innovative, high-end mep · pdf fileinnovative, high-end mep services ... hse policy c2a...
TRANSCRIPT
control & applications C
A2
Innovative, high-endMEP services
Control & Applications Abantia
Company Profile
Contents
5 VIsIon, MIssIon, & ValuEs
6 about C2a
8 sECtors & sErVICEs
10 ExPErtIsE
12 HEaltH, safEty & EnVIronMEnt
13 QualIty assuranCE & Control
14 rEfErEnCE ProjECts - abantIa
14 Industrial 14 Environmental & renewable Energy 17 Energy 18 Public Health & sanitation 20 Infrastructures & transport 21 tertiary 24 leisure, Culture & sport
26 rEfErEnCE ProjECts - CaE
31 ContaCt Info
Copyright © 2011 Control & Applications Abantia. All rights reserved. The Control & Applications Abantia logo and any alternative version thereof are trademarks and service marks of Control & Applications Abantia. The other names mentioned, regis-tered or not, are the property of their respective companies. Information contained in this document is provided without liability for information purposes only and is subject to change without notice. No representation or warranty is given or to be implied as to the completeness of information or fitness to any particular purposes. C2A reserves the right to revise or change this data at any time without further notice.
www.caeabantia.com Control & Applications Abantia | 5
Vision, Mission, & Values
Vision
“looking for and finding new fields for growth, by participation in applied engineering projects in
different countries and diversifying our activities. Creating sections, specializing in new technologi-
cal fields and delivering at the utmost quality.”
Mission
“We are citizens of our time. We aim to improve major communication infrastructure, make tech-
nology available to public heath, education and cultural centers and also respect the environment
in everything we do.”
Values
C2a is known in the industry as a result of placing importance on the following values:
� trust � Honesty � Commitment � Customer satisfaction � People � Quality � loyalty to customers
www.caeabantia.com6 | Control & Applications Abantia
C2A is a joint venture between Abu Dhabi’s Control Applications Emirates and the Spanish
Abantia Instalaciones. The company was formed in 2010 with a plan to bring world class
mechanical, electrical and plumbing services to the GCC. The company also brings their
wealth of knowledge in the renewable energy sector to the region.
C2A is positioned to tackle all complex MEP projects. These projects include situations where clients need to rely on stable mechanical, electrical and plumbing works including:
� Renewable energy installations � Luxury hotel complexes � Hospitals and medical facilities � Office blocks � Museums and theme parks � Theaters and auditoriums � Government and armed forces � Transportation
About C2A
C2A is also involved in projects for the industrial sec-tor, including:
� Power plants � Logistics � Manufacturing factories (food, beverage, phar-
maceutical, automotive) � Data centers and technology parks
www.caeabantia.com Control & Applications Abantia | 7
Abantia
Established in 1944 and privately held, Abantia is a holding company that currently employs over 2,300 people worldwide.
Abantia Instalaciones is one of the leading Spanish technical service providers in the field of electrical and mechanical engineering, maintenance, security and in-formation and communication technology.
Abantia serves clients in many sectors from energy, industry, services, environment, transport up to the communication sector.
CAE
Since 1977, Control and Applications Emirates (CAE) has strived to become the leading engineering, pro-curement, construction and maintenance company in Abu Dhabi. CAE has achieved more than 14 million safe man hours and has become the trusted partner for clients such as ADWEA, DEWA, Aldar, Granite, OTV, Honeywell, Siemens and the ADNOC Group of Companies (ADCO, ADGAS, GASCO, TAKREER, etc…)
Parent Companies:
www.caeabantia.com8 | Control & Applications Abantia
Sectors & Services
Infrastructure
(Industrial, Commercial & Civil buildings)
Oil & Gas
(onshore & offshore)
Power, Water & Waste Water
Renewable Energy
Telecommunications
Petrochemical
www.caeabantia.com Control & Applications Abantia | 9
� Servicing, Maintenance & Upgrade � Turnkey Projects � Start-Up � Shutdown � Hot Changeover
Project Life Cycle
R&D/Project DevelopmentC2a’s projects are precisely laid out with objectives, achievement dates and quality standards that guarantees that every project is undertaken correctly.
Design & EngineeringC2a has project managers and engineers who are experts in con-ceptual design, Pre-fEED (preliminary front end engineering de-sign) and fEED (front-End Engineering Design).
Procurementthe C2a procurement team has over 30 years combined experi-ence and has worked directly or in partnership with a number of the largest companies in the region.
Construction, Assembling & Installationthe C2a team strives to achieve the highest quality during con-struction, assembly and installation. While keeping the project schedule in mind, C2a professionals take extra care to install equipment correctly and ensure no lost time injury.
Testing & Commissioninga special group of engineers designated to carry out site tests on all installed equipment. these experts ensure that all systems and components are designed, installed, tested, operated and main-tained according to the requirements of the clients.
Services
www.caeabantia.com10 | Control & Applications Abantia
Electrical & Power
� Cable works (LV / MV / HV) � Power installations � Distribution boards � Lighting systems � Earthing works � Lightning protection � Power distribution units � Dynamic-rotary UPS � Uninterrupted backup power
Mechanical
� Piping & ducting works � HVAC � Plumbing, drainage and sewage � Fire fighting � Clean rooms � Industrial refrigeration � Laminar air flow solutions � Cold-aisle containments � Medical and industrial gases
Control & Instrumentation
� DCS � SCADA � PLC based systems � Field Instruments � Emergency shutdown � Fire and gas
Expertise
www.caeabantia.com Control & Applications Abantia | 11
Telecommunications & Low Current
� Fiber optic installations � Telephone systems � Structured cabling � Active networks � PA / GA systems � PLC automation � Full BMS integration � Telemetry systems � Nurse-call � Audio-visuals
Security
� Access control systems � SMATV / CCTV systems � Fire alarm � Safety and surveillance � Burglary alarm
www.caeabantia.com12 | Control & Applications Abantia
Health, Safety & Environment
HSE Policy
� C2a ensures that the highest standards in health, safety and environmental protection are met
� Parent company CaE is a certified member of the british safety Council
� C2a has adopted aDnoC HsE policy and Code of Practice
HSE Management System
C2A is intent of developing a culture of HSE manage-ment in every project it begins. The company has be-gan this by instilling HSE best practices within its own employees and ensuring that the contractors that C2A use have the same thinking when it comes to health, safety and the environment.
HSE Goals For Every Project
� No LTI (Lost Time Injury) � Maintain accident-free environment � Zero environmental damage
BRITISHSAFETY
COUNCIL
Member
www.caeabantia.com Control & Applications Abantia | 13
Quality Assurance & Control
Corporate Quality Policy Statement
“to consistently meet and exceed customers expectations in service performance and delivery.
Control & applications abantia (C2a) is committed to successful completion of all assigned pro-
jects to the best quality and standard”
Quality Certifications
CAE and Abantia are both registered as Quality Assured Organizations.
CAE received ISO 9001:2008 from Lloyd's Register Quality Assurance (LRQA)
Abantia received international ISO 9001:2000 and ISO 14001:1996 from Spanish authority (ENAC)
Management Review
A management review is conducted every three months. This review gives vital insight into the current effectiveness of the Quality Management System. Po-tential deficiencies can be brought to light and action can be taken.
Quality Audit
Every six months the company is audited by 3rd party, ‘Lloyds Register for Quality Assurance’ to ensure strict compliance to ISO 9001:2008.
Periodical audits are also conducted by C2A’s clients and original equipment manufacturers to ensure com-pliance to the Project Quality Plan.
Internal audits take place at points within the year led by the company’s Lead Auditor for ISO 9001:2008.
C2A Quality Assurance/Quality Control Organization
Continual Improvement
C2A top management is dedicated to continual im-provement. This includes innovative training, advanced data analysis using statistical techniques as well as ka-izen and six sigma methodology. These practices are the building blocks of the C2A Quality Management System.
www.caeabantia.com14 | Control & Applications Abantia
AC Marca Group Factory
Bodegas Roda’s Industrial Plant
Juneda I Slurry Treatment Plant
Photovoltaic Plant for Solmir
Location:Client:
Scope:
Location:Client:
Scope:
Location:Client:
Scope:
Location:Client:
Scope:
barcelona, spainaC Marca Group
Installations and construction work. among its installa-tions, it is worth mentioning an automated warehouse with a capacity for 14,000 pallets and a photovoltaic plate for generating electricity for own consumption.
la rioja, spainbodegas roda
Construction of an indus trial plant as an extension of the existing wine cellar and extension of the under-ground floor, ground floor and loft. Construction in-volved methods that would not alter the quality of the wines, either due to vibrations or atmospheric changes.
lleida, spaintraCjusa
Design and construction of a physical and chemi cal slurry treatment plant with power cogeneration
Miralcamp, spainsolmir
Design and construction of a photovoltaic solar plant. abantia has a 50% stake in the operation and manage-ment of the plant.
INDUSTRIAL
ENVIRONMENTAL & RENEWABLE ENERGy
Reference Projects - Abantia
www.caeabantia.com Control & Applications Abantia | 15
Abantia Sol de Málaga Photovoltaic Park
Photovoltaic Generation Plant in Abanilla
Aigües Ter Llobregat Solar Plant
Location:Client:
Scope:
Location:Client:
Scope:
Location:Client:
Scope:
Málaga, spainMunicipality of Campillos
We put the photovoltaic solar plant in commission. the plant, which comprises 18 power stations of 100 kW each and uses fixed structures with two positions, is expected to export 3,176,411 kW to the network per year.
abanilla, spainabanilla
Installed a photovoltaic solar plant with a nominal pow-er of 3.8 MW. the plant comprises 38 individual power stations of 100 Kw each, which use photovoltaic panels mounted on a fixed structure with the correct orienta-tion and inclination to obtain maximum performance.
barcelona, spain atll (aigües ter llobregat)
Put up 15,000 photovoltaic panels in commission. thanks to this plant, which cost 13.5 million euros, 1,060 t of Co2 emissions will be prevented from enter-ing the atmosphere, as this project forms part of atll’s sustainability Plan.
Abener Solar Energy Plant
Location:Client:
Scope:
seville, spainabener for sanlúcar solar, s.a.
Workshop manufacture and assembly of 624 heliostats for a solar energy plant. Heliostats are mobile mirrors which reflect and concentrate the solar radiation they receive on a receptor located on a 100 m high tower.
www.caeabantia.com16 | Control & Applications Abantia
Photovoltaic Solar Plant for Enersol
Location:Client:
Scope:
toledo, spainEnersol
Construction of photovoltaic solar energy plant with dual axis tracking systems, large-scale use of double-axle followers to increase electrical energy production
SAVA Slurry Reduction and Treatment Plant
Energy Exploitation Plant in Almendralejo
Aigües Ter Llobregat Plant
Location:Client:
Scope:
Location:Client:
Scope:
Location:Client:
Scope:
Miralcamp, spainjV with Comsa Medio ambiente
Constructing a plant for the treatment and reduction of excess slurry from the farms with a treatment capacity of 110,000 tn/year and a continuous operation system of 8,150 hours a year
badajoz, spainEnagás
Construction and supply of a plant for the generation of electricity using residual heat sources. the installation has two main units: a thermal recovery unit compris-ing five thermal recovery boilers, which exchange heat with a second oEC power generation unit.
abrera, spainatll aigües ter llobregat
update of the remote control system and installations for the water supply system. abantia has set up the al-most 150 remote stations, in successive phases, most of the remote stations, as well as their electrical instal-lations, instruments and civil works.
Reference Projects - Abantia
www.caeabantia.com Control & Applications Abantia | 17
Trigeneration Plant
Location:Client:
Scope:
Dominican republicPunta Cana
Energy power plant project, in EPC mode, for the supply of electrical and thermal energy, in the form of steam for laundromats, sanitary hot water (sHW) and cold water for air-conditioning to a group of adjacent hotels
Offshore Plant, Adriatic Project
Location:Client:
Scope:
Cádiz, spainExxon Mobil
assembly of stainless steel pipes in prefa bricated mod-ules and ongoing assembly on a floating concrete raft. the entire plant will be transferred to the north adri-atic, near Venice, to connect to the Italian distribution network.
VAG Slurry Treatment Plant
Location:Client:
Scope:
juneda, spainValoritzacions agroramaderes de les Garrigues
abantia has carried out the urbanization, underground installations, engine building and assembly thereof, metalic structures and assembly of processing equip-ment, as well as natural gas supply installations and electricity line.
ENERGy
Loeches Sludge Drying Plant
Location:Client:
Scope:
Madrid, spainCanal Isabel II
Construction of the loeches sludge drying plant. the turnkey supply contract comprises an electrical cogen-eration plant with Escher-Wyss® technology with a capacity of 10 t/h of evaporated water, equivalent to 105,000 t/year of purified sludge.
www.caeabantia.com18 | Control & Applications Abantia
Pedraforca Building in Pere Virgili Health Park
Hospital Clínic Casualty Building
Location:Client:
Scope:
Location:Client:
Scope:
Madrid, spainPere Virgili Health Park
Construction of the building. Installations include, amongst others, four rooms for dentistry, two casu-alty rooms, surgeries, offices and other services. this building was constructed within the time frame of 12 months, improving on the initial deadline of 16 months.
barcelona, spainsatHEr, s.a.
Complete electrical and special installations in the new 9-storey building, maintenance and operation of the centralized technical management system
PUBLIC HEALTH & SANITATION
Sant Joan de Déu Hospital
Sant Gervasi Funeral Home
Location:Client:
Scope:
Location:Client:
Scope:
barcelona, spainsant joan de Déu Hospital
Carried out the extension works
barcelona, spainbarcelona funeral services
Installations of lighting and mains power, Installations of the Pa system, the communications network and the safety & fire protection
Reference Projects - Abantia
www.caeabantia.com Control & Applications Abantia | 19
Red Cross Hospital
SAR - Home for the Elderly
Location:Client:
Scope:
Location:Client:
Scope:
barcelona, spainspanish red Cross
Construction and refurbishing of a new primary health-care and prevention centre
Madrid, spains.a.r. foundation
a joint project involving different companies of the abantia Group.
Hospital Universitari Sant Joan De Reus
Hospital de Villanueva
Location:Client:
Scope:
Location:Client:
Scope:
tarragona, spainInnova
MEP installations for this more than 93,000 square me-ters hospital complex
Guatemala City, GuatemalaMinistry of Health (Guatemala)
full construction and MEP works of the new hospital equip with 103 beds, 5 operating rooms, and two de-livery rooms spread over a total area of 17,500 square meters.
www.caeabantia.com20 | Control & Applications Abantia
FGC Plaça Europa Railway Station
Barcelona Metro Line 9 Installations
Location:Client:
Scope:
Location:Client:
Scope:
barcelona, spainfGC (Catalan Government railways)
Installations of the control and communications sys-tems for the Plaça Europa station in l’Hospitalet de llobregat for the the autonomous Government of Cata-lonia’s national railway, as well as the link between the l9 and the future fira de barcelona station
barcelona, spainIfErCat
Project design and carrying out of work on telecommu-nications system, traction substations, receiving sub-stations and energy distribution systems for the line 9 of the barcelona Metro system
INFRASTRUCTURES & TRANSPORT
Installations at FGC Pallejà Railway Station
Location:Client:
Scope:
barcelona, spainfGC (Catalan Government railways)
Designed the radio communications and digital trans-mission, access control, the installations control, the public address & intercom, the video surveillance sys-tem and integration of all of the systems at the fGC control centre in sant boi del llobregat, barcelona
Barcelona El Prat Airport
Location:Client:
Scope:
barcelona, spainaEna (spanish airports and air navigation)
Carried out the work and installations for remodelling the power station at barcelona airport. the project consists of the installation of 46 transformer stations distributed throughout the building, and their low volt-age switchboards.
Reference Projects - Abantia
www.caeabantia.com Control & Applications Abantia | 21
The Spanish National Post Office
Meeza Data Center MV2
Location:Client:
Scope:
Location:Client:
Scope:
barcelona, spainCorreos y telégrafos
Maintenance of new post office letter and object clas-sification lines
Doha, QatarMeeza (Qatar foundation)
Complete integrated MEP package (data hall, utilities center, offices)
Meeza Data Center MV3
Location:Client:
Scope:
Doha, QatarMeeza (Qatar foundation)
Complete integrated MEP package (data hall, utilities center, offices)
TERTIARy
Banco Sabadell Atlántico Building
Location:Client:
Scope:
barcelona, spainbanco sabadell, s.a.
rehabilitation and renovation of the 27-storey banco sabadell atlántico building. It is worth highlighting the extra logistical effort required in order for a 27-storey building to remain operative while work was still in progress.
www.caeabantia.com22 | Control & Applications Abantia
Forum Barcelona Building and Pergolas
Gas Tower Building
Location:Client:
Scope:
Location:Client:
Scope:
barcelona, spainbarcelona City Council, Infraestructuras del llevant de barcelona, s.a.Construction of pergolas and exterior development. the equipment supplied contains the most advanced technology, such as variable position fire detectors and “dome” cameras, offering the building the highest lev-els of security.
barcelona, spainGas natural sDG, s.a.
supply, installation and activation of audiovisual sys-tems that include the video-projection, public address, interpretation and videoconference systems for the au-ditorium, the boardroom, management committee room and press room
Sea Towers Complex
Caser Insurance Headquarters
Location:Client:
Scope:
Location:Client:
Scope:
Gdynia, PolandInvest Konfort, s.a.
responsible for all work related to safety, control and electricity systems. the complex is comprised of two apartment buildings and a commercial-leisure area. It is the tallest residential building in Poland.
Madrid, spainseguros Caser
Electrical, lighting and power installations, electrical panels and transformer station; the building’s techni-cal management system for the central services of the insurance company Caser in Madrid
Reference Projects - Abantia
www.caeabantia.com Control & Applications Abantia | 23
Hotel Casa Fuster
Hotel Princess
Location:Client:
Scope:
Location:Client:
Scope:
barcelona, spainHoteles Center
fitting of fire safety installations
barcelona, spainEspais & landscape Diagonal Mar
Mandatory maintenance of installations
Hotel Meliá Golf Vichy Catalán
Location:Client:
Scope:
Catalonia, spainGolf Hotel Malavella, s.l.
Water park leisure area. Exterior residential estate and access road. a joint project carried out by firms from the abantia group.
Casa de les Punxes
Location:Client:
Scope:
barcelona, spainInmobiliaria Colonial
restoration of the building, making it suitable for of-fice and residential use. this project has allowed us to obtain the maximum classification k-7-e as a specialist firm in the restoration of historical-artistic real estate.
www.caeabantia.com24 | Control & Applications Abantia
Cosmocaixa Science Museum
Faunia Biological Park
Location:Client:
Scope:
Location:Client:
Scope:
barcelona, spainla Caixa foundation
Installations of electrical, security system, system inte-gration, access system, control system and audiovisual systems
Madrid, spainbiological Park of Madrid
Construction, installation, engineering, project manage-ment and design. the work required the moving and com-pacting of more than 360,000 m3 of earth, 26,000 t. of concrete, 4 km of interior paths, 60 km network for drain-age and water network and 12 km of fibre-optic cables.
Pérez Galdós Theatre
Valencia Opera House
Location:Client:
Scope:
Location:Client:
Scope:
las Palmas, Canary IslandsPérez Galdós theatre foundation
Carried out the stage installations for the Pérez Galdós theatre in las Palmas de Gran Canaria
Valencia, spainthe autonomous Government of Valencia
Carried out the stage machinery and audiovisual instal-lations at the Valencia opera House, located in the City of arts and sciences complex
LEISURE, CULTURE & SPORT
Reference Projects - Abantia
www.caeabantia.com Control & Applications Abantia | 25
Club Atlético Barceloneta Swimming Pools
Reconstruction work on Gran Teatre del Liceu
Location:Client:
Scope:
Location:Client:
Scope:
barcelona, spainbarcelona City Council
Construction of the Club atlético de la barceloneta covered pool and 1st and 2nd phase construction of the sports com-plex at the old san sebastián baths. 3rd phase construction of an uncovered, saltwater pool, complementary leisure areas, changing rooms, water-park and increased parking
barcelona, spainConsorci del Gran teatre del liceu
Installed the electrical, mechanical, control, communi-cations and security systems. the installations and the building must form a harmonious complex of coopera-tive functioning.
www.caeabantia.com26 | Control & Applications Abantia
Reference Projects - CAE
Ruwais 4th NGL Train Instrumentation Works
RTU/SCADA Replacement
Modernization of SCADA & Instruments/Control Systems (MOSAICS)
Asab Accommodation Facilities
Location:Client:
Scope:
Location:Client:
Scope:
Location:Client:
Scope:
Location:Client:
Scope:
ruwais, abu Dhabi, u.a.E.Petrofac - Gs Engineering Construction / GasCo
Instrumentation & telecom, tie-in works, cathodic pro-tection works, instrumentation hook-ups, testing & pre-commissioning, supply & installation of all materials and temporary construction works
umm shaif, Zakum (offshore Platforms), u.a.E.aDMa-oPCo
EPC & commissioning, instrumentation, electrical and mechanical works, hot changeover, DCs upgrade, rtu / sCaDa / hydraulic safety shutdown system replace-ment, solar panels, telemetry interface, cabling
Zirku Island, u.a.E.Honeywell / ZaDCo
Electrical, instrumentation & civil works, hot changeo-ver and sCaDa, EsD, f&G, DCs upgrade
asab, abu Dhabi, u.a.E.Granite / GasCo
Design, engineering, procurement, construction, in-stallation & commissioning of: electrical distribution network, sMatV system and voice & data networks, 11 kV substations, lV power distribution, internal and external electrification, structured cabling system
www.caeabantia.com Control & Applications Abantia | 27
Formula 1 Race Track
Habshan Non-Process Buildings
Desalination Plant Electrical Works
Ruwais Refinery ExpansionUtilities and Offside Unit E&I
Location:Client:
Scope:
Location:Client:
Scope:
Location:Client:
Scope:
Location:Client:
Scope:
yas Island, abu Dhabi, u.a.E.PKE siemens / alDar
Engineering, procurement and construction works for all buildings, installation of complete systems: lighting, small power, earthing, lightning protection, fire alarm systems, structured cabling for all systems
Habshan, abu Dhabi, u.a.E.Granite / GasCo
Engineering, procurement, construction & commission-ing. 11 kV substations, lV power distribution, internal and external electrification, fire alarm and gas detec-tion system and Pabx works
fujairah, u.a.E.otV-Veolia / fujairah asia Power Company
Electrical works and instrumentation engineering works including detail design & supply for reverse osmosis plant. supply and installation of the following: electrical sleeves, steel structures, fire fighting works, complete lightning systems, small power works
ruwais, abu Dhabi, u.a.E.samsung / taKrEEr
Electrical, instrumentation works, testing and pre-com-missioning, assistance during commissioning and per-formance testing, supply & installation of all materials and temporary construction works
www.caeabantia.com28 | Control & Applications Abantia
AGD II Construction Camp & Temporary Facilities
Step I Ethylene Plant
Safety Integrity Level Study for Train I, II, III and Boilers 1-6 ESD Systems
Al Wathba Waste Water Treatment Plant
Location:Client:
Scope:
Location:Client:
Scope:
Location:Client:Scope:
Location:Client:
Scope:
asab, abu Dhabi, u.a.E.Granite / bechtel
Electrical, instrumentation works, cabling, power sup-ply, fire alarm, and sMatC systems
ruwais, abu Dhabi, u.a.E.alstom / borouge
Construction, commissioning, Pa system, fiber optic cables, security system, CCtV, telephone, and data systems
Das Island, u.a.E.aDGassafety Integrity level (sIl) study and procurement works, validation of fEED documents, assessment of existing safety related instrumentation, including site survey and field verification, field instruments installa-tion and support
al Wathba, al ain, abu Dhabi, u.a.E.otV-bEsIx sanotec jV / aDWEa
Electrical and instrumentation works, testing and pre-commissioning, assistance during commissioning and performance testing, supply and installation of all ma-terials, temporary construction works
Reference Projects - CAE
www.caeabantia.com Control & Applications Abantia | 29
SAS Fields E&I and Telecom Works
Ruwais Refinery Expansion - Tankageand Piping Unit Instrumentation Works
Allahamah Waste Water Treatment Plant
BeAAT Central EnvironmentProtection Facilities
Location:Client:
Scope:
Location:Client:
Scope:
Location:Client:
Scope:
Location:Client:
Scope:
sahil / asab / shah fields, abu Dhabi, u.a.E.tekfen / aDCo
Electrical and instrumentation works, transformers, switchgears, VsDs, Dbs, multiport selection valves, DG sets, f&G, alarm systems, assistance during valve retrofit-ting, electrical, instrumentation and telecom tie-ins
ruwais, abu Dhabi, u.a.E.Daewoo / taKrEEr
Installation of instrumentation works and its related items, testing and pre-commissioning, assistance dur-ing commissioning and performance testing supply and installation of all materials, temporary construction works
allahamah, al ain, abu Dhabi, u.a.E.otV - besix sanotec jV / aDWEa
Installation of instrumentation works and its related items, testing and pre-commissioning, assistance during commissioning and performance testing, supply and in-stallation of all materials, temporary construction works
ruwais, abu Dhabi, u.a.E.snC lavalin / taKrEEr
Procurement, construction, commissioning, total plant electrical works including 11 kV substation, power distri-bution, lighting, earthing, feed to process loads, total plant instrumentation works including control room equipments such as PlC, fire & gas system, Pa system etc.
www.caeabantia.com30 | Control & Applications Abantia
Reference Projects - CAE
Boilers Control System Upgrade
Water Injection System Upgrade
Habshan Industrial Facilities
Location:Client:
Scope:
Location:Client:
Scope:
Location:Client:
Scope:
Das Island, abu Dhabi, u.a.E.aDMa-oPCo
EPC and commissioning, electrical, instrumentation, civil works, changeover of control system during shut-down, control, system, PlC, bMs and cabling works
asab, abu Dhabi, u.a.E.Cat / aDCo
Complete EPC, electrical and instrumentation, sCaDa, controls systems, power supply and cabling works
Habshan, abu Dhabi, u.a.E. al fara’a / GasCo
Complete MEP works (design, detailed engineering, testing, installation and commissioning), electrical works, telecom system, HVaC, plumbing and drainage, fire fighting works
Control & Applications Abantia
15th Floor Al Masraf Building Sheikh Hamdan Street P.O. Box 3687 Abu Dhabi, U.A.E.
Tel: +971 2 6767 965 Fax: +971 2 6767 956 Email: [email protected]
www.caeabantia.com
www.caeme.com Control & applications Emirates
www.abantia.com abantia Group
www.cagroup.ae Control & applications Group
Contact Info
Hamdan Street
Electra Street
Al S
alam
Str
eet
SUN & SAND Elenco EmiratesGroup
HAl Salamah
Hospital
AL MASRAFBANK
(Former)RBS Bank
Bldg
National Bank ofUmm Al Qaiwain
Hazza binZayed Mosque
Electra Park
Fresh Chicken King
InternationalRotana Inn
TO TOURIST CLUB
TO C
ORN
ICH
E
TO AIRPORT ROAD
TO AIRPORT ROAD TO TOURIST CLUB
Control & Applications Abantia15th Floor - 1503 Al Masraf Bank Building
Sheikh Hamdan StreetAbu Dhabi, UAE
Tel: +971 2 6767 965Fax: +971 2 6767 956
control & applications C
A2
Control & Applications AbantiaLocation Map
Control & Applications Abantia
15th Floor Al Masraf Building Sheikh Hamdan Street P.O. Box 3687 Abu Dhabi, U.A.E.
Tel: +971 2 6767 965 Fax: +971 2 6767 956 Email: [email protected]
www.caeabantia.com
Copyright © 2011 Control & Applications Abantia. All rights reserved. The Control & Applications Abantia logo and any alternative version thereof are trademarks and service marks of Control & Applications Abantia. The other names mentioned, registered or not, are the property of their respective companies. Information contained in this document is provided without liability for information purposes only and is subject to change without notice. No representation or warranty is given or to be implied as to the completeness of information or fitness to any particular purposes. C2A reserves the right to revise or change this data at any time without further notice.