initial remediation - landfill area construction …

17
© 2020 Microsoft Corporation © 2020 TomTom INITIAL REMEDIATION - LANDFILL AREA CONSTRUCTION DRAWINGS ROUGH AND READY ISLAND PORT OF STOCKTON STOCKTON, CALIFORNIA JUNE 2021 LOCATION MAP VICINITY MAP B C D E F 8 7 6 5 4 3 G 2 1 8 7 6 5 4 3 2 1 B C D E F G A A INITIAL REMEDIATION - LANDFILL AREA PORT OF STOCKTON 2201 WEST WASHINGTON STREET, STOCKTON, CALIFORNIA 95203 PROJECT: SITE: TITLE: APPROVED BY: REVIEWED BY: DRAWING NO.: OF DRAWN BY: DESIGN BY: CHECKED BY: FILE: PROJECT NO.: DATE: DATE REV APP DESCRIPTION DRN 17 JUNE 2021 WR2501B CONSTRUCTION DRAWINGS WR2501B-01 JM BX JM FS FS COVER AND INDEX SHEET 1

Upload: others

Post on 12-May-2022

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: INITIAL REMEDIATION - LANDFILL AREA CONSTRUCTION …

© 2020 Microsoft Corporation © 2020 TomTom

INITIAL REMEDIATION - LANDFILL AREA

CONSTRUCTION DRAWINGS

ROUGH AND READY ISLAND

PORT OF STOCKTON

STOCKTON, CALIFORNIA

JUNE 2021

LOCATION MAP

VICINITY MAP

B

C

D

E

F

876543

G

21

87654321

B

C

D

E

F

G

AA

INITIAL REMEDIATION - LANDFILL AREA

PORT OF STOCKTON

2201 WEST WASHINGTON STREET, STOCKTON, CALIFORNIA 95203

PROJECT:

SITE:

TITLE:

APPROVED BY:

REVIEWED BY: DRAWING NO.:

OF

DRAWN BY:

DESIGN BY:

CHECKED BY: FILE:

PROJECT NO.:

DATE:

DATEREV APPDESCRIPTION DRN

17

JUNE 2021

WR2501B

CONSTRUCTION DRAWINGS

WR2501B-01

JM

BX

JM

FS

FS

COVER AND INDEX SHEET

1

Page 2: INITIAL REMEDIATION - LANDFILL AREA CONSTRUCTION …

B

C

D

E

F

876543

G

21

87654321

B

C

D

E

F

G

AA

INITIAL REMEDIATION - LANDFILL AREA

PORT OF STOCKTON

2201 WEST WASHINGTON STREET, STOCKTON, CALIFORNIA 95203

PROJECT:

SITE:

TITLE:

APPROVED BY:

REVIEWED BY: DRAWING NO.:

OF

DRAWN BY:

DESIGN BY:

CHECKED BY: FILE:

PROJECT NO.:

DATE:

DATEREV APPDESCRIPTION DRN

17

JUNE 2021

WR2501B

CONSTRUCTION DRAWINGS

WR2501B-02

JM

BX

JM

FS

FS 2

GENERAL NOTES

Page 3: INITIAL REMEDIATION - LANDFILL AREA CONSTRUCTION …

© 2020 Microsoft Corporation © 2020 Maxar ©CNES (2020) Distribution Airbus DS

AREA 4

AREA 3

AREA 1

AREA 2

SITE ACCESS

RAIL LINE

IAS-11

CONSOLIDATION

AREA

EXISTING RAMP

STOCKPILE 1

NORTH LANDFILL AREA (SEE DRAWING NO.4)

IAS-11 LANDFILL AREA (SEE DRAWING NO.6 - 10)

STOCKPILE 2

RAIL LINE AREA (SEE DRAWING NO.3)

SITE ACCESS

NEW ACCESS ROAD

PERIMETER LEVEE

(EXISTING)

PUMP STATION

NORTH LANDFILL AREA

(SEE DRAWING NO.5)

SOUTH LANDFILL AREA (SEE DRAWINGS NO.4 & NO.5)

STAGING AREA

ACCESS ROAD

9-1B

11-1

39-1B

39-1A

9-1A

9-1D

9-1C

3/4-1A

3/4-1B

B

C

D

E

F

876543

G

21

87654321

B

C

D

E

F

G

AA

INITIAL REMEDIATION - LANDFILL AREA

PORT OF STOCKTON

2201 WEST WASHINGTON STREET, STOCKTON, CALIFORNIA 95203

PROJECT:

SITE:

TITLE:

APPROVED BY:

REVIEWED BY: DRAWING NO.:

OF

DRAWN BY:

DESIGN BY:

CHECKED BY: FILE:

PROJECT NO.:

DATE:

DATEREV APPDESCRIPTION DRN

17

JUNE 2021

WR2501B

CONSTRUCTION DRAWINGS

WR2501B-03

JM

BX

JM

FS

FS

SITE PLAN

3

N

Page 4: INITIAL REMEDIATION - LANDFILL AREA CONSTRUCTION …

CELL A

CELL B

CELL C

CELL D

CELL F

CELL E

CELL I

CELL H

CELL J

CELL M

CELL K

CELL L

CELL N

CELL P

CELL Q

DUCK POND

11-1

9-1A

9-1D

9-1B

9-1C

3/4-1A

3/4-1B

39-1B

39-1A

RAIL LINE EXCAVATION

BOUNDARY

IAS-11

CONSOLIDATION

AREA

PUMP STATION

STOCKPILE 2

STOCKPILE 1

ACCESS ROAD

B

C

D

E

F

876543

G

21

87654321

B

C

D

E

F

G

AA

INITIAL REMEDIATION - LANDFILL AREA

PORT OF STOCKTON

2201 WEST WASHINGTON STREET, STOCKTON, CALIFORNIA 95203

PROJECT:

SITE:

TITLE:

APPROVED BY:

REVIEWED BY: DRAWING NO.:

OF

DRAWN BY:

DESIGN BY:

CHECKED BY: FILE:

PROJECT NO.:

DATE:

DATEREV APPDESCRIPTION DRN

17

JUNE 2021

WR2501B

CONSTRUCTION DRAWINGS

WR2501B-04

JM

BX

JM

FS

FS

EXCAVATION PLAN - RAIL LINE

4

N

Page 5: INITIAL REMEDIATION - LANDFILL AREA CONSTRUCTION …

0

-2

-1

12

3

4

0

0

1

1

2

2

3

0

0

1

1

0

0

1 1

2

2

0

1

2

3

2

3

4

0

0

1

1

2

23

3

0

-4

-3

-2

-1

1

1

1

2

2

3

4

3

0

1

2

3

CELL A

CELL B

CELL C

CELL D

CELL E

CELL F

A

A'

BOTTOM OF EXCAVATION

(SEE TABLE FOR ELEVATIONS)

EXISTING GRADE

EL

EV

AT

IO

N (F

EE

T)

EL

EV

AT

IO

N (F

EE

T)

DISTANCE (FEET)

Profile View of Base Grade

-10

-5

0

5

10

-10

-5

0

5

10

0+00 0+25 0+50 0+75 1+00 1+25 1+50 1+75 2+00 2+25 2+50

0.5H:1V EXCAVATION (NOTE 4)

WASTE CELL LIMITS

CELL M

CELL L

CELL N

CELL P

CELL K

B

C

D

E

F

876543

G

21

87654321

B

C

D

E

F

G

AA

INITIAL REMEDIATION - LANDFILL AREA

PORT OF STOCKTON

2201 WEST WASHINGTON STREET, STOCKTON, CALIFORNIA 95203

PROJECT:

SITE:

TITLE:

APPROVED BY:

REVIEWED BY: DRAWING NO.:

OF

DRAWN BY:

DESIGN BY:

CHECKED BY: FILE:

PROJECT NO.:

DATE:

DATEREV APPDESCRIPTION DRN

17

JUNE 2021

WR2501B

CONSTRUCTION DRAWINGS

WR2501B-05

JM

BX

JM

FS

FS5

EXCAVATION PLAN - WASTE CELLS

N

0

1

A-A'SECTION

EXCAVATION - WASTE CELLS (TYPICAL)-

WASTE CELLS

NORTH LANDFILL AREA2

WASTE CELLS

SOUTH LANDFILL AREA2

Page 6: INITIAL REMEDIATION - LANDFILL AREA CONSTRUCTION …

-4

01

2

3

1

1

2

2

0

0

1

1

2

23

3

0

0

1 1

11-1

9-1A

9-1D

9-1B

9-1C

B

B'

E

E'

DD'

C

C'

3/4-1A

3/4-1B

39-1B (SEE

SHEET 7)

39-1A

ELE

VA

TIO

N (F

EE

T)

ELE

VA

TIO

N (F

EE

T)

DISTANCE (FEET)

-8

-6

-4

-2

0

2

4

-8

-6

-4

-2

0

2

4

0+00 0+25 0+50

ELE

VA

TIO

N (F

EE

T)

ELE

VA

TIO

N (F

EE

T)

DISTANCE (FEET)

-8

-6

-4

-2

0

2

4

-8

-6

-4

-2

0

2

4

0+00 0+25 0+50

ELE

VA

TIO

N (F

EE

T)

ELE

VA

TIO

N (F

EE

T)

DISTANCE (FEET)

-8

-6

-4

-2

0

2

4

-8

-6

-4

-2

0

2

4

0+00 0+25 0+50

ELE

VA

TIO

N (F

EE

T)

ELE

VA

TIO

N (F

EE

T)

DISTANCE (FEET)

-8

-6

-4

-2

0

2

4

-8

-6

-4

-2

0

2

4

0+00 0+25 0+50

BOTTOM OF

EXCAVATION

EXISTING GRADE

BOTTOM OF EXCAVATION

EXISTING GRADE

B-B'SECTION

EXCAVATION - 9-1A

C-C'SECTION

EXCAVATION - 9-1B

D-D'SECTION

EXCAVATION - 9-1C

E-E'SECTION

EXCAVATION - 9-1D

BOTTOM OF

EXCAVATION

(9-1D)

EXISTING GRADE

BOTTOM OF

EXCAVATION

(9-1C)

BOTTOM OF

EXCAVATION

EXISTING GRADE

B

C

D

E

F

876543

G

21

87654321

B

C

D

E

F

G

AA

INITIAL REMEDIATION - LANDFILL AREA

PORT OF STOCKTON

2201 WEST WASHINGTON STREET, STOCKTON, CALIFORNIA 95203

PROJECT:

SITE:

TITLE:

APPROVED BY:

REVIEWED BY: DRAWING NO.:

OF

DRAWN BY:

DESIGN BY:

CHECKED BY: FILE:

PROJECT NO.:

DATE:

DATEREV APPDESCRIPTION DRN

17

JUNE 2021

WR2501B

CONSTRUCTION DRAWINGS

WR2501B-06

JM

BX

JM

FS

FS6

EXCAVATION PLAN - AREAS OF KNOWN CONTAMINATION

N

0

1

AREAS OF KNOWN CONTAMINATION

NORTH LANDFILL AREA2

AREAS OF KNOWN CONTAMINATION

SOUTH LANDFILL AREA2

Page 7: INITIAL REMEDIATION - LANDFILL AREA CONSTRUCTION …

39-1B

39-1A

F

F'

ELE

VA

TIO

N (F

EE

T)

ELE

VA

TIO

N (F

EE

T)

DISTANCE (FEET)

-15

-10

-5

0

5

10

-15

-10

-5

0

5

10

0+00 0+25 0+50 0+75 1+00 1+25 1+45

EXISTING GRADE

BOTTOM OF EXCAVATION

EL. -6.6 FT (NOTE 5)

3'

?

?

? ?

?

?

?

?

??

?

?

EL. -8.5 FT (NOTE 4)EL. -8.5 FT (NOTE 4)

B

C

D

E

F

876543

G

21

87654321

B

C

D

E

F

G

AA

INITIAL REMEDIATION - LANDFILL AREA

PORT OF STOCKTON

2201 WEST WASHINGTON STREET, STOCKTON, CALIFORNIA 95203

PROJECT:

SITE:

TITLE:

APPROVED BY:

REVIEWED BY: DRAWING NO.:

OF

DRAWN BY:

DESIGN BY:

CHECKED BY: FILE:

PROJECT NO.:

DATE:

DATEREV APPDESCRIPTION DRN

17

JUNE 2021

WR2501B

CONSTRUCTION DRAWINGS

WR2501B-07

JM

BX

JM

FS

FS7

EXCAVATION PLAN - AREA OF KNOWN CONTAMINATION 39-1B

N

0

1

F-F'SECTION

EXCAVATION - 39-1B

AREAS OF KNOWN CONTAMINATION

SOUTH LANDFILL AREA (39-1A AND 1B)2

Page 8: INITIAL REMEDIATION - LANDFILL AREA CONSTRUCTION …

2

2

2

3

3

3

4

4

1

1

2

2

3

4

2

2

0

-4

-3

-2

-1

1

2

3

4

3

0

0

1

1

2

2

3

0

1

2

3

0

0

1

1

0

0

1

1

1

2

3

1

1

2

2

3

0

1

1

2

2

1

2

IAS-11 WASTE PLACEMENT BOUNDARY

IAS-11 CONSOLIDATION AREA

IAS-11 EDGE OF LINER

IAS-11 EARTHWORK BOUNDARY

0

0

0

0

0

0

0

0

0

1

1

1

1

1

1

1

2

2

2

2

2

2

2

2

2

3

3

3

0

1

2

3

3

3

00

1

1

1

1

1

2

2

2

1

2

22

22

2

3

3

33

3

3

BASE GRADE EL +0' (NAVD 88)

X

X'

ELE

VA

TIO

N (F

EE

T)

ELE

VA

TIO

N (F

EE

T)

DISTANCE (FEET)

-5

0

5

10

-5

0

5

10

0+00 1+00 2+00 3+00 4+00 5+00 5+37

2'

EXISTING GRADE

BASE GRADE (NOTE 3)EXISTING GRADING (NOTE 3)

EL +0 FT (NAVD 88)

8.25'

2'

8.25'

B

C

D

E

F

876543

G

21

87654321

B

C

D

E

F

G

AA

INITIAL REMEDIATION - LANDFILL AREA

PORT OF STOCKTON

2201 WEST WASHINGTON STREET, STOCKTON, CALIFORNIA 95203

PROJECT:

SITE:

TITLE:

APPROVED BY:

REVIEWED BY: DRAWING NO.:

OF

DRAWN BY:

DESIGN BY:

CHECKED BY: FILE:

PROJECT NO.:

DATE:

DATEREV APPDESCRIPTION DRN

17

JUNE 2021

WR2501B

CONSTRUCTION DRAWINGS

WR2501B-08

JM

BX

JM

FS

FS8

IAS-11 BASE GRADING PLAN

N

0

1

0

1

X-X'SECTION

BASE GRADING CROSS SECTION-

NOT TO SCALE

Page 9: INITIAL REMEDIATION - LANDFILL AREA CONSTRUCTION …

IAS-11 WASTE PLACEMENT BOUNDARY

IAS-11 CONSOLIDATION AREA

IAS-11 EDGE OF LINER

IAS-11 EARTHWORK BOUNDARY

5.0%

5

.

0

%

4

.

0

H

:

1

V

4

.0

H

:1

V

4.0

H:1

V

4

.0

H

:1

V

4

.

0

H

:

1

V

4.0H:1V

0

5

5

10

1

0

8

9

1

1

1

2

1

3

1

4

1

4

0

0

0

0

0

-4

-3

-

2

-

1

1

1

1

1

1

2

2

2

2

2

3

3

3

4

3

4

4

-

4

-

3

0

0

0

0

0

0

0

0

1

1

1

1

1

1

1

1

1

2

2

2

2

2

2

2

2

2

2

2

3

3

3

3

3

3

3

4

4

4

44

0

0

1

1

2

2

3

3

1

2

2

2

2

3

X

X'

ELE

VA

TIO

N (F

EE

T)

ELE

VA

TIO

N (F

EE

T)

DISTANCE (FEET)

-5

0

5

10

15

20

-5

0

5

10

15

20

0+00 1+00 2+00 3+00 4+00 5+00 5+37

BASE GRADE (SEE DRAWING 8)

EXISTING GRADE

CONSOLIDATED WASTE

2'

8.25'

2'

8.25'

B

C

D

E

F

876543

G

21

87654321

B

C

D

E

F

G

AA

INITIAL REMEDIATION - LANDFILL AREA

PORT OF STOCKTON

2201 WEST WASHINGTON STREET, STOCKTON, CALIFORNIA 95203

PROJECT:

SITE:

TITLE:

APPROVED BY:

REVIEWED BY: DRAWING NO.:

OF

DRAWN BY:

DESIGN BY:

CHECKED BY: FILE:

PROJECT NO.:

DATE:

DATEREV APPDESCRIPTION DRN

17

JUNE 2021

WR2501B

CONSTRUCTION DRAWINGS

WR2501B-9

JM

BX

JM

FS

FS9

TOP OF WASTE GRADING PLAN

N

0

1

15

16

X-X'SECTION

WASTE CELL CROSS SECTION-

Page 10: INITIAL REMEDIATION - LANDFILL AREA CONSTRUCTION …

IAS-11 CONSOLIDATION AREA

IAS-11 EDGE OF LINER

IAS-11 EARTHWORK BOUNDARY

0

0

5

5

1

0

1

0

1

5

1

5

1

1

1

2

1

3

1

4

1

6

A

4

.

0

H

:

1

V

4.0

H:1

V

4

.

0

H

:

1

V

4

.0

H

:1

V

4.0

H:1

V

4.0H

:1V

>>

>>

>>

>>

>>

>>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

SUBDRAIN PIPE AND LINER

TERMINATION AT TOE

4

16

MAX SPACING BETWEEN

SUBDRAIN PIPES 40 FT

7

16

SUBDRAIN PIPE

0

0

0

0

1

1

1

1

1

1

1

1

2

2

2

2

3

3

3

3

4

4

0

0

0

-4

-4

-3

-

3

-2

-

1

1

1

1

2

2

2

3

3

0

0

0

0

0

0

0

0

1

1

1

1

1

1

1

2

2

2

2

2

2

2

2

2

2

3

3

3

3

4

4

0

0

1

1

2

2

3

3

X

X'

5.0%

4

.

0

%

5

.

0

%

4.9

%

2.6%

4.5%

3

.

2

%

5

.

2

%

4

.

2

%

4.9%

3.4%

2.2%

5

.

1

%

5

.

2

%

5

.

2

%

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

SUBDRAIN PIPE LOCATION

ELE

VA

TIO

N (F

EE

T)

ELE

VA

TIO

N (F

EE

T)

DISTANCE (FEET)

-5

0

5

10

15

20

-5

0

5

10

15

20

0+00 1+00 2+00 3+00 4+00 5+00 5+37

EXISTING GRADE

BASE GRADE (SEE DRAWING 8)

2-FT FOUNDATION LAYER

CONSOLIDATED WASTE

GEOSYNTHETICS (TOP OF FOUNDATION LAYER)

2'

8.25'

2'

8.25'

B

C

D

E

F

876543

G

21

87654321

B

C

D

E

F

G

AA

INITIAL REMEDIATION - LANDFILL AREA

PORT OF STOCKTON

2201 WEST WASHINGTON STREET, STOCKTON, CALIFORNIA 95203

PROJECT:

SITE:

TITLE:

APPROVED BY:

REVIEWED BY: DRAWING NO.:

OF

DRAWN BY:

DESIGN BY:

CHECKED BY: FILE:

PROJECT NO.:

DATE:

DATEREV APPDESCRIPTION DRN

17

JUNE 2021

WR2501B

CONSTRUCTION DRAWINGS

WR2501B-10

JM

BX

JM

FS

FS10

TOP OF FOUNDATION LAYER GRADING PLAN

N

0

1

15

16

X-X'SECTION

WASTE CELL CROSS SECTION-

> > > >

Page 11: INITIAL REMEDIATION - LANDFILL AREA CONSTRUCTION …

3" DIA HDPE LFG

VENT RISER

10

17

STRIP GEOCOMPOSITE

(NOTE 2)

MULTI-FLOW DRAIN STRIP

CONNECTOR OR EQUIVALENT

0

0

5

5

1

0

10

1

5

1

5

1

1

1

2

1

3

1

4

1

6

10

17

1

1

2

2

3

4

1

1

1

1

2

2

2

2

2

3

3

4

4

0

0

1

1

2

2

3

3

0

1

2

3

4

IAS-11 CONSOLIDATION AREA

IAS-11 EDGE OF LINER

EXTENT OF BLANKET

GEOCOMPOSITE

9

17

B

C

D

E

F

876543

G

21

87654321

B

C

D

E

F

G

AA

INITIAL REMEDIATION - LANDFILL AREA

PORT OF STOCKTON

2201 WEST WASHINGTON STREET, STOCKTON, CALIFORNIA 95203

PROJECT:

SITE:

TITLE:

APPROVED BY:

REVIEWED BY: DRAWING NO.:

OF

DRAWN BY:

DESIGN BY:

CHECKED BY: FILE:

PROJECT NO.:

DATE:

DATEREV APPDESCRIPTION DRN

17

JUNE 2021

WR2501B

CONSTRUCTION DRAWINGS

WR2501B-11

JM

BX

JM

FS

FS11

LANDFILL GAS VENTING SYSTEM LAYOUT

N

0

1

15

16

Page 12: INITIAL REMEDIATION - LANDFILL AREA CONSTRUCTION …

4

.

0

%

A

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>>

>>

>>

>>

>>

>>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

4

16

7

16

0

0

-

1

-

1

1

1

2

2

3

5

1

0

10

1

5

15

1

1

1

2

1

3

1

4

1

6

1

6

4.0

H:1

V

4

.

0

H

:

1

V

4

.0

H

:1

V

4.0

H:1

V

4.0H

:1V

4

.

0

H

:

1

V

SUBDRAIN PIPE

SUBDRAIN PIPE AND LINER

TERMINATION AT TOE

SUBDRAIN PIPES (NOTE 3)

SWALE (NOTE 3)

5

.

2

%

5

.

2

%

8

.

8

%

2.6%

2.2%

5

.

1

%

5

.

2

%

2.3

%

10.4%

1

.2

%

1

.

4

%

4.9

%

4.5%

3

.9

%

5.0%

5

.

0

%

3

.

2

%

3.4%

4

.

2

%

4.9%

-

4

-

4

-

3

0

0

-3

-

2

-

1

1

1

2

2

3

3

00

1

1

1

2

2

3

3

3

3

4

4

4

4

4

4

2

2

2

0

0

1

1

2

0

0

1

1

2

2

3

3

2

3

4

0

1

1

1

0

0

5

1

2

3

4

6

5

2

2

3

4

6

5

3

3

4

6

1

2

X

X'

14.3%

ELE

VA

TIO

N (F

EE

T)

ELE

VA

TIO

N (F

EE

T)

DISTANCE (FEET)

-5

0

5

10

15

20

-5

0

5

10

15

20

0+00 1+00 2+00 3+00 4+00 5+00 5+37

2'

8.25'

2'

8.25'

EXISTING GRADE

BASE GRADE (SEE DRAWING 8)

2-FT FOUNDATION LAYER

CONSOLIDATED WASTE

GEOSYNTHETICS (TOP OF FOUNDATION LAYER)

TIE IN TO SWALE

GEOTEXTILE

EARTHFILL WEDGE

SWALE (NOTE 4)

B

C

D

E

F

876543

G

21

87654321

B

C

D

E

F

G

AA

INITIAL REMEDIATION - LANDFILL AREA

PORT OF STOCKTON

2201 WEST WASHINGTON STREET, STOCKTON, CALIFORNIA 95203

PROJECT:

SITE:

TITLE:

APPROVED BY:

REVIEWED BY: DRAWING NO.:

OF

DRAWN BY:

DESIGN BY:

CHECKED BY: FILE:

PROJECT NO.:

DATE:

DATEREV APPDESCRIPTION DRN

17

JUNE 2021

WR2501B

CONSTRUCTION DRAWINGS

WR2501B-12

JM

BX

JM

FS

FS12

EARTHFILL WEDGE GRADING PLAN

N

0

1

15

16

X-X'SECTION

WASTE CELL CROSS SECTION-

> > > >

0

1

Page 13: INITIAL REMEDIATION - LANDFILL AREA CONSTRUCTION …

5.0%

4

.

0

%

5

.

0

%

4.9

%

2.6%

2.2%

4.5%

3

.

2

%

5

.

1

%

5

.

2

%

5

.

2

%

5

.

2

%

A

4

.

2

%

4.9%

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>>

>>

>>

>>

>>

>>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

2.3

%

3

.9

%

0

0

-

1

-

1

1

1

2

2

3

10.4%

8

.

8

%

ACCESS ROAD ON SLOPE

OF FINAL COVER

SWALE (NOTE 4)

1

.2

%

1

.

4

%

3.4%

7

16

0

0

-4

-4

-3

-

3

-2

-

1

1

1

2

2

3

3

1

2

3

4

0

0

1

1

2

2

0

1

2

2

2

2

3

4

0

1

1

1

2

2

2

3

0

0

1

1

2

2

3

3

1

1

X

X'

14.3%

ACCESS ROAD ON SLOPE

OF FINAL COVER

ACCESS ROAD ON

TOP OF FINAL COVER

FINAL COVER SYSTEM

PERIMETER OF TURNAROUND ON TOP DECK

SUBDRAIN PIPES

2

15

3

15

1

15

2

15

NOTE 2

4

16

VEGETATIVE SOIL COVER

SUBDRAIN PIPE

VEGETATIVE SOIL COVER

SUBDRAIN PIPE AND LINER

TERMINATION AT TOE

3

15

4

.

0

H

:

1

V

4.0

H:1

V

4

.

0

H

:

1

V

4

.0

H

:1

V

4.0

H:1

V

4.0H

:1V

10

1

0

1

2

1

4

1

6

ELE

VA

TIO

N (F

EE

T)

ELE

VA

TIO

N (F

EE

T)

DISTANCE (FEET)

-5

0

5

10

15

20

-5

0

5

10

15

20

0+00 1+00 2+00 3+00 4+00 5+00 5+37

2'

8.25'

2'

8.25'

EXISTING GRADE

BASE GRADE (SEE DRAWING 8)

2-FT FOUNDATION LAYER

CONSOLIDATED WASTE

GEOSYNTHETICS (TOP OF FOUNDATION LAYER)

TIE IN TO SWALE

1-FT VEGETATIVE LAYER

GEOTEXTILE

GRAVEL

SWALE (NOTE 4)

B

C

D

E

F

876543

G

21

87654321

B

C

D

E

F

G

AA

INITIAL REMEDIATION - LANDFILL AREA

PORT OF STOCKTON

2201 WEST WASHINGTON STREET, STOCKTON, CALIFORNIA 95203

PROJECT:

SITE:

TITLE:

APPROVED BY:

REVIEWED BY: DRAWING NO.:

OF

DRAWN BY:

DESIGN BY:

CHECKED BY: FILE:

PROJECT NO.:

DATE:

DATEREV APPDESCRIPTION DRN

17

JUNE 2021

WR2501B

CONSTRUCTION DRAWINGS

WR2501B-13

JM

BX

JM

FS

FS13

TOP OF EROSION RESISTANT LAYER GRADING PLAN

N

0

1

15

16

X-X'SECTION

WASTE CELL CROSS SECTION-

> > > >

0

1

Page 14: INITIAL REMEDIATION - LANDFILL AREA CONSTRUCTION …

A

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>>

>>

>>

>>

>>

>>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

ACCESS ROAD ON SLOPE

OF FINAL COVER

ACCESS ROAD ON

TOP OF FINAL COVER

(NOTE 4)

FINAL COVER SYSTEM

PERIMETER OF TURNAROUND ON TOP DECK

SUBDRAIN PIPES

SWALE (NOTE 3)

2

15

3

15

1

15

8

16

2

15

NOTE 2

4

.

0

H

:

1

V

4.0

H:1

V

4

.

0

H

:

1

V

4

.0

H

:1

V

4.0

H:1

V

4.0H

:1V

4

16

7

16

VEGETATIVE SOIL COVER

SUBDRAIN PIPE

VEGETATIVE SOIL COVER

SUBDRAIN PIPE AND LINER

TERMINATION AT TOE

0

0

-4

-4

-3

-

3

-2

-

1

1

1

2

2

3

3

1

2

3

4

0

0

1

1

2

2

0

1

2

2

2

2

3

4

0

1

1

1

2

2

2

3

0

0

1

1

2

2

3

3

1

1

>

>

>

>

>

>

>

>

>>

>

>

>

>

>

>

>

>

5

16

5

16

RIP RAP (NOTE 4)

RIP RAP

(NOTE 4)

X

X'

>

>>

>>

>

>

>

>

>

>

>

>

>

11,12

17

SETTLEMENT MONUMENT

STORMWATER V-DITCH AND VEGETATIVE SOIL

COVER SUBDRAIN PIPE

6

16

STORMWATER V-DITCH AND VEGETATIVE SOIL

COVER SUBDRAIN PIPE

14

17

STORMWATER

CHANNEL

FIBER ROLLS

15

17

ACCESS ROAD ON SLOPE

OF FINAL COVER

3

15

2

4

1

3

FIBER ROLLS

15

17

16

17

STORMWATER CHANNEL

ELE

VA

TIO

N (F

EE

T)

ELE

VA

TIO

N (F

EE

T)

DISTANCE (FEET)

-5

0

5

10

15

20

-5

0

5

10

15

20

0+00 1+00 2+00 3+00 4+00 5+00 5+37

2'

8.25'

2'

8.25'

EXISTING GRADE

BASE GRADE (SEE DRAWING 8)

2-FT FOUNDATION LAYER

CONSOLIDATED WASTE

GEOSYNTHETICS (TOP OF FOUNDATION LAYER)

TIE IN TO SWALE

1-FT VEGETATIVE LAYER

GEOTEXTILE

GRAVEL

SWALE (NOTE 3)

RIP-RAP (NOTE 4)

B

C

D

E

F

876543

G

21

87654321

B

C

D

E

F

G

AA

INITIAL REMEDIATION - LANDFILL AREA

PORT OF STOCKTON

2201 WEST WASHINGTON STREET, STOCKTON, CALIFORNIA 95203

PROJECT:

SITE:

TITLE:

APPROVED BY:

REVIEWED BY: DRAWING NO.:

OF

DRAWN BY:

DESIGN BY:

CHECKED BY: FILE:

PROJECT NO.:

DATE:

DATEREV APPDESCRIPTION DRN

17

JUNE 2021

WR2501B

CONSTRUCTION DRAWINGS

WR2501B-14

JM

BX

JM

FS

FS14

STORMWATER LAYOUT

N

0

1

15

16

X-X'SECTION

WASTE CELL CROSS SECTION-

> > > >

>

> > >

15

16

Page 15: INITIAL REMEDIATION - LANDFILL AREA CONSTRUCTION …

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

12" VEGETATIVE LAYER

CONSOLIDATED WASTE

24" FOUNDATION LAYER

12" VEGETATIVE LAYER

2

1

2

1

12" BASE ROCK/GRAVEL

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

VARIES (15' MINIMUM)

DOUBLE-SIDED DRAINAGE GEOCOMPOSITE

16 OZ/SY NONWOVEN GEOTEXTILE

40 MIL DOUBLE-SIDED

TEXTURED LLDPE

GEOMEMBRANE

DOUBLE-SIDED BLANKET GEOCOMPOSITE

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

12" VEGETATIVE LAYER

CONSOLIDATED WASTE

24" FOUNDATION LAYER

12" VEGETATIVE LAYER

4

1

12" BASE ROCK/GRAVEL

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

4

1

4%

15' WIDE ACCESS ROAD

DOUBLE-SIDED DRAINAGE GEOCOMPOSITE

16 OZ/SY NONWOVEN GEOTEXTILE

40 MIL DOUBLE-SIDED

TEXTURED LLDPE

GEOMEMBRANE

DOUBLE-SIDED BLANKET GEOCOMPOSITE

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

FOUNDATION LAYER

CONSOLIDATED WASTE

VEGETATIVE LAYER

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

12"

24"

40 MIL DOUBLE-SIDED

TEXTURED LLDPE

GEOMEMBRANE

DOUBLE-SIDED DRAINAGE GEOCOMPOSITE

DOUBLE-SIDED BLANKET GEOCOMPOSITE

VEGETATION (NOTE 4)

B

C

D

E

F

876543

G

21

87654321

B

C

D

E

F

G

AA

INITIAL REMEDIATION - LANDFILL AREA

PORT OF STOCKTON

2201 WEST WASHINGTON STREET, STOCKTON, CALIFORNIA 95203

PROJECT:

SITE:

TITLE:

APPROVED BY:

REVIEWED BY: DRAWING NO.:

OF

DRAWN BY:

DESIGN BY:

CHECKED BY: FILE:

PROJECT NO.:

DATE:

DATEREV APPDESCRIPTION DRN

17

JUNE 2021

WR2501B

CONSTRUCTION DRAWINGS

WR2501B-15

JM

BX

JM

FS

FS15

DETAILS I

1. VEGETATIVE LAYER TO BE PLACED BY CONTRACTOR ON SIDE SLOPES,

STARTING FROM THE BASE UP USING A CAT D4 LGP (OR APPROVED

EQUIVALENT).

2. IF CONTRACTOR PROPOSES OTHER METHODS NOT CURRENTLY EVALUATED

FOR CONSTRUCTION OF THE VEGETATIVE LAYER, THEY MUST BE REVIEWED

AND APPROVED BY ENGINEER BEFORE IMPLEMENTATION.

3. THICKNESS AND OVERLAP GEOMETRY OF GEOSYNTHETICS SHOWN ARE

EXAGGERATED IN SCALE RELATIVE TO OTHER LAYERS FOR ILLUSTRATIVE

PURPOSES ONLY.

4. HYDROSEED SURFACE AFTER VEGETATIVE LAYER PLACEMENT.

Page 16: INITIAL REMEDIATION - LANDFILL AREA CONSTRUCTION …

C

O

N

S

O

L

ID

A

T

E

D

W

A

S

T

E

2

4

"

F

O

U

N

D

A

T

IO

N

L

A

Y

E

R

1

2

"

V

E

G

E

T

A

T

IV

E

L

A

Y

E

R

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

XX

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

XXXX

XXXXX

XXXXXX

XXXXX

XXXXXX

XXXXXX

XXXXX

XXXXXX

XXXXX

XXXXXX

XXXXXX

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

XX

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

2'

EARTHFILL

EG

2

1

~

4

1

8'

12 "

1'

4"Ø PERFORATED SDR-11

HDPE SUBDRAIN PIPE (NOTE 5)

DOUBLE-SIDED BLANKET

GEOCOMPOSITE

16 OZ/SY NONWOVEN GEOTEXTILE

DOUBLE-SIDED DRAINAGE GEOCOMPOSITE

RIP RAP (NOTE 4)

GRAVEL

40 MIL DOUBLE-SIDED TEXTURED

LLDPE GEOMEMBRANE

16 OZ/SY NONWOVEN GEOTEXTILE

16 OZ/SY NONWOVEN GEOTEXTILE

40 MIL DOUBLE-SIDED TEXTURED

LLDPE GEOMEMBRANE FALP

EXTRUSION WELD

C

O

N

S

O

L

ID

A

T

E

D

W

A

S

T

E

2

4

"

F

O

U

N

D

A

T

IO

N

L

A

Y

E

R

1

2

"

V

E

G

E

T

A

T

IV

E

L

A

Y

E

R

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

4

1

2

1

1'

4"Ø PERFORATED SDR-11

HDPE SUBDRAIN PIPE (NOTE 5)

DOUBLE-SIDED DRAINAGE GEOCOMPOSITE

16 OZ/SY NONWOVEN GEOTEXTILE

40 MIL DOUBLE-SIDED

TEXTURED LLDPE

GEOMEMBRANE

DOUBLE-SIDED DRAINAGE GEOCOMPOSITE

C

O

N

S

O

L

ID

A

T

E

D

W

A

S

T

E

2

4

"

F

O

U

N

D

A

T

IO

N

L

A

Y

E

R

1

2

"

V

E

G

E

T

A

T

IV

E

L

A

Y

E

R

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

~

2

1

~

4

1

2

1

~

2

1

2'

1'

4"Ø PERFORATED SDR-11

HDPE SUBDRAIN PIPE (NOTE 5)

DOUBLE-SIDED BLANKET GEOCOMPOSITE

16 OZ/SY NONWOVEN GEOTEXTILE

40 MIL DOUBLE-SIDED

TEXTURED LLDPE

GEOMEMBRANE

DOUBLE-SIDED DRAINAGE GEOCOMPOSITE

6"

1'

16 OZ/SY NONWOVEN GEOTEXTILE

1'

3-INCH THICK GRAVEL

C

O

N

S

O

L

ID

A

T

E

D

W

A

S

T

E

2

4

"

F

O

U

N

D

A

T

IO

N

L

A

Y

E

R

1

2

"

V

E

G

E

T

A

T

IV

E

L

A

Y

E

R

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

XX

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

XX

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

2

1

~

4

1

2

1

~

~2

1

2'

1'

4"Ø PERFORATED SDR-11

HDPE SUBDRAIN PIPE (NOTE 5)

DOUBLE-SIDED BLANKET GEOCOMPOSITE

16 OZ/SY NONWOVEN GEOTEXTILE

40 MIL DOUBLE-SIDED

TEXTURED LLDPE

GEOMEMBRANE

DOUBLE-SIDED DRAINAGE GEOCOMPOSITE

6"

1'

16OZ/SY NONWOVEN GEOTEXTILE

1'

3-INCH THICK GRAVEL

C

O

N

S

O

L

ID

A

T

E

D

W

A

S

T

E

2

4

"

F

O

U

N

D

A

T

IO

N

L

A

Y

E

R

1

2

"

V

E

G

E

T

A

T

IV

E

L

A

Y

E

R

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

XX

XXXXX

XXXXXX

XXXXX

XXXXXX

XXXXXX

XXXXX

XXXXXX

XXXXX

XXXXXX

XXXXXX

XX

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

XX

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

2'

EARTHFILL

EG

2

1

~

4

1

8'

1'

12"

1'

4"Ø PERFORATED SDR-11

HDPE SUBDRAIN PIPE (NOTE 5)

DOUBLE-SIDED BLANKET

GEOCOMPOSITE

16 OZ/SY NONWOVEN GEOTEXTILE

DOUBLE-SIDED DRAINAGE GEOCOMPOSITE

RIP RAP (NOTE 4)

16 OZ/SY NONWOVEN GEOTEXTILE

GRAVEL

4"Ø PERFORATED SDR-11

HDPE SUBDRAIN PIPE

40 MIL DOUBLE-SIDED TEXTURED

LLDPE GEOMEMBRANE

16 OZ/SY NONWOVEN GEOTEXTILE

40 MIL DOUBLE-SIDED TEXTURED

LLDPE GEOMEMBRANE FALP

EXTRUSION WELD

B

C

D

E

F

876543

G

21

87654321

B

C

D

E

F

G

AA

INITIAL REMEDIATION - LANDFILL AREA

PORT OF STOCKTON

2201 WEST WASHINGTON STREET, STOCKTON, CALIFORNIA 95203

PROJECT:

SITE:

TITLE:

APPROVED BY:

REVIEWED BY: DRAWING NO.:

OF

DRAWN BY:

DESIGN BY:

CHECKED BY: FILE:

PROJECT NO.:

DATE:

DATEREV APPDESCRIPTION DRN

17

JUNE 2021

WR2501B

CONSTRUCTION DRAWINGS

WR2501B-15

JM

BX

JM

FS

FS16

DETAILS II

1. VEGETATIVE LAYER TO BE PLACED BY CONTRACTOR ON SIDE SLOPES,

STARTING FROM THE BASE UP USING A CAT D4 LGP (OR APPROVED

EQUIVALENT).

2. IF CONTRACTOR PROPOSES OTHER METHODS NOT CURRENTLY EVALUATED

FOR CONSTRUCTION OF THE VEGETATIVE LAYER, THEY MUST BE REVIEWED

AND APPROVED BY ENGINEER BEFORE IMPLEMENTATION.

3. THICKNESS AND OVERLAP GEOMETRY OF GEOSYNTHETICS SHOWN ARE

EXAGGERATED IN SCALE RELATIVE TO OTHER LAYERS FOR ILLUSTRATIVE

PURPOSES ONLY.

4. ROCK RIP-RAP SHALL MEET REQUIREMENTS OF CALTRANS ROCK RIP-RAP

CLASS I AND BE PLACED IN ACCORDANCE WITH METHOD B OF THE CALTRANS

STANDARD SPECIFICATIONS.

5. SUBDRAIN PERFORATED DRAINAGE PIPES SHALL BE SPACED A MAXIMUM OF 40

FEET MEASURED ALONG THE VEGETATIVE SOIL COVER SLOPE. SUBDRAIN

PIPES SHALL DISCHARGE AT THE PERIMETER OF IAS-11 TO THE GRAVEL LAYER.

Page 17: INITIAL REMEDIATION - LANDFILL AREA CONSTRUCTION …

NOTES:

1. CONTRACTOR SHALL INSTALL SETTLEMENT MONUMENT SO THAT BOTTOM OF SETTLEMENT

MONUMENT IS ABOVE GEOSYNTHETICS. THE GEOSYNTHETICS SHALL NOT BE PENETRATED BY THE

SETTLEMENT MONUMENT MATERIALS.

1'

2'

0.08'

0.17'

3'

1.5' DIA.

(MIN)

6" SQUARE PRECAST

CONCRETE MONUMENT

FINISHED GRADE

CAST-IN-PLACE CONCRETE

(4,000 PSI AT 28 DAYS)

GRAVEL BASE

SETTLEMENT

MONUMENT

DETAIL (TYPICAL)

0.5'

0.5'

0.29'

2"

0.06'

0.07'

3 1/2" DIA BRASS FLAT HEAD

MARKER WITH 2" MIN SHANK FOR

CASTING INTO CONCRETE POST

FACE OF PRECAST

CONCRETE POST

4

f

t

m

a

x

4

f

t

m

a

x

4

f

t

m

a

x

4

f

t

m

a

x

N.T.S.

TYPICAL FIBER ROLL INSTALLATION

ENTRENCHMENT DETAIL

N.T.S.

NOTES:

INSTALL FIBER ROLL

ALONG A LEVEL CONTOUR

4"

2"

20 FT MEASURED ALONG

THE FACE OF THE SLOPE

AS SHOWN

FIBER ROLL 6-IN

WOOD STAKES

MAX 4 FT SPACING

S

L

O

P

E

V

A

R

IE

S

FIBER ROLL

MAXIMUM LENGTH 12-IN (NOTE 2)

2

1

4

1

2

1

1

2

"

V

E

G

E

T

A

T

IV

E

L

A

Y

E

R

~

~

3-INCH THICK GRAVEL

SUBGRADE

1'

1'

6"6"

16OZ/SY NONWOVEN GEOTEXTILE

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

FOUNDATION LAYER

CONSOLIDATED WASTE

9

-

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

VEGETATIVE LAYER

12"

24"

3'

LFG 12-IN WIDE MULTI-FLOW

DRAIN STRIP (OR APPROVED

EQUIVALENT)

DOUBLE-SIDED BLANKET

GEOCOMPOSITE

40 MIL DOUBLE-SIDED

TEXTURED LLDPE

GEOMEMBRANE

3"Ø HDPE SDR-11 LFG VENT RISER

LFG MULTI-FLOW DRAIN

STRIP (OR APPROVED

EQUIVALENT) CONNECTOR

GEOMEMBRANE BOOT

DOUBLE-SIDED DRAINAGE

GEOCOMPOSITE

MOSQUITO SCREEN

PLAN

SECTION A-A'

1"

12"

LFG 1-IN. THICK, 12-IN. WIDE

MULTI-FLOW DRAIN STRIP (OR

APPROVED EQUIVALENT)

LFG MULTI-FLOW DRAIN STRIP

(OR APPROVED EQUIVALENT)

CONNECTOR FITTING

3"Ø SDR-11

RISER PIPE

E

A

R

T

H

F

IL

L

/E

X

IS

T

IN

G

G

R

A

D

E

3

1

1'

3-INCH THICK GRAVEL

SUBGRADE

6"

16OZ/SY NONWOVEN GEOTEXTILE

3

1

6"

B

C

D

E

F

876543

G

21

87654321

B

C

D

E

F

G

AA

INITIAL REMEDIATION - LANDFILL AREA

PORT OF STOCKTON

2201 WEST WASHINGTON STREET, STOCKTON, CALIFORNIA 95203

PROJECT:

SITE:

TITLE:

APPROVED BY:

REVIEWED BY: DRAWING NO.:

OF

DRAWN BY:

DESIGN BY:

CHECKED BY: FILE:

PROJECT NO.:

DATE:

DATEREV APPDESCRIPTION DRN

17

JUNE 2021

WR2501B

CONSTRUCTION DRAWINGS

WR2501B-15

JM

BX

JM

FS

FS17

DETAILS III

1. THICKNESS AND OVERLAP GEOMETRY OF GEOSYNTHETICS SHOWN ARE

EXAGGERATED IN SCALE RELATIVE TO OTHER LAYERS FOR ILLUSTRATIVE

PURPOSES ONLY.

2. INSTALLER SHALL NOT PUNCTURE GEOSYNTHETICS.