integrated sustainable development through collaboration

9
INTEGRATED SUSTAINABLE DEVELOPMENT THROUGH COLLABORATION Infrastructure Summit Polokwane 5 October 2010 Presented by Pierre Lourens Contact number: 082 577 7379 MINING

Upload: ollie

Post on 22-Feb-2016

28 views

Category:

Documents


0 download

DESCRIPTION

Infrastructure Summit Polokwane  5 October 2010. MINING. INTEGRATED SUSTAINABLE DEVELOPMENT THROUGH COLLABORATION . Presented by Pierre Lourens Contact number: 082 577 7379. Content. Introduction to the Producers Forums - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: INTEGRATED SUSTAINABLE DEVELOPMENT THROUGH COLLABORATION

INTEGRATED SUSTAINABLE DEVELOPMENT THROUGH

COLLABORATION

Infrastructure SummitPolokwane 5 October 2010

Presented by Pierre LourensContact number: 082 577 7379

MINING

Page 2: INTEGRATED SUSTAINABLE DEVELOPMENT THROUGH COLLABORATION

Content

1. Introduction to the Producers Forums

2. Implementation of sustainable integrated infrastructure projects at scale

3. Methodology

4. The Future

5. Way Forward

Page 3: INTEGRATED SUSTAINABLE DEVELOPMENT THROUGH COLLABORATION

Introduction to the Producers Forums

Steelpoort Valley Producers Forum

Mogalakwena Economic Sector

Forum

Olifants River Joint Water Forum

Page 4: INTEGRATED SUSTAINABLE DEVELOPMENT THROUGH COLLABORATION

Members of Limpopo Producers ForumsAnglo Operations Limited Pan Palladium South Africa (Pty) Ltd

Akanani Mining (Pty) Limited Plateau Resources (Pty) Limited

ASA Metals (Pty) Limited Platreef Resources (Pty) Limited

Assmang Limited (Dwarsrivier Mine) Rustenburg Platinum Mines (Pty) Limited (Eastern Limb Development)

Barplats Mines Limited (Rhodium Reefs) Samancor Chrome LimitedBoynton Investments (Pty) Limited Two Rivers Platinum (Pty) Limited

Bokoni Platinum Mine Twickenham Platinum Mine

Chromex Mining (Pty) Limited Veremo Holdings Limited

Corridor Mining Resources (Pty) Limited Western Platinum Limited (On behalf of Messina Platinum Mines Limited)

Eastern Platinum Limited Xstrata South Africa (Pty) Limited

Impala Platinum Limited (Marula) Umnotho weSizwe Investment Holdings (Pty)

Modikwa Platinum Mine Joint Venture Sishen Iron Ore Company (Pty) Ltd

MTC Minerals Smokey Hills Platinum

Northam Platinum Limited

Page 5: INTEGRATED SUSTAINABLE DEVELOPMENT THROUGH COLLABORATION

Integrated Approach

Integrated Project

Development

Page 6: INTEGRATED SUSTAINABLE DEVELOPMENT THROUGH COLLABORATION

MethodologyMethodology Methodology

Technical Training JTTT

Local Level

Page 7: INTEGRATED SUSTAINABLE DEVELOPMENT THROUGH COLLABORATION

Impact: MIG Achievements

Page 8: INTEGRATED SUSTAINABLE DEVELOPMENT THROUGH COLLABORATION

The futureThe Future

Page 9: INTEGRATED SUSTAINABLE DEVELOPMENT THROUGH COLLABORATION

What NowWay Forward