Industrial Summer Training at NTPC,Badarpur
Presented by:-Madhur Sharma(09011503010)
![Page 2: Industrial summer training at ntpc,badarpur](https://reader033.vdocuments.mx/reader033/viewer/2022061201/547936efb4af9fc3158b474f/html5/thumbnails/2.jpg)
Introduction
21/08/2013
![Page 3: Industrial summer training at ntpc,badarpur](https://reader033.vdocuments.mx/reader033/viewer/2022061201/547936efb4af9fc3158b474f/html5/thumbnails/3.jpg)
Overview of NTPC
NTPC was set up in the central sector in the 1975.
NTPC has installed capacity of 41,184 MW. It plans to be a 75,000 MW company by 2017.
Today NTPC contributes more than 3 / 5th of the total power generation in India
![Page 4: Industrial summer training at ntpc,badarpur](https://reader033.vdocuments.mx/reader033/viewer/2022061201/547936efb4af9fc3158b474f/html5/thumbnails/4.jpg)
Overview of NTPC
*Total Capacity of NTPC is 41,184MW
No. of Plants Capacity
NTPC OWNEDCoal 16 31855
Gas 7 3955
Renewable - 10
Total 23 35820
OWNED BY JVsCoal & Gas 7 5364
TOTAL 30 41,184
![Page 5: Industrial summer training at ntpc,badarpur](https://reader033.vdocuments.mx/reader033/viewer/2022061201/547936efb4af9fc3158b474f/html5/thumbnails/5.jpg)
Initiatives
• The company sets aside up to 0.5% of the profits for R&D.
• Roadmap developed for adopting Clean Development
• The welfare of project affected the local population around NTPC projects are taken care of through well drawn Rehabilitation and Resettlement policies.
• All stations of NTPC are ISO 14001 certified.
![Page 6: Industrial summer training at ntpc,badarpur](https://reader033.vdocuments.mx/reader033/viewer/2022061201/547936efb4af9fc3158b474f/html5/thumbnails/6.jpg)
BTPS(Badarpur Thermal Power Station)
![Page 7: Industrial summer training at ntpc,badarpur](https://reader033.vdocuments.mx/reader033/viewer/2022061201/547936efb4af9fc3158b474f/html5/thumbnails/7.jpg)
Overview of BTPS BTPS MEETS MORE THAN 24% OF DELHI’S
ELECTRICITY CONSUMPTION
INSTALLED CAPACITY 720 MW
DERATED CAPACITY 705 MW (3x95 + 2x210MW)
OWNED BY GOVT. OF INDIA, MINISTRY OF POWER
BEING MANAGED BY NTPC FOR THE LAST 26 YEARS SINCE 1st APRIL 1978
![Page 8: Industrial summer training at ntpc,badarpur](https://reader033.vdocuments.mx/reader033/viewer/2022061201/547936efb4af9fc3158b474f/html5/thumbnails/8.jpg)
NTPC Badarpur
BTPS was conceived in 1965 to meet the growing electricity demand of Northern Region.
The site construction activities started in 1968.
The plant became operational with the commissioning of its first unit on 26th July 1973, 2nd unit in ;74 , 3rd unit in ’75 , 4th unit in ’78 & 5th unit in ’81.
![Page 9: Industrial summer training at ntpc,badarpur](https://reader033.vdocuments.mx/reader033/viewer/2022061201/547936efb4af9fc3158b474f/html5/thumbnails/9.jpg)
![Page 10: Industrial summer training at ntpc,badarpur](https://reader033.vdocuments.mx/reader033/viewer/2022061201/547936efb4af9fc3158b474f/html5/thumbnails/10.jpg)
![Page 11: Industrial summer training at ntpc,badarpur](https://reader033.vdocuments.mx/reader033/viewer/2022061201/547936efb4af9fc3158b474f/html5/thumbnails/11.jpg)
BASIC THERMAL POWER PLANT
There are 3 main units:1. Steam Generator (Boiler)2. Steam Turbine3. Electric Generator
![Page 12: Industrial summer training at ntpc,badarpur](https://reader033.vdocuments.mx/reader033/viewer/2022061201/547936efb4af9fc3158b474f/html5/thumbnails/12.jpg)
Electricity from Coal
![Page 13: Industrial summer training at ntpc,badarpur](https://reader033.vdocuments.mx/reader033/viewer/2022061201/547936efb4af9fc3158b474f/html5/thumbnails/13.jpg)
OPERATION AND MAINTAINANCE
This control & instrumentation is the brain of the plant because from the relays to transmitters followed by the electronic computation chipsets and recorders and lastly the controlling circuitry, all fall under this. A View of Control Room at BTPS
![Page 14: Industrial summer training at ntpc,badarpur](https://reader033.vdocuments.mx/reader033/viewer/2022061201/547936efb4af9fc3158b474f/html5/thumbnails/14.jpg)
BOILER MAINTENANCE DEPARTMENT
![Page 15: Industrial summer training at ntpc,badarpur](https://reader033.vdocuments.mx/reader033/viewer/2022061201/547936efb4af9fc3158b474f/html5/thumbnails/15.jpg)
Water Circulation System
Natural circulation system Combined Circulation System
![Page 16: Industrial summer training at ntpc,badarpur](https://reader033.vdocuments.mx/reader033/viewer/2022061201/547936efb4af9fc3158b474f/html5/thumbnails/16.jpg)
WATER TREATMENT PLANT
Water treatment process is divided into three section:-•Pre-treatment section•Demineralization•Internal treatment
![Page 17: Industrial summer training at ntpc,badarpur](https://reader033.vdocuments.mx/reader033/viewer/2022061201/547936efb4af9fc3158b474f/html5/thumbnails/17.jpg)
ENVIRONMENTAL CONCERNS
![Page 18: Industrial summer training at ntpc,badarpur](https://reader033.vdocuments.mx/reader033/viewer/2022061201/547936efb4af9fc3158b474f/html5/thumbnails/18.jpg)
ENVIRONMENT MANAGEMENT,OCCUPATIONAL HEALTH AND SAFETY SYSTEMS
![Page 19: Industrial summer training at ntpc,badarpur](https://reader033.vdocuments.mx/reader033/viewer/2022061201/547936efb4af9fc3158b474f/html5/thumbnails/19.jpg)
POLLUTION CONTROL SYSTEMS
![Page 20: Industrial summer training at ntpc,badarpur](https://reader033.vdocuments.mx/reader033/viewer/2022061201/547936efb4af9fc3158b474f/html5/thumbnails/20.jpg)
ASH UTILISATION
![Page 21: Industrial summer training at ntpc,badarpur](https://reader033.vdocuments.mx/reader033/viewer/2022061201/547936efb4af9fc3158b474f/html5/thumbnails/21.jpg)
AFFORESTATION
![Page 22: Industrial summer training at ntpc,badarpur](https://reader033.vdocuments.mx/reader033/viewer/2022061201/547936efb4af9fc3158b474f/html5/thumbnails/22.jpg)
Thank youand have a nice day