Energy QuestionnaireThe purpose of this questionnaire is to gather information about a facility ahead of time in order to
facilitate preparedness of our personnel when they come on site. This questionnaire will ensure that
the time on site is spent efficiently and the analysis thorough.
1 Contact InformationName of Company
Address
Contact Name / Number of person in
Charge of the audit project
Name of Person(s) filling out the
Questionnaire
2 Operational Information about the facilityType of Company
Nature of Business
Number of Employees
Number of Shifts
Average number of employees per shift
Average working hrsWorking days per year
Size of the facility (sqft)
Number of floors and possible breakup
of area by floor
3 Electrical Load DetailsConnected Load (kva) .KW
Power Factor ..
Power Consumption per month from
Electricity board (average units)
. (Average from Jan to Dec 2009).
Average Electricity Board Power Bill
(avg. of last few months)
- (Average from Jan to Dec -2009).
Average Power generated from DG ( Average from Jan to Dec 2009)
Average Diesel Consumed .(Average from Jan to Dec 2009)
AMC and Spares cost for DG
maintenance
(Average from Jan to Dec 2009)
Average Cost of Power Rs ..per unit
-
8/8/2019 Industrial] Energy Audit
2/6
eQube
Page 2 of 6
4 Electricity Bill Split UpEstimate the amount of power each of the energy consumers take up in your facility
Appliance Percentage
Air-conditioning ..%Lighting ..%
Lifts ..%
Computers / Servers .%
Pumps .%
Others .%
Other Information
(do provide any other information that comes to mind)
5 Diesel Generator DetailsCapacity of Generator .. KVA x Nos
Monthly Diesel Consumption (avg) . (Avg. from Jan to Dec - 2009)
Average usage of Diesel Generators per day ..hrs
Number of units generated by the DG set per
month (average)
(Avg. from Jan to Dec - 2009)
Average cost of diesel (per Ltr @ Rs ./-)
Monthly maintenance costs for the DG sets
5.1 DG Set Consumption for a few months
Month Units of Power Generated (units) Qty of Diesel Consumed (lts)
March - 2009
April - 2009
June - 2009
July - 2009
Aug - 2009
6 Transformer DetailsTransformer Make Qty Size
...KVA 33KV/11KV
KVA 11KV/433V
-
8/8/2019 Industrial] Energy Audit
3/6
eQube
Page 3 of 6
7 Air Conditioning DetailsIs the full facility air-conditioned ? If not what is the
total sqft that is air-conditioned
Yes/ No. . Sqft
Type of Air-conditioning (central, packed / splits,unitary) Centralized
If Centralized, type (water-cooled, air-cooled) Water cooled & Air cooled
Hours of Usage per day 24hrs
Day time Usage .TR x .Hrs
Night time Usage ..TR x Hrs
No. of AHUs Nos.
Capacity of AHUs .. TR x .. Nos. .. Hrs
.. TR x Nos Hrs
.. TR x Nos. .. Hrs
.. TR x Nos. Hrs
Typical 12 Hour operation AHU In/ Out Temp ..o
C/ .o
CTypical 24 Hour operation AHU IN/ OUT Temp ..oC / oC
7.1 For Individual Air-conditioners
Make Type (split, window,
packaged, other)
Qty Tonnage
Blue Star DX . .tr
.. DX .. tr
7.2 For Central Air-Conditioners
7.2.1 Chiller DetailsQty Capacity
.. Nos (Water cooled type) TR.. Nos (Air cooled type) . TR
Chilled water in/ Out temp / oC
Condenser water in/ Out temp ./ oC
-
8/8/2019 Industrial] Energy Audit
4/6
eQube
Page 4 of 6
7.3 Chilled Water Pumping
Type of Pump (primary /
secondary)
Qty Flow Head Hours of
Operation
Motor HP
Primary-Air cooled .Hrs KW
Primary - Water cooled .Hrs KWPrimary-Condenser water .Hrs KW
Secondary Chilled water
Pumps
.Hrs ..KW VFD
8 Lighting DetailsPlease provide an estimate of the kind of lighting that is used in your facility. For instance, if there are
100 CFL (18w) lamps in the canteen used for about 10 hrs (average) per day, then the informationwould be location = canteen, type of fixture = CFL, qty = 100, wattage (18w), hrs / day of usage = 10
Location TypeofFixture Qtity Wattage(KW) Hrs/dayUsage(2*35WT5)
..(1*18WCFL)
..(1*25W)
..(2*10WCFL)
. (2*36WCFL)
(2*18WCFL)
.(1*35WFlouroscent)
..(1*40WFlouroscent)
.(2*28W
flouroscent)
..(1*26WCFL)
..(1*20WCFL)
(1*9WCFL)
..(1*36WCFL)
(1*150WHalogen)
Street
Street
9 Exhaust/ Ventilation System DetailsPlease provide the details/ no.s of exhaust hoods and sizes used in the facility
Location Capacity CFM &Static Pressure
Nos. Hours of Usage/day
Rating (KW)
-
8/8/2019 Industrial] Energy Audit
5/6
eQube
Page 5 of 6
10Computer / Server DetailsPlease provide an estimate of the computers / servers is used in facility with estimates of usage per day
Typeofcomputer(laptop,server,deskop,etc) Make Quantity Wattage
Hrs/dayUsage/ %loading
CRTMonitors
LCDMonitors
CPUs
Servers (RatingKW)
Laptops
11Heating DetailsType of
Heating
Appliance
Temperature of
usage
Temperature of
exhaust
Fuel used Hours of
operation/ day
Fuel
consumed
Furnace
Boilers
Air Heaters
12Air CompressorsType Make Capacity @
Pressure
Hours of
operation/ day
Energy
consumed/day
Loading
hours/unloadinghours
-
8/8/2019 Industrial] Energy Audit
6/6
eQube
Page 6 of 6
13UPS DetailsIf there is a UPS, then please provide information about it.
UPSSizeinKW Make BatterySizeandVoltage(AH) Numberofbatteries%Loading Listofdevices
poweredbytheUPSandwattage
14Other Significant Energy Consuming AppliancesList below other significant energy consumers such as pumps, lifts, etc.
Appliance Purpose Quantity Wattage Hrs/dayUsageFire
fighting
system
Lifts&DumpWeighters
STPsystem STP
ExhaustSystem
Toilets&kitchen
exhaust
Waterpumps
SupplyforBld&
others
15Energy Bills for 12 monthsKindly Scan or send a copy of the electricity bills (all of them) for the facility for the last 12 months
Electrical Thermal
Month Units Totalcost Cost/unit KL TotalCost Cost/Unit
Jan09
Feb09
Mar09
Apr09
May09
Jun09
Jul09
Aug09
Sep09
Oct09
Nov09
Dec09