Start Date: Project Name: End Date: Project Location: Step 3 - Find Precaution Level: Step 1 - Choose Step 2 - Choose Step 4 - Color level of project: work area: type of work: 1 - Work Area 1 - Work Area 2 - Type of Work 3 - Infection Control Precautions 1 4 A GREEN Non-Physician Offic Endo / DDCC Non-invasive, inspection, wallcover 1A, 2A, 3A, 5A, 6A, 6B, 6C, 6D 2 CSPD electrical trim, minor plumbing *Ceiling tile sprayed with bleac Kitchens, cafeteria Pharmacy Main NO sanding, wall cutting or dust prior to displacing, replaced CAM fl.1,6,10,11,12 AND all satellites generation at all immediately after visual inspect 4400, 7200 B * Visitor and patient traffic ro 6300, 6400 Dialysis Small scale, short duration, minima should avoid work area. 7300, 7400, 7500 ALL ORs dust generation. Including but not * Clean supplies transported and 10100, 10200 Perfusion, Card Cat limited to; cables or wires above c stored away from contaminated 11100, 11200 All ICUs and CCUs accessing chase spaces, wall cuttin materials. 11400, 11500 Chemo Center ceiling penetrations where dust can * Water interruption scheduled 12100, 12200 All nurseries be controlled during times of low activity. 13100, 17400 5300, 5400 C YELLOW 14400, 14500 14300 Work that generates moderate to hig 1B, 1C, 2B, 5B 15300, 15400, 15500 Radiation Oncology levels of dust, removal or demoliti In addition to GREEN precaution 17500 Gamma Knife fixed building components or * Mist work surfaces when cuttin 3 CAM fl. 4,7,8** assemblies, including but not limit *Air vents or returns blocked an Wound Center, CDL 3200, 5900 sanding walls, removing floorcoveri sealed - Facilities Engineering Admitting, ED 6900, 7900 ceiling tiles and casework, new wal to evaluate - If air handler sup Pulmonary Rehab 8100, 9400 construction, minor duct or electri construction area only, it shoul Resp Care, Lab 89ICU & PICRU work above ceilings, major cabling shut down PACU, Shukar, SDSA Bronch, MPC wiring activities, or anything that (monitor filters during contruct All Radiology and C 5 be completed within a single work and change if necessary) Physical Therapy Outside near shift. *1 room areas to have walls from CAM fl. 2,3,5,13,14 air intakes <75ft D to ceiling, door closed, frame a 2100, 6200, 6500 6 Major demolition or construction. door duct taped. 7100, 71OU Outside away from Including but not limited to; activ *Debris removed in covered, seal Nuclear Medicine which require consecutive work shif or taped containers, use service 9100, 9200 heavy demolition or removal of elevators or non patient elevato 10100, 10200, 10500 complete cabling or wiring systems, * Walk-off mats at entrance 4900, 5200 new construction. *Penetrations in walls not open Ultrasound NOTE: DAMAGED STEP 5 > 4 hours. Cover w/ plastic and ASBESTOS FOUND Date tape if more. ** Listings for are WILL BE ABATED Contractor *Ceiling tiles replaced ASAP, if not specifically OR ENCAPSULATED I am aware of and will enforce open >4 hours, must be covered. covered in work are PER Infection Control precautions required P ENVIRONMENTAL for this project. F HEALTH AND SAFETY POLICY BJH/WUSM Project Manager air intakes > 75 ft

Upload: bilal-salameh

Post on 02-Dec-2015

218 views

Category:

Documents


2 download

DESCRIPTION

inf

TRANSCRIPT

Page 1: Infection Control Risk Assessment BJC1

Barnes-Jewish Hospital Infection Control Risk Assessment Appendix B Revised 09/05

Start Date: Project Name:End Date: Project Location: Step 3 - Find Precaution Level: assessment belowStep 1 - Choose Step 2 - Choose Step 4 - Color level of project: Step 6 - Return to Infectionwork area: type of work: Control - Addresses below

1 - Work Area 1 - Work Area 2 - Type of Work 3 - Infection Control Precautions 3 - Infection Control Precautions1 4 A GREEN ORANGE

Non-Physician Offices Endo / DDCC Non-invasive, inspection, wallcovering, 1A, 2A, 3A, 5A, 6A, 6B, 6C, 6D 4A, 3B, 2C, 5C2 CSPD electrical trim, minor plumbing *Ceiling tile sprayed with bleach In addition to GREEN and

Kitchens, cafeterias Pharmacy Main NO sanding, wall cutting or dust prior to displacing, replaced YELLOW precautions;CAM fl.1,6,10,11,12** AND all satellites generation at all immediately after visual inspection. *Infection Control consulted

4400, 7200 B * Visitor and patient traffic routes * Dust minimized - partitions 6300, 6400 Dialysis Small scale, short duration, minimal should avoid work area. erected to deck above.7300, 7400, 7500 ALL ORs dust generation. Including but not * Clean supplies transported and * Optimal: Chute for debris removal,10100, 10200 Perfusion, Card Cath limited to; cables or wires above ceilings, stored away from contaminated with HEPA filter or see11100, 11200 All ICUs and CCUs accessing chase spaces, wall cutting, materials. YELLOW elevator guidelines.11400, 11500 Chemo Center ceiling penetrations where dust can * Water interruption scheduled * Barriers - dampers closed, assure12100, 12200 All nurseries be controlled during times of low activity. adjacent air filters functioning,13100, 17400 5300, 5400 C YELLOW airtight plastic or drywall barriers 14400, 14500 14300 Work that generates moderate to high 1B, 1C, 2B, 5B from floor to ceiling, seams sealed 15300, 15400, 15500 Radiation Oncology levels of dust, removal or demolition of In addition to GREEN precautions;17500 Gamma Knife fixed building components or * Mist work surfaces when cutting barriers must be removed carefully

3 CAM fl. 4,7,8** assemblies, including but not limited to; *Air vents or returns blocked and to minimize dust generation. BarriersWound Center, CDL 3200, 5900 sanding walls, removing floorcovering, sealed - Facilities Engineering to be disposed of with other debris.Admitting, ED 6900, 7900 ceiling tiles and casework, new wall to evaluate - If air handler supplies *Negative pressure in const. areaPulmonary Rehab 8100, 9400 construction, minor duct or electrical construction area only, it should be with HEPA filtersResp Care, Lab 89ICU & PICRU work above ceilings, major cabling or shut down *Increase air filter changing.PACU, Shukar, SDSA Bronch, MPC wiring activities, or anything that cannot (monitor filters during contruction * Vents cleaned prior to occupancyAll Radiology and CT 5 be completed within a single work and change if necessary) * Water lines at site and adjacentPhysical Therapy Outside near shift. *1 room areas to have walls from floor areas flushed prior to occupancyCAM fl. 2,3,5,13,14** air intakes <75ft D to ceiling, door closed, frame and *Outside demolition >75 feet from2100, 6200, 6500 6 Major demolition or construction. door duct taped. air intakes.7100, 71OU Outside away from Including but not limited to; activities *Debris removed in covered, sealed REDNuclear Medicine which require consecutive work shifts, or taped containers, use service 4B, 3C, 4C, 1D, 2D, 3D, 4D, 5D9100, 9200 heavy demolition or removal of elevators or non patient elevator. In addition to GREEN, YELLOW and 10100, 10200, 10500 complete cabling or wiring systems, * Walk-off mats at entrance ORANGE precautions;4900, 5200 new construction. *Penetrations in walls not open for *Infection Control consultedUltrasound NOTE: DAMAGED STEP 5 > 4 hours. Cover w/ plastic and *Patients relocated to remote area

ASBESTOS FOUND Date tape if more. away from construction.** Listings for areas WILL BE ABATED Contractor *Ceiling tiles replaced ASAP, ifnot specifically OR ENCAPSULATED I am aware of and will enforce open >4 hours, must be covered. STEP 6covered in work areas PER Infection Control precautions required Please send to Infection Control

ENVIRONMENTAL for this project. Fax 454-8738; mailstop 90-75-500HEALTH AND SAFETY POLICY BJH/WUSM Project Manager After Hours/weekend pager 424-4380

Step 5 - Sign and authorize risk

with duct tape or ECUs - NOTE

air intakes > 75 ft

[email protected]