inspection activites
TRANSCRIPT
NEW SHIPBUILDING INSPECTION ACTIVITIES
NGUYEN HUU TRI / NAVAL ARCHITECT /CLASS SURVEYOR/E-mail: [email protected],Phone:+84 974.277.245
Ethylene/LPG Carrier , view from Wheel House Chemical Tanker , view from Wheel House
Hull inspection Cargo Piping Inspection
Block Inspection Checked Spools and compare with Basic Cargo drawing and identification position to take X-ray film
Block erection Reviewed X-ray film for cargo pipe
Cargo tank installation Witnessed Dye check for branch cargo pipe
NEW SHIPBUILDING INSPECTION ACTIVITIES
NGUYEN HUU TRI / NAVAL ARCHITECT /CLASS SURVEYOR/E-mail: [email protected],Phone:+84 974.277.245
Cradle & Cargo Tank Foundation Control cargo pipe welding onboard ( Tig welding process with purging back up gas Argon)
Loadline Mark & Draft mark Pressure test for cargo pipe, using Nitrogen Air
Rescue boat test Cargo refrigerator compressor
Push up length check Sag – Gap check
NEW SHIPBUILDING INSPECTION ACTIVITIES
NGUYEN HUU TRI / NAVAL ARCHITECT /CLASS SURVEYOR/E-mail: [email protected],Phone:+84 974.277.245
Dry powder fire fighting system Life jacket
ELECTRICAL / MACHINERY / NAVIGATION EQUIPMENT INSPECTION
Cable fixed on tray Draft stop for cable installed in Engine Room
Fire Resistant Cable (FR. Cable) Intrinsically Safe Cable (IS cable)
Ex equipment installed in Hazardous Areas Lamp ,Ex type , installed in Paint store, Battery room
NEW SHIPBUILDING INSPECTION ACTIVITIES
NGUYEN HUU TRI / NAVAL ARCHITECT /CLASS SURVEYOR/E-mail: [email protected],Phone:+84 974.277.245
Cargo Tank - Automatic level gauge Ballast water treatment test onboard
Oil Discharge Monitoring System (OCMS System) Tank Pressure Transmitter (Simulation test)
Gas detector , installed Tank Gas detector , installed in Accommodation
Main Engine , Oil Mist detector test Inert Gas Generator (Chemical Tanker)
NEW SHIPBUILDING INSPECTION ACTIVITIES
NGUYEN HUU TRI / NAVAL ARCHITECT /CLASS SURVEYOR/E-mail: [email protected],Phone:+84 974.277.245
Main engine , UMS vessel Integrity Control Machinery System (ICMS system)
Alarm (M/E Slow Down – UMS vessel) Extension Alarm Panel (Unattend Machinery System)
Hydraulic valve control system Main Switchboard test
Mega Test Main Switchboard ,Over Current Test
NEW SHIPBUILDING INSPECTION ACTIVITIES
NGUYEN HUU TRI / NAVAL ARCHITECT /CLASS SURVEYOR/E-mail: [email protected],Phone:+84 974.277.245
Wheel house equipment Navigation Light
Radar SART test onboard
Fire Detection System ASI