5/23/2018 Installation and Commissioning of API 650 Tanks (Presentation Without Audio)
API 650 TANKS
INSTALLATION and COMMISSIONINGbyMike Raine BSc MSc MIEAust AFIAMDirector, Engineering ManagerFuel Tank and Pipe
-
5/23/2018 Installation and Commissioning of API 650 Tanks (Presentation Without Audio)
Process Water TanksFMG Cloudbreak Mine-site
5/27/2009 FUEL TANK & PIPE 2
-
5/23/2018 Installation and Commissioning of API 650 Tanks (Presentation Without Audio)
API 650 TANKS INSTALLATION
TANK BUNDS FOUNDATIONS/RING
BEAMS WELDING PROCEDURES
COMMISSIONING TANK STRAPPING NDT HYDROTESTING
5/27/2009 FUEL TANK & PIPE 3
FLOOR PLATE LAYOUT STRAKE LAYOUT ROOF CONSTRUCTION ROOF LIFT
NOZZLE INSTALLATION SURFACE PREPARATION TOLERANCES
CONTROL PHILOSOPHY INSTRUMENTS
-
5/23/2018 Installation and Commissioning of API 650 Tanks (Presentation Without Audio)
Process Water Tanks, DieselStorage Tanks, Cloudbreak
5/27/2009 FUEL TANK & PIPE 4
-
5/23/2018 Installation and Commissioning of API 650 Tanks (Presentation Without Audio)
TANK BUNDS AS1940 mandates bunded storage for hydrocarbon storage
facilities. Bund volume shall not be less than 110% of thevolume of storage. For multiple tanks, multiple products the storage volume is
110% of the largest tank. Although each tank must be
5/27/2009 FUEL TANK & PIPE 5
Bund Construction Earthen bund fully lined with a composite Geo-Fabric, Welded
HDPE liner, Geo Fabric Membrane installed on a select fill base Bund walls with a 45 Degress angle of repose covered with a
concrete filled revetment mattress. Revetment mattress can either be painted or covered with a layer
of concrete.
Bund liner is pneumatically leaked tested on the overlappingwelded seam.
-
5/23/2018 Installation and Commissioning of API 650 Tanks (Presentation Without Audio)
TANK BUND CONSTRUCTION1. Geo-Fabric HDPE Lined Bund.
2. Concrete filled revetment mattress prior tofinal coating.3. Compacted select fill providing a metre of
cover over the Geo-Fabric HDPE membrane.
5/27/2009 FUEL TANK & PIPE 6
-
5/23/2018 Installation and Commissioning of API 650 Tanks (Presentation Without Audio)
Tank Bund Construction
5/27/2009 FUEL TANK & PIPE 7
-
5/23/2018 Installation and Commissioning of API 650 Tanks (Presentation Without Audio)
Other forms of Bunding Self Bunded Tanks
Limits storage volumeand results in multipletanks.
Concrete Bunds
5/27/2009 FUEL TANK & PIPE 8
Effective for a tank farmwith an array of small
tanks. Both methods cost
prohibitive on largevolume storage facilities.
Images courtesy of DRA Tank
-
5/23/2018 Installation and Commissioning of API 650 Tanks (Presentation Without Audio)
Foundation Ring Beam Construction
Tank foundations at typically of 3 types.
Concrete Ring Wall Asphalt
-
5/27/2009 FUEL TANK & PIPE 9
FT&P almost exclusively build tanks on aconcrete ring wall foundation.
-
5/23/2018 Installation and Commissioning of API 650 Tanks (Presentation Without Audio)
Concrete Ring Beam Design Ring beams perform a variety of functions. A
critical aspect of ring beam design is whetherholding down bolts are required for windoverturning stability.
5/27/2009 FUEL TANK & PIPE 10
ac ors n uenc ng e nee s or o ng ownbolts include; Cyclonic region and prevailing wind speeds. (AS/NZS
1170.2:2002) Weight of Tank (excluding roof and contents) Aspect ratio of the tank, tall versus squat to achieve the same
storage Client specifications.
-
5/23/2018 Installation and Commissioning of API 650 Tanks (Presentation Without Audio)
Ring Wall Components Reinforcing Bars Re-bar comprises ligatures placed on an
angular pattern with a maintained
5/27/2009 FUEL TANK & PIPE 11
A total 8 to10 rolled circumferential lacebars located on the internal and externaldiameters of the ligatures.
Plywood board and rolled tubes make upthe remainder of the form.
-
5/23/2018 Installation and Commissioning of API 650 Tanks (Presentation Without Audio)
Ring Wall Components 30mm PVC pipes are installed at 4 angular locations
to provide weep holes leaking product. Tank earthing is facilitated by connecting the tankshell to the rebar.
The ring wall is back filled with select fill and
5/27/2009 FUEL TANK & PIPE 12
compac e o m . Diesel is sprayed on the fill to prevent corrosion of the
underside of the floor plate. Bitumen board installed on top of the ring wall
providing a compressive membrane between it andthe floor plate.
-
5/23/2018 Installation and Commissioning of API 650 Tanks (Presentation Without Audio)
Construction of Ring Wall Ring beam foundation is excavated after the liner has
been installed and the bund has been backfilled. A 50mm layer of blinding is installed to provide a stable
base for the construction of the formworks. Establishin a stable level base/foundation is critical to
5/27/2009 FUEL TANK & PIPE 13
achieving tight tolerances on the overall tank build.
-
5/23/2018 Installation and Commissioning of API 650 Tanks (Presentation Without Audio)
Ring Wall Construction
5/27/2009 FUEL TANK & PIPE 14
-
5/23/2018 Installation and Commissioning of API 650 Tanks (Presentation Without Audio)
Ring Wall Construction
5/27/2009 FUEL TANK & PIPE 15
-
5/23/2018 Installation and Commissioning of API 650 Tanks (Presentation Without Audio)
Holding Down Bolts Analysis
5/27/2009 FUEL TANK & PIPE 16
-
5/23/2018 Installation and Commissioning of API 650 Tanks (Presentation Without Audio)
Wind Forces, Overturning Moments
5/27/2009 FUEL TANK & PIPE 17
-
5/23/2018 Installation and Commissioning of API 650 Tanks (Presentation Without Audio)
Wind Forces, Overturning Moments
5/27/2009 FUEL TANK & PIPE 18
-
5/23/2018 Installation and Commissioning of API 650 Tanks (Presentation Without Audio)
Design of Anchor Bolts
5/27/2009 FUEL TANK & PIPE 19
-
5/23/2018 Installation and Commissioning of API 650 Tanks (Presentation Without Audio)
Holding Down bolt ArrangementRing Beam for HD Bolts Inverted Tee Ring Beam
5/27/2009 FUEL TANK & PIPE 20
-
5/23/2018 Installation and Commissioning of API 650 Tanks (Presentation Without Audio)
Holding Down Bolt ArrangementFEA of HD Arrangement Shell Bolting Arrangement
5/27/2009 FUEL TANK & PIPE 21
-
5/23/2018 Installation and Commissioning of API 650 Tanks (Presentation Without Audio)
Weep Hole, Earthling Strap
5/27/2009 FUEL TANK & PIPE 22
-
5/23/2018 Installation and Commissioning of API 650 Tanks (Presentation Without Audio)
Floor Plate Layout Typically floor plate ranges in thickness
from 6-10mm without the addition ofcorrosion allowance.
FT&P enerall utilise an offset over la in
5/27/2009 FUEL TANK & PIPE 23
plate arrangement. Alternatively, an annular plate arrangement
is often used which allows for thicker plate
at the shell interface and simplifies floorreplacement.
-
5/23/2018 Installation and Commissioning of API 650 Tanks (Presentation Without Audio)
Floor Plate Layout
5/27/2009 FUEL TANK & PIPE 24
-
5/23/2018 Installation and Commissioning of API 650 Tanks (Presentation Without Audio)
Floor Plate
5/27/2009 FUEL TANK & PIPE 25
-
5/23/2018 Installation and Commissioning of API 650 Tanks (Presentation Without Audio)
AS1692 3.7 and Applicable Welding Code
For Cylindrical Vertical Tanks greater
than 4.5m in diameter AS1692nominates a Category 6 tank.
a egory an AS1692 nominates either BS EN 14015 API620 orAPI650.
Welding Standard AS1692 allows an Australian Standard to be
nominated in place if both purchaser and contractorare agreeable.
5/27/2009 FUEL TANK & PIPE 26
-
5/23/2018 Installation and Commissioning of API 650 Tanks (Presentation Without Audio)
Welding Standard Which code FT&P use ? AS3992 and Pre-qualified Procedures? AS1554
API650
5/27/2009 FUEL TANK & PIPE 27
-
5/23/2018 Installation and Commissioning of API 650 Tanks (Presentation Without Audio)
Welding Standard API650 derives the welding code from Section IX of the ASME code.
FT&P almost exclusively use
proce ures qua e o . API650 Visual Examination permissible limits are
commensurate with the build conditions.
5/27/2009 FUEL TANK & PIPE 28
-
5/23/2018 Installation and Commissioning of API 650 Tanks (Presentation Without Audio)
Visual Examination
5/27/2009 FUEL TANK & PIPE 29
-
5/23/2018 Installation and Commissioning of API 650 Tanks (Presentation Without Audio)
Vertical Down API650 Procedure
5/27/2009 FUEL TANK & PIPE 30
-
5/23/2018 Installation and Commissioning of API 650 Tanks (Presentation Without Audio)
Welding Procedures Weld Procedures Defined under ASME IX FCAW/Machine Welded Horizontals
5/27/2009 FUEL TANK & PIPE 31
MMAW butt weld with backing plate for fillet
to butt weld transition as the floorapproaches the shell.
MMAW Iron Powder for fillet Welds on floor,roof, wind girder, compensating plates.
-
5/23/2018 Installation and Commissioning of API 650 Tanks (Presentation Without Audio)
Shell Plate ThicknessAppendix A, Determination of Shell Thickness
5/27/2009 FUEL TANK & PIPE 32
-
5/23/2018 Installation and Commissioning of API 650 Tanks (Presentation Without Audio)
Tank Aspect Ratio Tank Aspect Ratio is significant in the overall design of the
tank. In respect of tank holding down bolts, a squatter tank is
favourable. Increasing height increases static head which influences
.
Volume is proportional to Diameter Squared. Thuschanges in diameter have a great influence on height.
Squatter tanks are more economical on material.(Calculus minima question in TEE)
Increasing diameter is often restricted by space. Plate heights in either 3m or 3.2m thus preference fortanks over 6m high
5/27/2009 FUEL TANK & PIPE 33
-
5/23/2018 Installation and Commissioning of API 650 Tanks (Presentation Without Audio)
Aspect Ratio for 600kL Tank
5/27/2009 FUEL TANK & PIPE 34
-
5/23/2018 Installation and Commissioning of API 650 Tanks (Presentation Without Audio)
Shell Plate ThicknessAppendix A, Optional Design Basis for Small Tanks.
Appendix A allows joint efficiencies of either0.85 or 0.7 If 0.7 is used 42% additional plate thickness is
required. Joint efficiency of 0.7 provides a relaxation onNDT. Documented in Clause A3.4 of API650. By agreement of contractor and purchaser.
5/27/2009 FUEL TANK & PIPE 35
-
5/23/2018 Installation and Commissioning of API 650 Tanks (Presentation Without Audio)
Radiography RequirementPlate Thickness
-
5/23/2018 Installation and Commissioning of API 650 Tanks (Presentation Without Audio)
Radiography RequirementPlate Thickness
-
5/23/2018 Installation and Commissioning of API 650 Tanks (Presentation Without Audio)
Radiography RequirementPlate Thickness >25mm
5/27/2009 FUEL TANK & PIPE 38
-
5/23/2018 Installation and Commissioning of API 650 Tanks (Presentation Without Audio)
Radiography RequirementPlate Thickness
-
5/23/2018 Installation and Commissioning of API 650 Tanks (Presentation Without Audio)
Radiography RequirementRadiography Notes:
5/27/2009 FUEL TANK & PIPE 40
-
5/23/2018 Installation and Commissioning of API 650 Tanks (Presentation Without Audio)
Strake Layout
5/27/2009 FUEL TANK & PIPE 41
-
5/23/2018 Installation and Commissioning of API 650 Tanks (Presentation Without Audio)
Key Plates
5/27/2009 FUEL TANK & PIPE 42
-
5/23/2018 Installation and Commissioning of API 650 Tanks (Presentation Without Audio)
Location of Plates Shell plate horizontal and vertical
plate clearances are maintained bykey plates, shims and wedges.
5/27/2009 FUEL TANK & PIPE 43
ey p a es are secure o e s e . Driven wedges maintain the gaps for
welding
Shims maintain the clearance on thehorizontal weld.
-
5/23/2018 Installation and Commissioning of API 650 Tanks (Presentation Without Audio)
Automatic Welder This style of welder used
for horizontal welds. The welding process is
controlled by anoscillator.
5/27/2009 FUEL TANK & PIPE 44
welding parameters canbe controlled. The welder runs along a
magnetic flexible steeltrack.
Viable on larger tanks.
-
5/23/2018 Installation and Commissioning of API 650 Tanks (Presentation Without Audio)
Final Strakes
5/27/2009 FUEL TANK & PIPE 45
-
5/23/2018 Installation and Commissioning of API 650 Tanks (Presentation Without Audio)
Roof Construction
5/27/2009 FUEL TANK & PIPE 46
-
5/23/2018 Installation and Commissioning of API 650 Tanks (Presentation Without Audio)
Roof Construction Fuel Tank & Pipe often build the roof
on the ground and lift this on to thecompleted strakes.
5/27/2009 FUEL TANK & PIPE 47
u y eng neere s u es aregenerated using Spacegass and otheranalytical methods.
Lifting lug design
-
5/23/2018 Installation and Commissioning of API 650 Tanks (Presentation Without Audio)
Spacegass FEA model.
5/27/2009 FUEL TANK & PIPE 48
-
5/23/2018 Installation and Commissioning of API 650 Tanks (Presentation Without Audio)
Lifting Lug Design
5/27/2009 FUEL TANK & PIPE 49
-
5/23/2018 Installation and Commissioning of API 650 Tanks (Presentation Without Audio)
Finished Roof Can
5/27/2009 FUEL TANK & PIPE 50
-
5/23/2018 Installation and Commissioning of API 650 Tanks (Presentation Without Audio)
Roof Lift
5/27/2009 FUEL TANK & PIPE 51
-
5/23/2018 Installation and Commissioning of API 650 Tanks (Presentation Without Audio)
Tolerances and DeviationsAPI 650 provides guidance.Typical client requirements Circumference
1.5 x D/1000 +30mm
5/27/2009 FUEL TANK & PIPE 52
1.5 x D/1000 +20mm
Height and Horizontality of Plate Edge 40mm
Local Deviations Buckle height floor/roof plateD/1000 x (t+20)/t
-
5/23/2018 Installation and Commissioning of API 650 Tanks (Presentation Without Audio)
Verticality of the Tank
Tolerances and Deviations
5/27/2009 FUEL TANK & PIPE 53
-
5/23/2018 Installation and Commissioning of API 650 Tanks (Presentation Without Audio)
Tank Survey
5/27/2009 FUEL TANK & PIPE 54
-
5/23/2018 Installation and Commissioning of API 650 Tanks (Presentation Without Audio)
Tank Survey
5/27/2009 FUEL TANK & PIPE 55
-
5/23/2018 Installation and Commissioning of API 650 Tanks (Presentation Without Audio)
COMMISSIONING Tank Strapping
Tank Strapping is a method of measuring thedeviation of the tank from its cylindrical form. The method employs a laser and provides an
5/27/2009 FUEL TANK & PIPE 56
accura e c rcum eren a pro e o e an a
different heights up the tank. Strapping data is then entered into the tank
gauging system providing an accurate means ofinterpolating the tank volume.
Strapping Data
-
5/23/2018 Installation and Commissioning of API 650 Tanks (Presentation Without Audio)
Strapping Data
5/27/2009 FUEL TANK & PIPE 57
-
5/23/2018 Installation and Commissioning of API 650 Tanks (Presentation Without Audio)
Non Destructive Engineering FT&P employ the following methods on tank welds.
Vacuum box testing.
Radiography (Usually on Tee's i.e. intersections of vertical and
horizontal welds)
5/27/2009 FUEL TANK & PIPE 58
70%. (API 650)
Magnetic Particle Inspection (100% of Joints) Dye Penetrant (100% of Joints) Air Testing of compensating plates.
-
5/23/2018 Installation and Commissioning of API 650 Tanks (Presentation Without Audio)
MPI of Tank Welds
5/27/2009 FUEL TANK & PIPE 59
-
5/23/2018 Installation and Commissioning of API 650 Tanks (Presentation Without Audio)
HYDROTESTING Hydro testing
Subject to availability of clean water.
For diesel tanks hydro-testing subjects the tank to a structuralload higher than the service load due to difference in SG ofwater and Diesel.
Hydro Testing allows testing of tank settlement
5/27/2009 FUEL TANK & PIPE 60
-(Vacuum Box, MPI, Dye Penetrant on every joint)
On a 1.75Ml tank, the cost of clean water at a remote mine-site was $0.40 per litre.
Pragmatism prevailed, and Hydrotesting excluded. FT&P tender exclusions include provision of clean water. FT&P have experienced considerable algae growth on tank
internal surfaces following hydro testing and resulting insignificant additional costs arising out the cleaning the tank.
-
5/23/2018 Installation and Commissioning of API 650 Tanks (Presentation Without Audio)
PV Vents/Safety Valves On diesel tanks, FT&P
install self desiccating
filters Filters prevent ingress of
moisture arising from the
5/27/2009 FUEL TANK & PIPE 61
air humidity. Filters become clogged if
they are not maintained. This can create either a
vacuum or pressure
condition in the tank
-
5/23/2018 Installation and Commissioning of API 650 Tanks (Presentation Without Audio)
PV Vents/Safety Valves A vacuum condition can lead to catastrophic failure of a
tank. Mitigated by the PV Valve. A plastic bag secured over a tank vent during routine
maintenance led to tank failure in a UK refiner durin a
5/27/2009 FUEL TANK & PIPE 62
crash cooling event (rain storm).
Pressure 0 KPa Gauge Vacuum 1.3 KPa Gauge Vent sizing in accordance with AS1940
FT&P use Shands and Jur PV valves or equivalent. Sizing of vents will be undertaken by manufacturer
-
5/23/2018 Installation and Commissioning of API 650 Tanks (Presentation Without Audio)
PV Vent
5/27/2009 FUEL TANK & PIPE 63
-
5/23/2018 Installation and Commissioning of API 650 Tanks (Presentation Without Audio)
Venting Requirements
5/27/2009 FUEL TANK & PIPE 64
-
5/23/2018 Installation and Commissioning of API 650 Tanks (Presentation Without Audio)
Venting Requirements
5/27/2009 FUEL TANK & PIPE 65
-
5/23/2018 Installation and Commissioning of API 650 Tanks (Presentation Without Audio)
Flow Curve for a Vacuum Vent
5/27/2009 FUEL TANK & PIPE 66
-
5/23/2018 Installation and Commissioning of API 650 Tanks (Presentation Without Audio)
Rossing Fuel Tank Collapse 2 x 1.2m Litre fuel Tanks failed due to
vacuum condition. DN150 Vents on each tank replaced by
.
Gravity equalisation between tanksresulted in vacuum condition.
Tank collapsed due to inappropriate
sizing of the breathers.
5/27/2009 FUEL TANK & PIPE 67
-
5/23/2018 Installation and Commissioning of API 650 Tanks (Presentation Without Audio)
Tank Failure (Vacuum Condition)
5/27/2009 FUEL TANK & PIPE 68
-
5/23/2018 Installation and Commissioning of API 650 Tanks (Presentation Without Audio)
Tank Failure (Vacuum)
5/27/2009 FUEL TANK & PIPE 69
-
5/23/2018 Installation and Commissioning of API 650 Tanks (Presentation Without Audio)
Tank Failure (Vacuum)
5/27/2009 FUEL TANK & PIPE 70
-
5/23/2018 Installation and Commissioning of API 650 Tanks (Presentation Without Audio)
Tank Failure
5/27/2009 FUEL TANK & PIPE 71
-
5/23/2018 Installation and Commissioning of API 650 Tanks (Presentation Without Audio)
Tank Failure
5/27/2009 FUEL TANK & PIPE 72
-
5/23/2018 Installation and Commissioning of API 650 Tanks (Presentation Without Audio)
CONTROL PHILOSOPHY Checks
Tank SelectionControl, duty. Tank Selection
5/27/2009 FUEL TANK & PIPE 73
on ro , ng
High Level Alarm HH Alarm Double redundancy
of above. Low Level Arm
INSTRUMENTS
-
5/23/2018 Installation and Commissioning of API 650 Tanks (Presentation Without Audio)
Level Gauges FT&P use the OPW iSite system Accurate to 1 mm Provides temperature compensation for bulk
fluid temperature. (ATO Tax rebates)
5/27/2009 FUEL TANK & PIPE 74
Level gauge use strapping data to calculate
volume. The gauge supports many soft level alarms that
can be used for a variety of purposes includingbackup HH, H, L, LL alarms and re-order levelvia the Ethernet link.
The system is approved by the EPA in Californiaas a leak detection system.
-
5/23/2018 Installation and Commissioning of API 650 Tanks (Presentation Without Audio)
INSTRUMENTS
Level Switches Reed switch used for High, High High
5/27/2009 FUEL TANK & PIPE 75
e prov es ac up o e a ove.
Typically no other additionalinstruments are required.
-
5/23/2018 Installation and Commissioning of API 650 Tanks (Presentation Without Audio)
End of Presentation Thank you for your Attention!
Acknowledgements Michael King, .
5/27/2009 FUEL TANK & PIPE 76
Paula West, Alcoa Ben Pisano Blake Thompson CDMS.
Questions
-
5/23/2018 Installation and Commissioning of API 650 Tanks (Presentation Without Audio)
About FT&P , $ 30
, , , , , , , .
,
5/27/2009 FUEL TANK & PIPE 77
.
&
( )
-
5/23/2018 Installation and Commissioning of API 650 Tanks (Presentation Without Audio)
FT&P Rail Loading
5/27/2009 FUEL TANK & PIPE 78
-
5/23/2018 Installation and Commissioning of API 650 Tanks (Presentation Without Audio)
FT&P Rail Unloading
5/27/2009 FUEL TANK & PIPE 79
-
5/23/2018 Installation and Commissioning of API 650 Tanks (Presentation Without Audio)