Instrument StatusGLM Science Team Meeting
9 September 2016
Marc Rafal/GSFCGLM Instrument Manager
![Page 2: Instrument Status GLM Science Team Meeting 9 September 2016 Marc Rafal/GSFC GLM Instrument Manager](https://reader035.vdocuments.mx/reader035/viewer/2022062423/5697bfd41a28abf838cacb3b/html5/thumbnails/2.jpg)
• All instrument level tests successfully completed
• Installed on GOES-R Spacecraft• Spacecraft TVAC completed
– 8 Weeks 24/7 operations in simulated space environment
– All instruments and spacecraft tested as system
– End-to-End test with Ground System
• Harness repair to correct data ‘burst’ approved and scheduled– Ground Processing Algorithm update
to filter any remaining ‘bursts’ is they occur
• Spacecraft EMI/EMC, Vibration, and Acoustics tests coming up
2
FM-1 Status
![Page 3: Instrument Status GLM Science Team Meeting 9 September 2016 Marc Rafal/GSFC GLM Instrument Manager](https://reader035.vdocuments.mx/reader035/viewer/2022062423/5697bfd41a28abf838cacb3b/html5/thumbnails/3.jpg)
3
• Instrument fully integrated
• Instrument level Thermal Vacuum Testing successfully completed– Optical focus and alignment in vacuum demonstrated
– Thermal performance in expected launch, operational, and survival thermal environments demonstrated
• SU Vibration Testing successfully completed– Demonstrate survival of launch mechanical environment
• EMI/EMC testing started– Susceptibility to electromagnetic interference
– Compatibility with other instruments and spacecraft subsystems
• EU penalty TVAC and Vibe Tests after EMI/EMC– Four circuit cards reworked in response to reliability issue found on another mission
• Installation on GOES-S scheduled for November 2015
FM-2
![Page 4: Instrument Status GLM Science Team Meeting 9 September 2016 Marc Rafal/GSFC GLM Instrument Manager](https://reader035.vdocuments.mx/reader035/viewer/2022062423/5697bfd41a28abf838cacb3b/html5/thumbnails/4.jpg)
4
• Fabrication of major subassemblies well underway– Circuit cards being fabricated
– Buildup of Focal Plane Assembly started
– Lens Assembly fabrication complete
• SU Integration started
• Delivery to GOES-T scheduled for Fall 2016
FM-3
Credit: Lockheed Martin
![Page 5: Instrument Status GLM Science Team Meeting 9 September 2016 Marc Rafal/GSFC GLM Instrument Manager](https://reader035.vdocuments.mx/reader035/viewer/2022062423/5697bfd41a28abf838cacb3b/html5/thumbnails/5.jpg)
5
• Most components fabricated in parallel with FM-3– Detector Selected
– Lens assembly completed
– Filters fabrication complete
– Circuit cards in fabrication
• Delivery to GOES-U scheduled for Fall 2017
FM-4
Credit: Lockheed Martin
![Page 6: Instrument Status GLM Science Team Meeting 9 September 2016 Marc Rafal/GSFC GLM Instrument Manager](https://reader035.vdocuments.mx/reader035/viewer/2022062423/5697bfd41a28abf838cacb3b/html5/thumbnails/6.jpg)
6
• GLM team highly motivated and capable– Supporting 24/7 operations in Denver in parallel with
completing FM-2 and moving FM-3,4 forward
– Team has shown great dedication and flexibility
– Excellent collaboration between LM and Flight Project personnel
• GLM performing well in Spacecraft level tests
• Looking forward to launch, PLTs, and Operations
Summary