Building Information Modelling (BIM)Presented by: Rob Bowden
COPYRIGHT © 2013 MITSUBISHI ELECTRIC EUROPE B.V. ALL RIGHTS RESERVED
![Page 3: Innovations - Mitshubishi Electric 07.02.14](https://reader036.vdocuments.mx/reader036/viewer/2022062404/554a5668b4c905572f8b4c3b/html5/thumbnails/3.jpg)
Building Information Modelling (BIM)
• A method of collaborative working
• Greater productivity
• Risk management
• Sustainability
• Reduces waste and costs
COPYRIGHT © 2013 MITSUBISHI ELECTRIC EUROPE B.V. ALL RIGHTS RESERVED
![Page 4: Innovations - Mitshubishi Electric 07.02.14](https://reader036.vdocuments.mx/reader036/viewer/2022062404/554a5668b4c905572f8b4c3b/html5/thumbnails/4.jpg)
What is BIM?
• Emphasis often placed on the technology
• Digital representation of the building
• Information sharing via this model
• From design, through to construction and during occupation
COPYRIGHT © 2013 MITSUBISHI ELECTRIC EUROPE B.V. ALL RIGHTS RESERVED
![Page 5: Innovations - Mitshubishi Electric 07.02.14](https://reader036.vdocuments.mx/reader036/viewer/2022062404/554a5668b4c905572f8b4c3b/html5/thumbnails/5.jpg)
A Way of Working
• But the technology is a secondary consideration
• BIM is a way of working
• Not about modelling but about the process
• Teamwork and collaboration
COPYRIGHT © 2013 MITSUBISHI ELECTRIC EUROPE B.V. ALL RIGHTS RESERVED
![Page 6: Innovations - Mitshubishi Electric 07.02.14](https://reader036.vdocuments.mx/reader036/viewer/2022062404/554a5668b4c905572f8b4c3b/html5/thumbnails/6.jpg)
The BIM Task Group Definition
BIM is:
“Essentially value-creating collaboration through the entire life-cycle of an asset, underpinned by the creation, collation and exchange of shared 3D models and intelligent, structured data attached to them."
COPYRIGHT © 2013 MITSUBISHI ELECTRIC EUROPE B.V. ALL RIGHTS RESERVED
![Page 7: Innovations - Mitshubishi Electric 07.02.14](https://reader036.vdocuments.mx/reader036/viewer/2022062404/554a5668b4c905572f8b4c3b/html5/thumbnails/7.jpg)
A Brief History
• First discussed in the early 1990s
• Gained ground about ten years ago
• Current interest driven by Government Construction Strategy (2011)
COPYRIGHT © 2013 MITSUBISHI ELECTRIC EUROPE B.V. ALL RIGHTS RESERVED
![Page 8: Innovations - Mitshubishi Electric 07.02.14](https://reader036.vdocuments.mx/reader036/viewer/2022062404/554a5668b4c905572f8b4c3b/html5/thumbnails/8.jpg)
Government Construction Strategy
• Aims to achieve value for money on public build projects
• Requires use of collaborative BIM by end March 2016
• Project information, asset data, documentation - all must be electronic
COPYRIGHT © 2013 MITSUBISHI ELECTRIC EUROPE B.V. ALL RIGHTS RESERVED
![Page 9: Innovations - Mitshubishi Electric 07.02.14](https://reader036.vdocuments.mx/reader036/viewer/2022062404/554a5668b4c905572f8b4c3b/html5/thumbnails/9.jpg)
Government Targets
• Government places great emphasis on BIM
• Reduce capital cost
• Cut carbon
• 20% reduction required
• Also aim to cut timescales, accidents and waste
COPYRIGHT © 2013 MITSUBISHI ELECTRIC EUROPE B.V. ALL RIGHTS RESERVED
![Page 10: Innovations - Mitshubishi Electric 07.02.14](https://reader036.vdocuments.mx/reader036/viewer/2022062404/554a5668b4c905572f8b4c3b/html5/thumbnails/10.jpg)
Wider Objectives for BIM
• Global export market for UK construction
• Boosted by BIM: £7.6 million a year
• UK is leading the way in the use of BIM
• A window of opportunity
COPYRIGHT © 2013 MITSUBISHI ELECTRIC EUROPE B.V. ALL RIGHTS RESERVED
![Page 11: Innovations - Mitshubishi Electric 07.02.14](https://reader036.vdocuments.mx/reader036/viewer/2022062404/554a5668b4c905572f8b4c3b/html5/thumbnails/11.jpg)
Collaboration from Cradle to Grave
• Biggest impact is a change in the way of working
• Move away from silos and incompatible software
• Transparency, communication and collaboration
• Reduce waste in procurement, process and material
• Better handover from construction team to building owner/operator
COPYRIGHT © 2013 MITSUBISHI ELECTRIC EUROPE B.V. ALL RIGHTS RESERVED
![Page 12: Innovations - Mitshubishi Electric 07.02.14](https://reader036.vdocuments.mx/reader036/viewer/2022062404/554a5668b4c905572f8b4c3b/html5/thumbnails/12.jpg)
Benefits of BIM
• Benefits to all members of the construction team
• Designers test concepts and optimise design
• Contractors can preview the construction process
• Prepare and coordinate drawings
• Owners can optimise maintenance, boost efficiency, monitor life cycle costs
COPYRIGHT © 2013 MITSUBISHI ELECTRIC EUROPE B.V. ALL RIGHTS RESERVED
![Page 13: Innovations - Mitshubishi Electric 07.02.14](https://reader036.vdocuments.mx/reader036/viewer/2022062404/554a5668b4c905572f8b4c3b/html5/thumbnails/13.jpg)
Moving Forward with BIM
• Reduces work
• Results in fewer errors and re-working
• Minimises conflicts and changes during the construction process
• Greater productivity
• Lower costs
COPYRIGHT © 2013 MITSUBISHI ELECTRIC EUROPE B.V. ALL RIGHTS RESERVED
![Page 14: Innovations - Mitshubishi Electric 07.02.14](https://reader036.vdocuments.mx/reader036/viewer/2022062404/554a5668b4c905572f8b4c3b/html5/thumbnails/14.jpg)
More Than Just a 3D Model
• The mechanics of BIM
• More than computer-aided design
• Stores architectural, engineering and construction information
• Shared by the whole team
COPYRIGHT © 2013 MITSUBISHI ELECTRIC EUROPE B.V. ALL RIGHTS RESERVED
![Page 15: Innovations - Mitshubishi Electric 07.02.14](https://reader036.vdocuments.mx/reader036/viewer/2022062404/554a5668b4c905572f8b4c3b/html5/thumbnails/15.jpg)
Information is Key
• BIM models associate information about assets with geometry
• Documentation can be built in a more structured way
• Shared by project participants at different stages
• Captures programme and cost information
COPYRIGHT © 2013 MITSUBISHI ELECTRIC EUROPE B.V. ALL RIGHTS RESERVED
![Page 16: Innovations - Mitshubishi Electric 07.02.14](https://reader036.vdocuments.mx/reader036/viewer/2022062404/554a5668b4c905572f8b4c3b/html5/thumbnails/16.jpg)
Progression of BIM
• BIM is at different stages in different organisations
• Some using it in a relatively unsophisticated way
• Others fully integrated project models
• Based on Industry Foundation-Class (IFC) compliant data standards
COPYRIGHT © 2013 MITSUBISHI ELECTRIC EUROPE B.V. ALL RIGHTS RESERVED
![Page 17: Innovations - Mitshubishi Electric 07.02.14](https://reader036.vdocuments.mx/reader036/viewer/2022062404/554a5668b4c905572f8b4c3b/html5/thumbnails/17.jpg)
Open and Shared Information
• IFC is an open, object-based file format
• Designed to facilitate interoperability
• Not controlled by a single vendor
• IFC can be used to exchange and share BIM data
COPYRIGHT © 2013 MITSUBISHI ELECTRIC EUROPE B.V. ALL RIGHTS RESERVED
![Page 18: Innovations - Mitshubishi Electric 07.02.14](https://reader036.vdocuments.mx/reader036/viewer/2022062404/554a5668b4c905572f8b4c3b/html5/thumbnails/18.jpg)
BIM Levels
COPYRIGHT © 2013 MITSUBISHI ELECTRIC EUROPE B.V. ALL RIGHTS RESERVED
![Page 19: Innovations - Mitshubishi Electric 07.02.14](https://reader036.vdocuments.mx/reader036/viewer/2022062404/554a5668b4c905572f8b4c3b/html5/thumbnails/19.jpg)
Building Operation
• BIM and the life-cycle of a building
• Can also be used by building owners/managers
• Gives them a clear idea of exactly what is in their building
• Helps with maintenance planning
• In the long-term can also help with refurbishment/updating
COPYRIGHT © 2013 MITSUBISHI ELECTRIC EUROPE B.V. ALL RIGHTS RESERVED
![Page 20: Innovations - Mitshubishi Electric 07.02.14](https://reader036.vdocuments.mx/reader036/viewer/2022062404/554a5668b4c905572f8b4c3b/html5/thumbnails/20.jpg)
Soft Landings
• Soft Landings - a partner for BIM
• Developed by BSRIA and the Usable Buildings Trust
• 5-stage building procurement initiative
• Designers and contractors stay involved after completion
COPYRIGHT © 2013 MITSUBISHI ELECTRIC EUROPE B.V. ALL RIGHTS RESERVED
![Page 21: Innovations - Mitshubishi Electric 07.02.14](https://reader036.vdocuments.mx/reader036/viewer/2022062404/554a5668b4c905572f8b4c3b/html5/thumbnails/21.jpg)
Governments Response
• Government Soft Landings (GSL)
• Also going to be compulsory on Government projects after 2016
• Number of guiding principles
• Early engagement of the end-user
• Commitment to after-care
• Post-occupancy evaluation and feedback
COPYRIGHT © 2013 MITSUBISHI ELECTRIC EUROPE B.V. ALL RIGHTS RESERVED
![Page 22: Innovations - Mitshubishi Electric 07.02.14](https://reader036.vdocuments.mx/reader036/viewer/2022062404/554a5668b4c905572f8b4c3b/html5/thumbnails/22.jpg)
Thank you
We now invite you to ask any questions.
COPYRIGHT © 2013 MITSUBISHI ELECTRIC EUROPE B.V. ALL RIGHTS RESERVED
![Page 23: Innovations - Mitshubishi Electric 07.02.14](https://reader036.vdocuments.mx/reader036/viewer/2022062404/554a5668b4c905572f8b4c3b/html5/thumbnails/23.jpg)
We Support BIM
3D modellingAutodesk Revit most popular software
We can provide most models – ask your account manager for Revit files
![Page 24: Innovations - Mitshubishi Electric 07.02.14](https://reader036.vdocuments.mx/reader036/viewer/2022062404/554a5668b4c905572f8b4c3b/html5/thumbnails/24.jpg)
We Support EDSL TAS
Energy AnalysisFull implementation in EDSL Tas building energy simulation
software
VRF, Splits, Heat Recovery Ventilation, Ecodan air to water
![Page 25: Innovations - Mitshubishi Electric 07.02.14](https://reader036.vdocuments.mx/reader036/viewer/2022062404/554a5668b4c905572f8b4c3b/html5/thumbnails/25.jpg)
New City Multi YKM VRF
New Heating Only Split Systems
New M-Net Touch Screen Controller
New Simplified Controller
New MELCloud
Product Updates
![Page 26: Innovations - Mitshubishi Electric 07.02.14](https://reader036.vdocuments.mx/reader036/viewer/2022062404/554a5668b4c905572f8b4c3b/html5/thumbnails/26.jpg)
City Multi YKM VRF System
![Page 27: Innovations - Mitshubishi Electric 07.02.14](https://reader036.vdocuments.mx/reader036/viewer/2022062404/554a5668b4c905572f8b4c3b/html5/thumbnails/27.jpg)
City Multi VRF
VRF market is always developing and pushing new boundaries
Mitsubishi Electric remain at the forefront
Introducing YKM, the highest efficiency air source VRF system, optimised for seasonal performance
EP (High CoP) Models ONLY
Y Series Size 200 – 900
R2 Size 200 - 700
![Page 28: Innovations - Mitshubishi Electric 07.02.14](https://reader036.vdocuments.mx/reader036/viewer/2022062404/554a5668b4c905572f8b4c3b/html5/thumbnails/28.jpg)
City Multi VRF
The Complete Integrated Solution
![Page 29: Innovations - Mitshubishi Electric 07.02.14](https://reader036.vdocuments.mx/reader036/viewer/2022062404/554a5668b4c905572f8b4c3b/html5/thumbnails/29.jpg)
Why Focus on Seasonal Efficiency
COOLING COOLING SEASONSEASON
HEATING HEATING SEASONSEASON
For the majority of the heating and cooling season the VRF system runs at part load
![Page 30: Innovations - Mitshubishi Electric 07.02.14](https://reader036.vdocuments.mx/reader036/viewer/2022062404/554a5668b4c905572f8b4c3b/html5/thumbnails/30.jpg)
Seasonal Efficiency Legislative Drive
![Page 31: Innovations - Mitshubishi Electric 07.02.14](https://reader036.vdocuments.mx/reader036/viewer/2022062404/554a5668b4c905572f8b4c3b/html5/thumbnails/31.jpg)
Achieving Comfort & Control
Energy Saving Cooling Mode Refrigerant Temp Control Optimal control between capacity, efficiency & comfort
Outside 30°C
Target Evaporating Temperature 0°C
High Capacity
Comfortable Internal Condition
Outside 20°C
Target Evaporating Temperature 4°C
Required capacity
Mild off coil temperature
Improved efficiency
Comfortable Internal Condition
Decrease ambient temperature
![Page 32: Innovations - Mitshubishi Electric 07.02.14](https://reader036.vdocuments.mx/reader036/viewer/2022062404/554a5668b4c905572f8b4c3b/html5/thumbnails/32.jpg)
Heating Only Solutions
There are many reasons to use these energy efficient products to provide only heating to a building via the delivery method of air
Many buildings do not need cooling, for example schools and student accommodation
Heat pump air conditioning systems offer a simple, flexible and efficient method of delivering heat to a building
Help with Part L Compliance by removing all power consumption related to cooling
![Page 33: Innovations - Mitshubishi Electric 07.02.14](https://reader036.vdocuments.mx/reader036/viewer/2022062404/554a5668b4c905572f8b4c3b/html5/thumbnails/33.jpg)
Heating Only Option
3.5kW to 45kW
CUHZ-ZRP Product Reference
Same Spec/Price as Heating and Cool
Full Indoor Range Available
Must use PAR-31MAA controller to function
Heating Only Solutions
![Page 34: Innovations - Mitshubishi Electric 07.02.14](https://reader036.vdocuments.mx/reader036/viewer/2022062404/554a5668b4c905572f8b4c3b/html5/thumbnails/34.jpg)
Controls Update
![Page 35: Innovations - Mitshubishi Electric 07.02.14](https://reader036.vdocuments.mx/reader036/viewer/2022062404/554a5668b4c905572f8b4c3b/html5/thumbnails/35.jpg)
PAR-U01MEDU
- Replacement for the PAR-F27MEA- M-Net Controller- First Small Touch Screen Controller- Back Light- Built in PIR Occupancy Sensor- Screen Brightness Detector- Built in Temperature & Humidity
Sensor- Colour Indicator
![Page 36: Innovations - Mitshubishi Electric 07.02.14](https://reader036.vdocuments.mx/reader036/viewer/2022062404/554a5668b4c905572f8b4c3b/html5/thumbnails/36.jpg)
PAC-YT52CRAS
- Back Lit
- No Louvre Button
- Available Oct 2013
- UK Only
- Silver/Black Design
![Page 37: Innovations - Mitshubishi Electric 07.02.14](https://reader036.vdocuments.mx/reader036/viewer/2022062404/554a5668b4c905572f8b4c3b/html5/thumbnails/37.jpg)
MELCloud
- Cloud Based Control
- PC, Tablet or Smartphone
- Apple, Android, Windows or Blackberry
- Remote Control
- Multiple Users
![Page 38: Innovations - Mitshubishi Electric 07.02.14](https://reader036.vdocuments.mx/reader036/viewer/2022062404/554a5668b4c905572f8b4c3b/html5/thumbnails/38.jpg)
MELCloud
- Unit Control
- Reports
- Localised Weather Information
- Frost Protection
- 7 day Multi Programmable Timer and Holiday Mode
![Page 39: Innovations - Mitshubishi Electric 07.02.14](https://reader036.vdocuments.mx/reader036/viewer/2022062404/554a5668b4c905572f8b4c3b/html5/thumbnails/39.jpg)
MELCloud
- Phase 1 – M Series and Mr Slim
- Phase 2 - Ecodan
- Phase 3 – City Multi VRF
![Page 40: Innovations - Mitshubishi Electric 07.02.14](https://reader036.vdocuments.mx/reader036/viewer/2022062404/554a5668b4c905572f8b4c3b/html5/thumbnails/40.jpg)
MELCloud - MAC-557IF-E
The Mitsubishi Electric WiFi Interface is designed for communication to the Mitsubishi Electric MELCloud service
![Page 41: Innovations - Mitshubishi Electric 07.02.14](https://reader036.vdocuments.mx/reader036/viewer/2022062404/554a5668b4c905572f8b4c3b/html5/thumbnails/41.jpg)
Thank you