    Energy QuestionnaireThe purpose of this questionnaire is to gather information about a facility ahead of time in order to

    facilitate preparedness of our personnel when they come on site. This questionnaire will ensure that

    the time on site is spent efficiently and the analysis thorough.

    1 Contact InformationName of Company

    Address

    Contact Name / Number of person in

    Charge of the audit project

    Name of Person(s) filling out the

    Questionnaire

    2 Operational Information about the facilityType of Company

    Nature of Business

    Number of Employees

    Number of Shifts

    Average number of employees per shift

    Average working hrsWorking days per year

    Size of the facility (sqft)

    Number of floors and possible breakup

    of area by floor

    3 Electrical Load DetailsConnected Load (kva) .KW

    Power Factor ..

    Power Consumption per month from

    Electricity board (average units)

    . (Average from Jan to Dec 2009).

    Average Electricity Board Power Bill

    (avg. of last few months)

    - (Average from Jan to Dec -2009).

    Average Power generated from DG ( Average from Jan to Dec 2009)

    Average Diesel Consumed .(Average from Jan to Dec 2009)

    AMC and Spares cost for DG

    maintenance

    (Average from Jan to Dec 2009)

    Average Cost of Power Rs ..per unit

  • 8/8/2019 Industrial] Energy Audit

    2/6

    eQube

    Page 2 of 6

    4 Electricity Bill Split UpEstimate the amount of power each of the energy consumers take up in your facility

    Appliance Percentage

    Air-conditioning ..%Lighting ..%

    Lifts ..%

    Computers / Servers .%

    Pumps .%

    Others .%

    Other Information

    (do provide any other information that comes to mind)

    5 Diesel Generator DetailsCapacity of Generator .. KVA x Nos

    Monthly Diesel Consumption (avg) . (Avg. from Jan to Dec - 2009)

    Average usage of Diesel Generators per day ..hrs

    Number of units generated by the DG set per

    month (average)

    (Avg. from Jan to Dec - 2009)

    Average cost of diesel (per Ltr @ Rs ./-)

    Monthly maintenance costs for the DG sets

    5.1 DG Set Consumption for a few months

    Month Units of Power Generated (units) Qty of Diesel Consumed (lts)

    March - 2009

    April - 2009

    June - 2009

    July - 2009

    Aug - 2009

    6 Transformer DetailsTransformer Make Qty Size

    ...KVA 33KV/11KV

    KVA 11KV/433V

  • 8/8/2019 Industrial] Energy Audit

    3/6

    eQube

    Page 3 of 6

    7 Air Conditioning DetailsIs the full facility air-conditioned ? If not what is the

    total sqft that is air-conditioned

    Yes/ No. . Sqft

    Type of Air-conditioning (central, packed / splits,unitary) Centralized

    If Centralized, type (water-cooled, air-cooled) Water cooled & Air cooled

    Hours of Usage per day 24hrs

    Day time Usage .TR x .Hrs

    Night time Usage ..TR x Hrs

    No. of AHUs Nos.

    Capacity of AHUs .. TR x .. Nos. .. Hrs

    .. TR x Nos Hrs

    .. TR x Nos. .. Hrs

    .. TR x Nos. Hrs

    Typical 12 Hour operation AHU In/ Out Temp ..o

    C/ .o

    CTypical 24 Hour operation AHU IN/ OUT Temp ..oC / oC

    7.1 For Individual Air-conditioners

    Make Type (split, window,

    packaged, other)

    Qty Tonnage

    Blue Star DX . .tr

    .. DX .. tr

    7.2 For Central Air-Conditioners

    7.2.1 Chiller DetailsQty Capacity

    .. Nos (Water cooled type) TR.. Nos (Air cooled type) . TR

    Chilled water in/ Out temp / oC

    Condenser water in/ Out temp ./ oC

  • 8/8/2019 Industrial] Energy Audit

    4/6

    eQube

    Page 4 of 6

    7.3 Chilled Water Pumping

    Type of Pump (primary /

    secondary)

    Qty Flow Head Hours of

    Operation

    Motor HP

    Primary-Air cooled .Hrs KW

    Primary - Water cooled .Hrs KWPrimary-Condenser water .Hrs KW

    Secondary Chilled water

    Pumps

    .Hrs ..KW VFD

    8 Lighting DetailsPlease provide an estimate of the kind of lighting that is used in your facility. For instance, if there are

    100 CFL (18w) lamps in the canteen used for about 10 hrs (average) per day, then the informationwould be location = canteen, type of fixture = CFL, qty = 100, wattage (18w), hrs / day of usage = 10

    Location TypeofFixture Qtity Wattage(KW) Hrs/dayUsage(2*35WT5)

    ..(1*18WCFL)

    ..(1*25W)

    ..(2*10WCFL)

    . (2*36WCFL)

    (2*18WCFL)

    .(1*35WFlouroscent)

    ..(1*40WFlouroscent)

    .(2*28W

    flouroscent)

    ..(1*26WCFL)

    ..(1*20WCFL)

    (1*9WCFL)

    ..(1*36WCFL)

    (1*150WHalogen)

    Street

    Street

    9 Exhaust/ Ventilation System DetailsPlease provide the details/ no.s of exhaust hoods and sizes used in the facility

    Location Capacity CFM &Static Pressure

    Nos. Hours of Usage/day

    Rating (KW)

  • 8/8/2019 Industrial] Energy Audit

    5/6

    eQube

    Page 5 of 6

    10Computer / Server DetailsPlease provide an estimate of the computers / servers is used in facility with estimates of usage per day

    Typeofcomputer(laptop,server,deskop,etc) Make Quantity Wattage

    Hrs/dayUsage/ %loading

    CRTMonitors

    LCDMonitors

    CPUs

    Servers (RatingKW)

    Laptops

    11Heating DetailsType of

    Heating

    Appliance

    Temperature of

    usage

    Temperature of

    exhaust

    Fuel used Hours of

    operation/ day

    Fuel

    consumed

    Furnace

    Boilers

    Air Heaters

    12Air CompressorsType Make Capacity @

    Pressure

    Hours of

    operation/ day

    Energy

    consumed/day

    Loading

    hours/unloadinghours

  • 8/8/2019 Industrial] Energy Audit

    6/6

    eQube

    Page 6 of 6

    13UPS DetailsIf there is a UPS, then please provide information about it.

    UPSSizeinKW Make BatterySizeandVoltage(AH) Numberofbatteries%Loading Listofdevices

    poweredbytheUPSandwattage

    14Other Significant Energy Consuming AppliancesList below other significant energy consumers such as pumps, lifts, etc.

    Appliance Purpose Quantity Wattage Hrs/dayUsageFire

    fighting

    system

    Lifts&DumpWeighters

    STPsystem STP

    ExhaustSystem

    Toilets&kitchen

    exhaust

    Waterpumps

    SupplyforBld&

    others

    15Energy Bills for 12 monthsKindly Scan or send a copy of the electricity bills (all of them) for the facility for the last 12 months

    Electrical Thermal

    Month Units Totalcost Cost/unit KL TotalCost Cost/Unit

    Jan09

    Feb09

    Mar09

    Apr09

    May09

    Jun09

    Jul09

    Aug09

    Sep09

    Oct09

    Nov09

    Dec09