inst. logic diagrameia.onep.go.th/images/monitor/1553225901.pdf · elec. inst....

38
INST. LOGIC DIAGRAM VDU AREA (21UNIT) (COVER) DWG. NO. 61-1-3-00(21)-103-4-0 JOB NO. 7A48 SHEET NO. 1 OF 12 SHEET NO. INT’ NO. DESCRIPTION REMARKS 1 2 3 4 5 6 7 8 9 10 11 12 ES-2101 ES-2101 ES-2101 ES-2102 ES-2103 I-2106 I-2104 I-2105 I-2107 - - - COVER SHEET INDEX & REVISION SHEET VACUUM CHARGE HEATER (21B001) SHUTDOWN (1/3) VACUUM CHARGE HEATER (21B001) SHUTDOWN (3/3) VACUUM CHARGE HEATER (21B001) SHUTDOWN (2/3) 21B001 PILOT GAS VALVE OPEN/CLOSE (XV-2107) COMBUSTION AIR SYSTEM (21B001) VACUUM COLUMN (21C001) STRIPPING STEAM VALVE (FV-2120) VACUUM SYSTEM SLOP OIL PUMP START/STOP (21P014A/B) SUPER HIGH PRESS. STEAM INLET V/V OPEN (PV-2103) 61P001A/B (HS-2103) 21P012A/B (LSHL-2114) TO TANKAGE INDEX (VDU,21UNIT) REVISION REMARKS 1 2 3 4 5 6 7 8 9 10 11 12 0 1 2 3 4 SHEET NO. * * * * * * * * * * * JOB NO. 7A48 SHEET NO. 2 OF 12 PROCESS PIPING VESSELSSTRUCT. ELEC. INST. INST. LOGIC DIAGRAM INDEX & REVISION SHEET DWG NO. 61-1-3-00(21)-103-4-0 REV. 1 2 3 JAN.04.97 REVISED AS MARKED 0 C.M.J K.S.K J.T.J APR.02.96 REVISED AS MARKED C.M.J K.S.K J.T.J JAN.16.96 A.F.C K.S.K J.T.J K.S.K J.T.J DEC.22.95 FOR APPROVAL DATE DESCRIPTION Y.H.K Y.H.K DRWN CHKD APPD APPD

Upload: others

Post on 25-May-2020

15 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: INST. LOGIC DIAGRAMeia.onep.go.th/images/monitor/1553225901.pdf · elec. inst. dwgno.61-1-3-00(24)-103-4-0 jobno. 7a48 18rtb1 [1,2] 18rtb1 [17,18] 18rtb1 [3,4] 18rtb1 [19,20] 18rtb1

INST. LOGIC DIAGRAM

VDU AREA (21UNIT)(COVER)

DWG. NO. 61-1-3-00(21)-103-4-0

JOB NO. 7A48 SHEET NO. 1 OF 12

SHEET NO. INT’ NO. DESCRIPTION REMARKS

123456789101112

ES-2101ES-2101

ES-2101

ES-2102

ES-2103

I-2106

I-2104I-2105

I-2107

-

-- COVER SHEET

INDEX & REVISION SHEETVACUUM CHARGE HEATER (21B001) SHUTDOWN (1/3)

VACUUM CHARGE HEATER (21B001) SHUTDOWN (3/3)VACUUM CHARGE HEATER (21B001) SHUTDOWN (2/3)

21B001 PILOT GAS VALVE OPEN/CLOSE (XV-2107)COMBUSTION AIR SYSTEM (21B001)VACUUM COLUMN (21C001) STRIPPING STEAM VALVE (FV-2120)VACUUM SYSTEM SLOP OIL PUMP START/STOP (21P014A/B)SUPER HIGH PRESS. STEAM INLET V/V OPEN (PV-2103)61P001A/B (HS-2103)21P012A/B (LSHL-2114)

TO TANKAGE

INDEX (VDU,21UNIT)

REVISIONREMARKS

123456789

101112

0 1 2 3 4SHEET NO.

*

****

****

**

JOB NO. 7A48 SHEET NO. 2 OF 12

PROCESS PIPING VESSELS STRUCT. ELEC. INST.

INST. LOGIC DIAGRAMINDEX & REVISION SHEET

DWG NO. 61-1-3-00(21)-103-4-0

REV.

123 JAN.04.’97 REVISED AS MARKED

0

C.M.J K.S.K J.T.J

APR.02.’96 REVISED AS MARKED C.M.J K.S.K J.T.J

JAN.16.’96 A.F.C K.S.K J.T.J

K.S.K J.T.JDEC.22.’95 FOR APPROVAL

DATE DESCRIPTION

Y.H.K

Y.H.K

DRWNCHKD APPDAPPD

Page 2: INST. LOGIC DIAGRAMeia.onep.go.th/images/monitor/1553225901.pdf · elec. inst. dwgno.61-1-3-00(24)-103-4-0 jobno. 7a48 18rtb1 [1,2] 18rtb1 [17,18] 18rtb1 [3,4] 18rtb1 [19,20] 18rtb1

21B001 SHUTDOWN

BS-2101 BYPASS

AP1

BS-2102 BYPASS

AP1

BS-2104 BYPASS

AP1

BS-2103 BYPASS

AP1

FSLL-2109B

LL<XXXXD0

M / H3

FSLL-2109A

LL<XXXXD0M / H3

FSLL-2109C

LL<XXXXD0

M / H3

FSLL-2109D

LL<XXXXD0M / H

3

FALL-2108A

LL<XXXXAP0M / H

3

FALL-2108B

LL<XXXXAP0

M / H3

FALL-2108C

LL<XXXXAP0M / H

3

FALL-2108D

LL<XXXXAP0M / H

3

A

A

A

A

BA

OR

OR

OR

OR

BTO SHEET4 OF 12

21B001 COMMON BYPASS ALARM(NOTE 1)

NOTE 1 : LAMP ONWHEN ONE OFBYPASS SWITCHESIN UNIT 21

LOGIC BY PLC

CTO SHEET4 OF 12

DTO SHEET4 OF 12

ETO SHEET4 OF 12

2101

FALL

FALL

FALL

FALL

REV.

123 JAN.04.’97 REVISED AS MARKED

0

C.M.J K.S.K J.T.J

APR.02.’96 REVISED AS MARKED C.M.J K.S.K J.T.J

JAN.16.’96 A.F.C K.S.K J.T.J

K.S.K J.T.JDEC.22.’95 FOR APPROVAL

DATE DESCRIPTION

Y.H.K

Y.H.K

DRWNCHKD APPD APPD

SHEET NO. 3 OF 12

INST. LOGIC DIAGRAM(INTERLOCK NO. ES-2101)

PROCESS PIPING VESSELS STRUCT.

ELEC. INST.

DWG NO. 61-1-3-00(24)-103-4-0JOB NO. 7A48

18 R TB 1 [ 1,2 ]

18 R TB 1 [ 17,18 ]

18 R TB 1 [ 3,4 ]

18 R TB 1 [ 19,20 ]

18 R TB 1 [ 5,6 ]

18 R TB 1 [ 21,22 ]

18 R TB 1 [ 7,8 ]

18 R TB 1 [ 23,24 ]

21B001 SHUTDOWN

BS-2105 BYPASS

AP1

BS-2106 BYPASS

AP1

HS-2102A

EMERAC0

BS-2107 BYPASS

AP1

HS-2102B

L0

TAHH-2117

AP0

TAHH-2146

HH>XXXAP0

PAHH-2104

HH>XXAP0mmH O

HS-2102D

D1RESET

A

OR

BFROM SHEET3 OF 12

LOGIC BY PLC

TAHH

ATO SHEET5 OF 12OR

OR

2

C

HH>XXXC

TAHH

PAHH

C

D

E

FROM SHEET3 OF 12

FROM SHEET3 OF 12

FROM SHEET3 OF 12

BTO SHEET5 OF 12

CTO SHEET5 OF 12

A

S/D

EMERS/D

S

JOB NO. 7A48 SHEET NO. 4 OF 12

PROCESS PIPING VESSELS STRUCT.

ELEC. INST.

DWG NO. 61-1-3-00(21)-103-4-0

INST. LOGIC DIAGRAM(INTERLOCK NO. ES-2101)

REV.

123 JAN.04.’97 REVISED AS MARKED

0

C.M.J K.S.K J.T.J

APR.02.’96 REVISED AS MARKED C.M.J K.S.K J.T.J

JAN.16.’96 A.F.C K.S.K J.T.J

K.S.K J.T.JDEC.22.’95 FOR APPROVAL

DATE DESCRIPTION

Y.H.K

Y.H.K

DRWNCHKD APPD APPD

18 R TB 2 [ 1,2 ]

18 R TB 1 [ 3,4 ]

18 R TB 1 [ 55,56 ]

23 R TB 1 [ 19,20 ]

22 R TB 5 [ 29,30 ]

R

Page 3: INST. LOGIC DIAGRAMeia.onep.go.th/images/monitor/1553225901.pdf · elec. inst. dwgno.61-1-3-00(24)-103-4-0 jobno. 7a48 18rtb1 [1,2] 18rtb1 [17,18] 18rtb1 [3,4] 18rtb1 [19,20] 18rtb1

JOB NO. 7A48 SHEET NO. 5 OF 12

PROCESS PIPING VESSELS STRUCT.

ELEC. INST.

INST. LOGIC DIAGRAM(INTERLOCK NO. ES-2101)

21B001 SHUTDOWN

BS-2108 BYPASS

AP1

BS-2109 BYPASS

AP1

PDALL-2120

L0

2117L

0

PALL-2116

LL<XXXXL0

PALL-2114

LL<XXXXL0Kg/cm2

D0

LL<XXXXD0

PSLL-2115

LL<XXXXD0

BS-2110

AP1

AP1

HS-2102C

PILOTD0S/D

A

A

A

OR

OR

LOGIC BY PLC

FROM SHEET4 OF 12

BYPASS

PALL-

2118PSLL-

BS-2111

PDSLL-2119

Kg/cm2

Kg/cm2

LL<XXXXKg/cm2

LL<XXXXKg/cm2

LL<XXXXKg/cm2

BYPASS

Kg/cm2

PALL

PALL

PALL

PDALL

OR

OR

A

A

A

SC

4 OF 12 BFROM SHEET

A

FROM SHEET4 OF 12 A

XV-2101C10

CLOSEOPEN

10

XV-2101A10 CLOSE

OPEN

XV-2101B

CLOSEOPEN

XV-2102C

10

CLOSEOPEN

10

XV-2102A10 CLOSE

OPEN

XV-2102B

CLOSEOPEN

XV-210310 CLOSE

OPEN

10

XV-210410 CLOSE

OPEN

10

FUEL GAS

PILOT GAS

FUEL OIL

SOUR GAS

R

R

R

R

R

R

R

R

DT10 sec

NOR=1

OR

AXA2101

21B001SHUTDOWN

DWG NO. 61-1-3-00(21)-103-4-0

REV.

123 JAN.04.’97 REVISED AS MARKED

0

C.M.J K.S.K J.T.J

APR.02.’96 REVISED AS MARKED C.M.J K.S.K J.T.J

JAN.16.’96 A.F.C K.S.K J.T.J

K.S.K J.T.JDEC.22.’95 FOR APPROVAL

DATE DESCRIPTION

Y.H.K

Y.H.K

DRWNCHKD APPD APPD

*

DT10 sec

*

NOTE*: VARIABLEPARAMETER

SYMBOL & LEGENDSEE SHEET

23 F TB 3 [ 3,4 ]

18 R TB 2 [ 39,40 ]

23 F TB 3 [ 7,8 ]

23 F TB 3 [ 5,6 ]

18 R TB 1 [ 57,58 ]

23 F TB 3 [ 9,10 ]

18 R TB 1 [ 59,60 ]

22 R TB 1 [ 15,16 ]

22 R TB 1 [ 17,18 ]

22 R TB 1 [ 19,20 ]

22 R TB 1 [ 21,22 ]

22 R TB 1 [ 23,24 ]

22 R TB 1 [ 25,26 ]

22 R TB 1 [ 27,28 ]

22 R TB 1 [ 13,14 ]

R

JOB NO. 7A48 SHEET NO. 6 OF 12

PROCESS PIPING VESSELS STRUCT.

ELEC. INST.

INST. LOGIC DIAGRAM(INTERLOCK NO. I-2106)

21B001 SHUTDOWN

BS-2112 BYPASS

AP1

PSL-2122

LL<XXXXL0Kg/cm2

OR

LOGIC BY RELAY

PAL

10

XV-210710 CLOSE

OPENPILOT GASR

DWG NO. 61-1-3-00(21)-103-4-0

(C3 LPG)

123 JAN.04.’97 REVISED AS MARKED

0

C.M.J K.S.K J.T.J

APR.02.’96 REVISED AS MARKED C.M.J K.S.K J.T.J

JAN.16.’96 A.F.C K.S.K J.T.J

K.S.K J.T.JDEC.22.’95 FOR APPROVAL

DATE DESCRIPTION

Y.H.K

Y.H.K

DRWNCHKD APPD

23 F TB 3 [ 11,12 ]

23 F TB 1 [ 11,12 ]

ปจจบน XV-2107 ไมไดใชงาน

Page 4: INST. LOGIC DIAGRAMeia.onep.go.th/images/monitor/1553225901.pdf · elec. inst. dwgno.61-1-3-00(24)-103-4-0 jobno. 7a48 18rtb1 [1,2] 18rtb1 [17,18] 18rtb1 [3,4] 18rtb1 [19,20] 18rtb1

JOB NO. 7A48 SHEET NO. 7 OF 12

PROCESS PIPING VESSELS STRUCT.

ELEC. INST.

INST. LOGIC DIAGRAM(INTERLOCK NO. ES-2102)

COMBUSTION AIR SYSTEM

PAL-2131

L0

OR

LOGIC BY RELAY & PLC

PAL

10

21K001ASTART

DWG NO. 61-1-3-00(21)-103-4-0

PALL-2132

L0

BS-2113 BYPASS

AP1

HS- RESETAC

0

R

NATURAL DRAFTLL<XXXXmmHg

L<XXXXmmHg

PALL

10

21K001B

10

HV-210110 OPEN

10

HV-2102A10

CLOSEOPEN

10

HV-2102B10

CLOSE

10

HV-2102C10

CLOSEOPEN

10

HV-2102D10

CLOSEOPEN

1

1 START

1

0

0

1

(NOTE 1)

(NOTE 1)

I E

I E XL

XL

E I

E I

CONTROL

OPEN

STACK DAMPER

NATURAL AIR DAMPER

NATURAL AIR DAMPER

NATURAL AIR DAMPER

NATURAL AIR DAMPER

NOTE 1AFTER AUTO-STARTMANUAL STOP ONLY(HOLDING BY MCC)

123 JAN.04.’97 REVISED AS MARKED

0

C.M.J K.S.K J.T.J

APR.02.’96 REVISED AS MARKED C.M.J K.S.K J.T.J

JAN.16.’96 A.F.C K.S.K J.T.J

K.S.K J.T.JDEC.22.’95 FOR APPROVAL

DATE DESCRIPTION

Y.H.K

Y.H.K

DRWNCHKD APPDAPPD

2104

23 F TB 3 [ 13,14 ]

23 F TB 3 [ 15,16 ]

22 R TB 4 [ 25,26 ]

22 R TB 4 [ 27,28 ]

22 R TB 1 [ 3,4 ]

22 R TB 1 [ 5,6 ]

22 R TB 1 [ 7,8 ]

22 R TB 1 [ 9,10 ]

22 R TB 1 [ 11,12 ]

S

JOB NO. 7A48 SHEET NO. 8 OF 12

PROCESS PIPING VESSELS STRUCT. ELEC. INST.

INST. LOGIC DIAGRAM(INTERLOCK NO. ES-2103)

21B001 SHUTDOWN

BS-2415 BYPASS

AP1

LAHH-2109

HH>D0MM

OR

LOGIC BY RELAY

10

FV-212010 CLOSE

OPENR

LI-2108

HH>D0MM

A

LAHH

DWG NO. 61-1-3-00(21)-103-4-0

123 JAN.04.’97 REVISED AS MARKED

0

C.M.J K.S.K J.T.J

APR.02.’96 REVISED AS MARKED C.M.J K.S.K J.T.J

JAN.16.’96 A.F.C K.S.K J.T.J

K.S.K J.T.JDEC.22.’95 FOR APPROVAL

DATE DESCRIPTION

Y.H.K

Y.H.K

DRWNCHKD APPDAPPD

20 R TB 1 [ 1,2 ]

18 R TB 4 [ 53,54 ]

18 R TB 4 [ 13,14 ]

FROM LIC-2108

Page 5: INST. LOGIC DIAGRAMeia.onep.go.th/images/monitor/1553225901.pdf · elec. inst. dwgno.61-1-3-00(24)-103-4-0 jobno. 7a48 18rtb1 [1,2] 18rtb1 [17,18] 18rtb1 [3,4] 18rtb1 [19,20] 18rtb1

JOB NO. 7A48 SHEET NO. 9 OF 12

PROCESS PIPING VESSELS STRUCT.

ELEC. INST.

INST. LOGIC DIAGRAM(INTERLOCK NO. I-2104)

21P0014 A/B

LSHL-2118

D1

BY DCS LOGIC

10

21P014ASTART

DWG NO. 61-1-3-00(21)-103-4-0

H>MM I E

I E

XLE ISTOP

110

10

21P014BSTART XLE ISTOP

110

S

R1L<MM

123 JAN.04.’97 REVISED AS MARKED

0

C.M.J K.S.K J.T.J

APR.02.’96 REVISED AS MARKED C.M.J K.S.K J.T.J

JAN.16.’96 A.F.C K.S.K J.T.J

K.S.K J.T.JDEC.22.’95 FOR APPROVAL

DATE DESCRIPTION

Y.H.K

Y.H.K

DRWNCHKD APPD

18 R TB 7 [ 17,18 ]

22 R TB 4 [ 31,32 ]

22 R TB 4 [ 29,30 ]

JOB NO. 7A48 SHEET NO. 10 OF 12

PROCESS PIPING VESSELS STRUCT. ELEC. INST.

INST. LOGIC DIAGRAM(INTERLOCK NO. I-2105)

PV-2103

BS-2114 BYPASS

AP1

PAL-2103

L<L0Kg/cm2

OR

LOGIC BY RELAY

10

PV-210310

CLOSEOPEN

RPAL

DWG NO. 61-1-3-00(21)-103-4-0

ZH2103

123 JAN.04.’97 REVISED AS MARKED

0

C.M.J K.S.K J.T.J

APR.02.’96 REVISED AS MARKED C.M.J K.S.K J.T.J

JAN.16.’96 A.F.C K.S.K J.T.J

K.S.K J.T.JDEC.22.’95 FOR APPROVAL

DATE DESCRIPTION

Y.H.K

Y.H.K

DRWNCHKD APPD APPD

20 R TB 3 [ 3,4 ]

22 R TB 1 [ 45,46 ]

Page 6: INST. LOGIC DIAGRAMeia.onep.go.th/images/monitor/1553225901.pdf · elec. inst. dwgno.61-1-3-00(24)-103-4-0 jobno. 7a48 18rtb1 [1,2] 18rtb1 [17,18] 18rtb1 [3,4] 18rtb1 [19,20] 18rtb1

JOB NO. 7A48 SHEET NO. 11 OF 12

PROCESS PIPING VESSELS STRUCT.

ELEC. INST.

INST. LOGIC DIAGRAM(INTERLOCK NO. _____)

DCS & TANKAGE BY DCS LOGIC

DWG NO. 61-1-3-00(21)-103-4-0

HS- STOPD

0 XL2103

DCSTANKAGE61P001A/B

65-P-1-61-001A/B

VDU VDU

123 JAN.04.’97 REVISED AS MARKED

0

C.M.J K.S.K J.T.J

APR.02.’96 REVISED AS MARKED C.M.J K.S.K J.T.J

JAN.16.’96 A.F.C K.S.K J.T.J

K.S.K J.T.JDEC.22.’95 FOR APPROVAL

DATE DESCRIPTION

Y.H.K

Y.H.K

DRWNCHKD APPD

JOB NO. 7A48 SHEET NO. 12 OF 12

PROCESS PIPING VESSELS STRUCT.

ELEC. INST.

INST. LOGIC DIAGRAM(INTERLOCK NO. I-2107)

21P0012 A/B

LSHL-2114

D1

BY DCS LOGIC

10

21P012ASTART

DWG NO. 61-1-3-00(21)-103-4-0

H>MM I E

I E

XLE ISTOP

110

10

21P012BSTART XLE ISTOP

110

S

R1L<MM

123 JAN.04.’97 REVISED AS MARKED

0

C.M.J K.S.K J.T.J

APR.02.’96 REVISED AS MARKED C.M.J K.S.K J.T.J

JAN.16.’96 A.F.C K.S.K J.T.J

K.S.K J.T.JDEC.22.’95 FOR APPROVAL

DATE DESCRIPTION

Y.H.K

Y.H.K

DRWNCHKD APPD

18 R TB 7 [ 9,10 ]

22F TB 4 [ 42,43 ]

22F TB 4 [ 44,45 ]

Page 7: INST. LOGIC DIAGRAMeia.onep.go.th/images/monitor/1553225901.pdf · elec. inst. dwgno.61-1-3-00(24)-103-4-0 jobno. 7a48 18rtb1 [1,2] 18rtb1 [17,18] 18rtb1 [3,4] 18rtb1 [19,20] 18rtb1

JOB NO. 7A48 SHEET NO. OF

PROCESS PIPING VESSELS STRUCT. ELEC. INST.

INST. LOGIC DIAGRAM(INTERLOCK NO. ______)

XV-2151 BY DCS LOGIC

10

XV-215110 CLOSE

OPENLI-2116

L<D1MM

A

DWG NO. 61-1-3-00(21)-103-4-0

123 JAN.04.’97 REVISED AS MARKED

0

C.M.J K.S.K J.T.J

APR.02.’96 REVISED AS MARKED C.M.J K.S.K J.T.J

JAN.16.’96 A.F.C K.S.K J.T.J

K.S.K J.T.JDEC.22.’95 FOR APPROVAL

DATE DESCRIPTION

Y.H.K

Y.H.K

DRWNCHKD APPD APPD

22R TB 2 [ 28,29 ]LB02N11_218R TB 5 [ 63,64 ]

Page 8: INST. LOGIC DIAGRAMeia.onep.go.th/images/monitor/1553225901.pdf · elec. inst. dwgno.61-1-3-00(24)-103-4-0 jobno. 7a48 18rtb1 [1,2] 18rtb1 [17,18] 18rtb1 [3,4] 18rtb1 [19,20] 18rtb1

ซ-07 เอกสาร Traffic Regulation

Page 9: INST. LOGIC DIAGRAMeia.onep.go.th/images/monitor/1553225901.pdf · elec. inst. dwgno.61-1-3-00(24)-103-4-0 jobno. 7a48 18rtb1 [1,2] 18rtb1 [17,18] 18rtb1 [3,4] 18rtb1 [19,20] 18rtb1
Page 10: INST. LOGIC DIAGRAMeia.onep.go.th/images/monitor/1553225901.pdf · elec. inst. dwgno.61-1-3-00(24)-103-4-0 jobno. 7a48 18rtb1 [1,2] 18rtb1 [17,18] 18rtb1 [3,4] 18rtb1 [19,20] 18rtb1
jirada.paleepongpan
Text Box
Page 11: INST. LOGIC DIAGRAMeia.onep.go.th/images/monitor/1553225901.pdf · elec. inst. dwgno.61-1-3-00(24)-103-4-0 jobno. 7a48 18rtb1 [1,2] 18rtb1 [17,18] 18rtb1 [3,4] 18rtb1 [19,20] 18rtb1
Page 12: INST. LOGIC DIAGRAMeia.onep.go.th/images/monitor/1553225901.pdf · elec. inst. dwgno.61-1-3-00(24)-103-4-0 jobno. 7a48 18rtb1 [1,2] 18rtb1 [17,18] 18rtb1 [3,4] 18rtb1 [19,20] 18rtb1

ซ-08 เอกสารรายงานผลการตรวจเชคความปลอดภย

ระหวางเรอ/ทาเรอ

Page 13: INST. LOGIC DIAGRAMeia.onep.go.th/images/monitor/1553225901.pdf · elec. inst. dwgno.61-1-3-00(24)-103-4-0 jobno. 7a48 18rtb1 [1,2] 18rtb1 [17,18] 18rtb1 [3,4] 18rtb1 [19,20] 18rtb1
Page 14: INST. LOGIC DIAGRAMeia.onep.go.th/images/monitor/1553225901.pdf · elec. inst. dwgno.61-1-3-00(24)-103-4-0 jobno. 7a48 18rtb1 [1,2] 18rtb1 [17,18] 18rtb1 [3,4] 18rtb1 [19,20] 18rtb1
Page 15: INST. LOGIC DIAGRAMeia.onep.go.th/images/monitor/1553225901.pdf · elec. inst. dwgno.61-1-3-00(24)-103-4-0 jobno. 7a48 18rtb1 [1,2] 18rtb1 [17,18] 18rtb1 [3,4] 18rtb1 [19,20] 18rtb1
Page 16: INST. LOGIC DIAGRAMeia.onep.go.th/images/monitor/1553225901.pdf · elec. inst. dwgno.61-1-3-00(24)-103-4-0 jobno. 7a48 18rtb1 [1,2] 18rtb1 [17,18] 18rtb1 [3,4] 18rtb1 [19,20] 18rtb1
Page 17: INST. LOGIC DIAGRAMeia.onep.go.th/images/monitor/1553225901.pdf · elec. inst. dwgno.61-1-3-00(24)-103-4-0 jobno. 7a48 18rtb1 [1,2] 18rtb1 [17,18] 18rtb1 [3,4] 18rtb1 [19,20] 18rtb1

ซ-09 เอกสารประเมนความเสยง

Page 18: INST. LOGIC DIAGRAMeia.onep.go.th/images/monitor/1553225901.pdf · elec. inst. dwgno.61-1-3-00(24)-103-4-0 jobno. 7a48 18rtb1 [1,2] 18rtb1 [17,18] 18rtb1 [3,4] 18rtb1 [19,20] 18rtb1

1 HDPE 3-44-1/ . 2557 2562

2 PP 2-3-44-1/ . 2560 2562

3 (CP) 3-42(1)-1/ . 2557 2562

4 PPC 3-44-4/ .

3-42(1)-4/41 . 2557 25623-42(1)-4/ . 2557 25623-42(1)-3/ . 2557 25623-48(6)-1/ . 2557 2562

9 ( ) 3-49-1/ . 2557 256210( ) 3-49-1/ . 2557 2562

Page 19: INST. LOGIC DIAGRAMeia.onep.go.th/images/monitor/1553225901.pdf · elec. inst. dwgno.61-1-3-00(24)-103-4-0 jobno. 7a48 18rtb1 [1,2] 18rtb1 [17,18] 18rtb1 [3,4] 18rtb1 [19,20] 18rtb1

11 DCC 3-49-2/ . 2557 256212 3-50(4)-1/ . 2557 2562

3-42(1)-4/ 2557 25623-42(1)-11/ 2557 25623-42(1)-1/ . 2557 2562

3-49-1/ .24-04-2558

2563

. 61 . 61 . 61 . 61 . 61 . 61 . 61 . 61 . 61 . 62 . 62 . 62 . 62 . 62 . 62 . 622561 2562

28 62

Page 20: INST. LOGIC DIAGRAMeia.onep.go.th/images/monitor/1553225901.pdf · elec. inst. dwgno.61-1-3-00(24)-103-4-0 jobno. 7a48 18rtb1 [1,2] 18rtb1 [17,18] 18rtb1 [3,4] 18rtb1 [19,20] 18rtb1
Page 21: INST. LOGIC DIAGRAMeia.onep.go.th/images/monitor/1553225901.pdf · elec. inst. dwgno.61-1-3-00(24)-103-4-0 jobno. 7a48 18rtb1 [1,2] 18rtb1 [17,18] 18rtb1 [3,4] 18rtb1 [19,20] 18rtb1
Page 22: INST. LOGIC DIAGRAMeia.onep.go.th/images/monitor/1553225901.pdf · elec. inst. dwgno.61-1-3-00(24)-103-4-0 jobno. 7a48 18rtb1 [1,2] 18rtb1 [17,18] 18rtb1 [3,4] 18rtb1 [19,20] 18rtb1

ภาคผนวก ภาคผนวก ฌฌ หนงสอนาสงรายงานการวเคราะหความเสยงจาก

อนตรายทเกดจากการประกอบกจการโรงงาน

Page 23: INST. LOGIC DIAGRAMeia.onep.go.th/images/monitor/1553225901.pdf · elec. inst. dwgno.61-1-3-00(24)-103-4-0 jobno. 7a48 18rtb1 [1,2] 18rtb1 [17,18] 18rtb1 [3,4] 18rtb1 [19,20] 18rtb1
Page 24: INST. LOGIC DIAGRAMeia.onep.go.th/images/monitor/1553225901.pdf · elec. inst. dwgno.61-1-3-00(24)-103-4-0 jobno. 7a48 18rtb1 [1,2] 18rtb1 [17,18] 18rtb1 [3,4] 18rtb1 [19,20] 18rtb1
Page 25: INST. LOGIC DIAGRAMeia.onep.go.th/images/monitor/1553225901.pdf · elec. inst. dwgno.61-1-3-00(24)-103-4-0 jobno. 7a48 18rtb1 [1,2] 18rtb1 [17,18] 18rtb1 [3,4] 18rtb1 [19,20] 18rtb1

ภาคผนวก ภาคผนวก ญญ รายงานการบนทกอบตเหต

ชวงเดอนกรกฎาคมถงธนวาคม 2561

Page 26: INST. LOGIC DIAGRAMeia.onep.go.th/images/monitor/1553225901.pdf · elec. inst. dwgno.61-1-3-00(24)-103-4-0 jobno. 7a48 18rtb1 [1,2] 18rtb1 [17,18] 18rtb1 [3,4] 18rtb1 [19,20] 18rtb1

โครงการ ........................................................................................... บรษท ....................................................................................................................

จดทารายงานโดย ...............................................................................................................................................................................................................

ระหวางเดอน ................................................... พ.ศ. .......................... ถง เดอน ................................................... พ.ศ. .............................................

ประเภทอบตเหต(1) ความถ'ของอบตเหต(2) สถานท'เกดอบตเหต เปาหมายการลดอบตเหต(3)

ไมม - - - มการกาหนด KPI ดาน Safety

TRIR ≤ 0.44

หมายเหต ( 1 ) นยามของประเภทของอบตเหต เชน รายแรง บาดเจบเลกนอย จานวนวนท'ตองหยดงาน เปนตน

( 2 ) จานวนอบตเหตตอชวงเวลา

( 3 ) เปาหมายของโครงการในการลดสถตอบตเหต และเอกสารอางองท'เก'ยวของ

ช'อผบนทก ...............................................................................................................................................................................................................................

ช'อผตรวจสอบ/ควบคมขอมล ...............................................................................................................................................................................................

เบอรโทรศพท .....................................................................................................................................................................................................

แนวทางปฏบตภายหลงพบอบตเหต ....................................................................................................................................................................................

.................................................................................................................................................................................................................................................

สรปสถตอบตเหต

โรงงานผลตน �ามนหลอล�นพ �นฐาน ไออารพซ จากด (มหาชน)

บรษท ไออารพซ จากด (มหาชน)

นายสญญา เพธโส

นายเค�ยม บญม

มการวเคราะหอบตเหต เพ�อหาสาเหตและแนวทางการแกไข ปองกนไมใหอบตเหต

เกดซ �าอก

038611333

2561 2561กรกฏาคม ธนวาคม

Page 27: INST. LOGIC DIAGRAMeia.onep.go.th/images/monitor/1553225901.pdf · elec. inst. dwgno.61-1-3-00(24)-103-4-0 jobno. 7a48 18rtb1 [1,2] 18rtb1 [17,18] 18rtb1 [3,4] 18rtb1 [19,20] 18rtb1

ภาคผนวก ภาคผนวก ฎฎ รายงานผลการศกษาคณภาพนาคลองสาธารณะ

เขตพนทมาบตาพด จงหวดระยอง

ปงบประมาณ 2561

Page 28: INST. LOGIC DIAGRAMeia.onep.go.th/images/monitor/1553225901.pdf · elec. inst. dwgno.61-1-3-00(24)-103-4-0 jobno. 7a48 18rtb1 [1,2] 18rtb1 [17,18] 18rtb1 [3,4] 18rtb1 [19,20] 18rtb1

รายงานสถานการณน าและสภาพภมอากาศ

สวนจดการสาธารณปโภคเขตประกอบการอตสาหกรรมไออารพซ (OSI)

กนยายน-ตลาคม 2561

Update by Thanawat Tinnarojsakul/2689

Page 29: INST. LOGIC DIAGRAMeia.onep.go.th/images/monitor/1553225901.pdf · elec. inst. dwgno.61-1-3-00(24)-103-4-0 jobno. 7a48 18rtb1 [1,2] 18rtb1 [17,18] 18rtb1 [3,4] 18rtb1 [19,20] 18rtb1

น าไหลลงอาง วนท 4 ต.ค.

น าไหลลงอางสะสมต งแต 1 ม.ค.

น าระบาย วนท 4 ต.ค.

น าระบาย สะสมต งแต 1 ม.ค.

ลาน ลบ.ม. 229.32 40,617.15 108.50 39,075.98

Update by Thanawat Tinnarojsakul/2689

แกงกระจาน

วชราลงกรณ

ขอมล ณ วนท 4 ตลาคม 2561

76%

แมงดฯ

แมกวงฯ

44%

65%

ภมพล

101%

กวคอหมา

74%

กวลม

87%

สรกต

73%

แควนอย 53%

หวยหลวง

98%

น าอน

76%

น าพง

72%

จฬาภรณ 35%

อบลรตน

69%

ลาปาว

88% 70% 55%66%

ลาแซะมลบน

ลานางรอง

34%

สรนธร

70%

ปาสกฯ

71%

ทบเสลา

28%

กระเสยว

38%ศรนครนทร

91%

89%

96%สยด90%

บางพระ

69%87%

90%

ปราณบร

74%

รชชประภา

85%

บางลาง

50%

สรปปรมาณน าในอางเกบน าขนาดใหญ ทวประเทศไทย

Source : http://water.rid.go.th/

95%

นฤบดนทรจนดา

94%

30%

แมมอก

จานวนอาง

ความจทระดบเกบกก (ลาน ลบ.ม.)

ปรมาตรใชการ(ลาน ลบ.ม.)

ปรมาตรน าในอาง (ลาน ลบ.ม.)

%ปรมาตรน าใชการ

(ลาน ลบ.ม.)%

35 70,867 47,325 56,208 79 32,663 46

<=30%

คาอธบายส

31-50%

51-80%

81-100%

>101%

Page 30: INST. LOGIC DIAGRAMeia.onep.go.th/images/monitor/1553225901.pdf · elec. inst. dwgno.61-1-3-00(24)-103-4-0 jobno. 7a48 18rtb1 [1,2] 18rtb1 [17,18] 18rtb1 [3,4] 18rtb1 [19,20] 18rtb1

Overview of IRPC Water resources

Update by Thanawat Tinnarojsakul/2689Source : Thanawat T.

โรงกรองน ำ IRPC บำนคำย

อำงฯประแสร

อำงฯ หนองปลำไหล

อำงฯ ดอกกรำย

โครงขำยทอสงน ำ WP(IRPC)

แมน ำระยอง

โรงกรองน ำ IRPC ฝง IP

Water Tank

อำงฯ คลองใหญ

โครงขำยทอผนน ำประแสร-หนองปลำไหล

โครงขำยทอผนน ำประแสร-คลองใหญ

Page 31: INST. LOGIC DIAGRAMeia.onep.go.th/images/monitor/1553225901.pdf · elec. inst. dwgno.61-1-3-00(24)-103-4-0 jobno. 7a48 18rtb1 [1,2] 18rtb1 [17,18] 18rtb1 [3,4] 18rtb1 [19,20] 18rtb1

สรปภาพรวมปรมาณน าในอางเกบน าจงหวดระยอง

Update by Thanawat Tinnarojsakul/2689Source : ฝายจดสรรน า โครงการชลประทานระยอง

ลมน ำคลองใหญ

ลมน ำประแสร

สรป : ปรมำณน ำในอำงฯลมน ำคลองใหญ ณ วนท 4 ต.ค. 61 เทำกบ 247.94 ลำน ลบ.ม. อยในเกณฑเฝำระวง คดเปน 87.53%

Page 32: INST. LOGIC DIAGRAMeia.onep.go.th/images/monitor/1553225901.pdf · elec. inst. dwgno.61-1-3-00(24)-103-4-0 jobno. 7a48 18rtb1 [1,2] 18rtb1 [17,18] 18rtb1 [3,4] 18rtb1 [19,20] 18rtb1

รายงานสถานการณน าในอางเกบน าจงหวดระยอง

Update by Thanawat Tinnarojsakul/2689Source : ฝายจดสรรน า โครงการชลประทานระยอง

Page 33: INST. LOGIC DIAGRAMeia.onep.go.th/images/monitor/1553225901.pdf · elec. inst. dwgno.61-1-3-00(24)-103-4-0 jobno. 7a48 18rtb1 [1,2] 18rtb1 [17,18] 18rtb1 [3,4] 18rtb1 [19,20] 18rtb1

รายงานปรมาณน า และน าฝนในอางเกบน าจงหวดระยอง

Update by Thanawat Tinnarojsakul/2689Source : ฝายจดสรรน า โครงการชลประทานระยอง

Page 34: INST. LOGIC DIAGRAMeia.onep.go.th/images/monitor/1553225901.pdf · elec. inst. dwgno.61-1-3-00(24)-103-4-0 jobno. 7a48 18rtb1 [1,2] 18rtb1 [17,18] 18rtb1 [3,4] 18rtb1 [19,20] 18rtb1

สรปภาพรวมการระบายน า แมน าระยอง(ฝายบานคาย)

Update by Thanawat Tinnarojsakul/2689Source : ฝายจดสรรน า โครงการชลประทานระยอง

Page 35: INST. LOGIC DIAGRAMeia.onep.go.th/images/monitor/1553225901.pdf · elec. inst. dwgno.61-1-3-00(24)-103-4-0 jobno. 7a48 18rtb1 [1,2] 18rtb1 [17,18] 18rtb1 [3,4] 18rtb1 [19,20] 18rtb1

Update by Thanawat Tinnarojsakul/2689Source : Water war room วนท 28 กนยายน 2561

สรป : ปจจบนมการสบผนน าจากอางฯ ประแสร มาลงท อางฯคลองใหญ ณ ต งแต ม.ค. - ส.ค. 2561 ปรมาณ รวม 26.4 ลาน ลบ.ม., ลงทอางฯหนองปลาไหล ต งแต ก.พ. - ส.ค. 2561 ปรมาณ 22.18 ลาน ลบ.ม.

สรปการเตรยมความพรอม แกไขปญหาภยแลง ป 2561

Page 36: INST. LOGIC DIAGRAMeia.onep.go.th/images/monitor/1553225901.pdf · elec. inst. dwgno.61-1-3-00(24)-103-4-0 jobno. 7a48 18rtb1 [1,2] 18rtb1 [17,18] 18rtb1 [3,4] 18rtb1 [19,20] 18rtb1

Update by Thanawat Tinnarojsakul/2689

สรป : แนวโนมปรมาณน าคงเหลอ ปจจบน อยในเกณปกต (สงกวาการคาดการณ) โดยมอตราการใชน าเฉลย อยท 0.8 – 1 ลาน ลบ.ม./วน

สรปสถานการณ และการเฝาระวงปรมาณน าในอางเกบน า ลมน าคลองใหญ ป 2561

Source : Water war room วนท 28 กนยายน 2561

Page 37: INST. LOGIC DIAGRAMeia.onep.go.th/images/monitor/1553225901.pdf · elec. inst. dwgno.61-1-3-00(24)-103-4-0 jobno. 7a48 18rtb1 [1,2] 18rtb1 [17,18] 18rtb1 [3,4] 18rtb1 [19,20] 18rtb1

สรปสถานการณ และการเฝาระวงดานคณภาพน า ในอางเกบน า ลมน าคลองใหญ ป 2561

Update by Thanawat Tinnarojsakul/2689Source : LIMs/IRPC วนท 1 ตลาคม 2561

จดเกบตวอยำง Chloride (ppm) Conductivity (uS/cm)

1. อำงฯ คลองใหญ 11.00 102.90

2. อำงฯ หนองปลำไหล 21.90 238.00

3. อำงฯ ดอกกรำย 23.18 305.00

4. คลองหนองกรบ 6.73 95.10

5. คลองหนองสนม 12.17 142.90

6. คลองปลำกง 39.56 291.00

7. ละหำรไร 10.65 117.70

8. แมน ำระยอง(บำนคำย) 19.92 192.80

Spec. of raw water for WP production- Cl content < 40 ppm, Conductivity < 250 uS/cm

Page 38: INST. LOGIC DIAGRAMeia.onep.go.th/images/monitor/1553225901.pdf · elec. inst. dwgno.61-1-3-00(24)-103-4-0 jobno. 7a48 18rtb1 [1,2] 18rtb1 [17,18] 18rtb1 [3,4] 18rtb1 [19,20] 18rtb1

สรปปรมาณน าในบอเกบน าสารอง พ นท IRPC (ฝง IP)

บอ 2 = 89.55%

บอ 3 = 37.55%

บอ 2/1

บอ 4/2

บอ 4/1บอ 5/1

บอ 4 = 88.70%

บอ 5 = 87.85%

บอ 1 = 94.32%

Source : IRPC(OSI), (1) : reference TPI plan year 1995 , (2) : reference TBC consultant year 2012

สรป : ขอมล ณ วนท 1 ต.ค. 2561 ปรมำณน ำเกบกก พนทฝง IP รวม 5 บอ เทำกบ 5.103 ลำน ลบ.ม. (77.75%)

Res. No. Capacity(MCM)

Actual(MCM)

1 2.082(1) 1.9632 0.729(2) 0.6533 1.622(2) 0.6094 1.036(2) 0.9185 1.093(2) 0.960

Total 6.562 5.103

Update by Thanawat Tinnarojsakul/2689

เปลยนแปลงเพมขนจำกเดอนทผำนมำ เปลยนแปลงลดลงจำกเดอนทผำนมำ