July 12, 2011. Indianola Middle School. ARCHITECTS. AREA A. Steel framing being set at new Main Entry to school. ARCHITECTS. AREA A. Steel framing being set and block wall being laid at new Main Entry to school. ARCHITECTS. AREA A. - PowerPoint PPT Presentation
TRANSCRIPT
INDIANOLA MIDDLE SCHOOL
INDIANOLA MIDDLE SCHOOLJuly 12, 2011
ARCHITECTS
AREA A Steel framing being set
at new Main Entry to school.
ARCHITECTS
AREA A Steel framing being set
and block wall being laid at new Main Entry to school.
ARCHITECTS
AREA A Demo work
proceeding at new Guidance Counselor waiting area.
ARCHITECTS
AREA C Foundation walls
being set and concrete being poured at new Fieldhouse Gym.
ARCHITECTS
AREA C Foundation walls
being set and concrete being poured at new Fieldhouse Gym.
ARCHITECTS
AREA C Foundation walls
being set and concrete being poured at new Fieldhouse Gym.
ARCHITECTS
AREA C Site grading
complete and light poles being set at new bus lane drive aisle.
ARCHITECTS
AREA D Selective demo and
floor slabs being removed at old competition gym.
ARCHITECTS
AREA D New block wall
being laid and door and window frames being set at new multipurpose room.
ARCHITECTS
ALT #1 Site demo and
grading completed and new entry drive pour started at road connection to Highway 92.