information school hall hire 30/5/17 · workshop style: tbc banquet style tbc cocktail style: tbc...

4
CHRISTCHURCH BOYS HIGH SCHOOL INFORMATION SCHOOL HALL HIRE

Upload: lamkhue

Post on 18-May-2019

214 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: INFORMATION SCHOOL HALL HIRE 30/5/17 · Workshop Style: TBC Banquet Style TBC Cocktail Style: TBC HIRE RATES (Discussion about rates can be directed to the Senior Master, Operations.)

CHRISTCHURCH BOYS HIGH SCHOOL

INFORMATION

SCHOOL HALL HIRE

lowej
Typewritten Text
30/5/17
lowej
Typewritten Text
lowej
Typewritten Text
lowej
Typewritten Text
lowej
Typewritten Text
lowej
Typewritten Text
Page 2: INFORMATION SCHOOL HALL HIRE 30/5/17 · Workshop Style: TBC Banquet Style TBC Cocktail Style: TBC HIRE RATES (Discussion about rates can be directed to the Senior Master, Operations.)

UP

UP

3

2

1

10987654 17161514131211

6

5

4

3

2

1

654321

UPDN

A

B

C

D

E

F

G

1 82 74 5

H

3 6

AA

MAIN BLOCKVESTIBULE

20720

21670

1.07STORAGE

1.01HALL

1.06CIRCULATION

1.08CIRCULATION

1.09LIFT

1.10TBC

1.02STAGE

4000

4000

4000

4000

4000

4000

30300

4450 8415 4570 8415 4450

2930

0

EXISTING

MEZZANINE ABOVE

EXISTING STAIR

UP

UP UP

UPA

B

C

D

E

F

G

1 2 74 5

H

3 6

AA

1

2

3

4

5

6

STAGEBELOW

HALLBELOW

STAGEBELOW

LEVEL 1MAIN BLOCK

3.01CONTROL ROOM

Christchurch Boys’ High School New Hall

GROUND FLOOR PLAN MEZZANINE FLOOR PLAN

lowej
Typewritten Text
lowej
Typewritten Text
lowej
Typewritten Text
lowej
Typewritten Text
Page 3: INFORMATION SCHOOL HALL HIRE 30/5/17 · Workshop Style: TBC Banquet Style TBC Cocktail Style: TBC HIRE RATES (Discussion about rates can be directed to the Senior Master, Operations.)

Hall Information for Users - June 2017 1

CBHS SCHOOL HALL HIRE – INFORMATION FOR USERS

ALL PRICES ARE EXCLUSIVE OF GST AND SUBJECT TO CHANGE.

REQUEST TO USE THE SCHOOL HALL A ‘Request to Hire’ application can be found on the CBHS website and can be emailed to the school or sent in hard copy. All users, their function and purpose of hire must align with the values and strategic direction of Christchurch Boys’ High School. This will be determined by the Headmaster or his delegated representative SCHOOL HALL CAPACITY

Theatre Style Downstairs: 842 Upper Level: 510

Workshop Style: TBC

Banquet Style TBC Cocktail Style: TBC

HIRE RATES (Discussion about rates can be directed to the Senior Master, Operations.)

Notes: 1. A community group is defined as a group who is ‘not for profit’ whose prime aim is to deliver community benefits. 2. These rates are correct at 30 May 2017 and may be subject to change. Please confirm before entering into an Agreement to Hire.

Commercial Community

Half Day (8am - 12 noon or 1pm – 5pm)

$800 $250

Full Day (8am – 5pm) $1500 $500

Evening (6pm-11pm) $1000 $300

Hourly Rate $200 $100

Inclusions

Daily cleaning (all areas) Standard Seating set up Data Projector & screen Stage seating - 100

Additions Technical Assistant - $25 per hour (subject to requirements) Lock up - $25 per hour (to be agreed) Changes to standard set up: $25 per hour Catering by arrangement with CBHS supplier

CATERING (All catering for events held in the CBHS School Hall must be arranged through one of the following preferred suppliers.)

Adams House Hostel (school events)

Contact: Jenny Yee Phone: 03 348 0130 Email: [email protected]

CBHS PTA or Sports Group

Contact: Jo Van Wiggen Phone: 03 355 1054 Email: [email protected]

Moveable Feasts Contact: Kate Cartwright Phone: 03 389 8617 or 027 257 4325 Email: [email protected]

Wigram Catering Company Contact: Anton Matthews Phone : 027 301 3850 Email: [email protected]

Page 4: INFORMATION SCHOOL HALL HIRE 30/5/17 · Workshop Style: TBC Banquet Style TBC Cocktail Style: TBC HIRE RATES (Discussion about rates can be directed to the Senior Master, Operations.)

Christchurch Boys’ High School

Site Plan

Master Plan

18CBHS Masterplan

JUNE 2016 / REVISION I

N

PREPARED FOR DRAWING REV.DRAWING No.

JOB No.

SCALE @ A1 1:

CBHS SITE PLANMAY 2016 CBHS May update SK-003

214355

1000

T/S70m2

Old Boys Museum

Covered Walkway by building above

E

MASTERPLAN CONCEPT Ground Floor

10m50mSCALE: 1:1000

FOYER

FOYER FOYER

Hard Materials Courtyard

TE REO

ADMINISTRATION

FOOD TECH

(2)

Headmaster

HALL

BIG ROOM

DEANS FARM BUILDINGS

Curriculum Breakdown

• Reduction of carparks at main entry. Enhance welcome area. Seating for ceremonial entry and recognition of Tangata whenua.

• New teaching and sport buildings to have better ‘fronts’- views into spaces, active edges (doors) facing into central areas.

• Food tech and lunch connected to smaller format sport areas.

• Bike entry link from Unicycle Bikeway but with better security and possible location of bike parks closer to active areas.

• Staff room in current location with languages to the west and maths east. Both with vertical links to additional space at ground floor.

• Social Science new teaching space with links to English and new library in the ‘New Caddick Teaching Block’.

• New Science at the upper level with a connection to Maths. (Science labs best upstairs for ventilation).

• Double height and mezzanine space exists in the new Gyms and Hall.

• New quad spaces / outdoor spaces created by the new Caddick Teaching Block – protected and sheltered from the wind.

• New Caddick block proposed as a two story structure, to improve circulation around the campus, reduce the weight of proposed building on TC3 land therefore reducing construction complexity and cost, reduce building shading on the Memorial Park, Avon side park setting,

• Southern Teaching Block activated by busy atrium spaces allow connections from the protected quad space through to the Memorial Lawn, creating stronger links across the campus.

• New gym to enhance and anchor high performance sport campus.

• Main Block, Big Room, Changing Rooms and Food Tech to be refurbished.

NEW GYM

Olympic Basketball Court Size 32x19m

SPG Gym allowance 1,061m2

Bik

es

BOT owned

*

**

**

*Memorial

Park

Refurbished

*

The Avon

MUSIC

DRAMA (2)

Whanau Room

Red Zone TC3 Foundation

Energy Center

Study and Meeting area

Caretakers House

Avon Link

COVERED POOL

COMMERCE

(3)

*

ESOL LEARNER SUPPORT

(2)

DEANS

LIBRARY

P.E

(2)

ENGLISH

(5)

SOCIAL SCIENCE

(4)

SPG Lib allowance

600m2

Gymnasium Teaching spaces

2.7

ART

(4)

HARD

TECH

(3)

19CBHS Masterplan

JUNE 2016 / REVISION I

N

PREPARED FOR DRAWING REV.DRAWING No.

JOB No.

SCALE @ A1 1:

CBHS SITE PLANMAY 2016 CBHS May update SK-003

214355

1000

STAFF

HALL

NEW GYM

SPG Gym allowance 1,061m2

*

*

*

*

P.E

(3)

LANGUAGES

(4)COMMERCE

(1)

First FloorMASTERPLAN CONCEPT Curriculum Breakdown

The Avon

10m50mSCALE: 1:1000

*

Sound reasoning for 2 storey building was identified:

• Reducing building weight, and construction complexity - therefore construction cost is reduced accordingly.

• Over shadowing of memorial lawn by a taller building is kept at a more manageable height. Sun Study on page 38.

• Easier campus circulation and reduced vertical circulation.

MATHS

(9)

ENGLISH

(5)SCIENCE

(9)

SOCIAL SCIENCE

(6)

HERITAGE BLOCK

HALL

LIBRARY

GYM

GROUND FLOOR PLAN FIRST FLOOR PLAN

H E R I T A G E

S P O R T S

A C A D E

M I

C