indianola middle school

11
INDIANOLA MIDDLE SCHOOL INDIANOLA MIDDLE SCHOOL July 12, 2011 ARCHITECTS

Upload: archana-krishnan

Post on 30-Dec-2015

31 views

Category:

Documents


0 download

DESCRIPTION

July 12, 2011. Indianola Middle School. ARCHITECTS. AREA A. Steel framing being set at new Main Entry to school. ARCHITECTS. AREA A. Steel framing being set and block wall being laid at new Main Entry to school. ARCHITECTS. AREA A. - PowerPoint PPT Presentation

TRANSCRIPT

INDIANOLA MIDDLE SCHOOL

INDIANOLA MIDDLE SCHOOLJuly 12, 2011

ARCHITECTS

AREA A Steel framing being set

at new Main Entry to school.

ARCHITECTS

AREA A Steel framing being set

and block wall being laid at new Main Entry to school.

ARCHITECTS

AREA A Demo work

proceeding at new Guidance Counselor waiting area.

ARCHITECTS

AREA C Foundation walls

being set and concrete being poured at new Fieldhouse Gym.

ARCHITECTS

AREA C Foundation walls

being set and concrete being poured at new Fieldhouse Gym.

ARCHITECTS

AREA C Foundation walls

being set and concrete being poured at new Fieldhouse Gym.

ARCHITECTS

AREA C Site grading

complete and light poles being set at new bus lane drive aisle.

ARCHITECTS

AREA D Selective demo and

floor slabs being removed at old competition gym.

ARCHITECTS

AREA D New block wall

being laid and door and window frames being set at new multipurpose room.

ARCHITECTS

ALT #1 Site demo and

grading completed and new entry drive pour started at road connection to Highway 92.

ARCHITECTS