inspire thematic working group production and industrial facilities (pf)
DESCRIPTION
INSPIRE THEMATIC WORKING GROUP Production and Industrial Facilities (PF). Edinburgh, Scotland 30 June 2011. The group. Claudia “THE Editor” Pegoraro. Angel “Tres Sombreros” Lopez. EDITOR (From Feb 2010). EDITOR (2010) / P.O.C. Heinrich “Level of detail” Geerling. EXPERT. Andrea - PowerPoint PPT PresentationTRANSCRIPT
1
INSPIRE THEMATIC WORKING GROUPINSPIRE THEMATIC WORKING GROUP
Production and Industrial Facilities (PF)Production and Industrial Facilities (PF)
Edinburgh, Scotland
30 June 2011
2
The group
Heinrich “Level of detail”Geerling
Claudia “THE Editor” Pegoraro
Antonello “IPPC” Navarretta
Angel “Tres Sombreros” Lopez
Andrea“what’s your main occupation”
Giacomelli
FACILITATOR
EDITOR (2010) / P.O.CEDITOR (From Feb 2010)
EXPERT
EXPERT
3
Input
1. User survey documents + core INSPIRE reference material
2. Expert-derived documents(directly used by experts in their other job
or from their contacts)
3. Other EU projects
4INSPIRE progress 4
Activity tracking (R.O.M.) Activity tracking (R.O.M.) apr 2010 – jun 2011apr 2010 – jun 2011
0
20
40
60
80
100
120
14019
/04/
2010
03/0
5/20
10
17/0
5/20
10
31/0
5/20
10
14/0
6/20
10
28/0
6/20
10
12/0
7/20
10
26/0
7/20
10
09/0
8/20
10
23/0
8/20
10
06/0
9/20
10
20/0
9/20
10
04/1
0/20
10
18/1
0/20
10
01/1
1/20
10
15/1
1/20
10
29/1
1/20
10
13/1
2/20
10
27/1
2/20
10
10/0
1/20
11
24/0
1/20
11
07/0
2/20
11
21/0
2/20
11
07/0
3/20
11
21/0
3/20
11
04/0
4/20
11
18/0
4/20
11
02/0
5/20
11
16/0
5/20
11
30/0
5/20
11
13/0
6/20
11
27/0
6/20
11
TWG-PF
JRC
Meetings (face-to-face or remote)
5
Output
1. A UML model
2. The data specification(model + use cases)
3. Increased insight on the dataspecification process
6
The Model (1/4)SITE
FACILITY
INSTALLATIONPART
PLOT INSTALLATIONADDRESS(link)
BUILDING(link to BU)
OPERATOR
7
The Model (2/4)
TechnicalUnit
8
The Model (3/4)
ACTIVITY
Process input Process output
ProductWasteEnergySubstance
Emission
Production process
9
Cross-theme relationships
AdministrativeUnits
Cadastralparcels
Addresses
Land Use
Area Mgmt.
…as explicit Relationships…
10INSPIRE progress 10
Key changes from v1.0 to v2.0Key changes from v1.0 to v2.0
• A dedicated editor (with prior experience on Annex I)
• A common model for the “Facility”
• A productive Winter
11INSPIRE progress 11
Parts to be surely improvedParts to be surely improved
• Use Cases
• Energy production facilities
• Off-shore facilities
• Statistical applications of PF data (e.g. statistical business registers)
• Planning
12
Interesting topics
• Temporal aspects (change in use of facilities)
• What about the production process (IN or OUT of scope ? Different views exist and are not currently reconciled)
13
Please note……
Page VI
…and a couple of other similar notes in the text
14
Next steps
• K.I.S.S.
• Next teleconference: July 8
• “recruitment” of testers/reviewers
• Prepare to receive comments
• Follow “revamped” facilitation strategy (defined in May in an informal meeting in Torino and shared with all other TWGs).
1515
If you don’t register to be a tester or If you don’t register to be a tester or reviewer (for any of the groups), please reviewer (for any of the groups), please
tell us whytell us why
Andrea Giacomelli - [email protected]