instructions for installation of econnecx ir re this must be pol aded onto the ec e contact us via...
TRANSCRIPT
![Page 1: Instructions for installation of econnecx IR re This must be pol aded onto the ec e contact us via th web site. This p 10 opening/clos blinds in a home talled econnecx t the point](https://reader035.vdocuments.mx/reader035/viewer/2022070609/5ad28b767f8b9afa798cd338/html5/thumbnails/1.jpg)
Instru There ardevice.
Stage 1Discuss The hom
o
o
o
o
o
o
o
o
o All otheto schedinstallat Power Sto the e Outputseconnec
econnec
o
o
o Once yoRelay ra
Stage 2When in 0 ‐ 240 v
IR Outp
Inputs a
uctions for in
re 3 Stages involveconnecx™ must
1: Customer Cowhat you or your
me/ away mode r
Fridges – Free
Alarm – Smok
Dishwasher (i
Washing Mac
Sky Decoder –
Ventilation Sy
Entry Lights –
Solar Heating
Heated Towe
r sockets and fittdule to eliminate tion of the home
Supply: 220‐240 quipment)
s: econnecx™ hascx™ can switch an
RRR
RRRRR
cx™ can also contr
5 Infra‐red cocontact us to
Alarms: econn
Garage Doors
ou have confirmetings are for resis
2: Wiring nstalling econnec
volt relays The diagram cThe econnecx Any configuraconfigured as
uts When installinrun from econ These outputwish to controsupplied code If more of thaallow one out
and Outputs Home/Away diagram 1. Wenergise and the most freq
nstallation of
ved in the installabe installed by a
onsultation. r client wants to
requires the most
ezers – Hot Wate
ke Detectors – Ga
f operated when
chine and Dryer (i
– Answer Phone /
ystem
– Night Lights – Se
Pump
l Rails – Heat Pum
tings could be isothe standby pow/ away mode rela
V; (50‐60 Hz) ma
s 8 outputs that cything as long as
Relay 1 = Relay 2 = Relay 3 =
Relay 4 = Relay 5 = Relay 6 = Relay 7 = Relay 8 =
rol the following:
ontrolled appliancdiscuss loading o
necx™ will provide
s: econnecx™ will
d the requiremenstive loads only.
cx™ we recommen
configuration allox™ web site is pre–
ation of the mains required via the
ng IR it is importannecx™ to each ap
s will control anyol an appliance thes to econnecx™ w
an 5 IR devices wetput to control m
Mode Control: IfWe recommend thde‐energise via aquently used entr
f econnecx™
ation of econnecx registered electr
have econnecx™ c
t consideration.
r Cylinder – Heat
arage Door Open
n not at home)
if operated when
/ Router
ecurity System
mps – Under Floo
lated when awaywer consumptionay.
ax; current 1 amp
an be remotely c the 240volt relay
Hot WateUnder TileVentilatioWe recommend
Spare Heated ToEntry/ SecIndoor NigHome/ Aw
:
ces, e.g. heat pumon our site. We m
e the status of yo
provide the statu
nts you are readyNot suitable for
nd it is wired as p
ows the appliance–programmed an
s outputs relays e econnecx™ web
ant to install the ppliance that is to
y IR controlled aphat is currently nwhich will then be
ere required to bmultiple heat pum
f a home / away mhe installation of a low voltage inpury and exit point.
x™ to ensure a qurician and meet a
control.
We recommend
ting
ers (consider isol
n not at home)
or Heating or any
y from your home. The more you i
p (for permanentl
controlled or schey current ratings
r Cylindere Heating on System d scheduling of ventilation s
owel Railscurity Lightsght Lightsway Relay & Indic
mps or blinds. If ymay require your
our alarm and off
us of your garage
y to wire econnecconnection to iro
er the provided w
es in the home ond labelled for th
is acceptable as lsite upon commi
sensor facing theo be controlled.
pliance that is loaot loaded pleasee loaded onto the
be controlled e.g.ps in an office or
mode relay is insta LED or NEON aut provided by ec
ality installation.all local body and
that the followin
lating if holiday h
appliance that w
e, bach or office. solate in this mo
ly connected equ
eduled as requireare not exceede
Voltag0 ‐ 240 ‐ 240 ‐ 24
system to reduce power co
0 ‐ 240 ‐ 240 ‐ 240 ‐ 24
cator 0 ‐ 24
you have an infraremote for 5 wo
fer remote armin
e door and offer r
cx™ on core or floresc
wiring diagrams.
r office to continis configuration.
ong as the currenssioning should y
e appliances IR reThis must be pol
aded onto the ece contact us via the web site. This p
10 opening/closr blinds in a home
talled econnecx™
at the point of enconnecx™ Termina
Not all outputs d national electric
ng items are not i
home)
will be scheduled
You or your cliede the more you
uipment, readily a
ed. We recommed. ge40 volts40 volts40 voltsnsumption and eliminate th
40 volts40 volts40 volts40 volts40 volts
a‐red appliance thrking days. In mo
g and disarming
emote opening a
cent loads.
ue working in the
nt ratings of eachyou chose to alte
eceiver to ensure arity correct for o
connecx™ system.he IR page. This wprocess takes app
ing IR controlled e.
can control this try to indicate thal 2 via connectio
or functions are rcal regulations / s
solated in away m
by econnecx™
nt can then selecsave! Please see
accessible disconn
end the following
Current Ra15 amps m15 amps m15 amps m
he introduction of cold air o
15 amps m10 amps m10 amps m10 amps m10 amps m
hat you would likost cases this is a
and closing
e event of interne
h relay are not exr from normally c
reliable operatiooperation.
For a list pleasewill require you seproximately 5 wo
blinds, then an IR
switchboard moue status of the hoon block 10‐D. W
required to enjoystandards.
mode.
ct what lights ande wiring diagram
nect device shall
g as a guide (defa
ating max – resistive onmax– resistive onlmax– resistive onlover night
max– resistive onlmax– resistive onlmax– resistive onlmax– resistive onlmax– resistive onl
ke to control thata free service. (ww
et failure or disco
xceeded. The relaclosed or normal
on. A simple two
e visit www.econnending the remoorking days.
R expander will b
unted relay via reome / away modWe recommend t
y the features of
d fittings they wo1 for recommen
be incorporated
ult settings) how
nly ly ly
ly ly ly ly ly
t is not on our listww.econnecx.com
onnection of the
ay outputs can bely open or vice ve
core cable is req
necx.com/ir. Shote or manufactur
be required. This
elay 8 as per wirine relay. The relahe switch(s) is ins
this
uld like d
external
wever
t, please m/ir)
device.
e ersa.
quired to
ould you rer
would
ng y will stalled at
![Page 2: Instructions for installation of econnecx IR re This must be pol aded onto the ec e contact us via th web site. This p 10 opening/clos blinds in a home talled econnecx t the point](https://reader035.vdocuments.mx/reader035/viewer/2022070609/5ad28b767f8b9afa798cd338/html5/thumbnails/2.jpg)
Inputs a
Stage 3After wi
The follo
1.
2.
3.
4.
5.
and Outputs conti Alarm: econndisarming TerD. This can ei Garage door:
Option Oopener toOption Twthe wiring
3: Testing and ring econnecx™ is
owing tests are to
Test mains vo
i. Hold energ
ii. Once
Test IR
i. Hold secon
ii. Once
Garage door
i. Hold press
ii. Once
Internet Conn
i. After
ii. Connproce
Website Log I
This can
o Go
o Se
o Eit
o Co
o Fro
o Ty
Through
o On
re
se Please note th econnecx™ req
inued
necx™ provides a prminal 3 via connither be 12 volts
We recommendOne: To simplify wo provide an outpwo: If garage doog diagram 1. If re
Hand Over s ready to test. U
NOTE: ec
o be completed b
oltage outputs
down buttons 1 gise. Press again
e tested hold butt
down buttons 1 nd, off 0.5 of a se
e tested hold butt
down buttons 2 s again to energis
e tested hold butt
nection
r completing the
nect econnecx™ toess will take up to
In
n be completed at
o to www.econne
elect Manage Dev
ther log in as a ne
omplete necessar
om the ‘manage
ype in the device
hout these screen
□ clients n
□ clients e
□ clients c
□ econnec
□ name of
□ user nam
□ you will
settings
heat pu
nce completed yo
lay status (norma
lection of applian
hat econnecx™ wi
quires a yearly su
pulse output for aection block 10‐Bdirectly from the
d one of two optiwiring and eliminaput to state the dor outputs are unequired a simple
Upon power up ec
connecx™ requ
before making yo
& 3 for five secon to energise relay
ton 1 down for fi
& 4 for five secoecond). By lookin
ton 1 down for fi
& 4 for five Secose garage door sw
ton 1 down for fi
above checks yo
o your internet coo 1 min.
t any time on or o
ecx.com
vice
ew user or existin
ry fields in the ‘Cr
your econnecx™ d
serial number (lo
ns you will be ask
name / company
email address
contact phone nu
cx™ site address
f electrician and
me and password
be directed to th
s and select relay
mps etc. Upon se
ou will be directe
ally open or norm
nces the inputs a
ill give you 5 days
ubscription fee of
arming and disarmB. econnecx™ reqe alarm into econ
ons: ate the installatiodoor is closed. Thnavailable we recopantry door swit
connecx™ will set
uires 30 secon
our internet conn
nds, this will entey 2, repeat proce
ve seconds to ex
nds, this will enteng at the IR transm
ve seconds to ex
onds, this will entewitch 2.
ve seconds to ex
u are ready to co
onnection. econn
off site by the ele
ng user
reate User and ‘A
devices’ screen, s
ocated on packag
ked to complete t
umber
electrical compan
d for the client to
he “device setting
status (normally
election of applia
d to the “Configu
mally closed). You
nd outputs will a
s free connection
f $80 +GST which
ming. Your alarmquires an alarm stnecx™ or via clean
on of limit switchhis can then be wommend installatch could be fitte
all relays to defa
nds to initialis
ection.
er test mode oneess to test all outp
it.
er test mode twomitter through yo
it.
er test mode thre
it.
onnect to the eco
necx™ will autom
ectrician, homeow
Account Details’ s
select “add a new
ging and inside ec
the compulsory f
ny
o access “Manage
gs” section wher
y open or normall
ances the inputs a
ure Device” sectio
u will then load s
utomatically be c
n to complete thi
h can be paid upo
m will need to be tatus signal whichn contacts as pro
es on garage doowired directly intotion of a limit swd to the garage d
ault position.
se before indi
e. Once in test mputs.
o. This provides vour phone camer
ee. Once in test m
nnecx™ web site.
atically connect t
wner or office us
screens
w device”
connecx™ cabinet)
fields (we suggest
e Device”
e you will tick act
ly closed). You wi
and outputs will a
on where you wi
pecified applianc
configured as per
s commissioning
on commissioning
Trade
programmed so h will be suppliedvided by Termina
ors, if possible weeconnecx™ if it is
witch on the garagdoor opener.
icators are illu
ode press button
voltage to the IR ora you should see
mode press butto
to the website an
er.
)
t you obtain thes
tive relays to labe
ll then load spec
automatically be
ll label relays if d
ces, i.e. alarm; ga
r wiring diagram
process.
g or when the ow
e Mark RegistratioMod
this pulse outputd into Terminal 3 al 1 & 3 via conne
e recommend pros a 12 volt outputge door. This wo
uminated.
n 4 to energise re
outputs every 0.5e the LED flashing
on 4 to energise g
nd set up the defa
se from the client
el each one, if dif
cified appliances,
configured as pe
ifferent to the de
rage door; heat p
1.
wner logs on for th
on Number for ecdel Number EC19
t will allow arminvia connection bection block 10‐D
ograming the gart. uld be connected
elay 2, press again
5 second (On 0.5 g.
garage door switc
ault configuration
t first):
fferent to the def
i.e. alarm; garage
er wiring diagram
efault settings an
pumps etc. Upon
he first time.
connecx™ 96905896‐001 Revision C
ng and block 10‐D.
rage door
d as per
n to de‐
of
ch 1,
n. This
fault
e door;
1.
d select
n
8 C
![Page 3: Instructions for installation of econnecx IR re This must be pol aded onto the ec e contact us via th web site. This p 10 opening/clos blinds in a home talled econnecx t the point](https://reader035.vdocuments.mx/reader035/viewer/2022070609/5ad28b767f8b9afa798cd338/html5/thumbnails/3.jpg)
TM
1 2 3
NO
NC
C
1 2 3
NO
NC
C
1 2 3
NO
NC
C
1 2 3
NO
NC
C
1 2 3
NC
NO
C
(240 V AC max)(15 amps maxresitive only)
(240 V AC max)(10 amps maxresitive only)
(240 V AC max)(10 amps maxresitive only)
(240 V AC max)(10 amps maxresitive only)
(240 V AC max)(10 amps maxresitive only)
Ripple
1 2 3
NC
NO
C
1 2 3
NC
NO
C
1 2 3
NC
NO
C
HWC
circuit breaker
N
N
N
N
Phase
Phase
Phase
Phase
Phase
Phase
Phase
Phase
Under Tile Heating
Ventilation System
Spare
Relay 1 Relay 2 Relay 3 Relay 4 Relay 5 Relay 6 Relay 7 Relay 8
circuit breaker
circuit breaker
Heated Towel Rail 1
Heated Towel Rail 2
Heated Towel Rail 3
Entry / Security Lights
Indoor Night Lights
Neutral
123456123456123456
Ethernet
16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1
16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1
Infrared Terminals
Heat Pump 1
Heat Pump 2Spare IR 2
Spare IR 1 Heat Pump 3
IN 4
IN 3
IR+1
IR+2
IR+3
IR+4
123456
Garage 2Limit Switch
Garage DoorOpener
Garage 1Limit Switch
IN 0
IN 1
+12V
+12V
+12V
+12V
+12V
+12V
MIS
C 0
MIS
C 4
MIS
C 3
MIS
C 6
CAT
5
MIS
C 5
MIS
C 2
MIS
C 1
10-A 10-B 10-C 10-D
Garage 2Push Button
Garage 1 Push Button
Home / Away Button
Alarm Status
Router
circuit breaker
ther
mos
tat
isol
ator
isolator
isolator
isolator
isol
ator
Phase 1 Neutral 2
Mains Power In(220 - 240 V)(50 - 60 Hz)
(1 AMP max)
isolator
Coil
Indicator
N/CN/C
Garage DoorOpener
Install relay inalarm cabinetPulse for Alarm
Arm / Disarm
Coil
Coil
Extra Low Voltage / Ground Switching
(0-12 V)
Extra Low Voltage / Ground Switching
(0-12 V)
Extra Low Voltage / Ground Switching
(0-12 V)
Extra Low Voltage / Ground Switching
(0-12 V)
circuit breaker isolator
Please ensure circuit protection does not exceed current rating of switching relay (R1 – R4, 15 amps, R5 – R8, 10 amps)Relay ratings are for resistive loads only. Not suitable for connection to iron core or florescent loads.
(240 V AC max)(15 amps maxresitive only)
(240 V AC max)(15 amps maxresitive only)
(240 V AC max)(15 amps maxresitive only)
Recommended Installation Diagrams for econnecxTM
![Page 4: Instructions for installation of econnecx IR re This must be pol aded onto the ec e contact us via th web site. This p 10 opening/clos blinds in a home talled econnecx t the point](https://reader035.vdocuments.mx/reader035/viewer/2022070609/5ad28b767f8b9afa798cd338/html5/thumbnails/4.jpg)
Recommended cables
Lights econnecx™ to Main Entry Point (master off relay) . . . . . . . . . . . . . . . . . . . 2 core TPS econnecx™ to Entry Lights . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3 core TPS (if lights are scheduled in away mode) econnecx™ to Hallway Lights . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3 core TPS (if lights are scheduled in away mode)
Security econnecx™ to Alarm Panel . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4 core security cable (minimum) econnecx™ to Garage Door One & Two . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4 core security cable OR 1x cat 5
Heating & Ventilation econnecx™ to Infrared Controlled Device (heatpump) . . . . . . . . . 1x cat 5 (up to 4 devices) or 2 core (per each device) econnecx™ to Main Switch Board - HWC; heated towel rail; undertile heating; ventilation
Master Off Wiring econnecx™ to Main Entry Point (master off relay button) . . . 4 core security cable OR 1x cat 5 econnecx™ to Main Switch Board. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 core TPS for master off relay
Data / Internet econnecx™ to Router . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1x cat 5
a) Knock out 32mm hole as required
b) Fit bush or pack gland to open hole
c) Feed cables through hole and terminate
d) Seal gaps with fire retardent selant
Recommended Installation Diagrams for econnecx TM
![Page 5: Instructions for installation of econnecx IR re This must be pol aded onto the ec e contact us via th web site. This p 10 opening/clos blinds in a home talled econnecx t the point](https://reader035.vdocuments.mx/reader035/viewer/2022070609/5ad28b767f8b9afa798cd338/html5/thumbnails/5.jpg)
MainsSwitch
* HWC Oven * Heat RCD 1 PowerUnder Tile
* Heat Pump
* Ventilation Sub Main
PowerWashing MachineDryerGarage DoorsRouterSolar Water Pump* Heated Towel Rails
Main PhoneTV DecoderFridgeFreezerDishwasherComputer ?
econnecx AlarmSmoke Detectors* Entrance Lights* Night Lights
Power
RCD 2
Essential
Master OffRelay
Relay 8
RCD 2Power Power Lights Power Power Lights
* econnecx controlled appliances (avoid master off isolation, so scheduling can occur in away mode)
TM
TM
TM
Recommended Installation Diagrams for econnecx TM