Inner Doha Resewerage Implementation Scheme (IDRIS)

ICE Qatar Meeting

17-May-2016 Doha, Qatar

Bill Van Wagenen- Programme Director

Val S. Frenkel – Principal PM

WHAT WE WILL PRESENT

1. Safety Moment

2. The Need - Why IDRIS

3. The Solution

4. Our Delivery – Unique and Innovative

5. Progress So Far

6. The Future

7. Questions and Answers

3

WHY IDRIS ?

4

.

Qatar Population Growth

SUPPORTING POPULATION GROWTH…

South Doha forecasted to grow

from 600,000 to 1.5 million

By 2030

5

SOUTH DOHA FLOODING Aggravated By Increased

Density Of The Area

Flooding in the Heart of Doha….

6

THE PROBLEM…..A Public Health Hazard….

7

30 Pumping Stations to

be decommissioned

Doha South STW operating

since 1980

AGING SEWERAGE INFRASTRUCTURE….

8

Planned Stadium Next Door to Doha South STW

New Stadium

IMPACTS TO WORLD CUP 2022…….

9

10

Sewer Link TunnelMain

TunnelsNew Pump

Station

New Treatment

Plant

Treated Effluent Return System

Main Trunk Sewer

Existing

Sewers

Lateral

Interceptor Sewers

Pump

Station

Sewage

Treatment

Works

IDRIS COMPONENTS

Sewage Treatment Works

Existing Sewers

Pump Station

A Sustainable Design that uses gravity to convey the used water

11

LIS-01

MTS-01

LIS-03

MTS-02

LIS-02

MTS-03

TRS-01

TPS/STW

LIS-03

Lateral Interceptor Sewer

Lateral Interceptor Sewer

Lateral Interceptor Sewer

Lateral Interceptor Sewer

Main Trunk Sewer

Main Trunk Sewer

Main Trunk Sewer

Terminal Pump Station / Sewage treatment Works

Treated Return System

IDRIS PROJECT PACKAGES

12

Completion

2011 2012 2013 2014 2015 2016 2017 2018 2019

Today

TPS/STW Contract Award Q2 2016

MTS Contracts AwardedQ1/Q2 2015

Implementation Contract Prequalification Oct 2013

Preliminary DesignApr 2013

Concept Design

Oct 2012

2020

Dec 2011

PMC Contract Award

Q4 2020

LIS Contracts Awarded Q3 2015/Q1 2016

IDRIS TIMELINE

13

IDRIS Implementation…

Packaging Strategy

AWARDED

AWARDED

FINAL TENDER

PHASE

FINAL TENDER

PHASE

14

Innovative Technologies Introduced

15

Technological Innovation Vertical Shaft Sinking Machine

16

Advanced Wastewater Treatment Plant SummaryTAKE AWAY

Screen Grit Removal Solids Settling 1st

1 2 3Steps

7 4

Biological TreatmentWater

Reuse

6

Membrane

FiltrationSolids Settling 2nd

5

Disinfection

UV

Inactivation

HIGHEST QUALITY PRODUCED WATER

17

Integrated Tunnel Precast Segments

• Primary, secondary and HDPE lining precast together

• Fiber reinforced concrete

• Improved quality

• Safer installation

18

No outfall - TSE system integrated

IDRIS is a part of long term

Drainage master plan for Qatar

including expanded TSE usage

19

PROGRAMME DELIVERY….

20

MTS PACKAGE (3 CONTRACTS)

Execution Contractors

LIS PACKAGE (3 CONTRACTS) TPS|STW PACKAGE (1 CONTRACT)

PUBLIC WORKS

AUTHORITY

PROGRAMME MANAGEMENT CONSULTANT

Supervision Consultant

Design Consultant

Execution Contractors

Supervision Consultant

Design Consultant

Execution Contractors

Supervision Consultant

Design Consultant

QCE QCE QCE

Contract Administration

Design Management

Detailed Design

Contract Administration

Design Management

Detailed Design

Contract Administration

Design Management

Detailed Design

Supervision Consultant Supervision Consultant Supervision Consultant

Construction Supervision

SITE SUPERVISIONConstruction Supervision

SITE SUPERVISION Construction Supervision

SITE SUPERVISION

Enhanced Authority Oversight Model

21

COLLABORATIVE HSE CULTURE

Focus On Worker Welfare

• Centralized dining and food preparation• Living Quarters Meet QF Standards

Evaporating Cooling Bandana

• Workers wets every three

hours

• Reduces temperature by up

to 10°c

22

STRONG GROUNDWATER CONTROL PROGRAMNo Active Dewatering Allowed

Diaphragm Walls Vertical Shaft Machine

Grouting & Rock BoltingSecant Walls

23

CEEEQUAL Utilized By Idris / FIRST TIME IN THE GCC

Environmental Sustainability & Assessment rating

& award scheme for Infrastructure projects.

CEEQUAL celebrates the commitment of the

civil engineering industry

• CEEQUAL is an environmental award system

developed by the engineering community (ICE)

for use in analysis of infrastructure projects.

• Scoring revised through regional assessment

team to be appropriate to the Qatar environment.

24

20 year O&M Incentives TPS/STW contractor

DBO procurement and delivery strategy - one entity

design, build and operate TPS/STW for 20 years

25

CONNECTED BIM……..Benefit the entire project team

All IDRIS Contracts Will Have 4D BIM

26

Integrated Document Management System

PWA

PMCSubContractor

SC

Contractor

IDRIS

PROJECTS

DOCUMENT

QCE

COMMON SYSTEM SHARED ACROSS

THE PROGRAMME

27

Our Progress So Far……..

28

29

Accommodate

economic &

planned growth

Provide 50 year

sewerage solution

for Doha’s largest

catchment

Produce up to

500,000 m3/day high

quality TSE (reuse

water) by 2030

THE OUTCOME…….

Eliminate serious

public health issue

caused by foul

sewage

Eliminate aging

pump stations

30

THE FUTURE

Questions and Answers