information school hall hire 30/5/17 · workshop style: tbc banquet style tbc cocktail style: tbc...
TRANSCRIPT
CHRISTCHURCH BOYS HIGH SCHOOL
INFORMATION
SCHOOL HALL HIRE
UP
UP
3
2
1
10987654 17161514131211
6
5
4
3
2
1
654321
UPDN
A
B
C
D
E
F
G
1 82 74 5
H
3 6
AA
MAIN BLOCKVESTIBULE
20720
21670
1.07STORAGE
1.01HALL
1.06CIRCULATION
1.08CIRCULATION
1.09LIFT
1.10TBC
1.02STAGE
4000
4000
4000
4000
4000
4000
30300
4450 8415 4570 8415 4450
2930
0
EXISTING
MEZZANINE ABOVE
EXISTING STAIR
UP
UP UP
UPA
B
C
D
E
F
G
1 2 74 5
H
3 6
AA
1
2
3
4
5
6
STAGEBELOW
HALLBELOW
STAGEBELOW
LEVEL 1MAIN BLOCK
3.01CONTROL ROOM
Christchurch Boys’ High School New Hall
GROUND FLOOR PLAN MEZZANINE FLOOR PLAN
Hall Information for Users - June 2017 1
CBHS SCHOOL HALL HIRE – INFORMATION FOR USERS
ALL PRICES ARE EXCLUSIVE OF GST AND SUBJECT TO CHANGE.
REQUEST TO USE THE SCHOOL HALL A ‘Request to Hire’ application can be found on the CBHS website and can be emailed to the school or sent in hard copy. All users, their function and purpose of hire must align with the values and strategic direction of Christchurch Boys’ High School. This will be determined by the Headmaster or his delegated representative SCHOOL HALL CAPACITY
Theatre Style Downstairs: 842 Upper Level: 510
Workshop Style: TBC
Banquet Style TBC Cocktail Style: TBC
HIRE RATES (Discussion about rates can be directed to the Senior Master, Operations.)
Notes: 1. A community group is defined as a group who is ‘not for profit’ whose prime aim is to deliver community benefits. 2. These rates are correct at 30 May 2017 and may be subject to change. Please confirm before entering into an Agreement to Hire.
Commercial Community
Half Day (8am - 12 noon or 1pm – 5pm)
$800 $250
Full Day (8am – 5pm) $1500 $500
Evening (6pm-11pm) $1000 $300
Hourly Rate $200 $100
Inclusions
Daily cleaning (all areas) Standard Seating set up Data Projector & screen Stage seating - 100
Additions Technical Assistant - $25 per hour (subject to requirements) Lock up - $25 per hour (to be agreed) Changes to standard set up: $25 per hour Catering by arrangement with CBHS supplier
CATERING (All catering for events held in the CBHS School Hall must be arranged through one of the following preferred suppliers.)
Adams House Hostel (school events)
Contact: Jenny Yee Phone: 03 348 0130 Email: [email protected]
CBHS PTA or Sports Group
Contact: Jo Van Wiggen Phone: 03 355 1054 Email: [email protected]
Moveable Feasts Contact: Kate Cartwright Phone: 03 389 8617 or 027 257 4325 Email: [email protected]
Wigram Catering Company Contact: Anton Matthews Phone : 027 301 3850 Email: [email protected]
Christchurch Boys’ High School
Site Plan
Master Plan
18CBHS Masterplan
JUNE 2016 / REVISION I
N
PREPARED FOR DRAWING REV.DRAWING No.
JOB No.
SCALE @ A1 1:
CBHS SITE PLANMAY 2016 CBHS May update SK-003
214355
1000
T/S70m2
Old Boys Museum
Covered Walkway by building above
E
MASTERPLAN CONCEPT Ground Floor
10m50mSCALE: 1:1000
FOYER
FOYER FOYER
Hard Materials Courtyard
TE REO
ADMINISTRATION
FOOD TECH
(2)
Headmaster
HALL
BIG ROOM
DEANS FARM BUILDINGS
Curriculum Breakdown
• Reduction of carparks at main entry. Enhance welcome area. Seating for ceremonial entry and recognition of Tangata whenua.
• New teaching and sport buildings to have better ‘fronts’- views into spaces, active edges (doors) facing into central areas.
• Food tech and lunch connected to smaller format sport areas.
• Bike entry link from Unicycle Bikeway but with better security and possible location of bike parks closer to active areas.
• Staff room in current location with languages to the west and maths east. Both with vertical links to additional space at ground floor.
• Social Science new teaching space with links to English and new library in the ‘New Caddick Teaching Block’.
• New Science at the upper level with a connection to Maths. (Science labs best upstairs for ventilation).
• Double height and mezzanine space exists in the new Gyms and Hall.
• New quad spaces / outdoor spaces created by the new Caddick Teaching Block – protected and sheltered from the wind.
• New Caddick block proposed as a two story structure, to improve circulation around the campus, reduce the weight of proposed building on TC3 land therefore reducing construction complexity and cost, reduce building shading on the Memorial Park, Avon side park setting,
• Southern Teaching Block activated by busy atrium spaces allow connections from the protected quad space through to the Memorial Lawn, creating stronger links across the campus.
• New gym to enhance and anchor high performance sport campus.
• Main Block, Big Room, Changing Rooms and Food Tech to be refurbished.
NEW GYM
Olympic Basketball Court Size 32x19m
SPG Gym allowance 1,061m2
Bik
es
BOT owned
*
**
**
*Memorial
Park
Refurbished
*
The Avon
MUSIC
DRAMA (2)
Whanau Room
Red Zone TC3 Foundation
Energy Center
Study and Meeting area
Caretakers House
Avon Link
COVERED POOL
COMMERCE
(3)
*
ESOL LEARNER SUPPORT
(2)
DEANS
LIBRARY
P.E
(2)
ENGLISH
(5)
SOCIAL SCIENCE
(4)
SPG Lib allowance
600m2
Gymnasium Teaching spaces
2.7
ART
(4)
HARD
TECH
(3)
19CBHS Masterplan
JUNE 2016 / REVISION I
N
PREPARED FOR DRAWING REV.DRAWING No.
JOB No.
SCALE @ A1 1:
CBHS SITE PLANMAY 2016 CBHS May update SK-003
214355
1000
STAFF
HALL
NEW GYM
SPG Gym allowance 1,061m2
*
*
*
*
P.E
(3)
LANGUAGES
(4)COMMERCE
(1)
First FloorMASTERPLAN CONCEPT Curriculum Breakdown
The Avon
10m50mSCALE: 1:1000
*
Sound reasoning for 2 storey building was identified:
• Reducing building weight, and construction complexity - therefore construction cost is reduced accordingly.
• Over shadowing of memorial lawn by a taller building is kept at a more manageable height. Sun Study on page 38.
• Easier campus circulation and reduced vertical circulation.
MATHS
(9)
ENGLISH
(5)SCIENCE
(9)
SOCIAL SCIENCE
(6)
HERITAGE BLOCK
HALL
LIBRARY
GYM
GROUND FLOOR PLAN FIRST FLOOR PLAN
H E R I T A G E
S P O R T S
A C A D E
M I
C