KIEWIT Infrastructure Company Presentation Title: McCook Reservoir Tunnel The McCook Reservoir is currently under construction by Kiewit, when completed, the reservoir will have a total capacity of 10 BG. Phase 1 of the reservoir is planned to be completed by 2017. The McCook Reservoir will provide over $90 million per year in flood damage reduction benefits to 3,100,000 people in 37 communities. This project includes drill and blast excavation, concrete tunnel lining, steel tunnel liner, and a high head gate system to control the water in-flows. WEDNESDAY SEPT 12 TH NOON Brown Hall W210 INDUSTRY SPEAKER SEMINAR Please come and welcome our Featured Speakers: Josh Armstrong, Ben Seling, Concrete Tunnel Lining Engineer Superintendent COMING SOON…. Noon, Wed 9/19 - Bill Hansmire, Parsons Brinckerhoff Noon, Fri 9/21- Vojtech Gall, Gall-Ziedler Consultants, LLC Sponsored by: UCA and The Center for Underground Construction & Tunneling Contact INFO: Amy Martin, [email protected] (303) 384-2587

Upload: others

Post on 12-Sep-2021

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Infrastructure Company

KIEWIT Infrastructure Company

Presentation Title:

McCook Reservoir Tunnel

The McCook Reservoir is currently under construction by Kiewit, when completed, the reservoir will have a total capacity of 10 BG. Phase 1 of the reservoir is planned to be completed by 2017. The McCook Reservoir will provide over $90 million per year in flood damage reduction benefits to 3,100,000 people in 37 communities. This project includes drill and blast excavation, concrete tunnel lining, steel tunnel liner, and a high head gate system to control the water in-flows.

WEDNESDAY SEPT 12TH NOON Brown Hall W210

INDUSTRY SPEAKER SEMINAR Please come and welcome our Featured Speakers:

Josh Armstrong, Ben Seling,

Concrete Tunnel Lining Engineer Superintendent

COMING SOON…. Noon, Wed 9/19 - Bill Hansmire, Parsons Brinckerhoff Noon, Fri 9/21- Vojtech Gall, Gall-Ziedler Consultants, LLC

Sponsored by: UCA and The Center for Underground Construction & Tunneling Contact INFO: Amy Martin, [email protected] (303) 384-2587