inspection results (irr) · inspection results (irr) unit 32965 (126) no. assets sub ... (b)(1) are...

37
Inspection Results (IRR) UNIT 32965 (126) No. Assets Sub Module Qst # Question ID References Question Text Result Issue Summary Inspection Notes 1. UNIT 32965 (and 1 other assets) CR.CRMGEN 1. CR.CRMGEN.CRMCRITERIA.P 195.446(a) Does the process adequately address criteria by which the operator determines which of its facilities are control rooms? Sat -- BP operate three control room centers located at Renton, WA; Tulsa, OK; and Long Beach, CA. Each control room is a stand alone center that are not connected. This inspection will apply to the Olympic Pipeline control center located in Renton, WA. 2. UNIT 32965 (and 1 other assets) CR.CRMGEN 2. CR.CRMGEN.CRMMGMT.P 195.446(a) Are CRM procedures formalized and controlled? Sat -- Annual review is very October by control center training coordinator. 3. UNIT 32965 (and 1 other assets) CR.CRMGEN 3. CR.CRMGEN.CRMIMPLEMENT.R 195.446(a) Were procedures approved, in place, and implemented on or before the regulatory deadline? Sat -- Control Room Operation, Management & Emergency Response (OMER) was developed 1-23-2009. 4. UNIT 32965 (and 1 other assets) CR.CRMGEN 4. CR.CRMGEN.CRMPROCLOCATION.O 195.446(a) Are procedures readily available to controllers in the control room? Sat -- All controllers have access to to the Document Record Management (DRM) system for Control Room Procedures. 5. UNIT 32965 (and 1 other assets) CR.CRMRR 1. CR.CRMRR.RESPONSIBLE.P 195.446(b)(1) Are there clear processes to describe each controller's physical domain of responsibility for pipelines and other facility assets? Sat -- Olympic Pipeline has two controllers and a qualified supervisor. Each controller monitors the 20-inch mainline from Ferndale to Portland, OR. and the second controller monitors the 16-inch mainline from Ferndale to Seattle, WA. 6. UNIT 32965 (and 1 other assets) CR.CRMRR 2. CR.CRMRR.QUALCONTROL.P 195.446(b)(1) Are there provisions in place to assure that only qualified individuals may assume control at any console/desk? Sat -- The two mainline controllers and their supervisor are control room qualified. 7. UNIT 32965 (and 1 other assets) CR.CRMRR 3. CR.CRMRR.DOMAINCHANGE.P 195.446(b)(1) If the physical domain of responsibility periodically changes, has a Sat -- Procedure: FCTRL- OPS-463-004 Sections 8-13; Physical Change Results (IRR) file:///C:/InspectionAssistant/App/chrome/content/0.1/index.html?ff_profi... 1 of 37 5/15/2013 10:07 AM

Upload: phungquynh

Post on 28-Apr-2018

217 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Inspection Results (IRR) · Inspection Results (IRR) UNIT 32965 (126) No. Assets Sub ... (b)(1) Are there clear processes to describe each controller's physical domain of ... Sections

Inspection Results (IRR)

UNIT 32965 (126)

No. AssetsSub

ModuleQst# Question ID References Question Text Result

IssueSummary

InspectionNotes

1. UNIT 32965(and 1otherassets)

CR.CRMGEN 1. CR.CRMGEN.CRMCRITERIA.P 195.446(a) Does the processadequately addresscriteria by whichthe operatordetermines whichof its facilities arecontrol rooms?

Sat -- BP operate threecontrol roomcenters located atRenton, WA;Tulsa, OK; andLong Beach, CA. Each control roomis a stand alonecenter that arenot connected. This inspectionwill apply to theOlympic Pipelinecontrol centerlocated in Renton,WA.

2. UNIT 32965(and 1otherassets)

CR.CRMGEN 2. CR.CRMGEN.CRMMGMT.P 195.446(a) Are CRMproceduresformalized andcontrolled?

Sat -- Annual review isvery October bycontrol centertrainingcoordinator.

3. UNIT 32965(and 1otherassets)

CR.CRMGEN 3. CR.CRMGEN.CRMIMPLEMENT.R 195.446(a) Were proceduresapproved, in place,and implementedon or before theregulatorydeadline?

Sat -- Control RoomOperation,Management &EmergencyResponse (OMER)was developed1-23-2009.

4. UNIT 32965(and 1otherassets)

CR.CRMGEN 4. CR.CRMGEN.CRMPROCLOCATION.O 195.446(a) Are proceduresreadily available tocontrollers in thecontrol room?

Sat -- All controllershave access to tothe DocumentRecordManagement(DRM) system forControl RoomProcedures.

5. UNIT 32965(and 1otherassets)

CR.CRMRR 1. CR.CRMRR.RESPONSIBLE.P 195.446(b)(1) Are there clearprocesses todescribe eachcontroller's physicaldomain ofresponsibility forpipelines and otherfacility assets?

Sat -- Olympic Pipelinehas twocontrollers and aqualifiedsupervisor. Eachcontrollermonitors the20-inch mainlinefrom Ferndale toPortland, OR. andthe secondcontrollermonitors the16-inch mainlinefrom Ferndale toSeattle, WA.

6. UNIT 32965(and 1otherassets)

CR.CRMRR 2. CR.CRMRR.QUALCONTROL.P 195.446(b)(1) Are there provisionsin place to assurethat only qualifiedindividuals mayassume control atany console/desk?

Sat -- The two mainlinecontrollers andtheir supervisorare control roomqualified.

7. UNIT 32965(and 1otherassets)

CR.CRMRR 3. CR.CRMRR.DOMAINCHANGE.P 195.446(b)(1) If the physicaldomain ofresponsibilityperiodicallychanges, has a

Sat -- Procedure:FCTRL-OPS-463-004Sections 8-13;Physical Change

Results (IRR) file:///C:/InspectionAssistant/App/chrome/content/0.1/index.html?ff_profi...

1 of 37 5/15/2013 10:07 AM

Page 2: Inspection Results (IRR) · Inspection Results (IRR) UNIT 32965 (126) No. Assets Sub ... (b)(1) Are there clear processes to describe each controller's physical domain of ... Sections

No. AssetsSub

ModuleQst# Question ID References Question Text Result

IssueSummary

InspectionNotes

clear process beenestablished todescribe theconditions for whensuch a changeoccurs?

to Back-upFacility.

8. UNIT 32965(and 1otherassets)

CR.CRMRR 4. CR.CRMRR.RESPCHANGE.P 195.446(b)(1) Do processesaddress acontroller's roleduring temporaryimpromptu(unplanned)changes incontrollerresponsibilities?

Sat -- Procedure:FCTRL-OPS-463-004Sections 8-12;Shift Turn Overand Hand-OverResponsibilities.

9. UNIT 32965(and 1otherassets)

CR.CRMRR 5. CR.CRMRR.COMMANDVERIFY.P 195.446(b)(1) Do the definedroles andresponsibilitiesrequire controllersto stay at theconsole to verify allSCADA commandsthat have beeninitiated arefulfilled, and thatcommands givenvia verbalcommunicationsare acknowledgedbefore leaving theconsole for anyreason?

Sat -- Shift LeaderResponsibilitiesinclude takingover controllerconsole duringchange overbecause all shiftchanges areverbal commands.

10. UNIT 32965(and 1otherassets)

CR.CRMRR 6. CR.CRMRR.AUTHORITYABNORMAL.P 195.446(b)(2) Have processesbeen established todefine thecontrollers'authority andresponsibilitieswhen an abnormaloperating conditionis detected?

Sat -- Information iscontained inOMER Book #1,page 3 and OMERBook #2,paragraph H forAbnormal Action.

11. UNIT 32965(and 1otherassets)

CR.CRMRR 7. CR.CRMRR.PRESSLIMITS.O 195.446(b)(2) Are controllersaware of thecurrent MOPs of allpipeline segmentsfor which they areresponsible, andhave they beenassigned theresponsibility tomaintain thosepipelines at orbelow the MOP?

Sat -- --

12. UNIT 32965(and 1otherassets)

CR.CRMRR 8. CR.CRMRR.AUTHORITYEMERGENCY.P 195.446(b)(3) Do processesdefine thecontrollers'authority andresponsibility tomake decisions,take actions, andcommunicate withothers upon beingnotified of, or upondetection of, andduring, anemergency or if aleak or rupture is

Sat -- CRM P-195.466(b)(2) & OMERBook 2, paragraphH & I

Results (IRR) file:///C:/InspectionAssistant/App/chrome/content/0.1/index.html?ff_profi...

2 of 37 5/15/2013 10:07 AM

Page 3: Inspection Results (IRR) · Inspection Results (IRR) UNIT 32965 (126) No. Assets Sub ... (b)(1) Are there clear processes to describe each controller's physical domain of ... Sections

No. AssetsSub

ModuleQst# Question ID References Question Text Result

IssueSummary

InspectionNotes

suspected?

13. UNIT 32965(and 1otherassets)

CR.CRMRR 9. CR.CRMRR.EVACUATION.P 195.446(b)(3) Do processesspecifically addressthe controller'sresponsibilities inthe event thecontrol room mustbe evacuated?

Sat -- --

14. UNIT 32965(and 1otherassets)

CR.CRMRR 10. CR.CRMRR.COMMSYSFAIL.P 195.446(b)(3) Do processesspecifically addressthe controller'sresponsibilities inthe event of aSCADA system ordatacommunicationssystem failureimpacting largesections of thecontroller's domainof responsibility?

Sat -- OMER Book 2Section 5.99.1,paragraph G and J

15. UNIT 32965(and 1otherassets)

CR.CRMRR 11. CR.CRMRR.HANDOVER.P 195.446(b)(4)(195.446(c)(5))

Have processesbeen establishedfor the hand-over ofresponsibility thatspecify the type ofinformation to becommunicated tothe oncoming shift?

Sat -- FCTRL-OPS-463-004

16. UNIT 32965(and 1otherassets)

CR.CRMRR 12. CR.CRMRR.HANDOVERDOC.P 195.446(b)(4)(195.446(c)(5))

Do processesrequire that recordsdocument thehand-over ofresponsibility,document the timethe actualhand-over ofresponsibilityoccurs, and the keyinformation andtopics that werecommunicatedduring thehand-over?

Sat -- --

17. UNIT 32965(and 1otherassets)

CR.CRMRR 13. CR.CRMRR.HANDOVERDOC.R 195.446(b)(4)(195.446(c)(5))

Are there recordsthat document thehand-over ofresponsibility,document the timethe actualhand-over ofresponsibilityoccurs, and the keyinformation andtopics that werecommunicatedduring thehand-over?

Sat -- --

18. UNIT 32965(and 1otherassets)

CR.CRMRR 14. CR.CRMRR.HANDOVEROVERLAP.P 195.446(b)(4) Do processesrequire thecontrollers todiscuss recent andimpendingimportant activitiesensuring adequateoverlap?

Sat -- --

Results (IRR) file:///C:/InspectionAssistant/App/chrome/content/0.1/index.html?ff_profi...

3 of 37 5/15/2013 10:07 AM

Page 4: Inspection Results (IRR) · Inspection Results (IRR) UNIT 32965 (126) No. Assets Sub ... (b)(1) Are there clear processes to describe each controller's physical domain of ... Sections

No. AssetsSub

ModuleQst# Question ID References Question Text Result

IssueSummary

InspectionNotes

19. UNIT 32965(and 1otherassets)

CR.CRMRR 15. CR.CRMRR.HANDOVERALTERNATIVE.P 195.446(b)(4) When a controller isunable to continueor assumeresponsibility forany reason, do theshift hand-overprocesses includealternative shifthand-over actionsthat specificallyaddress thissituation?

Sat -- --

20. UNIT 32965(and 1otherassets)

CR.CRMRR 16. CR.CRMRR.UNATTENDCONSOLE.P 195.446(b)(4) Has the operatorestablished anadequate processfor occasions whenthe console is lefttemporarilyunattended for anyreason?

NA -- No such eventoccurred, orcondition existed,in the scope ofinspection review.

21. UNIT 32965(and 1otherassets)

CR.CRMRR 17. CR.CRMRR.CONSOLECOVERAGE.P 195.446(b)(4) Do processesmaintain adequateconsole coverageduring shifthand-over?

Sat -- --

22. UNIT 32965(and 1otherassets)

CR.SCADA 1. CR.SCADA.SYSTEMMOC.P 195.446(c)(1) Do processesclearly define thetypes of changes tothe SCADAsystem(s) thatconstituteadditions,expansions, orreplacements underthe meaning of theCRM rule?

Sat -- --

23. UNIT 32965(and 1otherassets)

CR.SCADA 2. CR.SCADA.DISPLAYCONFIG.P 195.446(c)(1) Are there writtenprocesses toimplement the APIRP 1165 displaystandards to theSCADA systemsthat have beenadded, expanded,or replaced sinceAugust 1, 2012?

Sat -- --

24. UNIT 32965(and 1otherassets)

CR.SCADA 3. CR.SCADA.HUMANFACTORS.R 195.446(c)(1) Has section 4 ofAPI RP 1165regarding humanfactors engineeringbeen implemented?

Sat -- --

25. UNIT 32965(and 1otherassets)

CR.SCADA 4. CR.SCADA.DISPLAYHARDWARE.R 195.446(c)(1) Has section 5 ofAPI RP 1165regarding displayhardware beenimplemented?

Sat -- --

26. UNIT 32965(and 1otherassets)

CR.SCADA 5. CR.SCADA.DISPLAYLAYOUT.R 195.446(c)(1) Has section 6 ofAPI RP 1165regarding displaylayout andorganization beenimplemented?

Sat -- --

27. UNIT 32965(and 1otherassets)

CR.SCADA 6. CR.SCADA.DISPLAYNAVIGATION.R 195.446(c)(1) Has section 7 ofAPI RP 1165regarding displaynavigation beenimplemented?

Sat -- --

Results (IRR) file:///C:/InspectionAssistant/App/chrome/content/0.1/index.html?ff_profi...

4 of 37 5/15/2013 10:07 AM

Page 5: Inspection Results (IRR) · Inspection Results (IRR) UNIT 32965 (126) No. Assets Sub ... (b)(1) Are there clear processes to describe each controller's physical domain of ... Sections

No. AssetsSub

ModuleQst# Question ID References Question Text Result

IssueSummary

InspectionNotes

28. UNIT 32965(and 1otherassets)

CR.SCADA 7. CR.SCADA.DISPLAYOBJECTS.O 195.446(c)(1) Has section 8 ofAPI RP 1165regarding displayobjectcharacteristics beenimplemented?

Sat -- --

29. UNIT 32965(and 1otherassets)

CR.SCADA 8. CR.SCADA.DISPLAYDYNAMICS.R 195.446(c)(1) Has section 9 ofAPI RP 1165regarding displayobject dynamicsbeen implemented?

Sat -- --

30. UNIT 32965(and 1otherassets)

CR.SCADA 9. CR.SCADA.CONTROLSELECTION.R 195.446(c)(1) Has section 10 ofAPI RP 1165 controlselection andtechniques beenimplemented?

Sat -- --

31. UNIT 32965(and 1otherassets)

CR.SCADA 10. CR.SCADA.ADMINISTRATION.R 195.446(c)(1) Has section 11 ofAPI RP 1165administration beenimplemented?

Sat -- --

32. UNIT 32965(and 1otherassets)

CR.SCADA 11. CR.SCADA.1165IMPRACTICAL.R 195.446(c)(1) If any/all applicableparagraph(s) of APIRP 1165 have notbeen implemented,has it beendemonstrated anddocumented thatthe unimplementedprovisions areimpractical for theSCADA systemused?

Sat -- --

33. UNIT 32965(and 1otherassets)

CR.SCADA 12. CR.SCADA.SETPOINT.P 195.446(c)(2)(195.406(b))

Does the processadequately definesafety-relatedpoints?

Sat -- Procedure CTULM-SCD-OPS-460-003

34. UNIT 32965(and 1otherassets)

CR.SCADA 13. CR.SCADA.SETPOINT.R 195.446(c)(2) Do records indicatesafety-relatedpoints have beenadequatelyimplemented?

Sat -- --

35. UNIT 32965(and 1otherassets)

CR.SCADA 14. CR.SCADA.POINTVERIFY.P 195.446(c)(2) Are there adequateprocesses to defineand identify thecircumstanceswhich require apoint-to-pointverification?

Sat -- SOP ProcedureSCADA Pt. to Pt.Testing Section8.0

36. UNIT 32965(and 1otherassets)

CR.SCADA 15. CR.SCADA.POINTVERIFY.R 195.446(c)(2) Have requiredpoint-to-pointverifications beenperformed?

Sat -- --

37. UNIT 32965(and 1otherassets)

CR.SCADA 16. CR.SCADA.POINTVERIFYEXTENT.P 195.446(c)(2) Are there adequateprocesses for thethoroughness of thepoint-to-pointverification?

Sat -- --

38. UNIT 32965(and 1otherassets)

CR.SCADA 17. CR.SCADA.POINTVERIFYEXTENT.R 195.446(c)(2) Do recordsdemonstrateadequatethoroughness of thepoint-to-pointverification?

Sat -- --

39. UNIT 32965(and 1otherassets)

CR.SCADA 18. CR.SCADA.POINTVERFIYINTVL.P 195.446(c)(2) Is there anadequate processfor defining whenthe point-to-point

Sat -- --

Results (IRR) file:///C:/InspectionAssistant/App/chrome/content/0.1/index.html?ff_profi...

5 of 37 5/15/2013 10:07 AM

Page 6: Inspection Results (IRR) · Inspection Results (IRR) UNIT 32965 (126) No. Assets Sub ... (b)(1) Are there clear processes to describe each controller's physical domain of ... Sections

No. AssetsSub

ModuleQst# Question ID References Question Text Result

IssueSummary

InspectionNotes

verification must becompleted?

40. UNIT 32965(and 1otherassets)

CR.SCADA 19. CR.SCADA.POINTVERFIYINTVL.R 195.446(c)(2) Do records indicatethe point-to-pointverification hasbeen completed atthe requiredintervals?

Sat -- --

41. UNIT 32965(and 1otherassets)

CR.SCADA 20. CR.SCADA.COMMPLAN.P 195.446(c)(3) Has an internalcommunicationplan beenestablished andimplemented thatis adequate tomanually operatethe pipeline duringa SCADAfailure/outage?

Sat -- --

42. UNIT 32965(and 1otherassets)

CR.SCADA 21. CR.SCADA.COMMPLAN.R 195.446(c)(3) Has the internalcommunicationplan been testedand verified formanual operationof the pipelinesafely at least onceeach calendar yearbut at intervals notexceeding 15months?

Sat -- --

43. UNIT 32965(and 1otherassets)

CR.SCADA 22. CR.SCADA.BACKUPSCADA.O 195.446(c)(4) Is there a backupSCADA system?

Sat -- --

44. UNIT 32965(and 1otherassets)

CR.SCADA 23. CR.SCADA.BACKUPSCADADEV.P 195.446(c)(4) Has the use of thebackup SCADAsystem fordevelopment workbeen defined?

Sat -- Development hasfull capabilitiesand is not a partof the back-upsystem. Reviewed settingsfor 64 pressureswitches from2012 data.

45. UNIT 32965(and 1otherassets)

CR.SCADA 24. CR.SCADA.BACKUPSCADATEST.R 195.446(c)(4) Is the backupSCADA systemtested at least onceeach calendar yearat intervals not toexceed 15 months?

Sat -- --

46. UNIT 32965(and 1otherassets)

CR.SCADA 25. CR.SCADA.BACKUPSCADAVERIFY.R 195.446(c)(4) Does the testingverify that thereare adequateprocesses in placefor decision-makingand internalcommunications tosuccessfullyimplement atransition fromprimary SCADA tobackup SCADA, andback to primarySCADA?

Sat -- --

47. UNIT 32965(and 1otherassets)

CR.SCADA 26. CR.SCADA.BACKUPSCADAADEQUACY.R 195.446(c)(4) If the back-upSCADA system isnot designed tohandle all thefunctionality of the

Sat -- --

Results (IRR) file:///C:/InspectionAssistant/App/chrome/content/0.1/index.html?ff_profi...

6 of 37 5/15/2013 10:07 AM

Page 7: Inspection Results (IRR) · Inspection Results (IRR) UNIT 32965 (126) No. Assets Sub ... (b)(1) Are there clear processes to describe each controller's physical domain of ... Sections

No. AssetsSub

ModuleQst# Question ID References Question Text Result

IssueSummary

InspectionNotes

main SCADAsystem, does thetesting determinewhether there areadequateprocedures in placeto account fordisplaced and/ordifferent availablefunctions duringback-upoperations?

48. UNIT 32965(and 1otherassets)

CR.SCADA 27. CR.SCADA.BACKUPSCADATRANSFER.P 195.446(c)(4) Do processesadequately addressand test thelogistics oftransferring controlto a backup controlroom?

Sat -- --

49. UNIT 32965(and 1otherassets)

CR.SCADA 28. CR.SCADA.BACKUPSCADARETURN.P 195.446(c)(4) Do proceduresadequately addressand test thelogistics ofreturningoperations back tothe primary controlroom?

Sat -- --

50. UNIT 32965(and 1otherassets)

CR.SCADA 29. CR.SCADA.BACKUPSCADAFUNCTIONS.R 195.446(c)(4) Is a representativesampling of criticalfunctions in theback-up SCADAsystem beingtested to ensureproper operation inthe event thebackup system isneeded?

Sat -- The primarycomputer isrotated betweenRenton andTacoma ControlCenters.

51. UNIT 32965(and 1otherassets)

CR.CRMFM 1. CR.CRMFM.FATIGUEMITIGATION.P 195.446(d) Does the fatiguemitigation processor procedures(plan) identifyoperator-specificfatigue risks?

Sat -- SOP FCTRL-OPS463-009 (Rev7-31-'12)Olympic usesCircadian Study &Recommendationsto define operatorspecific fatiguerisks.

52. UNIT 32965(and 1otherassets)

CR.CRMFM 2. CR.CRMFM.FATIGUERISKS.P 195.446(d) Does the fatiguemitigation planadequately addresshow the programreduces the riskassociated withcontroller fatigue?

Sat -- Olympic uses 14hour limit per dayand maximum 65hours per 7-dayperiod.

53. UNIT 32965(and 1otherassets)

CR.CRMFM 3. CR.CRMFM.FATIGUEQUANTIFY.P 195.446(d) Do processesrequire that thepotentialcontribution ofcontroller fatigue toincidents andaccidents bequantified duringinvestigations?

Sat -- SMRS page 29.

54. UNIT 32965(and 1otherassets)

CR.CRMFM 4. CR.CRMFM.FATIGUEMANAGER.P 195.446(d) Is there adesignated fatiguerisk manager whois responsible andaccountable for

Sat -- --

Results (IRR) file:///C:/InspectionAssistant/App/chrome/content/0.1/index.html?ff_profi...

7 of 37 5/15/2013 10:07 AM

Page 8: Inspection Results (IRR) · Inspection Results (IRR) UNIT 32965 (126) No. Assets Sub ... (b)(1) Are there clear processes to describe each controller's physical domain of ... Sections

No. AssetsSub

ModuleQst# Question ID References Question Text Result

IssueSummary

InspectionNotes

managing fatiguerisk and fatiguecountermeasures,and someone(perhaps the sameperson) that isauthorized toreview and approveHOS emergencydeviations?

55. UNIT 32965(and 1otherassets)

CR.CRMFM 5. CR.CRMFM.SHIFTLENGTH.R 195.446(d)(1) Is the scheduledshift length lessthan or equal to 12hours (not includingshift hand-over) oris there adocumentedtechnical basis toshow that shiftlengths andschedule rotationsare adequate toprovide controllersoff-duty timesufficient to achieve8 hours ofcontinuous sleep?

Sat -- Procedure FCTRL-OPS-463-009. FRMS Document -DuPont Schedule(RP 755)

56. UNIT 32965(and 1otherassets)

CR.CRMFM 6. CR.CRMFM.SHIFTLENGTHTIME.R 195.446(d)(1) Does the operatorfactor in all timethe individual isworking for thecompany whenestablishing shiftlengths andschedule rotationsor is there adocumentedtechnical basis toshow that shiftlengths andschedule rotationsare adequate toprovide controllersoff-duty timesufficient to achieve8 hours ofcontinuous sleep?

Sat -- CircadianEvaluation forScientific Basis forWork Schedules.

57. UNIT 32965(and 1otherassets)

CR.CRMFM 7. CR.CRMFM.SCHEDULEDTIMEOFF.R 195.446(d)(1) Are all scheduledperiods of time offat least one hourlonger than 8 hoursplus commute timeor is there adocumentedtechnical basis toshow that shiftlengths andschedule rotationsare adequate toprovide controllersoff-duty timesufficient to achieve8 hours ofcontinuous sleep?

Sat -- --

58. UNIT 32965(and 1otherassets)

CR.CRMFM 8. CR.CRMFM.ONCALLCONTROLLER.R 195.446(d)(1) For controllers whoare on call, doesthe operatorminimize

Sat -- Two relief personsare available andtheir commutetime is counted

Results (IRR) file:///C:/InspectionAssistant/App/chrome/content/0.1/index.html?ff_profi...

8 of 37 5/15/2013 10:07 AM

Page 9: Inspection Results (IRR) · Inspection Results (IRR) UNIT 32965 (126) No. Assets Sub ... (b)(1) Are there clear processes to describe each controller's physical domain of ... Sections

No. AssetsSub

ModuleQst# Question ID References Question Text Result

IssueSummary

InspectionNotes

interrupting therequired 8 hours ofcontinuous sleep oris there adocumentedtechnical basis toshow that shiftlengths andschedule rotationsare adequate toprovide controllersoff-duty timesufficient to achieve8 hours ofcontinuous sleep?

for the same daythey arerequested towork. Thecommute time isnot counted if thecontroller isscheduled the daybefore their shift.

59. UNIT 32965(and 1otherassets)

CR.CRMFM 9. CR.CRMFM.MAXHOS.P 195.446(d)(4) Do processes limitthe maximum HOSlimit in any sliding7 day period to nomore than 65 hoursor is there adocumentedtechnical basis toshow reduction ofthe risk associatedwith controllerfatigue?

Sat --

60. UNIT 32965(and 1otherassets)

CR.CRMFM 10. CR.CRMFM.MINTIMEOFF.P 195.446(d)(4) After reaching theHOS limit in anysliding 7 dayperiod, is theminimum time offat least 35 hours oris there adocumentedtechnical basis toshow a reduction ofthe risk associatedwith controllerfatigue?

Sat -- FatigueManagement RiskSystem FCTRL-OPS-463-009

61. UNIT 32965(and 1otherassets)

CR.CRMFM 11. CR.CRMFM.DOCSCHEDULE.P 195.446(d)(4) Is there a formalsystem todocument allscheduled andunscheduled HOSworked, includingovertime and timespent performingduties other thancontrol roomduties?

Sat -- --

62. UNIT 32965(and 1otherassets)

CR.CRMFM 12. CR.CRMFM.DAYSOFF.P 195.446(d)(4) For normal businesshour typeoperations (i.e.,five days perweek), are no morethan five daysworked insuccession beforeat least two daysoff?

NA -- No such eventoccurred, orcondition existed,in the scope ofinspection review.

63. UNIT 32965(and 1otherassets)

CR.CRMFM 13. CR.CRMFM.WORKHOURS.R 195.446(d)(4) For normal businesshour typeoperations (i.e.,five days perweek), is the shiftstart time no earlier

NA -- No such eventoccurred, orcondition existed,in the scope ofinspection review.

Results (IRR) file:///C:/InspectionAssistant/App/chrome/content/0.1/index.html?ff_profi...

9 of 37 5/15/2013 10:07 AM

Page 10: Inspection Results (IRR) · Inspection Results (IRR) UNIT 32965 (126) No. Assets Sub ... (b)(1) Are there clear processes to describe each controller's physical domain of ... Sections

No. AssetsSub

ModuleQst# Question ID References Question Text Result

IssueSummary

InspectionNotes

than 6:00 a.m. andthe shift end timeno later than 7:00p.m.?

64. UNIT 32965(and 1otherassets)

CR.CRMFM 14. CR.CRMFM.FATIGUECOUNTERMEASURES.P 195.446(d)(4) For shifts longerthan 8 hours, havespecific fatiguecountermeasuresbeen implementedfor the ninth andbeyond hours?

Sat -- FatigueManagement RiskSystem FCTRL-OPS-463-009

65. UNIT 32965(and 1otherassets)

CR.CRMFM 15. CR.CRMFM.DAILYHOSLIMIT.P 195.446(d)(4) Do processes limitthe daily maximumHOS limit no morethan 14 hours inany sliding 24-hourperiod?

Sat -- Olympic Pipelineuses HOSED(Hours of ServicedEmergencyDocument) Form,referenceAdvisory BulletinADB-05-06, andProcedure463-009 page 18.

66. UNIT 32965(and 1otherassets)

CR.CRMFM 16. CR.CRMFM.CONTROLLERNUMBERS.O 195.446(d)(4) Do operationsinclude a sufficientnumber of qualifiedcontrollers?

Sat -- --

67. UNIT 32965(and 1otherassets)

CR.CRMFM 17. CR.CRMFM.OFFDUTYHOURS.P 195.446(d)(4) Do processesensure thatcontrollers areprovided with atleast thirty-five(35) continuousoff-duty hours whenlimits are reachedfollowing the mostrecent 35-hour(minimum) off-dutyrest period or isthere adocumentedtechnical basis toshow that themaximum limit oncontroller HOS isadequate to reducethe risk associatedwith controllerfatigue?

Sat -- Procedure463-009 page16-19.

68. UNIT 32965(and 1otherassets)

CR.CRMFM 18. CR.CRMFM.SHIFTHOLDOVER.P 195.446(d)(4) Does the shiftholdover processconform to shiftholdover guidelinesor is their adocumentedtechnical basis toshow that themaximum limit oncontroller HOS isadequate to reducethe risk associatedwith controllerfatigue?

Sat -- --

69. UNIT 32965(and 1otherassets)

CR.CRMFM 19. CR.CRMFM.SPECIFICCOUNTERMEASURES.P 195.446(d)(4) Do processesrequire specificfatiguecountermeasuresduring applicabletime periods, or is

Sat -- Fatigue RiskManagementFCTRL-OPS-466-009

Results (IRR) file:///C:/InspectionAssistant/App/chrome/content/0.1/index.html?ff_profi...

10 of 37 5/15/2013 10:07 AM

Page 11: Inspection Results (IRR) · Inspection Results (IRR) UNIT 32965 (126) No. Assets Sub ... (b)(1) Are there clear processes to describe each controller's physical domain of ... Sections

No. AssetsSub

ModuleQst# Question ID References Question Text Result

IssueSummary

InspectionNotes

there adocumentedtechnical basis toshow that themaximum limit oncontroller HOS isadequate to reducethe risk associatedwith controllerfatigue?

70. UNIT 32965(and 1otherassets)

CR.CRMFM 20. CR.CRMFM.HOSDEVIATIONS.P 195.446(d)(4) Is there a formalprocess forapprovingdeviations from themaximum HOSlimits?

Sat -- --

71. UNIT 32965(and 1otherassets)

CR.CRMFM 21. CR.CRMFM.FATIGUEEDUCATE.P 195.446(d)(2)(195.446(d)(3))

Does the programrequire that fatigueeducation/trainingis required for allcontrollers andcontrol roomsupervisors?

Sat -- --

72. UNIT 32965(and 1otherassets)

CR.CRMFM 22. CR.CRMFM.FATIGUEREFRESHER.R 195.446(d)(2)(195.446(d)(3))

Is refresher fatigueeducation providedat regular intervals?

Sat -- --

73. UNIT 32965(and 1otherassets)

CR.CRMFM 23. CR.CRMFM.FATIGUEREVIEW.P 195.446(d)(2)(195.446(d)(3))

Do processesrequire that theeffectiveness of thefatigueeducation/trainingprogram bereviewed at leastonce each calendaryear, not to exceed15 months?

Sat -- --

74. UNIT 32965(and 1otherassets)

CR.CRMFM 24. CR.CRMFM.FATIGUESTRATEGY.P 195.446(d)(2) Does fatigueeducation addressfatigue mitigationstrategies(countermeasures)?

Sat -- --

75. UNIT 32965(and 1otherassets)

CR.CRMFM 25. CR.CRMFM.OFFDUTY.P 195.446(d)(2) Does fatigueeducation addresshow off-dutyactivities contributeto fatigue?

Sat -- --

76. UNIT 32965(and 1otherassets)

CR.CRMFM 26. CR.CRMFM.FATIGUECONTENT.P 195.446(d)(3) Is the content offatigue trainingadequate fortraining controllersand supervisors torecognize theeffects of fatigue?

Sat -- --

77. UNIT 32965(and 1otherassets)

CR.CRMAM 1. CR.CRMAM.ALARM.P 195.446(e) Is the alarmmanagement plana formal processthat specificallyidentifies criticaltopical areasincluded in theprogram?

Sat -- Procedure FCTRL-OPS-463-007. The InternationalSociety of SCADA(ISA) isreferenced forManagement ofAlarm Systems forthe ProcessIndustries.

78. UNIT 32965(and 1other

CR.CRMAM 2. CR.CRMAM.ALARMMALFUNCTION.P 195.446(e)(1) Is there a processto identify andcorrect inaccurate

Sat -- --

Results (IRR) file:///C:/InspectionAssistant/App/chrome/content/0.1/index.html?ff_profi...

11 of 37 5/15/2013 10:07 AM

Page 12: Inspection Results (IRR) · Inspection Results (IRR) UNIT 32965 (126) No. Assets Sub ... (b)(1) Are there clear processes to describe each controller's physical domain of ... Sections

No. AssetsSub

ModuleQst# Question ID References Question Text Result

IssueSummary

InspectionNotes

assets) or malfunctioningalarms?

79. UNIT 32965(and 1otherassets)

CR.CRMAM 3. CR.CRMAM.ALARMREVIEW.P 195.446(e)(1) Does the review ofsafety-relatedalarms account fordifferent alarmdesigns and allalarmtypes/priorities?

Sat -- --

80. UNIT 32965(and 1otherassets)

CR.CRMAM 4. CR.CRMAM.CONTROLLERPERFORMANCE.P 195.446(e)(1) Does the review ofsafety-relatedalarms account forindividual-specificcontrollerqualification andperformance?

Sat -- --

81. UNIT 32965(and 1otherassets)

CR.CRMAM 5. CR.CRMAM.STALEDATA.P 195.446(e)(1) Does the review ofsafety-relatedalarms includespecific proceduresand practices formanaging stale orunreliable data?

Sat -- --

82. UNIT 32965(and 1otherassets)

CR.CRMAM 6. CR.CRMAM.MONTHLYANALYSIS.P 195.446(e)(2) Do processesrequire the monthlyidentification,recording, review,and analysis ofpoints that havebeen taken offscan, have hadalarms inhibited,generated falsealarms, or thathave had forced ormanual values forperiods of timeexceeding thatrequired forassociatedmaintenance oroperatingactivities?

Sat -- Procedure - OPS -460-012

83. UNIT 32965(and 1otherassets)

CR.CRMAM 7. CR.CRMAM.PROBLEMCORRECTION.P 195.446(e)(2) Does the alarmmanagement planinclude a processfor promptlycorrecting identifiedproblems and forreturning thesepoints to service?

Sat -- --

84. UNIT 32965(and 1otherassets)

CR.CRMAM 8. CR.CRMAM.ALARMSETPOINTS.P 195.446(e)(3) Is there a formalprocess todetermine thecorrect alarmsetpoint values andalarm descriptions?

Sat -- --

85. UNIT 32965(and 1otherassets)

CR.CRMAM 9. CR.CRMAM.SETTINGCONTROL.P 195.446(e)(3) Have proceduresbeen established toclearly address howand to what degreecontrollers canchange alarm limitsor setpoints, orinhibit alarms, ortake pointsoff-scan?

Sat -- --

Results (IRR) file:///C:/InspectionAssistant/App/chrome/content/0.1/index.html?ff_profi...

12 of 37 5/15/2013 10:07 AM

Page 13: Inspection Results (IRR) · Inspection Results (IRR) UNIT 32965 (126) No. Assets Sub ... (b)(1) Are there clear processes to describe each controller's physical domain of ... Sections

No. AssetsSub

ModuleQst# Question ID References Question Text Result

IssueSummary

InspectionNotes

86. UNIT 32965(and 1otherassets)

CR.CRMAM 10. CR.CRMAM.VERIFICATION.P 195.446(e)(3) Do processesrequire that anycalibration orchange to fieldinstruments requireverification of alarmsetpoints and alarmdescriptions?

Sat -- --

87. UNIT 32965(and 1otherassets)

CR.CRMAM 11. CR.CRMAM.PLANREVIEW.P 195.446(e)(4) Are there processesto review the alarmmanagement planat least once eachcalendar year, butat intervals notexceeding 15months, in order todetermine theeffectiveness of theplan?

Sat -- --

88. UNIT 32965(and 1otherassets)

CR.CRMAM 12. CR.CRMAM.PLANREVIEW.R 195.446(e)(4) Do records indicatereview of the alarmmanagement planat least once eachcalendar year, butat intervals notexceeding 15months, in order todetermine theeffectiveness of theplan?

Sat -- --

89. UNIT 32965(and 1otherassets)

CR.CRMAM 13. CR.CRMAM.WORKLOAD.P 195.446(e)(5) Does the CRMprogram have ameans ofidentifying andmeasuring the workload (content andvolume of generalactivity) beingdirected to anindividualcontroller?

Sat -- --

90. UNIT 32965(and 1otherassets)

CR.CRMAM 14. CR.CRMAM.WORKLOADMONITORING.P 195.446(e)(5) Is the process ofmonitoring andanalyzing generalactivitycomprehensive?

Sat -- --

91. UNIT 32965(and 1otherassets)

CR.CRMAM 15. CR.CRMAM.CONTROLLERREACTION.P 195.446(e)(5) Does the processhave a means ofdetermining thatthe controller hassufficient time toanalyze and reactto incomingalarms?

Sat -- --

92. UNIT 32965(and 1otherassets)

CR.CRMAM 16. CR.CRMAM.PERFORMANCEANALYSIS.R 195.446(e)(5) Has an analysisbeen performed todetermine ifcontroller(s)performance iscurrently adequate?

Sat -- Procedure-ADM-061-001

93. UNIT 32965(and 1otherassets)

CR.CRMAM 17. CR.CRMAM.DEFICIENCIES.P 195.446(e)(6) Is there a processto address howdeficiencies foundin implementing195.446(e)(1)through195.446(e)(5) will

Sat -- --

Results (IRR) file:///C:/InspectionAssistant/App/chrome/content/0.1/index.html?ff_profi...

13 of 37 5/15/2013 10:07 AM

Page 14: Inspection Results (IRR) · Inspection Results (IRR) UNIT 32965 (126) No. Assets Sub ... (b)(1) Are there clear processes to describe each controller's physical domain of ... Sections

No. AssetsSub

ModuleQst# Question ID References Question Text Result

IssueSummary

InspectionNotes

be resolved?

94. UNIT 32965(and 1otherassets)

CR.CRMAM 18. CR.CRMAM.DEFICIENCIES.R 195.446(e)(6) Do records indicatedeficiencies foundin implementing195.446(e)(1)through195.446(e)(5) havebeen resolved?

Sat -- --

95. UNIT 32965(and 1otherassets)

CR.CRMCMGT 1. CR.CRMCMGT.CHANGECOORDINATION.P 195.446(f)(1) Does the processassure changes infield equipment (forexample, moving avalve) that couldaffect control roomoperations arecoordinated withcontrol roompersonnel?

Sat -- ProcedureUSPL-MOO-001-001

96. UNIT 32965(and 1otherassets)

CR.CRMCMGT 2. CR.CRMCMGT.CHANGECOORDINATION.R 195.446(f)(1) Do records indicatethat changes infield equipment (forexample, moving avalve) that couldaffect control roomoperations werecoordinated withcontrol roompersonnel?

Sat -- --

97. UNIT 32965(and 1otherassets)

CR.CRMCMGT 3. CR.CRMCMGT.CHANGEMEETINGS.P 195.446(f)(1) Is there a processto mandate acontrol roomrepresentative willparticipate inmeetings wherechanges that coulddirectly or indirectlyaffect control roomoperations(including routinemaintenance andrepairs) are beingconsidered,designed andimplemented?

Sat -- --

98. UNIT 32965(and 1otherassets)

CR.CRMCMGT 4. CR.CRMCMGT.CHANGETRAINING.R 195.446(f)(1) Beforeimplementingchanges, do recordsindicate controllerswere provided withnotification andtraining to assuretheir ability tosafely incorporatethe proposedchange intooperations?

Sat -- --

99. UNIT 32965(and 1otherassets)

CR.CRMCMGT 5. CR.CRMCMGT.EMERGENCYCONTACT.P 195.446(f)(2) Is there a processrequiring fieldpersonnel andSCADA supportpersonnel tocontact the controlroom whenemergencyconditions exist?

Sat -- --

100. UNIT 32965(and 1

CR.CRMCMGT 6. CR.CRMCMGT.FIELDCONTACT.P 195.446(f)(2) Does the processrequire field

Sat -- --

Results (IRR) file:///C:/InspectionAssistant/App/chrome/content/0.1/index.html?ff_profi...

14 of 37 5/15/2013 10:07 AM

Page 15: Inspection Results (IRR) · Inspection Results (IRR) UNIT 32965 (126) No. Assets Sub ... (b)(1) Are there clear processes to describe each controller's physical domain of ... Sections

No. AssetsSub

ModuleQst# Question ID References Question Text Result

IssueSummary

InspectionNotes

otherassets)

personnel andSCADA supportpersonnel tocontact the controlroom when makingfield changes (forexample, moving avalve) that affectcontrol roomoperations?

101. UNIT 32965(and 1otherassets)

CR.CRMCMGT 7. CR.CRMCMGT.FIELDCHANGES.R 195.446(f)(2) Do records indicatefield personnel andSCADA supportpersonnelcontacted thecontrol room whenmaking fieldchanges (forexample, moving avalve) that affectcontrol roomoperations?

Sat -- --

102. UNIT 32965(and 1otherassets)

CR.CRMEXP 1. CR.CRMEXP.ABNORMALREVIEW.P 195.446(g)(1) Is there a formal,structured approachfor reviewing andcritiquingreportable eventsto identify lessonslearned?

Sat -- --

103. UNIT 32965(and 1otherassets)

CR.CRMEXP 2. CR.CRMEXP.ABNORMALREVIEW.R 195.446(g)(1) Do records indicatereviews ofreportable eventsspecificallyanalyzed allcontributing factorsto determine ifcontrol roomactions contributedto the event, andcorrected anydeficiencies?

Sat -- --

104. UNIT 32965(and 1otherassets)

CR.CRMEXP 3. CR.CRMEXP.LESSONSLEARNED.P 195.446(g)(2) Does the programrequire training onlessons learnedfrom a broad rangeof events(reportableincidents/accidents,near misses, leaks,operational andmaintenanceerrors, etc.), eventhough the controlroom may not havebeen at fault?

Sat -- --

105. UNIT 32965(and 1otherassets)

CR.CRMEXP 4. CR.CRMEXP.LESSONSLEARNED.R 195.446(g)(2) Has operatingexperience reviewtraining beenconducted onlessons learnedfrom a broad rangeof events(reportableincidents/accidents,near misses, leaks,operational andmaintenance

Sat -- --

Results (IRR) file:///C:/InspectionAssistant/App/chrome/content/0.1/index.html?ff_profi...

15 of 37 5/15/2013 10:07 AM

Page 16: Inspection Results (IRR) · Inspection Results (IRR) UNIT 32965 (126) No. Assets Sub ... (b)(1) Are there clear processes to describe each controller's physical domain of ... Sections

No. AssetsSub

ModuleQst# Question ID References Question Text Result

IssueSummary

InspectionNotes

errors, etc.)?

106. UNIT 32965(and 1otherassets)

CR.CRMTRAIN 1. CR.CRMTRAIN.CONTROLLERTRAIN.P 195.446(h) Has a controllertraining programbeen established toprovide training foreach controller tocarry out their rolesandresponsibilities?

Sat -- --

107. UNIT 32965(and 1otherassets)

CR.CRMTRAIN 2. CR.CRMTRAIN.CONTROLLERTRAIN.R 195.446(h) Has a controllertraining programbeen implementedto provide trainingfor each controllerto carry out theirroles andresponsibilities?

Sat -- --

108. UNIT 32965(and 1otherassets)

CR.CRMTRAIN 3. CR.CRMTRAIN.TRAININGREVIEW.P 195.446(h) Have processesbeen established toreview thecontroller trainingprogram content toidentify potentialimprovements atleast once eachcalendar year, butat intervals not toexceed 15 months?

Sat -- --

109. UNIT 32965(and 1otherassets)

CR.CRMTRAIN 4. CR.CRMTRAIN.TRAININGREVIEW.R 195.446(h) Have processesbeen implementedto review thecontroller trainingprogram content toidentify potentialimprovements atleast once eachcalendar year, butat intervals not toexceed 15 months?

Sat -- --

110. UNIT 32965(and 1otherassets)

CR.CRMTRAIN 5. CR.CRMTRAIN.TRAININGCONTENT.R 195.446(h) Does trainingcontent address allrequired material,including trainingeach controller tocarry out the rolesand responsibilitiesthat were definedby the operator?

Sat -- --

111. UNIT 32965(and 1otherassets)

CR.CRMTRAIN 6. CR.CRMTRAIN.AOCLIST.R 195.446(h)(1) Has a list of theabnormal operatingconditions that arelikely to occursimultaneously orin sequence beenestablished?

Sat -- Simultaneous orsequence AOC'shave beenincluded intraining forcontroller to takeaction to keeppeople safe firstand propertysecond.

112. UNIT 32965(and 1otherassets)

CR.CRMTRAIN 7. CR.CRMTRAIN.TRAININGABNORMAL.P 195.446(h)(1) Does the trainingprogram providecontroller trainingon recognizing andresponding toabnormal operatingconditions that arelikely to occursimultaneously or

Sat -- --

Results (IRR) file:///C:/InspectionAssistant/App/chrome/content/0.1/index.html?ff_profi...

16 of 37 5/15/2013 10:07 AM

Page 17: Inspection Results (IRR) · Inspection Results (IRR) UNIT 32965 (126) No. Assets Sub ... (b)(1) Are there clear processes to describe each controller's physical domain of ... Sections

No. AssetsSub

ModuleQst# Question ID References Question Text Result

IssueSummary

InspectionNotes

in sequence?

113. UNIT 32965(and 1otherassets)

CR.CRMTRAIN 8. CR.CRMTRAIN.TRAINING.O 195.446(h)(2) Does the trainingprogram use asimulator ortabletop exercisesto train controllershow to recognizeand respond toabnormal operatingconditions?

Sat -- --

114. UNIT 32965(and 1otherassets)

CR.CRMTRAIN 9. CR.CRMTRAIN.TRAINING.R 195.446(h)(2) Does the trainingprogram use asimulator ortabletop exercisesto train controllershow to recognizeand respond toabnormal operatingconditions?

Sat -- --

115. UNIT 32965(and 1otherassets)

CR.CRMTRAIN 10. CR.CRMTRAIN.COMMUNICATIONTRAINING.P 195.446(h)(3) Does the CRMprogram traincontrollers on theirresponsibilities forcommunicationunder theoperator'semergencyresponseprocedures?

Sat -- --

116. UNIT 32965(and 1otherassets)

CR.CRMTRAIN 11. CR.CRMTRAIN.SYSKNOWLEDGE.P 195.446(h)(4) Does the trainingprogram providecontrollers aworking knowledgeof the pipelinesystem, especiallyduring thedevelopment ofabnormal operatingconditions?

Sat -- --

117. UNIT 32965(and 1otherassets)

CR.CRMTRAIN 12. CR.CRMTRAIN.INFREQOPSLIST.R 195.446(h)(5) Has a list ofpipeline operatingsetups that areperiodically (butinfrequently) usedbeen established?

NA -- No such eventoccurred, orcondition existed,in the scope ofinspection review.

118. UNIT 32965(and 1otherassets)

CR.CRMTRAIN 13. CR.CRMTRAIN.INFREQOPSREVIEW.P 195.446(h)(5) Do processesspecify that, forpipeline operatingset-ups that areperiodically (butinfrequently) used,the controllers mustbe provided anopportunity toreview relevantprocedures inadvance of theiruse?

NA -- No such eventoccurred, orcondition existed,in the scope ofinspection review.

119. UNIT 32965(and 1otherassets)

CR.CRMCOMP 1. CR.CRMCOMP.SUBMITPROCEDURES.P 195.446(i) Are there adequateprocesses to assurethat the operator isresponsive torequests fromapplicable agenciesto submit their CRMprocedures?

Sat -- --

Results (IRR) file:///C:/InspectionAssistant/App/chrome/content/0.1/index.html?ff_profi...

17 of 37 5/15/2013 10:07 AM

Page 18: Inspection Results (IRR) · Inspection Results (IRR) UNIT 32965 (126) No. Assets Sub ... (b)(1) Are there clear processes to describe each controller's physical domain of ... Sections

No. AssetsSub

ModuleQst# Question ID References Question Text Result

IssueSummary

InspectionNotes

120. UNIT 32965(and 1otherassets)

CR.CRMCOMP 2. CR.CRMCOMP.SUBMITPROCEDURES.R 195.446(i) Has the operatorbeen responsive torequests fromapplicable agenciesto submit their CRMprocedures?

Sat -- A copy of BP'sCRM procedureswere requestedon February 27,2013 that was 61days before thescheduledinspection on April29, 2013. BPconsiders theirprocedures as aproprietarydocument and notmake theirprocedureavailable atanytime beforethe inspection. CFR 195.446Control RoomManagement (i)ComplianceValidation states: Upon request,operators mustsubmit theirprocedures toPHMSA (or theState Agency). BP needs to beforthright inexpressing theirintention andmake proceduresaccess by anagreement ratherthan stalling andevadingquestions. It'snot in the interestof PHMSA (or theState Agency) tosell or publish anoperator'sprocedure.

121. UNIT 32965(and 1otherassets)

CR.CRMCOMP 3. CR.CRMCOMP.CRMCOORDINATOR.R 195.446(i) Is there anindividual that isresponsible andaccountable forcompliance withrequests fromPHMSA or otherapplicableagencies?

Sat -- --

122. UNIT 32965(and 1otherassets)

CR.CRMCOMP 4. CR.CRMCOMP.RECORDS.P 195.446(j)(1) Recordsmanagementprocesses adequateto assure recordsare sufficient todemonstratecompliance withthe CRM rule?

Sat -- --

123. UNIT 32965(and 1otherassets)

CR.CRMCOMP 5. CR.CRMCOMP.RECORDS.R 195.446(j)(1) Are recordssufficient todemonstratecompliance withthe CRM rule?

Sat -- --

Results (IRR) file:///C:/InspectionAssistant/App/chrome/content/0.1/index.html?ff_profi...

18 of 37 5/15/2013 10:07 AM

Page 19: Inspection Results (IRR) · Inspection Results (IRR) UNIT 32965 (126) No. Assets Sub ... (b)(1) Are there clear processes to describe each controller's physical domain of ... Sections

No. AssetsSub

ModuleQst# Question ID References Question Text Result

IssueSummary

InspectionNotes

124. UNIT 32965(and 1otherassets)

CR.CRMCOMP 6. CR.CRMCOMP.ELECTRONICRECORDS.R 195.446(j)(1) Are electronicrecords properlystored,safeguarded, andreadily retrievable?

Sat -- --

125. UNIT 32965(and 1otherassets)

CR.CRMCOMP 7. CR.CRMCOMP.DEVIATIONS.P 195.446(j)(2) Are there processesto demonstrate andprovide adocumented recordthat everydeviation from anyCRM rulerequirement wasnecessary for safeoperation?

NA -- No such eventoccurred, orcondition existed,in the scope ofinspection review.

126. UNIT 32965(and 1otherassets)

CR.CRMCOMP 8. CR.CRMCOMP.DEVIATIONS.R 195.446(j)(2) Were all deviationsdocumented in away thatdemonstrates theywere necessary forsafe operation?

NA -- No such eventoccurred, orcondition existed,in the scope ofinspection review.

UNIT 925 (126)

No. AssetsSub

ModuleQst# Question ID References Question Text Result

IssueSummary

InspectionNotes

1. UNIT 925(and 1otherassets)

CR.CRMGEN 1. CR.CRMGEN.CRMCRITERIA.P 195.446(a) Does the processadequately addresscriteria by which theoperatordetermines which ofits facilities arecontrol rooms?

Sat -- BP operate threecontrol roomcenters located atRenton, WA;Tulsa, OK; andLong Beach, CA. Each control roomis a stand alonecenter that are notconnected. Thisinspection willapply to theOlympic Pipelinecontrol centerlocated in Renton,WA.

2. UNIT 925(and 1otherassets)

CR.CRMGEN 2. CR.CRMGEN.CRMMGMT.P 195.446(a) Are CRM proceduresformalized andcontrolled?

Sat -- Annual review isvery October bycontrol centertrainingcoordinator.

3. UNIT 925(and 1otherassets)

CR.CRMGEN 3. CR.CRMGEN.CRMIMPLEMENT.R 195.446(a) Were proceduresapproved, in place,and implementedon or before theregulatorydeadline?

Sat -- Control RoomOperation,Management &EmergencyResponse (OMER)was developed1-23-2009.

4. UNIT 925(and 1otherassets)

CR.CRMGEN 4. CR.CRMGEN.CRMPROCLOCATION.O 195.446(a) Are proceduresreadily available tocontrollers in thecontrol room?

Sat -- All controllers haveaccess to to theDocument RecordManagement(DRM) system forControl RoomProcedures.

5. UNIT 925(and 1otherassets)

CR.CRMRR 1. CR.CRMRR.RESPONSIBLE.P 195.446(b)(1) Are there clearprocesses todescribe eachcontroller's physicaldomain ofresponsibility forpipelines and other

Sat -- Olympic Pipelinehas two controllersand a qualifiedsupervisor. Eachcontroller monitorsthe 20-inchmainline from

Results (IRR) file:///C:/InspectionAssistant/App/chrome/content/0.1/index.html?ff_profi...

19 of 37 5/15/2013 10:07 AM

Page 20: Inspection Results (IRR) · Inspection Results (IRR) UNIT 32965 (126) No. Assets Sub ... (b)(1) Are there clear processes to describe each controller's physical domain of ... Sections

No. AssetsSub

ModuleQst# Question ID References Question Text Result

IssueSummary

InspectionNotes

facility assets? Ferndale toPortland, OR. andthe secondcontroller monitorsthe 16-inchmainline fromFerndale toSeattle, WA.

6. UNIT 925(and 1otherassets)

CR.CRMRR 2. CR.CRMRR.QUALCONTROL.P 195.446(b)(1) Are there provisionsin place to assurethat only qualifiedindividuals mayassume control atany console/desk?

Sat -- The two mainlinecontrollers andtheir supervisorare control roomqualified.

7. UNIT 925(and 1otherassets)

CR.CRMRR 3. CR.CRMRR.DOMAINCHANGE.P 195.446(b)(1) If the physicaldomain ofresponsibilityperiodicallychanges, has aclear process beenestablished todescribe theconditions for whensuch a changeoccurs?

Sat -- Procedure: FCTRL-OPS-463-004Sections 8-13;Physical Change toBack-up Facility.

8. UNIT 925(and 1otherassets)

CR.CRMRR 4. CR.CRMRR.RESPCHANGE.P 195.446(b)(1) Do processesaddress acontroller's roleduring temporaryimpromptu(unplanned)changes incontrollerresponsibilities?

Sat -- Procedure: FCTRL-OPS-463-004Sections 8-12;Shift Turn Overand Hand-OverResponsibilities.

9. UNIT 925(and 1otherassets)

CR.CRMRR 5. CR.CRMRR.COMMANDVERIFY.P 195.446(b)(1) Do the defined rolesand responsibilitiesrequire controllersto stay at theconsole to verify allSCADA commandsthat have beeninitiated arefulfilled, and thatcommands givenvia verbalcommunications areacknowledgedbefore leaving theconsole for anyreason?

Sat -- Shift LeaderResponsibilitiesinclude taking overcontroller consoleduring change overbecause all shiftchanges are verbalcommands.

10. UNIT 925(and 1otherassets)

CR.CRMRR 6. CR.CRMRR.AUTHORITYABNORMAL.P 195.446(b)(2) Have processesbeen established todefine thecontrollers'authority andresponsibilitieswhen an abnormaloperating conditionis detected?

Sat -- Information iscontained in OMERBook #1, page 3and OMER Book#2, paragraph Hfor AbnormalAction.

11. UNIT 925(and 1otherassets)

CR.CRMRR 7. CR.CRMRR.PRESSLIMITS.O 195.446(b)(2) Are controllersaware of thecurrent MOPs of allpipeline segmentsfor which they areresponsible, andhave they beenassigned the

Sat -- --

Results (IRR) file:///C:/InspectionAssistant/App/chrome/content/0.1/index.html?ff_profi...

20 of 37 5/15/2013 10:07 AM

Page 21: Inspection Results (IRR) · Inspection Results (IRR) UNIT 32965 (126) No. Assets Sub ... (b)(1) Are there clear processes to describe each controller's physical domain of ... Sections

No. AssetsSub

ModuleQst# Question ID References Question Text Result

IssueSummary

InspectionNotes

responsibility tomaintain thosepipelines at orbelow the MOP?

12. UNIT 925(and 1otherassets)

CR.CRMRR 8. CR.CRMRR.AUTHORITYEMERGENCY.P 195.446(b)(3) Do processes definethe controllers'authority andresponsibility tomake decisions,take actions, andcommunicate withothers upon beingnotified of, or upondetection of, andduring, anemergency or if aleak or rupture issuspected?

Sat -- CRM P-195.466(b)(2) & OMERBook 2, paragraphH & I

13. UNIT 925(and 1otherassets)

CR.CRMRR 9. CR.CRMRR.EVACUATION.P 195.446(b)(3) Do processesspecifically addressthe controller'sresponsibilities inthe event thecontrol room mustbe evacuated?

Sat -- --

14. UNIT 925(and 1otherassets)

CR.CRMRR 10. CR.CRMRR.COMMSYSFAIL.P 195.446(b)(3) Do processesspecifically addressthe controller'sresponsibilities inthe event of aSCADA system ordatacommunicationssystem failureimpacting largesections of thecontroller's domainof responsibility?

Sat -- OMER Book 2Section 5.99.1,paragraph G and J

15. UNIT 925(and 1otherassets)

CR.CRMRR 11. CR.CRMRR.HANDOVER.P 195.446(b)(4)(195.446(c)(5))

Have processesbeen established forthe hand-over ofresponsibility thatspecify the type ofinformation to becommunicated tothe oncoming shift?

Sat -- FCTRL-OPS-463-004

16. UNIT 925(and 1otherassets)

CR.CRMRR 12. CR.CRMRR.HANDOVERDOC.P 195.446(b)(4)(195.446(c)(5))

Do processesrequire that recordsdocument thehand-over ofresponsibility,document the timethe actualhand-over ofresponsibilityoccurs, and the keyinformation andtopics that werecommunicatedduring thehand-over?

Sat -- --

17. UNIT 925(and 1otherassets)

CR.CRMRR 13. CR.CRMRR.HANDOVERDOC.R 195.446(b)(4)(195.446(c)(5))

Are there recordsthat document thehand-over ofresponsibility,document the timethe actual

Sat -- --

Results (IRR) file:///C:/InspectionAssistant/App/chrome/content/0.1/index.html?ff_profi...

21 of 37 5/15/2013 10:07 AM

Page 22: Inspection Results (IRR) · Inspection Results (IRR) UNIT 32965 (126) No. Assets Sub ... (b)(1) Are there clear processes to describe each controller's physical domain of ... Sections

No. AssetsSub

ModuleQst# Question ID References Question Text Result

IssueSummary

InspectionNotes

hand-over ofresponsibilityoccurs, and the keyinformation andtopics that werecommunicatedduring thehand-over?

18. UNIT 925(and 1otherassets)

CR.CRMRR 14. CR.CRMRR.HANDOVEROVERLAP.P 195.446(b)(4) Do processesrequire thecontrollers todiscuss recent andimpendingimportant activitiesensuring adequateoverlap?

Sat -- --

19. UNIT 925(and 1otherassets)

CR.CRMRR 15. CR.CRMRR.HANDOVERALTERNATIVE.P 195.446(b)(4) When a controller isunable to continueor assumeresponsibility forany reason, do theshift hand-overprocesses includealternative shifthand-over actionsthat specificallyaddress thissituation?

Sat -- --

20. UNIT 925(and 1otherassets)

CR.CRMRR 16. CR.CRMRR.UNATTENDCONSOLE.P 195.446(b)(4) Has the operatorestablished anadequate processfor occasions whenthe console is lefttemporarilyunattended for anyreason?

NA -- No such eventoccurred, orcondition existed,in the scope ofinspection review.

21. UNIT 925(and 1otherassets)

CR.CRMRR 17. CR.CRMRR.CONSOLECOVERAGE.P 195.446(b)(4) Do processesmaintain adequateconsole coverageduring shifthand-over?

Sat -- --

22. UNIT 925(and 1otherassets)

CR.SCADA 1. CR.SCADA.SYSTEMMOC.P 195.446(c)(1) Do processesclearly define thetypes of changes tothe SCADAsystem(s) thatconstitute additions,expansions, orreplacements underthe meaning of theCRM rule?

Sat -- --

23. UNIT 925(and 1otherassets)

CR.SCADA 2. CR.SCADA.DISPLAYCONFIG.P 195.446(c)(1) Are there writtenprocesses toimplement the APIRP 1165 displaystandards to theSCADA systems thathave been added,expanded, orreplaced sinceAugust 1, 2012?

Sat -- --

24. UNIT 925(and 1otherassets)

CR.SCADA 3. CR.SCADA.HUMANFACTORS.R 195.446(c)(1) Has section 4 of APIRP 1165 regardinghuman factorsengineering beenimplemented?

Sat -- --

Results (IRR) file:///C:/InspectionAssistant/App/chrome/content/0.1/index.html?ff_profi...

22 of 37 5/15/2013 10:07 AM

Page 23: Inspection Results (IRR) · Inspection Results (IRR) UNIT 32965 (126) No. Assets Sub ... (b)(1) Are there clear processes to describe each controller's physical domain of ... Sections

No. AssetsSub

ModuleQst# Question ID References Question Text Result

IssueSummary

InspectionNotes

25. UNIT 925(and 1otherassets)

CR.SCADA 4. CR.SCADA.DISPLAYHARDWARE.R 195.446(c)(1) Has section 5 of APIRP 1165 regardingdisplay hardwarebeen implemented?

Sat -- --

26. UNIT 925(and 1otherassets)

CR.SCADA 5. CR.SCADA.DISPLAYLAYOUT.R 195.446(c)(1) Has section 6 of APIRP 1165 regardingdisplay layout andorganization beenimplemented?

Sat -- --

27. UNIT 925(and 1otherassets)

CR.SCADA 6. CR.SCADA.DISPLAYNAVIGATION.R 195.446(c)(1) Has section 7 of APIRP 1165 regardingdisplay navigationbeen implemented?

Sat -- --

28. UNIT 925(and 1otherassets)

CR.SCADA 7. CR.SCADA.DISPLAYOBJECTS.O 195.446(c)(1) Has section 8 of APIRP 1165 regardingdisplay objectcharacteristics beenimplemented?

Sat -- --

29. UNIT 925(and 1otherassets)

CR.SCADA 8. CR.SCADA.DISPLAYDYNAMICS.R 195.446(c)(1) Has section 9 of APIRP 1165 regardingdisplay objectdynamics beenimplemented?

Sat -- --

30. UNIT 925(and 1otherassets)

CR.SCADA 9. CR.SCADA.CONTROLSELECTION.R 195.446(c)(1) Has section 10 ofAPI RP 1165 controlselection andtechniques beenimplemented?

Sat -- --

31. UNIT 925(and 1otherassets)

CR.SCADA 10. CR.SCADA.ADMINISTRATION.R 195.446(c)(1) Has section 11 ofAPI RP 1165administration beenimplemented?

Sat -- --

32. UNIT 925(and 1otherassets)

CR.SCADA 11. CR.SCADA.1165IMPRACTICAL.R 195.446(c)(1) If any/all applicableparagraph(s) of APIRP 1165 have notbeen implemented,has it beendemonstrated anddocumented thatthe unimplementedprovisions areimpractical for theSCADA systemused?

Sat -- --

33. UNIT 925(and 1otherassets)

CR.SCADA 12. CR.SCADA.SETPOINT.P 195.446(c)(2)(195.406(b))

Does the processadequately definesafety-relatedpoints?

Sat -- Procedure CTULM-SCD-OPS-460-003

34. UNIT 925(and 1otherassets)

CR.SCADA 13. CR.SCADA.SETPOINT.R 195.446(c)(2) Do records indicatesafety-relatedpoints have beenadequatelyimplemented?

Sat -- --

35. UNIT 925(and 1otherassets)

CR.SCADA 14. CR.SCADA.POINTVERIFY.P 195.446(c)(2) Are there adequateprocesses to defineand identify thecircumstanceswhich require apoint-to-pointverification?

Sat -- SOP ProcedureSCADA Pt. to Pt.Testing Section 8.0

36. UNIT 925(and 1otherassets)

CR.SCADA 15. CR.SCADA.POINTVERIFY.R 195.446(c)(2) Have requiredpoint-to-pointverifications beenperformed?

Sat -- --

37. UNIT 925(and 1

CR.SCADA 16. CR.SCADA.POINTVERIFYEXTENT.P 195.446(c)(2) Are there adequateprocesses for the

Sat -- --

Results (IRR) file:///C:/InspectionAssistant/App/chrome/content/0.1/index.html?ff_profi...

23 of 37 5/15/2013 10:07 AM

Page 24: Inspection Results (IRR) · Inspection Results (IRR) UNIT 32965 (126) No. Assets Sub ... (b)(1) Are there clear processes to describe each controller's physical domain of ... Sections

No. AssetsSub

ModuleQst# Question ID References Question Text Result

IssueSummary

InspectionNotes

otherassets)

thoroughness of thepoint-to-pointverification?

38. UNIT 925(and 1otherassets)

CR.SCADA 17. CR.SCADA.POINTVERIFYEXTENT.R 195.446(c)(2) Do recordsdemonstrateadequatethoroughness of thepoint-to-pointverification?

Sat -- --

39. UNIT 925(and 1otherassets)

CR.SCADA 18. CR.SCADA.POINTVERFIYINTVL.P 195.446(c)(2) Is there anadequate processfor defining whenthe point-to-pointverification must becompleted?

Sat -- --

40. UNIT 925(and 1otherassets)

CR.SCADA 19. CR.SCADA.POINTVERFIYINTVL.R 195.446(c)(2) Do records indicatethe point-to-pointverification hasbeen completed atthe requiredintervals?

Sat -- --

41. UNIT 925(and 1otherassets)

CR.SCADA 20. CR.SCADA.COMMPLAN.P 195.446(c)(3) Has an internalcommunication planbeen establishedand implementedthat is adequate tomanually operatethe pipeline duringa SCADAfailure/outage?

Sat -- --

42. UNIT 925(and 1otherassets)

CR.SCADA 21. CR.SCADA.COMMPLAN.R 195.446(c)(3) Has the internalcommunication planbeen tested andverified for manualoperation of thepipeline safely atleast once eachcalendar year but atintervals notexceeding 15months?

Sat -- --

43. UNIT 925(and 1otherassets)

CR.SCADA 22. CR.SCADA.BACKUPSCADA.O 195.446(c)(4) Is there a backupSCADA system?

Sat -- --

44. UNIT 925(and 1otherassets)

CR.SCADA 23. CR.SCADA.BACKUPSCADADEV.P 195.446(c)(4) Has the use of thebackup SCADAsystem fordevelopment workbeen defined?

Sat -- Development hasfull capabilitiesand is not a part ofthe back-upsystem. Reviewedsettings for 64pressure switchesfrom 2012 data.

45. UNIT 925(and 1otherassets)

CR.SCADA 24. CR.SCADA.BACKUPSCADATEST.R 195.446(c)(4) Is the backupSCADA systemtested at least onceeach calendar yearat intervals not toexceed 15 months?

Sat -- --

46. UNIT 925(and 1otherassets)

CR.SCADA 25. CR.SCADA.BACKUPSCADAVERIFY.R 195.446(c)(4) Does the testingverify that there areadequate processesin place fordecision-makingand internalcommunications tosuccessfully

Sat -- --

Results (IRR) file:///C:/InspectionAssistant/App/chrome/content/0.1/index.html?ff_profi...

24 of 37 5/15/2013 10:07 AM

Page 25: Inspection Results (IRR) · Inspection Results (IRR) UNIT 32965 (126) No. Assets Sub ... (b)(1) Are there clear processes to describe each controller's physical domain of ... Sections

No. AssetsSub

ModuleQst# Question ID References Question Text Result

IssueSummary

InspectionNotes

implement atransition fromprimary SCADA tobackup SCADA, andback to primarySCADA?

47. UNIT 925(and 1otherassets)

CR.SCADA 26. CR.SCADA.BACKUPSCADAADEQUACY.R 195.446(c)(4) If the back-upSCADA system isnot designed tohandle all thefunctionality of themain SCADAsystem, does thetesting determinewhether there areadequateprocedures in placeto account fordisplaced and/ordifferent availablefunctions duringback-up operations?

Sat -- --

48. UNIT 925(and 1otherassets)

CR.SCADA 27. CR.SCADA.BACKUPSCADATRANSFER.P 195.446(c)(4) Do processesadequately addressand test thelogistics oftransferring controlto a backup controlroom?

Sat -- --

49. UNIT 925(and 1otherassets)

CR.SCADA 28. CR.SCADA.BACKUPSCADARETURN.P 195.446(c)(4) Do proceduresadequately addressand test thelogistics of returningoperations back tothe primary controlroom?

Sat -- --

50. UNIT 925(and 1otherassets)

CR.SCADA 29. CR.SCADA.BACKUPSCADAFUNCTIONS.R 195.446(c)(4) Is a representativesampling of criticalfunctions in theback-up SCADAsystem being testedto ensure properoperation in theevent the backupsystem is needed?

Sat -- The primarycomputer isrotated betweenRenton andTacoma ControlCenters.

51. UNIT 925(and 1otherassets)

CR.CRMFM 1. CR.CRMFM.FATIGUEMITIGATION.P 195.446(d) Does the fatiguemitigation processor procedures(plan) identifyoperator-specificfatigue risks?

Sat -- SOP FCTRL-OPS463-009 (Rev7-31-'12)Olympic usesCircadian Study &Recommendationsto define operatorspecific fatiguerisks.

52. UNIT 925(and 1otherassets)

CR.CRMFM 2. CR.CRMFM.FATIGUERISKS.P 195.446(d) Does the fatiguemitigation planadequately addresshow the programreduces the riskassociated withcontroller fatigue?

Sat -- Olympic uses 14hour limit per dayand maximum 65hours per 7-dayperiod.

53. UNIT 925(and 1otherassets)

CR.CRMFM 3. CR.CRMFM.FATIGUEQUANTIFY.P 195.446(d) Do processesrequire that thepotentialcontribution ofcontroller fatigue toincidents and

Sat -- SMRS page 29.

Results (IRR) file:///C:/InspectionAssistant/App/chrome/content/0.1/index.html?ff_profi...

25 of 37 5/15/2013 10:07 AM

Page 26: Inspection Results (IRR) · Inspection Results (IRR) UNIT 32965 (126) No. Assets Sub ... (b)(1) Are there clear processes to describe each controller's physical domain of ... Sections

No. AssetsSub

ModuleQst# Question ID References Question Text Result

IssueSummary

InspectionNotes

accidents bequantified duringinvestigations?

54. UNIT 925(and 1otherassets)

CR.CRMFM 4. CR.CRMFM.FATIGUEMANAGER.P 195.446(d) Is there adesignated fatiguerisk manager who isresponsible andaccountable formanaging fatiguerisk and fatiguecountermeasures,and someone(perhaps the sameperson) that isauthorized toreview and approveHOS emergencydeviations?

Sat -- --

55. UNIT 925(and 1otherassets)

CR.CRMFM 5. CR.CRMFM.SHIFTLENGTH.R 195.446(d)(1) Is the scheduledshift length lessthan or equal to 12hours (not includingshift hand-over) oris there adocumentedtechnical basis toshow that shiftlengths andschedule rotationsare adequate toprovide controllersoff-duty timesufficient to achieve8 hours ofcontinuous sleep?

Sat -- Procedure FCTRL-OPS-463-009. FRMS Document -DuPont Schedule(RP 755)

56. UNIT 925(and 1otherassets)

CR.CRMFM 6. CR.CRMFM.SHIFTLENGTHTIME.R 195.446(d)(1) Does the operatorfactor in all time theindividual is workingfor the companywhen establishingshift lengths andschedule rotationsor is there adocumentedtechnical basis toshow that shiftlengths andschedule rotationsare adequate toprovide controllersoff-duty timesufficient to achieve8 hours ofcontinuous sleep?

Sat -- CircadianEvaluation forScientific Basis forWork Schedules.

57. UNIT 925(and 1otherassets)

CR.CRMFM 7. CR.CRMFM.SCHEDULEDTIMEOFF.R 195.446(d)(1) Are all scheduledperiods of time offat least one hourlonger than 8 hoursplus commute timeor is there adocumentedtechnical basis toshow that shiftlengths andschedule rotationsare adequate toprovide controllersoff-duty time

Sat -- --

Results (IRR) file:///C:/InspectionAssistant/App/chrome/content/0.1/index.html?ff_profi...

26 of 37 5/15/2013 10:07 AM

Page 27: Inspection Results (IRR) · Inspection Results (IRR) UNIT 32965 (126) No. Assets Sub ... (b)(1) Are there clear processes to describe each controller's physical domain of ... Sections

No. AssetsSub

ModuleQst# Question ID References Question Text Result

IssueSummary

InspectionNotes

sufficient to achieve8 hours ofcontinuous sleep?

58. UNIT 925(and 1otherassets)

CR.CRMFM 8. CR.CRMFM.ONCALLCONTROLLER.R 195.446(d)(1) For controllers whoare on call, doesthe operatorminimizeinterrupting therequired 8 hours ofcontinuous sleep oris there adocumentedtechnical basis toshow that shiftlengths andschedule rotationsare adequate toprovide controllersoff-duty timesufficient to achieve8 hours ofcontinuous sleep?

Sat -- Two relief personsare available andtheir commutetime is counted forthe same day theyare requested towork. Thecommute time isnot counted if thecontroller isscheduled the daybefore their shift.

59. UNIT 925(and 1otherassets)

CR.CRMFM 9. CR.CRMFM.MAXHOS.P 195.446(d)(4) Do processes limitthe maximum HOSlimit in any sliding 7day period to nomore than 65 hoursor is there adocumentedtechnical basis toshow reduction ofthe risk associatedwith controllerfatigue?

Sat --

60. UNIT 925(and 1otherassets)

CR.CRMFM 10. CR.CRMFM.MINTIMEOFF.P 195.446(d)(4) After reaching theHOS limit in anysliding 7 day period,is the minimumtime off at least 35hours or is there adocumentedtechnical basis toshow a reduction ofthe risk associatedwith controllerfatigue?

Sat -- FatigueManagement RiskSystem FCTRL-OPS-463-009

61. UNIT 925(and 1otherassets)

CR.CRMFM 11. CR.CRMFM.DOCSCHEDULE.P 195.446(d)(4) Is there a formalsystem to documentall scheduled andunscheduled HOSworked, includingovertime and timespent performingduties other thancontrol roomduties?

Sat -- --

62. UNIT 925(and 1otherassets)

CR.CRMFM 12. CR.CRMFM.DAYSOFF.P 195.446(d)(4) For normal businesshour typeoperations (i.e., fivedays per week), areno more than fivedays worked insuccession before atleast two days off?

NA -- No such eventoccurred, orcondition existed,in the scope ofinspection review.

63. UNIT 925(and 1other

CR.CRMFM 13. CR.CRMFM.WORKHOURS.R 195.446(d)(4) For normal businesshour typeoperations (i.e., five

NA -- No such eventoccurred, orcondition existed,

Results (IRR) file:///C:/InspectionAssistant/App/chrome/content/0.1/index.html?ff_profi...

27 of 37 5/15/2013 10:07 AM

Page 28: Inspection Results (IRR) · Inspection Results (IRR) UNIT 32965 (126) No. Assets Sub ... (b)(1) Are there clear processes to describe each controller's physical domain of ... Sections

No. AssetsSub

ModuleQst# Question ID References Question Text Result

IssueSummary

InspectionNotes

assets) days per week), isthe shift start timeno earlier than 6:00a.m. and the shiftend time no laterthan 7:00 p.m.?

in the scope ofinspection review.

64. UNIT 925(and 1otherassets)

CR.CRMFM 14. CR.CRMFM.FATIGUECOUNTERMEASURES.P 195.446(d)(4) For shifts longerthan 8 hours, havespecific fatiguecountermeasuresbeen implementedfor the ninth andbeyond hours?

Sat -- FatigueManagement RiskSystem FCTRL-OPS-463-009

65. UNIT 925(and 1otherassets)

CR.CRMFM 15. CR.CRMFM.DAILYHOSLIMIT.P 195.446(d)(4) Do processes limitthe daily maximumHOS limit no morethan 14 hours inany sliding 24-hourperiod?

Sat -- Olympic Pipelineuses HOSED(Hours of ServicedEmergencyDocument) Form,reference AdvisoryBulletinADB-05-06, andProcedure 463-009page 18.

66. UNIT 925(and 1otherassets)

CR.CRMFM 16. CR.CRMFM.CONTROLLERNUMBERS.O 195.446(d)(4) Do operationsinclude a sufficientnumber of qualifiedcontrollers?

Sat -- --

67. UNIT 925(and 1otherassets)

CR.CRMFM 17. CR.CRMFM.OFFDUTYHOURS.P 195.446(d)(4) Do processesensure thatcontrollers areprovided with atleast thirty-five (35)continuous off-dutyhours when limitsare reachedfollowing the mostrecent 35-hour(minimum) off-dutyrest period or isthere a documentedtechnical basis toshow that themaximum limit oncontroller HOS isadequate to reducethe risk associatedwith controllerfatigue?

Sat -- Procedure 463-009page 16-19.

68. UNIT 925(and 1otherassets)

CR.CRMFM 18. CR.CRMFM.SHIFTHOLDOVER.P 195.446(d)(4) Does the shiftholdover processconform to shiftholdover guidelinesor is their adocumentedtechnical basis toshow that themaximum limit oncontroller HOS isadequate to reducethe risk associatedwith controllerfatigue?

Sat -- --

69. UNIT 925(and 1otherassets)

CR.CRMFM 19. CR.CRMFM.SPECIFICCOUNTERMEASURES.P 195.446(d)(4) Do processesrequire specificfatiguecountermeasuresduring applicable

Sat -- Fatigue RiskManagementFCTRL-OPS-466-009

Results (IRR) file:///C:/InspectionAssistant/App/chrome/content/0.1/index.html?ff_profi...

28 of 37 5/15/2013 10:07 AM

Page 29: Inspection Results (IRR) · Inspection Results (IRR) UNIT 32965 (126) No. Assets Sub ... (b)(1) Are there clear processes to describe each controller's physical domain of ... Sections

No. AssetsSub

ModuleQst# Question ID References Question Text Result

IssueSummary

InspectionNotes

time periods, or isthere a documentedtechnical basis toshow that themaximum limit oncontroller HOS isadequate to reducethe risk associatedwith controllerfatigue?

70. UNIT 925(and 1otherassets)

CR.CRMFM 20. CR.CRMFM.HOSDEVIATIONS.P 195.446(d)(4) Is there a formalprocess forapprovingdeviations from themaximum HOSlimits?

Sat -- --

71. UNIT 925(and 1otherassets)

CR.CRMFM 21. CR.CRMFM.FATIGUEEDUCATE.P 195.446(d)(2)(195.446(d)(3))

Does the programrequire that fatigueeducation/trainingis required for allcontrollers andcontrol roomsupervisors?

Sat -- --

72. UNIT 925(and 1otherassets)

CR.CRMFM 22. CR.CRMFM.FATIGUEREFRESHER.R 195.446(d)(2)(195.446(d)(3))

Is refresher fatigueeducation providedat regular intervals?

Sat -- --

73. UNIT 925(and 1otherassets)

CR.CRMFM 23. CR.CRMFM.FATIGUEREVIEW.P 195.446(d)(2)(195.446(d)(3))

Do processesrequire that theeffectiveness of thefatigueeducation/trainingprogram bereviewed at leastonce each calendaryear, not to exceed15 months?

Sat -- --

74. UNIT 925(and 1otherassets)

CR.CRMFM 24. CR.CRMFM.FATIGUESTRATEGY.P 195.446(d)(2) Does fatigueeducation addressfatigue mitigationstrategies(countermeasures)?

Sat -- --

75. UNIT 925(and 1otherassets)

CR.CRMFM 25. CR.CRMFM.OFFDUTY.P 195.446(d)(2) Does fatigueeducation addresshow off-dutyactivities contributeto fatigue?

Sat -- --

76. UNIT 925(and 1otherassets)

CR.CRMFM 26. CR.CRMFM.FATIGUECONTENT.P 195.446(d)(3) Is the content offatigue trainingadequate fortraining controllersand supervisors torecognize theeffects of fatigue?

Sat -- --

77. UNIT 925(and 1otherassets)

CR.CRMAM 1. CR.CRMAM.ALARM.P 195.446(e) Is the alarmmanagement plan aformal process thatspecificallyidentifies criticaltopical areasincluded in theprogram?

Sat -- Procedure FCTRL-OPS-463-007. TheInternationalSociety of SCADA(ISA) is referencedfor Management ofAlarm Systems forthe ProcessIndustries.

78. UNIT 925(and 1otherassets)

CR.CRMAM 2. CR.CRMAM.ALARMMALFUNCTION.P 195.446(e)(1) Is there a processto identify andcorrect inaccurateor malfunctioning

Sat -- --

Results (IRR) file:///C:/InspectionAssistant/App/chrome/content/0.1/index.html?ff_profi...

29 of 37 5/15/2013 10:07 AM

Page 30: Inspection Results (IRR) · Inspection Results (IRR) UNIT 32965 (126) No. Assets Sub ... (b)(1) Are there clear processes to describe each controller's physical domain of ... Sections

No. AssetsSub

ModuleQst# Question ID References Question Text Result

IssueSummary

InspectionNotes

alarms?

79. UNIT 925(and 1otherassets)

CR.CRMAM 3. CR.CRMAM.ALARMREVIEW.P 195.446(e)(1) Does the review ofsafety-relatedalarms account fordifferent alarmdesigns and allalarmtypes/priorities?

Sat -- --

80. UNIT 925(and 1otherassets)

CR.CRMAM 4. CR.CRMAM.CONTROLLERPERFORMANCE.P 195.446(e)(1) Does the review ofsafety-relatedalarms account forindividual-specificcontrollerqualification andperformance?

Sat -- --

81. UNIT 925(and 1otherassets)

CR.CRMAM 5. CR.CRMAM.STALEDATA.P 195.446(e)(1) Does the review ofsafety-relatedalarms includespecific proceduresand practices formanaging stale orunreliable data?

Sat -- --

82. UNIT 925(and 1otherassets)

CR.CRMAM 6. CR.CRMAM.MONTHLYANALYSIS.P 195.446(e)(2) Do processesrequire the monthlyidentification,recording, review,and analysis ofpoints that havebeen taken off scan,have had alarmsinhibited, generatedfalse alarms, or thathave had forced ormanual values forperiods of timeexceeding thatrequired forassociatedmaintenance oroperating activities?

Sat -- Procedure - OPS -460-012

83. UNIT 925(and 1otherassets)

CR.CRMAM 7. CR.CRMAM.PROBLEMCORRECTION.P 195.446(e)(2) Does the alarmmanagement planinclude a processfor promptlycorrecting identifiedproblems and forreturning thesepoints to service?

Sat -- --

84. UNIT 925(and 1otherassets)

CR.CRMAM 8. CR.CRMAM.ALARMSETPOINTS.P 195.446(e)(3) Is there a formalprocess todetermine thecorrect alarmsetpoint values andalarm descriptions?

Sat -- --

85. UNIT 925(and 1otherassets)

CR.CRMAM 9. CR.CRMAM.SETTINGCONTROL.P 195.446(e)(3) Have proceduresbeen established toclearly address howand to what degreecontrollers canchange alarm limitsor setpoints, orinhibit alarms, ortake pointsoff-scan?

Sat -- --

86. UNIT 925(and 1other

CR.CRMAM 10. CR.CRMAM.VERIFICATION.P 195.446(e)(3) Do processesrequire that anycalibration or

Sat -- --

Results (IRR) file:///C:/InspectionAssistant/App/chrome/content/0.1/index.html?ff_profi...

30 of 37 5/15/2013 10:07 AM

Page 31: Inspection Results (IRR) · Inspection Results (IRR) UNIT 32965 (126) No. Assets Sub ... (b)(1) Are there clear processes to describe each controller's physical domain of ... Sections

No. AssetsSub

ModuleQst# Question ID References Question Text Result

IssueSummary

InspectionNotes

assets) change to fieldinstruments requireverification of alarmsetpoints and alarmdescriptions?

87. UNIT 925(and 1otherassets)

CR.CRMAM 11. CR.CRMAM.PLANREVIEW.P 195.446(e)(4) Are there processesto review the alarmmanagement planat least once eachcalendar year, butat intervals notexceeding 15months, in order todetermine theeffectiveness of theplan?

Sat -- --

88. UNIT 925(and 1otherassets)

CR.CRMAM 12. CR.CRMAM.PLANREVIEW.R 195.446(e)(4) Do records indicatereview of the alarmmanagement planat least once eachcalendar year, butat intervals notexceeding 15months, in order todetermine theeffectiveness of theplan?

Sat -- --

89. UNIT 925(and 1otherassets)

CR.CRMAM 13. CR.CRMAM.WORKLOAD.P 195.446(e)(5) Does the CRMprogram have ameans of identifyingand measuring thework load (contentand volume ofgeneral activity)being directed to anindividualcontroller?

Sat -- --

90. UNIT 925(and 1otherassets)

CR.CRMAM 14. CR.CRMAM.WORKLOADMONITORING.P 195.446(e)(5) Is the process ofmonitoring andanalyzing generalactivitycomprehensive?

Sat -- --

91. UNIT 925(and 1otherassets)

CR.CRMAM 15. CR.CRMAM.CONTROLLERREACTION.P 195.446(e)(5) Does the processhave a means ofdetermining thatthe controller hassufficient time toanalyze and reactto incoming alarms?

Sat -- --

92. UNIT 925(and 1otherassets)

CR.CRMAM 16. CR.CRMAM.PERFORMANCEANALYSIS.R 195.446(e)(5) Has an analysisbeen performed todetermine ifcontroller(s)performance iscurrently adequate?

Sat -- Procedure-ADM-061-001

93. UNIT 925(and 1otherassets)

CR.CRMAM 17. CR.CRMAM.DEFICIENCIES.P 195.446(e)(6) Is there a processto address howdeficiencies found inimplementing195.446(e)(1)through195.446(e)(5) willbe resolved?

Sat -- --

94. UNIT 925(and 1otherassets)

CR.CRMAM 18. CR.CRMAM.DEFICIENCIES.R 195.446(e)(6) Do records indicatedeficiencies found inimplementing195.446(e)(1)

Sat -- --

Results (IRR) file:///C:/InspectionAssistant/App/chrome/content/0.1/index.html?ff_profi...

31 of 37 5/15/2013 10:07 AM

Page 32: Inspection Results (IRR) · Inspection Results (IRR) UNIT 32965 (126) No. Assets Sub ... (b)(1) Are there clear processes to describe each controller's physical domain of ... Sections

No. AssetsSub

ModuleQst# Question ID References Question Text Result

IssueSummary

InspectionNotes

through195.446(e)(5) havebeen resolved?

95. UNIT 925(and 1otherassets)

CR.CRMCMGT 1. CR.CRMCMGT.CHANGECOORDINATION.P 195.446(f)(1) Does the processassure changes infield equipment (forexample, moving avalve) that couldaffect control roomoperations arecoordinated withcontrol roompersonnel?

Sat -- ProcedureUSPL-MOO-001-001

96. UNIT 925(and 1otherassets)

CR.CRMCMGT 2. CR.CRMCMGT.CHANGECOORDINATION.R 195.446(f)(1) Do records indicatethat changes in fieldequipment (forexample, moving avalve) that couldaffect control roomoperations werecoordinated withcontrol roompersonnel?

Sat -- --

97. UNIT 925(and 1otherassets)

CR.CRMCMGT 3. CR.CRMCMGT.CHANGEMEETINGS.P 195.446(f)(1) Is there a processto mandate acontrol roomrepresentative willparticipate inmeetings wherechanges that coulddirectly or indirectlyaffect control roomoperations(including routinemaintenance andrepairs) are beingconsidered,designed andimplemented?

Sat -- --

98. UNIT 925(and 1otherassets)

CR.CRMCMGT 4. CR.CRMCMGT.CHANGETRAINING.R 195.446(f)(1) Beforeimplementingchanges, do recordsindicate controllerswere provided withnotification andtraining to assuretheir ability tosafely incorporatethe proposedchange intooperations?

Sat -- --

99. UNIT 925(and 1otherassets)

CR.CRMCMGT 5. CR.CRMCMGT.EMERGENCYCONTACT.P 195.446(f)(2) Is there a processrequiring fieldpersonnel andSCADA supportpersonnel tocontact the controlroom whenemergencyconditions exist?

Sat -- --

100. UNIT 925(and 1otherassets)

CR.CRMCMGT 6. CR.CRMCMGT.FIELDCONTACT.P 195.446(f)(2) Does the processrequire fieldpersonnel andSCADA supportpersonnel tocontact the controlroom when making

Sat -- --

Results (IRR) file:///C:/InspectionAssistant/App/chrome/content/0.1/index.html?ff_profi...

32 of 37 5/15/2013 10:07 AM

Page 33: Inspection Results (IRR) · Inspection Results (IRR) UNIT 32965 (126) No. Assets Sub ... (b)(1) Are there clear processes to describe each controller's physical domain of ... Sections

No. AssetsSub

ModuleQst# Question ID References Question Text Result

IssueSummary

InspectionNotes

field changes (forexample, moving avalve) that affectcontrol roomoperations?

101. UNIT 925(and 1otherassets)

CR.CRMCMGT 7. CR.CRMCMGT.FIELDCHANGES.R 195.446(f)(2) Do records indicatefield personnel andSCADA supportpersonnel contactedthe control roomwhen making fieldchanges (forexample, moving avalve) that affectcontrol roomoperations?

Sat -- --

102. UNIT 925(and 1otherassets)

CR.CRMEXP 1. CR.CRMEXP.ABNORMALREVIEW.P 195.446(g)(1) Is there a formal,structured approachfor reviewing andcritiquing reportableevents to identifylessons learned?

Sat -- --

103. UNIT 925(and 1otherassets)

CR.CRMEXP 2. CR.CRMEXP.ABNORMALREVIEW.R 195.446(g)(1) Do records indicatereviews ofreportable eventsspecifically analyzedall contributingfactors to determineif control roomactions contributedto the event, andcorrected anydeficiencies?

Sat -- --

104. UNIT 925(and 1otherassets)

CR.CRMEXP 3. CR.CRMEXP.LESSONSLEARNED.P 195.446(g)(2) Does the programrequire training onlessons learnedfrom a broad rangeof events(reportableincidents/accidents,near misses, leaks,operational andmaintenance errors,etc.), even thoughthe control roommay not have beenat fault?

Sat -- --

105. UNIT 925(and 1otherassets)

CR.CRMEXP 4. CR.CRMEXP.LESSONSLEARNED.R 195.446(g)(2) Has operatingexperience reviewtraining beenconducted onlessons learnedfrom a broad rangeof events(reportableincidents/accidents,near misses, leaks,operational andmaintenance errors,etc.)?

Sat -- --

106. UNIT 925(and 1otherassets)

CR.CRMTRAIN 1. CR.CRMTRAIN.CONTROLLERTRAIN.P 195.446(h) Has a controllertraining programbeen established toprovide training foreach controller tocarry out their rolesand responsibilities?

Sat -- --

Results (IRR) file:///C:/InspectionAssistant/App/chrome/content/0.1/index.html?ff_profi...

33 of 37 5/15/2013 10:07 AM

Page 34: Inspection Results (IRR) · Inspection Results (IRR) UNIT 32965 (126) No. Assets Sub ... (b)(1) Are there clear processes to describe each controller's physical domain of ... Sections

No. AssetsSub

ModuleQst# Question ID References Question Text Result

IssueSummary

InspectionNotes

107. UNIT 925(and 1otherassets)

CR.CRMTRAIN 2. CR.CRMTRAIN.CONTROLLERTRAIN.R 195.446(h) Has a controllertraining programbeen implementedto provide trainingfor each controllerto carry out theirroles andresponsibilities?

Sat -- --

108. UNIT 925(and 1otherassets)

CR.CRMTRAIN 3. CR.CRMTRAIN.TRAININGREVIEW.P 195.446(h) Have processesbeen established toreview thecontroller trainingprogram content toidentify potentialimprovements atleast once eachcalendar year, butat intervals not toexceed 15 months?

Sat -- --

109. UNIT 925(and 1otherassets)

CR.CRMTRAIN 4. CR.CRMTRAIN.TRAININGREVIEW.R 195.446(h) Have processesbeen implementedto review thecontroller trainingprogram content toidentify potentialimprovements atleast once eachcalendar year, butat intervals not toexceed 15 months?

Sat -- --

110. UNIT 925(and 1otherassets)

CR.CRMTRAIN 5. CR.CRMTRAIN.TRAININGCONTENT.R 195.446(h) Does trainingcontent address allrequired material,including trainingeach controller tocarry out the rolesand responsibilitiesthat were definedby the operator?

Sat -- --

111. UNIT 925(and 1otherassets)

CR.CRMTRAIN 6. CR.CRMTRAIN.AOCLIST.R 195.446(h)(1) Has a list of theabnormal operatingconditions that arelikely to occursimultaneously or insequence beenestablished?

Sat -- Simultaneous orsequence AOC'shave beenincluded in trainingfor controller totake action tokeep people safefirst and propertysecond.

112. UNIT 925(and 1otherassets)

CR.CRMTRAIN 7. CR.CRMTRAIN.TRAININGABNORMAL.P 195.446(h)(1) Does the trainingprogram providecontroller trainingon recognizing andresponding toabnormal operatingconditions that arelikely to occursimultaneously or insequence?

Sat -- --

113. UNIT 925(and 1otherassets)

CR.CRMTRAIN 8. CR.CRMTRAIN.TRAINING.O 195.446(h)(2) Does the trainingprogram use asimulator ortabletop exercisesto train controllershow to recognizeand respond toabnormal operatingconditions?

Sat -- --

Results (IRR) file:///C:/InspectionAssistant/App/chrome/content/0.1/index.html?ff_profi...

34 of 37 5/15/2013 10:07 AM

Page 35: Inspection Results (IRR) · Inspection Results (IRR) UNIT 32965 (126) No. Assets Sub ... (b)(1) Are there clear processes to describe each controller's physical domain of ... Sections

No. AssetsSub

ModuleQst# Question ID References Question Text Result

IssueSummary

InspectionNotes

114. UNIT 925(and 1otherassets)

CR.CRMTRAIN 9. CR.CRMTRAIN.TRAINING.R 195.446(h)(2) Does the trainingprogram use asimulator ortabletop exercisesto train controllershow to recognizeand respond toabnormal operatingconditions?

Sat -- --

115. UNIT 925(and 1otherassets)

CR.CRMTRAIN 10. CR.CRMTRAIN.COMMUNICATIONTRAINING.P 195.446(h)(3) Does the CRMprogram traincontrollers on theirresponsibilities forcommunicationunder the operator'semergencyresponseprocedures?

Sat -- --

116. UNIT 925(and 1otherassets)

CR.CRMTRAIN 11. CR.CRMTRAIN.SYSKNOWLEDGE.P 195.446(h)(4) Does the trainingprogram providecontrollers aworking knowledgeof the pipelinesystem, especiallyduring thedevelopment ofabnormal operatingconditions?

Sat -- --

117. UNIT 925(and 1otherassets)

CR.CRMTRAIN 12. CR.CRMTRAIN.INFREQOPSLIST.R 195.446(h)(5) Has a list ofpipeline operatingsetups that areperiodically (butinfrequently) usedbeen established?

NA -- No such eventoccurred, orcondition existed,in the scope ofinspection review.

118. UNIT 925(and 1otherassets)

CR.CRMTRAIN 13. CR.CRMTRAIN.INFREQOPSREVIEW.P 195.446(h)(5) Do processesspecify that, forpipeline operatingset-ups that areperiodically (butinfrequently) used,the controllers mustbe provided anopportunity toreview relevantprocedures inadvance of theiruse?

NA -- No such eventoccurred, orcondition existed,in the scope ofinspection review.

119. UNIT 925(and 1otherassets)

CR.CRMCOMP 1. CR.CRMCOMP.SUBMITPROCEDURES.P 195.446(i) Are there adequateprocesses to assurethat the operator isresponsive torequests fromapplicable agenciesto submit their CRMprocedures?

Sat -- --

120. UNIT 925(and 1otherassets)

CR.CRMCOMP 2. CR.CRMCOMP.SUBMITPROCEDURES.R 195.446(i) Has the operatorbeen responsive torequests fromapplicable agenciesto submit their CRMprocedures?

Sat -- A copy of BP's CRMprocedures wererequested onFebruary 27, 2013that was 61 daysbefore thescheduledinspection on April29, 2013. BPconsiders theirprocedures as aproprietary

Results (IRR) file:///C:/InspectionAssistant/App/chrome/content/0.1/index.html?ff_profi...

35 of 37 5/15/2013 10:07 AM

Page 36: Inspection Results (IRR) · Inspection Results (IRR) UNIT 32965 (126) No. Assets Sub ... (b)(1) Are there clear processes to describe each controller's physical domain of ... Sections

No. AssetsSub

ModuleQst# Question ID References Question Text Result

IssueSummary

InspectionNotes

document and notmake theirprocedureavailable atanytime before theinspection. CFR195.446 ControlRoomManagement (i)ComplianceValidation states: Upon request,operators mustsubmit theirprocedures toPHMSA (or theState Agency). BPneeds to beforthright inexpressing theirintention andmake proceduresaccess by anagreement ratherthan stalling andevadingquestions. It's notin the interest ofPHMSA (or theState Agency) tosell or publish anoperator'sprocedure.

121. UNIT 925(and 1otherassets)

CR.CRMCOMP 3. CR.CRMCOMP.CRMCOORDINATOR.R 195.446(i) Is there anindividual that isresponsible andaccountable forcompliance withrequests fromPHMSA or otherapplicableagencies?

Sat -- --

122. UNIT 925(and 1otherassets)

CR.CRMCOMP 4. CR.CRMCOMP.RECORDS.P 195.446(j)(1) Recordsmanagementprocesses adequateto assure recordsare sufficient todemonstratecompliance with theCRM rule?

Sat -- --

123. UNIT 925(and 1otherassets)

CR.CRMCOMP 5. CR.CRMCOMP.RECORDS.R 195.446(j)(1) Are recordssufficient todemonstratecompliance with theCRM rule?

Sat -- --

124. UNIT 925(and 1otherassets)

CR.CRMCOMP 6. CR.CRMCOMP.ELECTRONICRECORDS.R 195.446(j)(1) Are electronicrecords properlystored,safeguarded, andreadily retrievable?

Sat -- --

125. UNIT 925(and 1otherassets)

CR.CRMCOMP 7. CR.CRMCOMP.DEVIATIONS.P 195.446(j)(2) Are there processesto demonstrate andprovide adocumented recordthat every deviationfrom any CRM rulerequirement was

NA -- No such eventoccurred, orcondition existed,in the scope ofinspection review.

Results (IRR) file:///C:/InspectionAssistant/App/chrome/content/0.1/index.html?ff_profi...

36 of 37 5/15/2013 10:07 AM

Page 37: Inspection Results (IRR) · Inspection Results (IRR) UNIT 32965 (126) No. Assets Sub ... (b)(1) Are there clear processes to describe each controller's physical domain of ... Sections

Acceptable Use: Inspection documentation, including completed protocol forms, summary reports, executive summary reports, and enforcement

documentation are for internal use only by federal or state pipeline safety regulators. Some inspection documentation may contain information which the

operator considers to be confidential. In addition, supplemental inspection guidance and related documents in the file library are also for internal use only by

federal or state pipeline safety regulators (with the exception of documents published in the federal register, such as advisory bulletins). Do not distribute or

otherwise disclose such material outside of the state or federal pipeline regulatory organizations. Requests for such information from other government

organizations (including, but not limited to, NTSB, GAO, IG, or Congressional Staff) should be referred to PHMSA Headquarters Management.

No. AssetsSub

ModuleQst# Question ID References Question Text Result

IssueSummary

InspectionNotes

necessary for safeoperation?

126. UNIT 925(and 1otherassets)

CR.CRMCOMP 8. CR.CRMCOMP.DEVIATIONS.R 195.446(j)(2) Were all deviationsdocumented in away thatdemonstrates theywere necessary forsafe operation?

NA -- No such eventoccurred, orcondition existed,in the scope ofinspection review.

Results (IRR) file:///C:/InspectionAssistant/App/chrome/content/0.1/index.html?ff_profi...

37 of 37 5/15/2013 10:07 AM