innovations of civil engineering
TRANSCRIPT
Innovations Of Civil Engineering
And Their
Impact On Communities
Civil Engineering brings about unprecedented
developments that impact thousands of lives at
one instance yet at the same time it
safe-guards , alleviates even the smallest of
the communities .
Content and Indexing
Introduction to the view of Innovation in Civil Engineering and their Impact on Communities .
Civil Engineering Innovations in the Bandra - Worli Sea Link Project , Mumbai . (Case-Study 1) .
Technical Instances of the Sea Link Project
Civil Engineering Innovations in Kolkata Metro Extension Project in Duttabad . (Case-Study 2) .
Technical Instances of the Duttabad Constraint .
Civil Engineering Innovations in New Foremost Affordable Housing Projects .
Technical Instances for the prospected Maximum Efficiency Affordable Housing Projects .
Acknowledgement and Technical-References .
Conclusion .
The Mumbai Sea-Link Project
(Case Study – 1)
The Bandra Worli Sea Link Project defied imposing ,
rigorous Open Sea Conditions to create one of the
most phenomenal Cable Stayed Bridges spanning
across the continually transcending , roaring
Arabian Sea convening the entire outreach of the
Mumbai Suburbs to the main nerve-centre and
flourishing business district of the ever effervescent
Metropolis of Mumbai .
The Bandra-Worli Sea Link ;
an unprecedented Assertion of Civil
Engineering Ahead of its Time
The Bandra – Worli
Sea Link MegastructureThe Floating Barge based
enclosure Innovation of the
Sea Link Project .
The Sea-Link Project used Seismic
Arresters in the Open Sea extent
piers making it the first of its kind
Project .
The Mumbai Sea Link was the First
Open Sea
Cable Stayed Bridge Structure
of this epic proportions
Mumbai Sea-Link :-
Technical Instances
Civil Engineering Innovation to subjugate
the Duttabad Constraint
in Kolkata Metro Expansion Project
Technical Innovations used in the for the Duttabad extend
of the Kolkata Metro Expansion Project to advance
construction yet safe-guard the concerns of the community
underneath .
New-Age Prospected Maximum
Efficiency Affordable Housing Project
But the very ethos of this Project Civil Engineering took the surge ahead to safeguard and protect the thriving hope of the community by exemplifying innovations in the construction plan and putting forward a whole new design for the Duttabad Stretch of the Metro Megastructure . The New Design reduced the Pier requirement from a staggering 13 Piers to just 7 Piers at the same time conforming the stability of the structure so that the Ground Footprint of the Project is phenomenally reduced and consequently protecting the Community lying underneath yet at the same time ensuring the safety standard of the entire Project , without compensating for the stability owing to this Design up-gradation for the concerned segment w.r.t the remaining extents of the elevated Proposition . The Stability of the New Design was affirmed by decreasing the Girder Length , increasing the number of consequent sections and innovative Pier placing with a increased distance between a pair of Pier being increased from 25 m to 90 m in a new aesthetic plan where the relatively smaller sections are supported by Strategically Placed Pier which would account for the stability of the smaller section itself without having to sustain the load of the subsequent structures (adjacent Girder components) .
Prevailing Conventions of Affordable
Housing
Absence of Sanitary-Conditions and
deprivation from Privacy in
under-privileged Communities
Few Instances from Duttabad
Few Instances of impoverished
community settlement and the section
New Age Affordable Housing can Impact
the most
ConclusionThe entire project that I got a chance to uplift here transits through an subtle time-line exemplifying
groundbreaking Civil Innovations that We have accomplish in the past , that's currently apprehending achievement and that We can attain to incite class-leading strides in the field of Community apprising Civil Engineering in the approaching future .
The Bandra - Worli Sea Link Project defied imposing , rigorous Open Sea Conditions to create one of the most phenomenal Cable Stayed Bridges convening the entire outreach of the Mumbai Suburbs to the main nerve-centre and flourishing business district of the ever effervescent Metropolis of Mumbai .
It employed the following state-of-the-art innovations -
🔹 Enormous transiting barges comprehending simultaneously with the progressing construction in order to stage up protective barriers against the belligerent Wind Currents of the Arabian Sea furnishing a stable and constant working condition for the On Sea Sections of this Megastructure.
🔹 Its the First Sea Commute Bridge Structure in India to be fortified by Seismic Arresters so as to safe-guard the structure from Over Sea reverberations as well as for Earthquake Protection .
🔹 It stood ahead to constitute a cutting edge Cable Stayed section in the central expanse of the Bridge so as to concur it as Aesthetically Inimitable Project spanning across the Arabian Sea contours of Mumbai .
The execution of the Newly Proposed Metro Construction extent at Duttabad reaffirms to Us unflinchingly that Civil Engineering can bring about unrestrained Development yet at the same time safe-guarding the concerns , grievances and requirements of even the smallest of the Communities .
And the Pre-perceived Affordable Housing Project that I communed in this project stands to emerge beyond the conventions and confer that Civil Engineering can innovate , uplift and progress to sustain , shelter and usher the lives of people and Communities beyond obstacles , beyond barricades till the End of Time because the prospect of progress livened by Civil Engineering Innovations is infinite .
THANK YOU
• Presentation and concept by Aadhiraaj Roy.