Industry & Facilities Division
INSPECTION REPORT N°
IC/KOL/CC/11673/IR/002
Page: 1/4
Interim Final
BV Job nr: IND.K.4.13.0050
PROJECT: M/s Carlier Chains Ref: E-mail
BV Client: M/s Indian Chain Pvt. Ltd. P/o nr: (client to BV)
Manufacturer : M/s Indian Chain Pvt. Ltd. P/o nr: ACH11673, Dt. 03.05.13 (Client to Manufacturer)
Inspection requested by: M/s Indian Chain Pvt. Ltd.
SUPPLY / SUBJECT OF INSPECTION ITEM / TAG Nr QTYOpen Link Chain 5D DN 40, Pitch 200 x 60 mm Gr 40, Selfcoloured, 100 Mtr Lg, CMU-SWL: 20T50 CE-PL: 41T01 CR-BL: 102T50, Steel 27MnSi5
¢0506/1A to ¢0506/8A
08 Nos
DOCUMENTS OF REFERENCE : See continuation sheet for additional documents: Yes No
Title Reference n° Rev Approved by
Date
QAP Nil 0 M/s Carlier ---PO ACH11673 0 M/s Carlier 03.05.2013
INSPECTIONS : Results of inspection : Satisfactory UnsatisfactoryInspection place & Date or Period:
M/s Indian Chain Pvt. Ltd. on 17th
& 18th June 2013.Stage of inspection :
Before manufacturing During manufacturing Final Packing
Type of inspection: Pre-inspection meeting Document and QC record review Visual examination, checks Witnessing tests Manufacturing progress status Vendor assessment Final inspection Packing
(for details see continuation sheet)Stamping :
No
Non Conformities Reports (NCR): NCR’s issued during reported period :Nil
List of outstanding NCR’s : N.A
Main Conclusions & Remarks: (for details see continuation sheet)
On basis of final inspection as per QAP and P.O the above said material mention in SUPPLY / SUBJECT OF INSPECTION found conforming to P.O
Next visit scheduled: As Required
INSP 002 EnGM SI 101 Copyright Bureau Veritas 04/2011
![Page 2: Inspection Report 1](https://reader036.vdocuments.mx/reader036/viewer/2022082610/55cf91ed550346f57b91de2d/html5/thumbnails/2.jpg)
Industry & Facilities Division
INSPECTION REPORT N°
IC/KOL/CC/11673/IR/002 (continued)
Page: 2/4
Interim Final
IND.K.4.13.0050
Description of the inspections carried out: Introduction (Attendees, BV scope of work)
M/s Indian Chain Pvt. Ltd. has signed a contract for Third Party Inspection
Service with Bureau Veritas (India) Private Limited, for Inspection of items as
mentioned above. The Inspection Visits was fixed on 17th and 18th June
2013, and the attendees were as under:
1. Mr. Koushik Saha– M/s Bureau Veritas (India) Private Limited, Kolkata.
2. Mr. V.K. Juneja – M/s Indian Chain Pvt. Ltd.
Applicable Documents & Status of Approval (Type of documents reviewed & endorsed)1. Raw Material T.C Reviewed and found in line with QAP Requirements.
2. QAP Signed
Manufacturing Progress Status (Quantities) – Complete as per inspection call.
Details of inspection activities carried out with respect to scope of work (Visual
examination, witnessing NDT, dimensional checks, material identification…)
1. Material offered in Unpainted condition.
2. Material visually checked and found no harmful surface discontinuities.
3. Material dimensionally checked on random basis and found conforming to
P.O Requirements.
4. Proof Load Test carried out on 100% offered material at 41 MT and found
no permanent deformation.
5. Breaking Load Test carried out on 10% of Offered Qty (1 Nos.) as per QAP
at 102 MT on chain consist of 5 Links, and found no failure.
INSP 002 EnGM SI 101 Copyright Bureau Veritas 04/2011
![Page 3: Inspection Report 1](https://reader036.vdocuments.mx/reader036/viewer/2022082610/55cf91ed550346f57b91de2d/html5/thumbnails/3.jpg)
Industry & Facilities Division
INSPECTION REPORT N°
IC/KOL/CC/11673/IR/002 (continued)
Page: 3/4
Interim Final
IND.K.4.13.0050
6. Internal Inspection Report reviewed and found in line with P.O and QAP
requirement.
7. Raw Material T.C reviewed and found conforming to 27MnSi5.
8. Calibration Certificate reviewed and found in line with QAP requirement.
Surveillance with reference to ITP (Each activity elaborated in detail) - Nil
Results of Inspection (incl. calibration status of equipment / instruments used for the
inspection / testing)
1. Calibration of instruments used in inspection check and found in
valid condition.
2. On basis of final inspection as per QAP, Materials found in line
with P.O and QAP.
Problems pending (Areas of Concern, punch list…) - Nil
Stamping : Inspected material single Hard Punched with on
Body.
Photographs are as followes:
Proof Load Testing Proof Load Testing
INSP 002 EnGM SI 101 Copyright Bureau Veritas 04/2011
![Page 4: Inspection Report 1](https://reader036.vdocuments.mx/reader036/viewer/2022082610/55cf91ed550346f57b91de2d/html5/thumbnails/4.jpg)
Industry & Facilities Division
INSPECTION REPORT N°
IC/KOL/CC/11673/IR/002 (continued)
Page: 4/4
Interim Final
IND.K.4.13.0050
Sample selection for Break Load Testing
Break Load Testing Break Load TestingANNEXES Yes (Total number of pages: ) No
Inspected by: Checked by:
Name:Koushik Saha Signature:… Name:… Signature:…Date of issue:20.06.2013 Inspection centre: BV Kolkata