/2016 14/06/2016 06
195. BHARATHI CEMENT CORPORATION PVT LTD., KADAPA . 06/06/2016 16/06/2016 06
196. VIZAG SEAPORT,VISAKHAPATNAM,AP. 06/06/2016 08/06/2016 07
197. BHARATHI CEMENT CORPORATION PVT LTD., KADAPA . 06/06/2016 15/06/2016 06
198. VIZAG SEAPORT,VISAKHAPATNAM,AP. 06/06/2016 08/06/2016 07
199. BHARATHI CEMENT CORPORATION PVT LTD., KADAPA . 06/06/2016 15/06/2016 06
200. ANDHRA PRADESH POWER DEVELOPMENT COMPANY
LIMITED. 06/06/2016 08/06/2016 05
201. HINGIL 05/06/2016 08/06/2016 06
202. RAYALASEEMA THERMAL POWER PLANT, KADAPA. 04/06/2016 25/06/2016 04
203. PROMARG CONSULTANTS PRIVATE LIMITED HYDERABAD. 01/06/2016 30/06/2016 15
204. VISION INDIA DAIRY PRODUCTS, MADANAPALLI. 01/06/2016 15/06/2016 05
205. CRS RAILWAYS, RENIGUNTA. 01/06/2016 15/06/2016 04
206. NTTPS, VIJYAWADA,AP. 01/06/2016 15/06/2016 04
207. SRIKALAHASTHI PIPES LIMITED,
SRIKALAHASTHI MANDAL, AP. 01/06/2016 15/06/2016 12
208. HERITAGE FOODS (INDIA) LIMITED, Chittoor (Dt). 01/06/2016 15/06/2016 20
209. APGENCO, NELLORE. 01/06/2016 15/06/2016 08
210. AMARA RAJA BATTERIES, TIRUPATHI. 01/06/2016 15/06/2016 08
211. HERITAGE WINE INDUSTRY, BANGLORE. 01/06/2016 15/06/2016 16
212. RAYALASEEMA THERMAL POWER PLANT, KADAPA. 01/06/2016 15/06/2016 12
213. APGENCO, VIJAYAWADA. 01/06/2016 15/06/2016 11
214. SRIKALAHASTI PIPES PVT LIMITED, SRIKALAHASTI. 01/06/2016 15/06/2016 08
215. NELCAST, CHENNAI. 01/06/2016 15/06/2016 04
216. SUJAL PIPES, NANDYALA. 01/06/2016 15/06/2016 04
217. VTPS, VIJAYAWADA. 01/06/2016 15/06/2016 08
218. BHEL, HYDERABAD. 01/06/2016 15/06/2016 04
219. GRINDWELL, TIRUPATHI. 01/06/2016 15/06/2016 04
220. BHARATHI CEMENTS, KADAPA. 01/06/2016 15/06/2016 04
221. VTPS, VIZAG. 01/06/2016 15/06/2016 04
222. LARSEN & TOUBRO CONSTRUCTIONS. 01/06/2016 30/06/2016 01
223. TGP & GNSS CIRCLE, TIRUPATHI. 01/06/2016 30/06/2016 03
224. SAINT GOBAIN 01/06/2016 15/06/2016 05
225. CHIDA SPINNING MILL PVT. LTD. 01/06/2016 10/06/2016 06
226. EFFTRONICS SYSTEMS PVT. LTD. VIJAYAWADA 20/10/2016 19/10/2017 09
227. AMPHENOL ADVANCED SENSORS 01/12/2016 30/11/2017 05
228. BINATE TECHNOLOGIES PVT. LTD. 01/10/2016 30/09/2017 17
229. EZENITH –EMPOWER EDUCATION,MAHARASTRA 16/07/2016 20/07/2016 01
230. MY HOME CONSTRUCTIONS PVT. LTD., HYDERABAD. 01/06/2015 30/06/2015 10
S.No Company Name Date From Date To No of
Students
231. TGP AND GNSS PROJECT, IRRIGATION & CAD DEPT.,
GOVT. OF AP, GUNTUR. 01/06/2015 30/06/2015 02
232. RDS PROJECTS, KERALA. 01/06/2015 30/06/2015 05
233. PSR BUILDERS & DEVELOPERS, BANGALORE. 01/06/2015 30/06/2015 05
234. RDS PROJECTS, CHENNAI. 01/06/2015 30/06/2015 11
235. PROMARG CONSULTANTS PVT. LTD. 01/06/2015 30/06/2015 05
236. STARWORTH INFRASTRUCTURE & CONSTRUCTION LTD.,
BANGALORE. 01/06/2015 30/06/2015 05
237. MY HOME CONSTRUCTIONS PVT. LTD., HYDERABAD. 01/06/2015 30/06/2015 05
238. STUP CONSULTANCY PVT. LTD., BANGALORE. 01/06/2015 30/06/2015 05
239. APTRANSCO. 25/05/2015 24/06/2015 10
240. SOUTHERN RAILWAYS 01/06/2015 15/06/2015 04
241. APGENCO 08/06/2015 22/06/2015 09
242. APGENCO 25/05/2015 24/06/2015 04
243. APGENCO 01/06/2015 15/06/2015 05
244. REGEN POWERTECH PVT. LTD. 18/05/2015 11/06/2015 05
245. BHEL, RAMACHANDRAPURAM, HYDERABAD. 18/05/2015 01/06/2015 08
246. 132/33 KV SUBSTATION, CHANDRAGIRI. 25/05/2015 24/06/2015 05
247. 132/33 KV SUBSTATION, CHANDRAGIRI. 2/06/2015 11/06/2015 10
248. WIND POWER PLANT,
TIRUMALA TIRUPATIDEVASTANAMS,TIRUPATI. 8/06/2015 12/06/2015 04
249. 2 X 800 MW, SRI DAMODARAM SANJEEVAIAH THERMAL
POWER STATION,KRISHNAPATNAM, NELLORE(D). 02/06/2015 11/06/2015 09
250. 2 X 800 MW, SRI DAMODARAM SANJEEVAIAH THERMAL
POWER STATION,KRISHNAPATNAM, NELLORE(D). 08/06/2015 13/06/2015 10
251. 2 X 800 MW, SRI DAMODARAM SANJEEVAIAH THERMAL
POWER STATION,KRISHNAPATNAM, NELLORE(D). 01/06/2015 05/06/2015 04
252. 2 X 800 MW, SRI DAMODARAM SANJEEVAIAH THERMAL
POWER STATION,KRISHNAPATNAM, NELLORE(D). 20/05/2015 02/06/2015 05
253. 2 X 800 MW, SRI DAMODARAM SANJEEVAIAH THERMAL
POWER STATION,KRISHNAPATNAM, NELLORE(D). 01/06/2015 07/06/2015 10
254. APSPDCL, KADIRI, ANANTHAPURAM (DIST.). 02/06/2015 11/06/2015 09
255. SRISAILAM POWER PLANT, KURNOOL (DIST.). 25/05/2015 08/06/2015 05
256. S.V. SUGAR FACTORY, RENIGUNTA, CHITTOOR (DIST.). 01/06/2015 30/06/2015 05
257. S.V. SUGAR FACTORY, RENIGUNTA, CHITTOOR (DIST.). 18/05/2015 30/06/2015 05
258. ULTRATECH CEMENT LIMITED,
AP CEMENT WORKS, TADIPATRI. 01/06/2015 15/06/2015 05
259. RAYALASEEMMA THERMAL POWER PLANT
(RTPP),MUDDANUR YSR DISTRICT. 01/06/2015 15/06/2015 05
260. 440 KV SUBSTATION, VEPANJERI (V), CHITTOOR (DIST). 08/06/2015 22/06/2015 04
S.No Company Name Date From Date To No of
Students
261.
SRIKALAHASTHI PIPES LIMITED
(LANCO INDUSTRIES LIMITED,
SRIKALAHASTHI (M), CHITTOOR (DIST).
08/06/2015 17/06/2015 05
262.
SRIKALAHASTHI PIPES LIMITED
(LANCO INDUSTRIES LIMITED, SRIKALAHASTHI
(M),CHITTOOR (DIST).
01/06/2015 05/06/2015 04
263. PRAGATHI POWER SOLUTIONS, TIRUPATI. 18/05/2015 21/05/2015 05
264.
LANCO INDUSTRIES LIMITED,
RACHAGUNNERI (V) & (PO),
SRIKALAHASTI (MANDAL), CHITTOR(D).
25/05/2015 03/06/2015 04
265. SUDALAGUNTA SUGARS LIMITED,
B. N. KANDRIGA, CHITTOR(D). 25/05/2015 24/06/2015 04
266. GRINDWELL NORTON LTD.,
KARAKAMBADI (V), TIRUPATI. 01/06/2015 05/06/2015 04
267. VIDYUTH SOUDHA, KHAIRATHABAD, HYDERABAD. 25/05/2015 24/06/2015 04
268. AMPHENOL INTERCONNECT INDIA PVT. LTD.,
BHOSARI INDUSTRIAL AREA, PUNE. 16/11/2015 15/11/2016 05
269. BHEL, NANDAMBAKKAM, CHENNAI – 600089. 18/05/2015 30/05/2015 03
270. APGENCO, NELATUR, NELLORE DIST.
18/05/2015
30/05/2015 01
271. ISTRAC/ISRO, PEENYA INDUSTRIAL ESTATE,
PEENYA, BENGALURU. 18/05/2015 30/05/2015 04
272. ONGC, KAKINADA DIVISION, EAST GODAVARI. 18/05/2015 30/05/2015 01
273. SATISH DHAWAN SPACE CENTRE SHAR, SRIHARIKOTA. 18/05/2015 30/05/2015 08
274. HINDUSTAN COCO-COLA PVT. LIMITED, SRIKALAHASTHI. 18/05/2015 30/05/2015 04
275. O & M / RTPP, APGENCO, KADAPA (DIST). 18/05/2015 30/05/2015 04
276. KRISHNAPATNAM PORT, NELLORE (DIST). 18/05/2015 30/05/2015 05
277. SRI VARSHA FOOD PRODUCTS PVT LTD
RENIGUNTA, CHITTOOR (DIST). 18/05/2015 30/05/2015 04
278. MANALI PETROCHEMICAL LIMITED, CHENNAI. 18/05/2015 30/05/2015 04
279. GM GALLA FOODS, CHITTOOR (DT). 18/05/2015 30/05/2015 05
280. HERITAGE FOODS (INDIA) LIMITED CHITTOOR (DT). 18/05/2015 30/05/2015 02
281. KRISHNA PATNAM PORT PVT LTD, SPSR, NELLORE (DT). 18/05/2015 30/05/2015 02
282. MAHINDRA BALAJI AGENCIES & INDUSTRIES
SPSR, NELLORE (DT). 18/05/2015 30/05/2015 04
283. GM GALLA FOODS, CHITTOOR (DT). 18/05/2015 30/05/2015 08
284. HERITAGE FOODS (INDIA) LIMITED, CHITTOOR (DT). 18/05/2015 30/05/2015 02
285. LANCO INDUSTRIES PVT. LTD. CHITTOOR (DT). 18/05/2015 30/05/2015 08
286. AMARA RAJA BATTERIES PVT. LTD. TIRUPATI. 18/05/2015 30/05/2015 06
287. SNJ SUGAR AND PRODUCTS LTD, CHITTOOR (DT). 18/05/2015 30/05/2015 05
S.No Company Name Date From Date To No of
Students
288. APGENCO SDSTPS (2X800 MW), NELATUR, NELLORE. 18/05/2015 30/05/2015 03
289. NANDI AGRO INDUSTRIES PVT. LTD., 18/05/2015 30/05/2015 01
290. ECIL, HYDERABAD. 18/05/2015 30/05/2015 04
291. AMARRAJA INDUSTRIES PRIVATE LTD TIRUPATI. 18/05/2015 30/05/2015 04
292. SRI VARSHA FOOD PRODUCTS INDIA LTD, TIRUPATI. 18/05/2015 30/05/2015 05
293. SRI VENKATESWARA CO-OP SUGAR FACTORY LTD ,
CHITOOR (DT). 18/05/2015 30/05/2015 05
294. SRI KALAHASTI PIPES LIMITED
SRIKALAHASTI, CHITTOOR (DIST). 18/05/2015 30/05/2015 04
295. SOLVAY VISHNU BARIUM PVT. LTD, SRIKALAHASTI. 18/05/2015 30/05/2015 04
296. DODLA DAIRY, DEVARAYAPALEM, NELLORE (DIST.). 18/05/2015 30/05/2015 04
297. BHEL, RAMACHANDRAPURAM, HYDERABAD. 18/05/2015 30/05/2015 16
298. HERITAGE FOODS (INDIA) LIMITED, CHITTOOR (DIST.) 18/05/2015 30/05/2015 18
299. NARL, GADANKI. 18/05/2015 30/05/2015 15
300. HINDUSTAN COCA-COLA BEVERAGES PVT. LTD.
SRIKALAHASTI, CHITTOOR (DT). 18/05/2015 30/05/2015 10
301. DEFENCE RESEARCH & DEVELOPMENT LABORATORY
(DRDL), HYDERABAD. 16/01/2016 12/03/2016 05
302. ISRO TELEMETRY, TRACKING AND COMMAND NETWORK
(ISTRAC), BANGALORE. 16/01/2016 12/03/2016 04
303. ELECTRONICS CORPORATION OF INDIA LIMITED (ECIL),
HYDERABAD. 16/01/2016 12/03/2016 04
304. BHARAT SANCHAR NIGAM LIMITED (BSNL), CHENNAI . 16/01/2016 12/03/2016 03
305. INDIAN INSTITUTE OF TECHNOLOGY MADRAS
(IIT, CHENNAI). 16/01/2016 12/03/2016 04
306. VISTEON, CHENNAI. 16/01/2016 12/03/2016 04
307. BHARAT SANCHAR NIGAM LIMITED (BSNL), TIRUPATI. 16/01/2016 12/03/2016 04
308. DEFENCE ELECTRONICS RESEARCH LABORATORY (DLRL),
HYDERABAD. 16/01/2016 12/03/2016 04
309. VISAKHAPATNAM STEEL PLANT. 16/01/2016 12/03/2016 13
310. SATISH DHAWAN SPACE CENTRE (SHAR), SRIHARIKOTA. 16/01/2016 12/03/2016 01
311. ELECTRONICS CORPORATION OF INDIA LIMITED (ECIL),
HYDERABAD. 16/01/2016 12/03/2016 12
312. DEFENCE RESEARCH & DEVELOPMENT LABORATORY
(DRDL), HYDERABAD. 16/01/2016 12/03/2016 03
313. RELIANCE JIO, HYDERABAD. 03/11/2015 15/06/2015 01
314. SUFFIX TREE TECHNOLOGIES, BANGALORE. 03/11/2015 15/06/2015 02
315. VEDA IIT, HYDERABAD. 03/11/2015 15/06/2015 01
316. VIKRAM SARABAHAI SPACE CENTRE (VSSC), 03/11/2015 15/06/2015 01
S.No Company Name Date From Date To No of
Students
THIRUVANANTHAPURAM, KERALA.
317. CONTRIBE TECHNOLOGIES PRIVATE LIMITED,
HYDERABAD. 15/01/2016 15/03/2016 01
318. SV UNIVERSITY,TIRUPATI. 05/02/2015 10/03/2015 01
319. NARL, GADANKI. 15/06/2015 15/07/2015 01
320. PARADIGM CREATIVES, HYDERABAD. 16/05/2015 30/06/2015 01
321. IBM, BANGALORE. 1/10/2015 31/12/2015 03
322. IDISHA INFO LABS, BANGALORE. 14/12/2015 15/03/2016 02
323. ALT+ T LABS, BANGALORE. 18/01/2016 31/03/2016 03
324. IBM, HYDERABAD. 17/05/2015 30/08/2015 01
325. GROW-Z SOFTWARE SOLUTIONS, BANGALORE. 17/05/2015 31/06/2015 01
326. BSNL, HYDERABAD. 17/05/2016 31/06/2016 06
327. REBACA TECHNOLOGIES PVT. LTD., 1/10/2014 31/05/2015 01
328. GLOBAL RESEARCH INNOVATION AND DEVELOPMENT,
BANGALORE. 1/10/2014 31/05/2015 01
329. REDCARPET SOFTWARE SOLUTIONS, HYDERABAD. 1/11/2014 31/05/2015 01
330. AVANTTEC MEDICAL SYSTEMS (P) LTD. CHENNAI. 1/11/2015 30/05/2016 01
331. BINATE TECHNOLOGIES PVT. LTD., MADANAPALLI. 1/11/2015 30/05/2016 02
332. AMAZON. 29/02/2016 19/08/2016 02
333. BINATE TECHNOLOGIES PVT LTD., MADHANAPALLI 28/12/2015 11/07/2016 02
334. SATISH DHAWAN SPACE CENTRE.(SHAR) 24/10/2015 23/09/2016 01
335. AMARA RAJA BATTERIES PVT LTD. 18/01/2016 18/03/2016 04
336. AMAZON, INDIA. 01/02/2016 07/01/2016 02
337. ALT-T LABS, INDIA. 16/01/2016 30/04/2016 03
338. SDSC-ISRO, SRIHARIKOTA, NELLORE. 23/05/2016 30/06/2016 03
339. SDSC-ISRO, SRIHARIKOTA, NELLORE. 25/05/2015 20/06/2015 06
340. SIBAR AUTO PARTS, RENIGUNTA. 24/05/2015 04/06/2015 23
341. NELCAST PVT. LTD., GANDHI NAGAR, GUDUR. 25/05/2015 29/05/2015 05
342. BHARATHI CEMENTS CORPORATION PVT LTD,
NALLALINGAYA PALLI(P), KAMALAPURAM, KADAPA(DT). 25/05/2015 30/06/2015 09
343. RAYALASEEMA THERMAL POWER PLANT [RTPP], KADAPA. 25/05/2015 10/07/2015 05
344.
BALAJI ENGINEERING PVT. LTD., A/7, CHANDIVALI
INDUSTRIAL AREA, BEHIND COATS OF INDIA LTD.
CHANDIVALI,MUMBAI, MAHARASHTRA.
26/05/2015 06/06/2015 05
345. TTD TRANSPORT, OPP. ADMINISTRATIVE BUILDING,
K.T. ROAD, TIRUPATI. 26/05/2015 04/06/2015 04
346. AVEND TECHNOLOGIES, 7, GOLLARAPALYA HOSAHALLI,
LINGADEERANHALLI, KARNATAKA. 01/06/2015 06/06/2015 04
347. RABS ENGINEERING, NO-61, 62, ESWARAN KOIL STREET,
PORUR, CHENNAI, TAMIL NADU. 01/06/2015 06/06/2015 01
S.No Company Name Date From Date To No of
Students
348. RAYALASEEMA THERMAL POWER PLANT [RTPP], KADAPA. 01/06/2015 15/06/2015 05
349. RAYALASEEMA THERMAL POWER PLANT [RTPP], KADAPA. 01/06/2015 20/06/2015 05
350. NAVYA FOODS, RAYALASEEMA REGION, MUDIGOLAM,
IRALA MANDAL. 01/06/2015 14/06/2015 04
351. VIZAG STEEL PLANT, VISAKHAPATNAM. 01/06/2015 13/06/2015 04
352. BHEL, HYDERABAD. 03/06/2015 12/06/2015 05
353. BHEL, HYDERABAD. 03/06/2015 17/06/2015 04
354. HINDUSTAN COCA COLA PVT. LTD RACHAGUNNERI
VILLAGE, SRIKALAHASTI MANDAL. 03/06/2015 09/06/2015 08
355. VIZAG STEEL PLANT, VISAKHAPATNAM. 08/06/2015 20/06/2015 09
356. L & T, CHENNAI. 08/06/2015 18/06/2015 02
357.
SINERGIES CASTINGS , PLOT NO. 3 & 4,
VISAKHAKAPATNAM SPECIAL ECONOMIC ZONE,
DUVVADA, VISAKHAPATNAM.
17/06/2015 26/06/2015 05
358.
BALAJI ENGINEERING PVT. LTD., A/7, CHANDIVALI
INDUSTRIAL AREA, BEHIND COATS OF INDIA LTD.
CHANDIVALI, MUMBAI, MAHARASHTRA, INDIA.
26/05/2015 06/06/2015 05
359. DRDL, KANCHAN BAGH, HYDERABAD, TELANGANA. 22/06/2015 27/06/2015 04
360. SRI GOVINDARAJA TEXTILE PVT. LTD., S NO 70, PEDDA
RANGAPURAM, PULIVENDLA, PULIVENDLA, KADAPA. 08/06/2015 13/06/2015 04
361. ISRO, ANTARIKSH BHAVAN,
NEW BEL ROAD, BANGALORE. 19/05/2015 30/06/2015 04
362. INTERNSHALA, HYDERABAD. 01/06/2015 20/06/2016 01
363. AVEND TECHNOLOGIES, 7, GOLLARAPALYA HOSAHALLI,
LINGADEERANHALLI, KARNATAKA. 01/06/2015 06/06/2015 04
364. BHEL, HYDERABAD. 03/06/2015 12/06/2015 05
365. VIZAG STEEL PLANT, VISAKHAPATNAM. 08/06/2015 20/06/2015 09
366. BHEL, HYDERABAD. 08/06/2015 17/06/2015 04
367. SOUTHERN REGION FARM MACHINERY TRAINING AND
TESTING INSTITUTE, GARLADINNE, ANANTHAPUR. 30/05/2016 24/05/2016 04
368. VIZAG SEAPORT,VISAKHAPATNAM. 06/06/2016 08/06/2016 07
369. HINDUSTAN COCA COLA BEVERAGE PVT LTD., 10/06/2016 24/06/2016 32
370. SRIKALAHASTHI PIPES LIMITED,
SRIKALAHASTHI MANDAL. 07/06/2016 14/06/2016 06
371. DR ENTERPRISE AUTOMOTIVE PVT LTD.,UTHUKOTTAI ,
TIRUVALLURDIST, TN 27/05/2016 07/06/2016 06
372. TTD TRANSPORT DEPARTMENT, TIRUPATI 27/06/2016 02/07/2016 06
373. 33/11KV SUBSTATION ADDITIONAL ASSISTANT
ENGINEER, OPERATION APSPDCL, TIRUPATHI. 02/06/2014 28/06/2014 04
374. DIVISIONAL ENGINEER, 132/33 KVSUBSTATION
APTRANSCO TIRUPATHI. 23/06/2014 27/07/2014 04
S.No Company Name Date From Date To No of
Students
375. APGENCO RTPP, MUDDANUR, YSR KADAPA DIST., 30/06/2014 04/07/2014 04
376. APGENCO RTPP, MUDDANUR, YSR KADAPA DIST., 25/06/2014 30/06/2014 05
377. APGENCO RTPP, MUDDANUR, YSR KADAPA DIST., 25/06/2014 27/06/2014 05
378. 440 KV SUBSTATION, VEPANJERI (V), CHITTOOR (DIST). 15/06/2014 28/06/2014 04
379. 132/33 KV SUBSTATION, CHANDRAGIRI. 24/06/2014 26/06/2014 05
380. BHEL, HEAVY POWER EQUIPMENT PLANT,
RAMACHANDRAPURAM, HYDERABAD-502032. 03/07/2014 15/07/2014 05
381. 2 X 800 MW, SRI DAMODARAM SANJEEVAIAH THERMAL
POWER STATION,KRISHNAPATNAM, NELLORE(D).. 23/06/2014 06/07/2014 05
382. 220/132/33KV SUBSTATION, GREAMSPET, CHITTOR(D). 24/06/2014 29/06/2014 04
383. 132/33 KV SUBSTATION, THIRUCHANOOR ROAD,
TIRUPATHI. 23/06/2014 27/06/2014 05
384. APGENCO RTPP, MUDDANUR, YSR KADAPA DIST.,. 23/06/2014 27/06/2014 04
385. 220/132/33KV SUBSTATION, GREAMSPET, CHITTOR(D). 24/06/2014 24/06/2014 04
386. APGENCO RTPP, MUDDANUR, YSR KADAPA DIST., 16/06/2014 01/07/2014 04
387. 33/11KV SUBSTATION ADDITIONAL ASSISTANT
ENGINEER, OPERATION APSPDCL, TIRUPATHI. 02/06/2014 06/07/2014 05
388. 220/132/33KV SUBSTATION RAMAKRISHNA PURAM,
RENIGUNTA. 26/06/2014 25/06/2014 05
389. SOUTERN CENTRAL RAILWAYS, GUNTAKAL DIVISION,
25KV OVER HEAD EQUIPMENT CARE CENTER. 16/06/2014 01/07/2014 05
390. 220/132/33KV SUBSTATION, GREAMSPET, CHITTOR(D). 25/06/2014 28/06/2014 05
391. SRISAILAM POWER PLANT, KURNOOL (DIST). 18/06/2014 15/07/2014 05
392. APGENCO RTPP, MUDDANUR, YSR KADAPA DIST. 24/06/2014 01/07/2014 03
393. 440 KV SUBSTATION, VEPANJERI (V),CHITTOOR (DIST). 02/06/2014 26/06/2014 04
394. 220/132/33KV SUBSTATION, GREAMSPET, CHITTOR(D). 23/06/2014 27/06/2014 04
395. 2 X 800 MW, SRI DAMODARAM SANJEEVAIAH THERMAL
POWER STATION, KRISHNAPATNAM, NELLORE(D). 23/06/2014 28/06/2014 05
396. EMPEE POWER COMPANY LTD., NAIDUPET, NELLORE. 16/06/2014 26/06/2014 05
397. 33/11 KV SUBSTATION, CHANDRAGIRI. 24/06/2014 27/06/2014 05
398. 132/33 KV SUBSTATION, THIRUCHANOOR ROAD,
TIRUPATHI. 16/06/2014 06/07/2014 05
399. 220/132/33KV SUBSTATION RAMAKRISHNA PURAM,
RENIGUNTA. 20/06/2014 29/06/2014 05
400. 220/132/33KV SUBSTATION RAMAKRISHNA PURAM,
RENIGUNTA. 20/06/2014 22/06/2014 05
401. MANGAL INDUSTRIES, TIRUPATHI. 16/06/2014 01/07/2014 04
402. RAYALASEEMA THERMAL POWER PLANT, KADAPA. 16/06/2014 01/07/2014 04
403. GMHR, RELIANCE INDUSTRIES LIMITED, KAKINADA. 16/06/2014 01/07/2014 04
404. APPDCL, NELATURU VILLAGE, NELLORE. 16/06/2014 01/07/2014 02
S.No Company Name Date From Date To No of
Students
405. AMARA RAJA BATTERIES LTD,
KARAKAMBADI ROAD, TIRUPATI. 16/06/2014 01/07/2014 08
406.
SUDALAGUNTA SUGARS PVT LTD,
KATUR POST,10TH MILE, B N KANDRIGA MANDAL,
SRIKALAHASTHI.
16/06/2014 01/07/2014 04
407.
A.P. CEMENT WORKS,
BHOGASAMUDRAM, TADIPATRI (MANDAL),
ANANTAPUR (DT),
16/06/2014 01/07/2014 03
408.
RAYALASEEMA THERMAL POWER PLANT,
V.V.REDDY NAGAR, RTPP COLONY,
YERRAGUNTLA (M),
KADAPA-516001.
16/06/2014 01/07/2014 04
409.
BHARATHI CEMENT CORPORATION PVT. LTD.,
NALLALINGAYAPALLI (V), KAMALAPURAM (M),
KADAPA(D)-516289.
16/06/2014 01/07/2014 09
410.
TTI
VISHAKAPATNAM STEEL PLANT
VISHAKAPATNAM - 530 032
16/06/2014 01/07/2014 20
411. BOSCH LIMITED, BANGALORE - 560027 16/06/2014 01/07/2014 04
412.
KRISHNAPATNAM PORT,
MUTHUKUR ROAD,
NELLORE-524003
16/06/2014 01/07/2014 01
413. NATIONAL ATMOSPHERIC RESEARCH LABORATORY
(NARL), GADANKI. 20/05/2015 30/06/2015 04
414. TATA CONSULTANCY SERVICES (TCS), HYDERABAD. 22/05/2014 22/05/2015 03
415. MOSIC SOLUTIONS PVT. LTD., RID DEPARTMENT,
BANGALORE. 22/05/2014 22/05/2015 01
416. NATIONAL MINERAL DEVELOPMENT CORPORATION
(NMDC), IIT BOMBAY. 22/05/2014 22/05/2015 02
417. IIIT HYDERABAD. 20/05/2014 26/06/2014 01
418. ALL INDIA RADIO. 14/07/2014 19/07/2014 15
419. ALL INDIA RADIO. 11/08/2014 23/08/2014 10
420. BSNL. 08/08/2014 22/08/2014 04
421. BHEL. 22/10/2014 21/06/2015 02
422. AT&T GLOBAL BUSINESS. 08/01/2014 08/09/2014 01
423. AT&T GLOBAL BUSINESS. 18/01/2014 19/09/2014 01
424. NATIONAL ATMOSPHERIC RESEARCH LABORATORY 16/01/2014 16/09/2014 02
425. RELGO NETWORKS. 22/01/2014 15/09/2014 03
426. C-DAC 14/01/2014 14/09/2014 02
427. HANSOFT INC PVT. LTD., BANGALORE. 20/06/2014 01/07/2014 14
428. COLEAGUE SOLUTIONS, BANGALORE. 20/06/2014 01/07/2014 11
S.No Company Name Date From Date To No of
Students
429. RS SOFT PVT. LTD., BANGALORE. 20/06/2014 01/07/2014 12
430. WEBTEK LABS PVT. LTD, BANGALORE. 20/06/2014 01/07/2014 06
431. YOUNG MIND TECHNOLOGY SOLUTIONS PVT. LTD,
BANGALORE. 20/06/2014 01/07/2014 03
432. JAPAK ONLINE SERVICES, PVT., LTD., BANGALORE. 20/06/2014 01/07/2014 03
433. APPLE INDUSTRIES LTD. , BASHEER BAGH, HYDERABAD. 16/06/2014 30/06/2014 10
434. BHEL, HYDERABAD. 16/06/2014 30/06/2014 04
435. SIBAR AUTO PARTS, RENIGUNTA. 16/06/2014 01/07/2014 05
436. RAYALASEEMA THERMAL POWER PLANT [RTPP], KADAPA. 16/06/2014 03/07/2014 05
437. RAVANDS CONTROLS INC., MALAIAH PALLI ROAD,
CHANDRAGIRI- 517 101, TIRUPATI. A.P. 16/06/2014 30/06/2014 05
438. BALAJI DAIRY, TIRUPATI. 16/06/2014 01/07/2014 05
439. CENTRAL RAILWAY SOUTH [CRS] WORKSHOP,
RENIGUNTA ROAD, SETTI PALLY. 16/06/2014 01/07/2014 05
440. BHEL, HYDERABAD 16/06/2014 30/06/2014 04
441. GARUDA POLYMERS PVT. LTD., HYDERABAD 16/06/2014 26/07/2014 05
442. GARUDA POLYMERS PVT. LTD., HYDERABAD 16/06/2014 23/07/2014 05
443. BHEL, HYDERABAD 16/06/2014 30/06/2014 04
444. VOLT ARC COMPANY, RENIGUNTA 16/06/2014 01/07/2014 05
445. RAYALASEEMA THERMAL POWER PLANT [RTPP], KADAPA. 18/06/2014 03/07/2014 05
446. RAYALASEEMA THERMAL POWER PLANT [RTPP], KADAPA. 18/06/2014 03/07/2014 13
447. M/S CIVIL-AID TECHNO CLINIC PRIVATE LIMITED,
BANGALORE 06/01/2013 31/06/2013 05
448. M/S ULTRA-TECH CEMENTS PVT. LTD., BANGALORE 06/01/2013 31/06/2013 05
449. M/S MY HOME CONSTRUCTIONS PVT. LTD., HYDERABAD 06/01/2013 31/06/2013 05
450. NATIONAL ATMOSPHERIC RESEARCH LABORATORY,
DEPARTMENT OF SPACE, GADANKI, CHITTOOR 06/01/2013 31/06/2013 05
451. TIRUMALA TIRUPATI DEVASTHANAMS, TIRUPATI. 06/01/2013 31/06/2013 05
452. M/S LARSEN & TOUBRO LIMITED, CHENNAI 06/01/2013 31/06/2013 06
453. M/S VVIZAG STEEL PLANT, VIZAG 06/01/2013 31/06/2013 11
454. M/S PHOENIX GROUP, HYDERABAD 06/01/2013 31/06/2013 08
455. TGP AND GNSS PROJECT, IRRIGATION & CAD DEPT.,
GOVT. OF AP, TIRUPATI 06/01/2013 31/06/2013 08
456. M/S GVR INFRA PROJECTS LIMITED, CHENNAI 06/01/2013 31/06/2013 04