Institut IGH d.d. 5. Construction. Institut IGH d.d. 5. Construction. Institut IGH d.d. 6. Structures. Bridges More than 800 different structures. Institut IGH d.d. 6. Structures. Institut IGH d.d. 6. Structures. Institut IGH d.d. Tunnels Total length of tunnels: 85 km - PowerPoint PPT PresentationTRANSCRIPT
Institut IGH d.d.
5. Construction
Institut IGH d.d.
5. Construction
Institut IGH d.d.
6. Structures
Bridges
More than 800 different structures
hma
x=44
.2
MOST GUDUCA
52.0
204.0
62.096.067.0
VRPOLJEPIROVAC
hma
x=55
.0
hma
x=60
.0
50.050.040.0 50.050.0 50.0 40.0
MOST KRKA
VIJADUKT DRAGE
MOST DABAR
Institut IGH d.d.
6. Structures
Institut IGH d.d.
6. Structures
Institut IGH d.d.
Tunnels
Total length of tunnels: 85 kmThe longest tunnel: 5,79 km
Institut IGH d.d.
7. Financing
• fuel tax: EUR 0,082/lit• toll collection• charges for the use of roadside land• loan proceeds
• Total cost of motorway system 2001 – 2008: EUR 9 billion• loans: EUR 5.3 billion• average price per km: 8 million
Average Anual Daily Traffic 2010:12.404vehicles
Institut IGH d.d.
Total toll collection revenue in 2010:
€267 Mil
Toll collection:
I CAT: 0,053 EUR/km
II CAT: 0,080
III CAT: 0,120
IV CAT: 0,170
7. Financing
Institut IGH d.d.
8. Impacts (sustainability)
Economy: transit, tourism, new jobs…
Social impact: integration
Institut IGH d.d.
8. Impacts (sustainability)
Roads open but also create new vistas
Each generation of builders has the responsibility to leave the works worthy to be shown in postcard pictures.
Institut IGH d.d.
9. FuturePelješac Bridge
Institut IGH d.d.
9. FutureRailways + ports
Connections to towns
New concessions?
Institut IGH d.d.
Thank you for your attention
The Developement of Motorway network in Croatia