interim submission design studio air
DESCRIPTION
ÂTRANSCRIPT
Design stuDio Airinterim PresentAtionstefAnie JuDD 638809
reseArch fielDBiomimicry
manifold installation at the AA Projects review 2004
‘Biomimicry is when the design and production of materials and structures are modelled on or take the ideas of biological processes and entities.’
cAse stuDy 1.0Aranda lasch - the morning line
I chose Aranda Lasch’s ‘The Morning Line’ as my first biomimicry case study. I chose it because it is interesting and I found there were so many opportunities for adaptation.
There are so many geometries at different scales, it creates an interesting composition, I would like to perhaps use these ideas in my future designs.
My selection criteria was based on:
1. Whether the outcome was interesting, is it
plain and simple? Or is it detailed and different?
2. Individuality. How different is
it to the original design?
4. Potential. Can I further this design, or is it at
its peak? I want to be able to continue exploring
an idea, not have the limits reached early on.
cAse stuDy 2.0 icD/itKe research Pavilion 2011
Cull pointsto make 2D
voronoicurves
Wrapthe 2D curves
around 3D curves
defining the boundary of the
pavilion
Mid Pointsof curves, the
point then offset peperpendicular in the positive
direction
Cutting Planeoffset curves
perpendicular fromthe base polygon
to create a capped surface
Surface Splitsplit the part of
the geometry above and below the
cutting plane for
Process DiAgrAm
1
2
3
4
exPlorAtion
Is it Dynamic? Design Potential Response to the Site Biomimetic Form
PrototyPes
ProPosAl for WAlKWAy
Direct the flow of people Interesting Tactile Experience
Connection Between Coop and Garden
relAtion to the sitematerials
french Pavilion, World expo 2015 inmilan, xtu Architects
Nature and Man Made Combined
Harmonious Integration