intern report

40
HIMALAYA COLLEGE OF ENGINEERING CHYASAL, LALITPUR DEPARTMENT OF ARCHITECTURE PRACTICUM 4 th year 1 st part MANISH KRISHNA BARUN 068/B.ARCH/09

Upload: manish

Post on 14-Feb-2016

218 views

Category:

Documents


0 download

DESCRIPTION

Architecture

TRANSCRIPT

Page 1: Intern Report

HIMALAYA COLLEGE OF ENGINEERINGCHYASAL, LALITPUR

DEPARTMENT OF ARCHITECTURE

PRACTICUM 4th year 1st part

MANISH KRISHNA BARUN

068/B.ARCH/09

Page 2: Intern Report

INTRODUCTION TO FIRM

With the assist of Nepal Government under Ministry of Urban Development, DUDBC works on making drawing of different governmental buildings, construction and its repair.

With the aim to urbanize the unmanaged buildings in the country, it was noticed initially as in the fiscal year 2027/2028 B.S and was thoroughly established in the year 2028 B.S.

DUDBC, Kavre division looks after the four district of Kavrepalanchowk: Ramechhap, Dolakha, Kavre and Sindhupalchowk

Development of sustainable cities and construction of safe buildings as the main goal of the office.

o Location : 28 kilo, Dhulikhel

Page 3: Intern Report

PROJECT INVOLVEDFORESTRY DEPARTMENT

 MUSEUM

 BARRACK

 CO-OPERATIVE OFFICE

 RESIDENCES  at Kathmandu  at Pepsicola, Kathmandu  at Dhulikhel  at Kalanki

 INTERIOR OF SURVEY DEPARTMENT

Page 4: Intern Report

FORESTRY DEPARTMENTLocation: Adda Bazar, DhulikhelPlinth area: 171.87 sq.mTopography: ContourBuilding type: OfficialOrientation: North- South Construction type: RCC frame structureNumber of storey: Two and halfMaterials used: Brick, Tiles, Timber,Glass, Marble, Aluminum opening, etc

REQUIREMENTS: •Training Hall •DFO Chamber•AFO Chamber x 2•Administrative Chamber•Account Room•Court Room•Guard Room•Pantry•Toilet

Page 5: Intern Report

•General mass limited to ground floor.

•Main entrance at the south side and

secondary entrance at the north side.

•Store room for Account section.

•External access for training hall.

Page 6: Intern Report

•Secondary passage connecting Chief Office and

Court Office.

•Common space in between private spaces.

•Chief Office with attached toilet and a small

private room.

•Guest Room with an attached toilet.•Consideration for future extension.

Page 7: Intern Report
Page 8: Intern Report

STAIRCASE DETAIL

WALL DETAIL

Page 9: Intern Report

MUSEUM, JIRI•Location: Jiri, Dolakha

•Plinth area:

188.83 m.sq

•Construction Type: RCC

frame structure

•Number of storey: 3

•REQUIREMENTS:

•Staircase

•Two Halls (150 m.sq)

•Small Cubicles (2.5m X

2.5m)

•Large Hall

•Windows at each

bay.

Page 10: Intern Report

•Right hand circulation

•Main entrance at the north

•Small cubicles

•Large Hall

•Central space with double height

Page 11: Intern Report
Page 12: Intern Report

BARRACK, DHULIKHEL

REQUIREMENTS: Male Room for 6 men Female Room for 4 women Head of Police’s Room Office Kitchen Dinning Storage Toilets+Bathrooms

• Location: Adda Bazar, Dhulikhel• Plinth Area: 108.97 m.sq

Page 13: Intern Report
Page 14: Intern Report
Page 15: Intern Report

CO-OPERATIVE OFFICE, DHULIKHEL

REQUIREMENTS: •Meeting Hall •Help Desk •Darta Chalani •Officer Room x 2 •Chief Office •Account Room + Store room•Planning Section •Organization Section •Training Hall •Quarter for a single family•Toilets Storage (3.6m X 3.1m)•Guard Room (4.4m X 3.8m

•Location: Dhulikhel•Plinth Area: 140 m.sq•Topography: Flat land with natural vegetation•Building type: Official•Orientation: North- South • Construction type: RCC frame structure•Number of storey: Four and half•Materials used: Brick, Tiles, Timber, Glass, Marble, Aluminum opening, etc.

Page 16: Intern Report

•Main entrance at the north side.•Lobby space for easy flow of people.•Secondary entrance for the meeting hall.•Space used below the staircase.

Page 17: Intern Report

•Attached toilet for Chief Office and Officer Room.•Storage for Account Room•Excessive sunlight in Chief Room.

•Training Room and Working Sections

Page 18: Intern Report

•Quarter for one family with Living Room, Kitchen, 2 Bed Room and a toilet.

Page 19: Intern Report
Page 20: Intern Report

RESIDENCE, KATHMANDU•Location: Kathmandu•Site Area: 974.54 sq ft•Plinth Area: 677.25 sq ft

Page 21: Intern Report
Page 22: Intern Report

RESIDENCE, PEPSICOLA

REQUIREMENT: •Parking•Bedroom (10’ x 10’)•Living Room (10’ x 17’)•Toilet (4’x 6’)•Kitchen and Dining Room (10’ x 11’)•Puja Room (6’ x 6’)

•Location: Pepsicola, Kathmandu•Site Area: 1708.27 sq ft•Plinth Area: 677.25 sq ft

Page 23: Intern Report

•For rental purpose.•2 Bedrooms at the south side.•Central Living space with a bathroom.•Kitchen and Dining at the north side

Page 24: Intern Report

•For client’s own purpose.•2 Bedrooms •Central Living space with a bathroom.•Living space opened to covered balcony at the west.

Page 25: Intern Report

•Kitchen and Dining room at the north.•Bedroom at the south.•Central lounge space opened to open balcony at the west.

Page 26: Intern Report
Page 27: Intern Report
Page 28: Intern Report

RESIDENCE, DHULIKHEL

•Location: Dhulikhel •Site Area: 5293.09 sq ft•Plinth Area: 2698.80 sq ft 

REQUIREMENTS: Parking•Living Room•Kitchen and Dining•Bedroom x 2•Master Bedroom•Guest Room•Bathrooms•Storage

Conceptual Blocks

Irregular contour levels

Page 29: Intern Report

•Centrally located main entrance.•Large Living Space opens to an open terrace•Secondary entrance for the kitchen.•Central staircase leading up to the upper floor.•Large windows for light and the scenic view.

•Covered parking space.•Storage below the staircase.

Page 30: Intern Report

•Central staircase divides to two corridor passages.•Master Bedroom at south-east with closet and attached bathroom.•2 Bedrooms with closet.•Every room opens up to a large open terrace.•Passage beside the staircase leads to the terrace.•Open terrace for various use.•Large windows in every room for light and the scenic view.

Page 31: Intern Report
Page 32: Intern Report
Page 33: Intern Report
Page 34: Intern Report

RESIDENCE, KATHMANDU

Page 35: Intern Report

SURVEY OFFICE, DHULIKHEL

REQUIREMENTS: •Chief Office•PA’s Office•Waiting Space•Meeting Space•Toilet

Page 36: Intern Report

Waiting Space

Chief Desk

Meeting Space

Private Space

Reception

Page 37: Intern Report

Meeting SpaceChief Desk

Glass Sliding Door

Book shelf as partition element

Page 38: Intern Report

SITE VISITBuilding Layout,Dhulikhel.

Wooden peg

Threads connecting

pegs

Site Excavation,Forestry Department,Dhulikhel

Trench for foundation

Marked area for

excavation

Page 39: Intern Report

SITE VISITCDO office, Chautara•Retaining Wall

Stone Masonry work in C.M 1:6

Working in parts

Page 40: Intern Report