index [] · 2019-03-13 · address: alexandria, egypt, smouha, end of 14 may bridge, land mark...

173

Upload: others

Post on 02-Aug-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: INDEX [] · 2019-03-13 · Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25 ELGindy Contracting in brief “ELGENDY
Page 2: INDEX [] · 2019-03-13 · Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25 ELGindy Contracting in brief “ELGENDY

( P a g e :2)

Tele fax: 002 03 4294424 - Mobile: 002 01066676350 -WhatsApp: 002 01094855591

Email: [email protected] - [email protected] - Web Site: www.el-gindy.com

Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25

INDEX:

COMPANY DATA ………………………………………………………………………. 3

Introduction ……………………………………………………………………… 4

Soil Investigation ……………………………………………………………………… 8

C.F. A Piles ……………………………………………………………………… 17

Bored Piles ……………………………………………………………………… 48

Helical Piles ……………………………………………………………………… 54

Micro piles ……………………………………………………………………… 58

Strauss piles ……………………………………………………………………… 64

Vibroflotation “Stone Column” ……………………………………………………………. 70

Pile Load Test and Plate Load Test ……………………………………………………... 75

Supervision for Pile Load Test and Plate Load Test ………………...…………………. 88

Soil shoring ……………………………………………………………………… 90

Dewatering ……………………………………………………………………… 103

Soil Grouting ……………………………………………………………………… 136

Underground construction Caisson sinking ……………………………………………. 150

Building Construction …………………………………………………………………… 154

Cathodic Protection ……………………………………………………………………… 164

Tunneling works ……………………………………………………………………… 166

Repairing works ………………………………………………………………………. 168

Offshore Construction ……………………………………………………………………. 170

Project Management ……………………………………………………………………… 172

Page 3: INDEX [] · 2019-03-13 · Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25 ELGindy Contracting in brief “ELGENDY

( P a g e :3)

Tele fax: 002 03 4294424 - Mobile: 002 01066676350 -WhatsApp: 002 01094855591

Email: [email protected] - [email protected] - Web Site: www.el-gindy.com

Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25

EL GINDY CONTRACTING COMPANY DATA

Name: EL GINDY CONTRACTING.

The legal entity: Limited partnership corporations.

Specialization: Integrated Contracting Company.

Address:

Main Office: 82 St. Al Tayar Ahmed Saud - Bolokly - Al Raml Alexandria.

Floor No.25, ndance (B), 2End Of 14 May Bridge, Land Mark Buildings, Entr Branch:

Smouha, Alexandria, Egypt.

Store and workshop: Behind the Higher Institute Naja Al Rawaf - behind Radi Trans

Company - King Mariout.

No of Commercial Register: 8753- East of Alexandria

No of Tax card: 033-538-427

No. of Registration for Private Sector Contractor: 1574/C

No. of Egyptian Federation for Construction & Building Contractors: 5216

ID Company: 427538033

No. of Social insurance card: 1174331

For contact:

Tel Fax: 022 03 4294424

Mobile: 01066676350

WhatsApp: 01094855591

Email: [email protected]

Page 4: INDEX [] · 2019-03-13 · Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25 ELGindy Contracting in brief “ELGENDY

( P a g e :4)

Tele fax: 002 03 4294424 - Mobile: 002 01066676350 -WhatsApp: 002 01094855591

Email: [email protected] - [email protected] - Web Site: www.el-gindy.com

Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25

Mission and Vision “ELGINDY CONTRACTING” aiming to provide

customers with high-quality service at Reasonable

prices. The company is pursuing initiatives that

apply expert knowledge and expanded services to

achieve even greater customer satisfaction. In its

approach to Promising growth fields such as the

environment-related market and renewal projects.

At “ELGINDY CONTRACTING” our Mission is

to remain a growing business providing quality

construction services, safely and responsibly.

Our Vision is to be contractor & employer of first

choice for those who share our values.

Our integrity is not negotiable, we do what we say,

we have best solution for all and we maintain high

ethical standards.

We listen to clients, employees & other

stakeholders.

We communicate clearly.

We question the way things are done.

We focus on results not excuses.

We go the extra distance to get the job done.

We ensure people can work safely and free from

discrimination.

We passionately care for our environment and the

needs of others.

We achieve through team effort.

We share knowledge and skills to achieve

excellence.

We acknowledge the achievements of others.

We have a culture that does not seek to blame.

We invest in and reward our people.

Page 5: INDEX [] · 2019-03-13 · Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25 ELGindy Contracting in brief “ELGENDY

( P a g e :5)

Tele fax: 002 03 4294424 - Mobile: 002 01066676350 -WhatsApp: 002 01094855591

Email: [email protected] - [email protected] - Web Site: www.el-gindy.com

Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25

Our Target

The qualitative targets are expressed in

ELGINDY, five zeros vision:

• Zero loss-making projects. Loss makers

destroy profitability and customer

relationships

• Zero accidents, whereby the safety of

our personnel as well as subcontractors,

suppliers and general public is ensured

at and around our projects

• Zero environmental incidents, by which

our projects should be executed in a

manner that minimizes environmental

impact

• Zero ethical breaches, meaning that we

take a zero-tolerance approach to any

form of bribery or corruption

• Zero defects, with the double aim of

improving the bottom line and

increasing customer satisfaction

The qualitative targets, as expressed in the five

zeros, reflect our core values.

The five zeros as well as the outperform

financial targets also provide the basis for

incentive systems at various levels within

ELGINDY Company.

Page 6: INDEX [] · 2019-03-13 · Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25 ELGindy Contracting in brief “ELGENDY

( P a g e :6)

Tele fax: 002 03 4294424 - Mobile: 002 01066676350 -WhatsApp: 002 01094855591

Email: [email protected] - [email protected] - Web Site: www.el-gindy.com

Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25

Our Strategy

ELGINDY, strategy for achieving the

operative and financial targets is:

• To focus on core businesses in

construction and development.

• To be an international company,

with a leading position in selected

home markets.

• To take advantage of the Group’s

collective resources – brand,

employee expertise and financial

strength.

• To foresee and systematically

manage risk.

• To enhance green expertise

throughout our operations.

• To be an industry leader in green

building and sustainability,

particularly in occupational health

and safety, ethics and environment.

• To recruit, develop and retain

competent employees and to

achieve a greater diversity.

• To capitalize on urbanization trends.

Page 7: INDEX [] · 2019-03-13 · Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25 ELGindy Contracting in brief “ELGENDY

( P a g e :7)

Tele fax: 002 03 4294424 - Mobile: 002 01066676350 -WhatsApp: 002 01094855591

Email: [email protected] - [email protected] - Web Site: www.el-gindy.com

Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25

ELGindy Contracting in brief

“ELGENDY CONTRACTING” was established in

year 1994 under provision of law no.23 of Egypt. We

have a great history in construction and our

experiences give us a leadership in construction

branches.

The company offers a wide range of activities such as:

• Dewatering (Deep wells, open trench and sump,

Well point system and combined system).

• Deep foundation (CFA “continuous Flight

Auger”, bored piles, Helical Piles and micro

piles).

• Soil shoring (wood shuttering, sheet piles,

retained piles).

• Soil injection, soil nailing and anchoring.

• Underground construction (caisson sink, water

tanks, tunnels).

• Marine Construction.

• Super structures (industrial, schools, villas,

etc.…).

• Project management.

Page 8: INDEX [] · 2019-03-13 · Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25 ELGindy Contracting in brief “ELGENDY

( P a g e :8)

Tele fax: 002 03 4294424 - Mobile: 002 01066676350 -WhatsApp: 002 01094855591

Email: [email protected] - [email protected] - Web Site: www.el-gindy.com

Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25

Soil Investigation

“”

“”

Page 9: INDEX [] · 2019-03-13 · Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25 ELGindy Contracting in brief “ELGENDY

( P a g e :9)

Tele fax: 002 03 4294424 - Mobile: 002 01066676350 -WhatsApp: 002 01094855591

Email: [email protected] - [email protected] - Web Site: www.el-gindy.com

Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25

Soil Investigation:

We have been providing quality soil investigation service to contractors, developers and consultants since

1987’s.

• Undisturbed / Piston Soil Sampling

• Standard Penetration Test

• Diamond Rock Coring

• In-situ Permeability Test

• Soil report

Page 10: INDEX [] · 2019-03-13 · Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25 ELGindy Contracting in brief “ELGENDY

( P a g e :10)

Tele fax: 002 03 4294424 - Mobile: 002 01066676350 -WhatsApp: 002 01094855591

Email: [email protected] - [email protected] - Web Site: www.el-gindy.com

Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25

Page 11: INDEX [] · 2019-03-13 · Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25 ELGindy Contracting in brief “ELGENDY

( P a g e :11)

Tele fax: 002 03 4294424 - Mobile: 002 01066676350 -WhatsApp: 002 01094855591

Email: [email protected] - [email protected] - Web Site: www.el-gindy.com

Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25

Projects with Petrojet

Company

Page 12: INDEX [] · 2019-03-13 · Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25 ELGindy Contracting in brief “ELGENDY

( P a g e :12)

Tele fax: 002 03 4294424 - Mobile: 002 01066676350 -WhatsApp: 002 01094855591

Email: [email protected] - [email protected] - Web Site: www.el-gindy.com

Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25

NO. Project Date General Contractor Owner

1 Soil Investigation for Various

Projects.

1987 Petrojet - Northern

Branch

Various companies

2 Soil Investigation for Various

Projects.

1988 Petrojet - Northern

Branch

Various companies

3 Soil Investigation for Petrogas

Project.

1988 Petrojet - Northern

Branch

Petrogas

4 Soil Investigation for Various

Projects.

1989 Petrojet - Northern

Branch

Various companies

5 Soil Investigation for Various

Projects.

1990 Petrojet - Northern

Branch

Various companies

6 Soil Investigation for Various

Projects.

1991 Petrojet - Northern

Branch

Various companies

7 Soil Investigation for Various

Projects.

1992 Petrojet - Northern

Branch

Various companies

8 Soil Investigation for Various

Projects.

1993 Petrojet - Northern

Branch

Various companies

9 Soil Investigation for Various

Projects.

1994 Petrojet - Northern

Branch

Various companies

10 Soil Investigation for Various

Projects.

1995 Petrojet - Northern

Branch

Various companies

11 Soil Investigation for Various

Projects.

1996 Petrojet - Northern

Branch

Various companies

12 Soil Investigation for Petrogas

Project.

1996 Petrojet - Northern

Branch

Petrogas

13 Soil Investigation for AMOC

Project.

1996 Petrojet - Northern

Branch

AMOC

14 Soil Investigation for Various

Projects.

1997 Petrojet - Northern

Branch

Various companies

15 Soil Investigation for APRC

Project.

1997 Petrojet - Northern

Branch

APRC

16 Soil Investigation for Various

Projects.

1998 Petrojet - Northern

Branch

Various companies

17 Soil Investigation for Various

Projects.

1999 Petrojet - Northern

Branch

Various companies

18 Soil Investigation for Petrogas

Project.

2000 Petrojet - Northern

Branch

Petrogas

19 Soil Investigation for Various

Projects.

2001 Petrojet - Northern

Branch

Various companies

Page 13: INDEX [] · 2019-03-13 · Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25 ELGindy Contracting in brief “ELGENDY

( P a g e :13)

Tele fax: 002 03 4294424 - Mobile: 002 01066676350 -WhatsApp: 002 01094855591

Email: [email protected] - [email protected] - Web Site: www.el-gindy.com

Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25

NO. Project Date General Contractor Owner

20 Soil Investigation for Petrogas

Project.

2003 Petrojet - Northern

Branch

Petrogas

21 Soil Investigation for Petrogas

Project.

2003 Petrojet - Northern

Branch

Petrogas

22 Soil Investigation for Egyptian

Linear Alkyl Project.

2003 Petrojet - Northern

Branch

Egyptian Linear

Alkyl

23 Soil Investigation for Sugar

Factory Project.

2006 Petrojet - Northern

Branch

El Nubaria Co. For

Sugar Manufacturing

and Refining

24 Soil Investigation for the new

administrative capital Project.

2016 Petrojet - The Main

Branch

The new

administrative

capital

Page 14: INDEX [] · 2019-03-13 · Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25 ELGindy Contracting in brief “ELGENDY

( P a g e :14)

Tele fax: 002 03 4294424 - Mobile: 002 01066676350 -WhatsApp: 002 01094855591

Email: [email protected] - [email protected] - Web Site: www.el-gindy.com

Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25

Projects with other

companies

Page 15: INDEX [] · 2019-03-13 · Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25 ELGindy Contracting in brief “ELGENDY

( P a g e :15)

Tele fax: 002 03 4294424 - Mobile: 002 01066676350 -WhatsApp: 002 01094855591

Email: [email protected] - [email protected] - Web Site: www.el-gindy.com

Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25

NO. Project Date General Contractor Owner

1 Soil Investigation for Various

Projects.

1987 Various Subcontractor

Various companies

2 Soil Investigation for Various

Projects.

1988 Various Subcontractor

Various companies

3 Soil Investigation for Various

Projects.

1989 Various Subcontractor

Various companies

4 Soil Investigation for Various

Projects.

1990 Various Subcontractor

Various companies

5 Soil Investigation for Various

Projects.

1991 Various Subcontractor

Various companies

6 Soil Investigation for Various

Projects.

1992 Various Subcontractor

Various companies

7 Soil Investigation for Various

Projects.

1993 Various Subcontractor

Various companies

8 Soil Investigation for Various

Projects.

1994 Various Subcontractor

Various companies

9 Soil Investigation for Various

Projects.

1995 Various Subcontractor

Various companies

10 Soil Investigation for Various

Projects.

1996 Various Subcontractor

Various companies

11 Soil Investigation for Various

Projects.

1997 Various Subcontractor

Various companies

12 Soil Investigation for El Nasr

Leather Tanning Factory Project.

1997 Subcontractor El Nasr Leather

Tanning Factory

13 Soil Investigation for Various

Projects.

1998 Various Subcontractor

Various companies

14 Soil Investigation for Various

Projects.

1999 Various Subcontractor

Various companies

15 Soil Investigation for Various

Projects.

2000 Various Subcontractor

Various companies

16 Soil Investigation for Sidpec

Stores Project.

2000 Alex Steel for Petroleum Services

Sidi Kerir

Petrochemicals Co

17 Soil Investigation for Various

Projects.

2001 Various Subcontractor

Various companies

18 Soil Investigation for Various

Projects.

2002 Various Subcontractor

Various companies

19 Soil Investigation for Various

Projects.

2003 Various Subcontractor

Various companies

Page 16: INDEX [] · 2019-03-13 · Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25 ELGindy Contracting in brief “ELGENDY

( P a g e :16)

Tele fax: 002 03 4294424 - Mobile: 002 01066676350 -WhatsApp: 002 01094855591

Email: [email protected] - [email protected] - Web Site: www.el-gindy.com

Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25

NO. Project Date General Contractor Owner

20 Soil Investigation for Various

Projects.

2004 Various Subcontractor

Various companies

21 Soil Investigation for Various

Projects.

2005 Various Subcontractor

Various companies

22 Soil Investigation for Various

Projects.

2006 Various Subcontractor

Various companies

23 Soil Investigation for Various

Projects.

2007 Various Subcontractor

Various companies

24 Soil Investigation for Various

Projects.

2008 Various Subcontractor

Various companies

25 Soil Investigation for Various

Projects.

2009 Various Subcontractor

Various companies

26 Soil Investigation for Middle

East Oil Refinery Project.

2015 Enppi and

DAPPOLONIA

MIDOR

27 Soil Investigation for Radio

drinking water station Project

“Matrouh Governorate”.

2016 Tabarak Contracting

Company Holding Company

for drinking water

and sanitary

drainage

28 Soil Investigation for Nile Delta Gas Development project.

2016 DR. Hamza and

Partners Office

British Petroleum

(BP worldwide)

29 Soil Investigation for Zohr Gas

Field Project.

2016 Enppi and

DAPPOLONIA

MIDOR

30 Soil Investigation for Ras Al

Teen Port Project.

2017 Abnaa Abdul Salam Ras Al Teen Port

31 Soil Investigation for Dry Yeast

storage project.

2017 LESAFFRE EGYPT LESAFFRE EGYPT

32 Soil Investigation for Halaib

Dairy and Juice Project in New

Damietta “Damietta

Governorate”

2018 Sama Egypt for

Contracting Halaib Dairy and

Juice Company

33 Soil Investigation for Dry Yeast

storage project.

2018 LESAFFRE EGYPT LESAFFRE EGYPT

Page 17: INDEX [] · 2019-03-13 · Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25 ELGindy Contracting in brief “ELGENDY

( P a g e :17)

Tele fax: 002 03 4294424 - Mobile: 002 01066676350 -WhatsApp: 002 01094855591

Email: [email protected] - [email protected] - Web Site: www.el-gindy.com

Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25

Continuous Flight Auger piles

(C.F. A piles)

“”

“”

Page 18: INDEX [] · 2019-03-13 · Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25 ELGindy Contracting in brief “ELGENDY

( P a g e :18)

Tele fax: 002 03 4294424 - Mobile: 002 01066676350 -WhatsApp: 002 01094855591

Email: [email protected] - [email protected] - Web Site: www.el-gindy.com

Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25

Deep Foundation:

CFA: Continuous Flight Auger (CFA) Piling is one of the most widely adopted piling techniques due to its low

impact on the surrounding environment. It is ideal for use near any environmentally sensitive situation

including but not limited to listed buildings, water treatment works and contaminated sites.

Page 19: INDEX [] · 2019-03-13 · Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25 ELGindy Contracting in brief “ELGENDY

( P a g e :19)

Tele fax: 002 03 4294424 - Mobile: 002 01066676350 -WhatsApp: 002 01094855591

Email: [email protected] - [email protected] - Web Site: www.el-gindy.com

Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25

Projects with Petrojet

Company

Page 20: INDEX [] · 2019-03-13 · Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25 ELGindy Contracting in brief “ELGENDY

( P a g e :20)

Tele fax: 002 03 4294424 - Mobile: 002 01066676350 -WhatsApp: 002 01094855591

Email: [email protected] - [email protected] - Web Site: www.el-gindy.com

Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25

NO. Project Date General Contractor Owner

1 Drilling using Continuous Flight

Auger piles for (Petroleum

Cooperative Society) Project.

1997 Petrojet - Northern

Branch

Petroleum

Cooperative Society

2 Drilling using Continuous Flight

Auger piles for Accompanying

Project.

1998 Petrojet - Northern

Branch

SIDPEC

3 Drilling using Continuous Flight

Auger piles for Gasco Project.

1998 Petrojet - Northern

Branch

Gasco

4 Drilling using Continuous Flight

Auger piles for Badr El Din

Petroleum Project.

1999 Petrojet - Northern

Branch

Bapetco

5 Drilling using Continuous Flight

Auger piles for Propane Project.

2002 Petrojet - Northern

Branch

WEPCO

6 Drilling using Continuous Flight

Auger piles for WEPCO Project.

2003 Petrojet - Northern

Branch

WEPCO

7 Drilling using Continuous Flight

Auger piles for LNG Project.

2004 Petrojet - Northern

Branch

Egyptian LNG

8 Drilling using Continuous Flight

Auger piles for (FB. 402.A) tank

Project.

2004 Petrojet - Northern

Branch

Egyptian

Petrochemicals

Company

9 Drilling using Continuous Flight

Auger piles for ABUK Project.

2004 Petrojet - Northern

Branch

ABUK

10 Drilling using Continuous Flight

Auger piles for ABUK Project.

2005 Petrojet - Northern

Branch

ABUK

11 Drilling using Continuous Flight

Auger piles for 41”: 81” Line

Amreya Petroleum Project.

2005 Petrojet - Northern

Branch

APRC

12 Drilling using Continuous Flight

Auger piles for Ship Supply

Station Project.

2005 Petrojet - Northern

Branch

Rashpetco

13 Drilling using Continuous Flight

Auger piles for Sugar Factory

Project.

2005 Petrojet - Northern

Branch

El Nubaria Co. For

Sugar Manufacturing

and Refining

14 Drilling using Continuous Flight

Auger piles for Electricity

Towers Project “Burj Al Arab

area”.

2005 Petrojet - Northern

Branch

Egypt Electricity

Holding Company

Page 21: INDEX [] · 2019-03-13 · Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25 ELGindy Contracting in brief “ELGENDY

( P a g e :21)

Tele fax: 002 03 4294424 - Mobile: 002 01066676350 -WhatsApp: 002 01094855591

Email: [email protected] - [email protected] - Web Site: www.el-gindy.com

Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25

NO. Project Date General Contractor Owner

15 Drilling using Continuous Flight

Auger piles for Alexandria

Fertilizers Project.

2005 Petrojet - Northern

Branch

Alex Fert

16 Drilling using Continuous Flight

Auger piles for Sugar Factory

Project.

2006 Petrojet - Northern

Branch

El Nubaria Co. For

Sugar Manufacturing

and Refining

17 Drilling using Continuous Flight

Auger piles for Alexandria

Petroleum Project.

2006 Petrojet - Northern

Branch

Alexandria

Petroleum Company

18 Drilling using Continuous Flight

Auger piles for ELAB Project.

2006 Petrojet - Northern

Branch

Egyptian Linear

Alkyl

19 Drilling using Continuous Flight

Auger piles for Beni Suef silos

Project.

2007 Petrojet - Southern

Branch

Egyptian Holding

Company for silos

and storage

20 Drilling using Continuous Flight

Auger piles for ELAB Project.

2007 Petrojet - Northern

Branch

Egyptian Linear

Alkyl

21 Drilling using Continuous Flight

Auger piles for ELAB Project.

2008 Petrojet - Northern

Branch

Egyptian Linear

Alkyl

22 Drilling using Continuous Flight

Auger piles for El - Wastani

station Project

2009 Petrojet - Northern

Branch

El Wastani

Petroleum

23 Drilling using Continuous Flight

Auger piles for circular tank

Petrogas Project.

2010 Petrojet - Northern

Branch

Petrogas

24 Drilling using Continuous Flight

Auger piles for EStyrenics

Project.

2010 Petrojet - Northern

Branch

Egyptian Styrenics

25 Drilling using Continuous Flight

Auger piles for ELAB Project.

2011 Petrojet - Northern

Branch

Egyptian Linear

Alkyl

26 Drilling using Continuous Flight

Auger piles for EStyrenics

Project.

2011 Petrojet - Northern

Branch

Egyptian Styrenics

27 Drilling using Continuous Flight

Auger piles for ANRPC Project.

2011 Petrojet - Northern

Branch

ANRPC

28 Drilling using Continuous Flight

Auger piles for ELAB Project.

2012 Petrojet - Northern

Branch

Egyptian Linear

Alkyl

Page 22: INDEX [] · 2019-03-13 · Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25 ELGindy Contracting in brief “ELGENDY

( P a g e :22)

Tele fax: 002 03 4294424 - Mobile: 002 01066676350 -WhatsApp: 002 01094855591

Email: [email protected] - [email protected] - Web Site: www.el-gindy.com

Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25

NO. Project Date General Contractor Owner

29 Drilling using Continuous Flight

Auger piles for Sour Water

Project.

2012 Petrojet - Northern

Branch

ANRPC

30 Drilling using Continuous Flight

Auger piles for Polyethylene

Project.

2012 Petrojet - Northern

Branch

Egyptian

Petrochemicals

Company

31 Drilling using Continuous Flight

Auger piles for Egyptian Pumps

Company Project.

2012 Petrojet -Eastern

Branch

Egyptian Pumps

Company

32 Drilling using Continuous Flight

Auger piles for ANRPC Project.

2013 Petrojet - Northern

Branch

ANRPC

33 Drilling using Continuous Flight

Auger piles for Polyethylene

Project.

2013 Petrojet - Northern

Branch

Egyptian

Petrochemicals

Company

34 Drilling using Continuous Flight

Auger piles for Polyethylene

Project.

2014 Petrojet - Northern

Branch

Egyptian

Petrochemicals

Company

35 Drilling using Continuous Flight

Auger piles for Nasr Petroleum

Project.

2014 Petrojet - Eastern

Branch

Nasr Petroleum

36 Drilling using Continuous Flight

Auger piles for circular tank

Petrogas Project.

2014 Petrojet - Northern

Branch

Petrogas

37 Drilling using Continuous Flight

Auger piles for Petrochemicals

“alshaela” Project.

2014 Petrojet - Northern

Branch

Egyptian

Petrochemicals

Company

38 Drilling using Continuous Flight

Auger piles for Nasr Petroleum

(Stage 02) Project.

2014 Petrojet - Eastern

Branch

Nasr Petroleum

39 Drilling using Continuous Flight

Auger piles for ERC Mostorod

Project.

2014 Petrojet - Southern

Branch

Egyptian Refining

Company

40 Drilling using Continuous Flight

Auger piles for ABUK Project.

2014 Petrojet - Southern

Branch Abu Qir For Fertilizers

41 Drilling using Continuous Flight

Auger piles for Beni Suef silos

Project.

2015 Petrojet - Southern

Branch

Egyptian Holding

Company for silos

and storage

Page 23: INDEX [] · 2019-03-13 · Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25 ELGindy Contracting in brief “ELGENDY

( P a g e :23)

Tele fax: 002 03 4294424 - Mobile: 002 01066676350 -WhatsApp: 002 01094855591

Email: [email protected] - [email protected] - Web Site: www.el-gindy.com

Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25

NO. Project Date General Contractor Owner

42 Drilling using Continuous Flight

Auger piles for circular tank

Petrogas (Stage 01) 22/6/2015

Project.

2015 Petrojet - Northern

Branch

Petrogas

43 Drilling using Continuous Flight

Auger piles for circular tank

Petrogas (Stage 02) 11/9/2015

Project.

2015 Petrojet - Northern

Branch

Petrogas

44 Drilling using Continuous Flight

Auger piles for Rasheed line

Burullus Gas Company Project.

2015 Petrojet - Northern

Branch

BGC

45 Drilling using Continuous Flight

Auger piles for CCR (Stage 01)

17/3/2016 Project.

2016 Petrojet - Northern

Branch

ANRPC

46 Drilling using Continuous Flight

Auger piles for CCR (Stage 02)

22/5/2016 Project.

2016 Petrojet - Northern

Branch

ANRPC

47 Drilling using Continuous Flight

Auger piles for circular tank

Petrogas (Stage 03) 18/9/2016

Project.

2016 Petrojet - Northern

Branch

Petrogas

48 Drilling using Continuous Flight

Auger piles for Electricity line

of Burullus Project.

2016 Petrojet - Northern

Branch

West Delta

Electricity Station

49 Drilling using Continuous Flight

Auger piles for Petrobel Project.

2017 Petrojet - Eastern

Branch

Belayim Petroleum

50 Drilling using Continuous Flight

Auger piles for CCR (Stage 03)

5/4/2017 Project.

2017 Petrojet - Northern

Branch

ANRPC

51 Drilling using Continuous Flight

Auger piles for ADCO Gasco

Project.

2018 Petrojet - Northern

Branch

Egyptian Natural

Gas Company

52 Drilling using Continuous Flight

Auger piles for the Emirati

District in Port Said Project.

2018 Petrojet - Eastern

Branch

Belayim Petroleum

Page 24: INDEX [] · 2019-03-13 · Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25 ELGindy Contracting in brief “ELGENDY

( P a g e :24)

Tele fax: 002 03 4294424 - Mobile: 002 01066676350 -WhatsApp: 002 01094855591

Email: [email protected] - [email protected] - Web Site: www.el-gindy.com

Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25

Projects with other

companies

Page 25: INDEX [] · 2019-03-13 · Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25 ELGindy Contracting in brief “ELGENDY

( P a g e :25)

Tele fax: 002 03 4294424 - Mobile: 002 01066676350 -WhatsApp: 002 01094855591

Email: [email protected] - [email protected] - Web Site: www.el-gindy.com

Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25

NO. Project Date General Contractor Owner

1 Drilling using Continuous Flight

Auger piles for Residential

Building Project.

1995 Local Unit Edkou Residential Building

2 Drilling using Continuous Flight

Auger piles for Abu Madi gas

field station Project.

2001 Petromaint

Gasco

3 Drilling using Continuous Flight

Auger piles for Government

Service Building Project.

2008 wady Alnil for

General Contracting Government Service

Building

4 Drilling using Continuous Flight

Auger piles for Nubaria Station

Project.

2008 NATGAS Nubaria Natural Gas

5 Drilling using Continuous Flight

Auger piles for Gas Stations

Kom Hamada And Abu Homs

Project.

2009 Subcontractor NATGAS

6 Drilling using Continuous Flight

Auger piles for Holding

Company for drinking water and

sanitary drainage Project.

2009 Alexandria

Construction

“Talaat Moustafa”

Holding Company

for drinking water

and sanitary

drainage

7 Drilling using Continuous Flight

Auger piles for Commercial

building Project.

2009 Gama for Trading

and Contracting

Ceramica

Cleopatra Group

8 Drilling using Continuous Flight

Auger piles for Residential

Building “Golden Tower

Semouha” Project.

2009 Al Madinah for

Contracting

Residential Building

9 Drilling using Continuous Flight

Auger piles for Commercial

building “Batal Ahmed Abdel

Aziz Street” Project.

2009 Delta Construction and

Development

Company

Ceramica

Cleopatra Group

10 Drilling using Continuous Flight

Auger piles for Commercial

building Project.

2009 Gama for Trading

and Contracting

Carrefour

” Alnajar Mall”

11 Drilling using Continuous Flight

Auger piles for Residential

Building Project “Alex

Governorate”.

2009 Subcontractor Residential Building

Page 26: INDEX [] · 2019-03-13 · Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25 ELGindy Contracting in brief “ELGENDY

( P a g e :26)

Tele fax: 002 03 4294424 - Mobile: 002 01066676350 -WhatsApp: 002 01094855591

Email: [email protected] - [email protected] - Web Site: www.el-gindy.com

Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25

NO. Project Date General Contractor Owner

12 Drilling using Continuous Flight

Auger piles for Residential

Building Project “Alex

Governorate”.

2009 Subcontractor Residential Building

13 Drilling using Continuous Flight

Auger piles for Residential

Building “Golf Sporting”

Project.

2009 Egyptian House for

Architecture and

Development

Residential Building

14 Drilling using Continuous Flight

Auger piles for “Abu Qir

Power Station” Project.

2010 Alahlia for

Contracting

Abu Qir

Power Station

15 Drilling using Continuous Flight

Auger piles for Holding

Company for drinking water and

sanitary drainage “Bilqas area”

Project.

2010 Horse Engineering

Works Alex

Holding Company

for drinking water

and sanitary

drainage

16 Drilling using Continuous Flight

Auger piles for Royal Hospital

Project.

2010 MAS for engineering

and contracting Royal Hospital

17 Drilling using Continuous Flight

Auger piles for Residential

Building Project.

2010 Emaar Real Estate

Development and

Contracting

Residential Building

18 Drilling using Continuous Flight

Auger piles for Residential

Building Project.

2010 El Halawany Real

Estate Investment Residential Building

19 Drilling using Continuous Flight

Auger piles for Residential

Building “Alex Governorate”

Project.

2010 Subcontractor Residential Building

20 Drilling using Continuous Flight

Auger piles for “KASR EL

AINY” Project.

2010 RAK for Contracting Medical Services

Building

21 Drilling using Continuous Flight

Auger piles for Fifth Assembly

Mall Project.

2010 Amwaj Real Estate

Investment and

Tourism

Mall

22 Drilling using Continuous Flight

Auger piles for Residential

Building Project “Cairo

Governorate”.

2010 Emaar Real Estate

Development and

Contracting

Residential Building

Page 27: INDEX [] · 2019-03-13 · Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25 ELGindy Contracting in brief “ELGENDY

( P a g e :27)

Tele fax: 002 03 4294424 - Mobile: 002 01066676350 -WhatsApp: 002 01094855591

Email: [email protected] - [email protected] - Web Site: www.el-gindy.com

Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25

NO. Project Date General Contractor Owner

23 Drilling using Continuous Flight

Auger piles for Administrative

building Project.

2010 Subcontractor Martec International

24 Drilling using Continuous Flight

Auger piles for Residential

Building Project “Cairo

Governorate”.

2010 Subcontractor Residential Building

25 Drilling using Continuous Flight

Auger piles for Residential

Building Project “Beheira

Governorate”.

2011 Subcontractor Residential Building

26 Drilling using Continuous Flight

Auger piles for Residential

Building Project “Beni Suef

Governorate”.

2011 Subcontractor Residential Building

27 Drilling using Continuous Flight

Auger piles for Residential

Building Project “Alex

Governorate”.

2011 Subcontractor Residential Building

28 Drilling using Continuous Flight

Auger piles for Residential

Building Project “Alex

Governorate”.

2011 Subcontractor Residential Building

29 Drilling using Continuous Flight

Auger piles for Residential

Building Project “Alex

Governorate”.

2011 Subcontractor Residential Building

30 Drilling using Continuous Flight

Auger piles for Residential

Building Project “Alex

Governorate”.

2011 Subcontractor Residential Building

31 Drilling using Continuous Flight

Auger piles for Residential

Building Project “Alex

Governorate”.

2011 Subcontractor Residential Building

32 Drilling using Continuous Flight

Auger piles for Residential

Building Project “Alex

Governorate”.

2011 Subcontractor Residential Building

Page 28: INDEX [] · 2019-03-13 · Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25 ELGindy Contracting in brief “ELGENDY

( P a g e :28)

Tele fax: 002 03 4294424 - Mobile: 002 01066676350 -WhatsApp: 002 01094855591

Email: [email protected] - [email protected] - Web Site: www.el-gindy.com

Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25

NO. Project Date General Contractor Owner

33 Drilling using Continuous Flight

Auger piles for Residential

Building Project “Alex

Governorate”.

2011 Subcontractor Residential Building

34 Drilling using Continuous Flight

Auger piles for Holding

Company for drinking water and

sanitary drainage Project.

2011 Horse Engineering

Works Alex

Holding Company

for drinking water

and sanitary

drainage

35 Drilling using Continuous Flight

Auger piles for Residential

Building Project “Alex

Governorate”.

2011 Subcontractor Residential Building

36 Drilling using Continuous Flight

Auger piles for Residential

Building Project “Alex

Governorate”.

2011 Subcontractor Residential Building

37 Drilling using Continuous Flight

Auger piles for Residential

Building Project “Alex

Governorate”.

2011 Subcontractor Residential Building

38 Drilling using Continuous Flight

Auger piles for Residential

Building Project “Alex

Governorate”.

2011 Subcontractor Residential Building

39 Drilling using Continuous Flight

Auger piles for Residential

Building Project “Alex

Governorate”.

2011 Subcontractor Residential Building

40 Drilling using Continuous Flight

Auger piles for Residential

Building Project “Alex

Governorate”.

2012 Subcontractor Residential Building

41 Drilling using Continuous Flight

Auger piles for Holding

Company for drinking water and

sanitary drainage” Abdul Qader

Station” Project.

2012 Alexandria

Construction

“Talaat Moustafa”

Holding Company

for drinking water

and sanitary

drainage

42 Drilling using Continuous Flight

Auger piles for Rehab City

Project “Cairo Governorate”.

2012 Alexandria

Construction

“Talaat Moustafa”

Rehab City

Page 29: INDEX [] · 2019-03-13 · Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25 ELGindy Contracting in brief “ELGENDY

( P a g e :29)

Tele fax: 002 03 4294424 - Mobile: 002 01066676350 -WhatsApp: 002 01094855591

Email: [email protected] - [email protected] - Web Site: www.el-gindy.com

Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25

NO. Project Date General Contractor Owner

43 Drilling using Continuous Flight

Auger piles for Residential

Building Project “Alex

Governorate”.

2012 El Baroun For Real

Estate Investment and

Contracting

Residential Building

44 Drilling using Continuous Flight

Auger piles for Residential

Building Project “Alex

Governorate”.

2012 Subcontractor Residential Building

45 Drilling using Continuous Flight

Auger piles for Residential

Building Project “Alex

Governorate”.

2012 Subcontractor Residential Building

46 Drilling using Continuous Flight

Auger piles for Residential

Building Project “Alex

Governorate”.

2012 Subcontractor Residential Building

47 Drilling using Continuous Flight

Auger piles for Residential

Building Project “Alex

Governorate”.

2012 Subcontractor Residential Building

48 Drilling using Continuous Flight

Auger piles for Residential

Building Project “Alex

Governorate”.

2012 Subcontractor Residential Building

49 Drilling using Continuous Flight

Auger piles for Residential

Building Project “Alex

Governorate”.

2012 Subcontractor Residential Building

50 Drilling using Continuous Flight

Auger piles for Residential

Building Project “Alex

Governorate”.

2012 SABB Engineering

and Construction Owners Association

51 Drilling using Continuous Flight

Auger piles for Residential

Building Project “Alex

Governorate”.

2012 Subcontractor Residential Building

52 Drilling using Continuous Flight

Auger piles for Residential

Building Project “Alex

Governorate”.

2012 Subcontractor Residential Building

Page 30: INDEX [] · 2019-03-13 · Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25 ELGindy Contracting in brief “ELGENDY

( P a g e :30)

Tele fax: 002 03 4294424 - Mobile: 002 01066676350 -WhatsApp: 002 01094855591

Email: [email protected] - [email protected] - Web Site: www.el-gindy.com

Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25

NO. Project Date General Contractor Owner

53 Drilling using Continuous Flight

Auger piles for Residential

Building Project “Alex

Governorate”.

2012 Subcontractor Residential Building

54 Drilling using Continuous Flight

Auger piles for Residential

Building Project “Alex

Governorate”.

2012 Subcontractor Residential Building

55 Drilling using Continuous Flight

Auger piles for Residential

Building Project “Alex

Governorate”.

2012 Subcontractor Residential Building

56 Drilling using Continuous Flight

Auger piles for Residential

Building Project “Alex

Governorate”.

2012 Subcontractor Residential Building

57 Drilling using Continuous Flight

Auger piles for Residential

Building Project “Alex

Governorate”.

2012 Subcontractor Residential Building

58 Drilling using Continuous Flight

Auger piles for Residential

Building Project “Alex

Governorate”.

2012 Subcontractor Residential Building

59 Drilling using Continuous Flight

Auger piles for Residential

Building Project “Alex

Governorate”.

2012 Subcontractor Residential Building

60 Drilling using Continuous Flight

Auger piles for Residential

Building Project “Alex

Governorate”.

2012 Subcontractor Residential Building

61 Drilling using Continuous Flight

Auger piles for Residential

Building Project “Alex

Governorate”.

2012 Subcontractor Residential Building

62 Drilling using Continuous Flight

Auger piles for Residential

Building Project “Alex

Governorate”.

2012 Subcontractor Residential Building

Page 31: INDEX [] · 2019-03-13 · Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25 ELGindy Contracting in brief “ELGENDY

( P a g e :31)

Tele fax: 002 03 4294424 - Mobile: 002 01066676350 -WhatsApp: 002 01094855591

Email: [email protected] - [email protected] - Web Site: www.el-gindy.com

Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25

NO. Project Date General Contractor Owner

63 Drilling using Continuous Flight

Auger piles for Residential

Building Project “Alex

Governorate”.

2012 Subcontractor Residential Building

64 Drilling using Continuous Flight

Auger piles for Residential

Building Project “Alex

Governorate”.

2012 Subcontractor Residential Building

65 Drilling using Continuous Flight

Auger piles for Residential

Building Project “Cairo

Governorate”.

2013 Subcontractor Residential Building

66 Drilling using Continuous Flight

Auger piles for Residential

Building Project “Cairo

Governorate”.

2013 Subcontractor Residential Building

67 Drilling using Continuous Flight

Auger piles for Residential

Building Project “Cairo

Governorate”.

2013 Subcontractor Residential Building

68 Drilling using Continuous Flight

Auger piles for Residential

Building Project “Cairo

Governorate”.

2013 Subcontractor Residential Building

69 Drilling using Continuous Flight

Auger piles for Residential

Building Project “Beni Suef

Governorate”.

2013 Nile Plaza Contracting

Company Residential Building

70 Drilling using Continuous Flight

Auger piles for Residential

Building Project “Alex

Governorate”.

2013 Al Furat Real Estate

Investment Residential Building

71 Drilling using Continuous Flight

Auger piles for Residential

Building Project “Alex

Governorate”.

2013 Osos for investment

and real estate

development

Residential Building

72 Drilling using Continuous Flight

Auger piles for Residential

Building Project “Alex

Governorate”.

2013 El Baroun For Real

Estate Investment and

Contracting

Residential Building

Page 32: INDEX [] · 2019-03-13 · Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25 ELGindy Contracting in brief “ELGENDY

( P a g e :32)

Tele fax: 002 03 4294424 - Mobile: 002 01066676350 -WhatsApp: 002 01094855591

Email: [email protected] - [email protected] - Web Site: www.el-gindy.com

Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25

NO. Project Date General Contractor Owner

73 Drilling using Continuous Flight

Auger piles for Residential

Building Project “Alex

Governorate”.

2013 Basile Contracting and

Trading Residential Building

74 Drilling using Continuous Flight

Auger piles for Residential

Building Project “Alex

Governorate”.

2013 Subcontractor Residential Building

75 Drilling using Continuous Flight

Auger piles for Residential

Building Project “Alex

Governorate”.

2013 Renana Contracting

Company Residential Building

76 Drilling using Continuous Flight

Auger piles for Residential

Building Project “Alex

Governorate”.

2013 EL Sanhoori

Contracting and

Trading Company

Residential Building

77 Drilling using Continuous Flight

Auger piles for Residential

Building Project “Alex

Governorate”.

2013 EL Hussam and Sayed

Mahmoud Company

and their partner

Residential Building

78 Drilling using Continuous Flight

Auger piles for Residential

Building Project “Alex

Governorate”.

2013 Qasr ELsalam

Company Residential Building

79 Drilling using Continuous Flight

Auger piles for Discharge of

Belqas Project “Alex

Governorate”.

2013 Horace Engineering

Works Holding Company

for drinking water

and sanitary

drainage

80 Drilling using Continuous Flight

Auger piles for Residential

Building Project “Cairo

Governorate”.

2013 Essam Mohammed

Mustafa Ali and

Partners Company

Residential Building

81 Drilling using Continuous Flight

Auger piles for Residential

Building Project “Alex

Governorate”.

2013 Subcontractor Residential Building

82 Drilling using Continuous Flight

Auger piles for Residential

Building Project “Alex

Governorate”.

2013 Subcontractor Residential Building

Page 33: INDEX [] · 2019-03-13 · Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25 ELGindy Contracting in brief “ELGENDY

( P a g e :33)

Tele fax: 002 03 4294424 - Mobile: 002 01066676350 -WhatsApp: 002 01094855591

Email: [email protected] - [email protected] - Web Site: www.el-gindy.com

Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25

NO. Project Date General Contractor Owner

83 Drilling using Continuous Flight

Auger piles for Residential

Building Project “Alex

Governorate”.

2013 Subcontractor Residential Building

84 Drilling using Continuous Flight

Auger piles for Residential

Building Project “Alex

Governorate”.

2013 Subcontractor Residential Building

85 Drilling using Continuous Flight

Auger piles for Residential

Building Project “Alex

Governorate”.

2013 Subcontractor Residential Building

86 Drilling using Continuous Flight

Auger piles for Residential

Building Project “Alex

Governorate”.

2013 Subcontractor Residential Building

87 Drilling using Continuous Flight

Auger piles for Residential

Building Project “Alex

Governorate”.

2013 Subcontractor Residential Building

88 Drilling using Continuous Flight

Auger piles for Residential

Building Project “Alex

Governorate”.

2013 Subcontractor Residential Building

89 Drilling using Continuous Flight

Auger piles for Residential

Building Project “Alex

Governorate”.

2013 Subcontractor Residential Building

90 Drilling using Continuous Flight

Auger piles for Residential

Building Project “Alex

Governorate”.

2013 Subcontractor Residential Building

91 Drilling using Continuous Flight

Auger piles for Residential

Building Project “Alex

Governorate”.

2013 Subcontractor Residential Building

92 Drilling using Continuous Flight

Auger piles for Residential

Building Project “Alex

Governorate”.

2013 Subcontractor Residential Building

Page 34: INDEX [] · 2019-03-13 · Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25 ELGindy Contracting in brief “ELGENDY

( P a g e :34)

Tele fax: 002 03 4294424 - Mobile: 002 01066676350 -WhatsApp: 002 01094855591

Email: [email protected] - [email protected] - Web Site: www.el-gindy.com

Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25

NO. Project Date General Contractor Owner

93 Drilling using Continuous Flight

Auger piles for Residential

Building Project “Alex

Governorate”.

2013 Subcontractor Residential Building

94 Drilling using Continuous Flight

Auger piles for Residential

Building Project “Alex

Governorate”.

2013 Subcontractor Residential Building

95 Drilling using Continuous Flight

Auger piles for Residential

Building Project “Alex

Governorate”.

2013 Subcontractor Residential Building

96 Drilling using Continuous Flight

Auger piles for Residential

Building Project “Alex

Governorate”.

2013 Subcontractor Residential Building

97 Drilling using Continuous Flight

Auger piles for Residential

Building Project “Alex

Governorate”.

2013 Subcontractor Residential Building

98 Drilling using Continuous Flight

Auger piles for Residential

Building Project “Alex

Governorate”.

2013 Subcontractor Residential Building

99 Drilling using Continuous Flight

Auger piles for Residential

Building Project “Alex

Governorate”.

2013 Subcontractor Residential Building

100 Drilling using Continuous Flight

Auger piles for Residential

Building Project “Alex

Governorate”.

2013 Subcontractor Residential Building

101 Drilling using Continuous Flight

Auger piles for Residential

Building Project “Alex

Governorate”.

2013 Subcontractor Residential Building

102 Drilling using Continuous Flight

Auger piles for Residential

Building Project “Alex

Governorate”.

2013 Subcontractor Residential Building

Page 35: INDEX [] · 2019-03-13 · Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25 ELGindy Contracting in brief “ELGENDY

( P a g e :35)

Tele fax: 002 03 4294424 - Mobile: 002 01066676350 -WhatsApp: 002 01094855591

Email: [email protected] - [email protected] - Web Site: www.el-gindy.com

Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25

NO. Project Date General Contractor Owner

103 Drilling using Continuous Flight

Auger piles for Residential

Building Project “Alex

Governorate”.

2013 Subcontractor Residential Building

104 Drilling using Continuous Flight

Auger piles for Residential

Building Project “Alex

Governorate”.

2013 Subcontractor Residential Building

105 Drilling using Continuous Flight

Auger piles for Residential

Building Project “Beheira

Governorate”.

2014 EL Hussam and Sayed

Mahmoud Company

and their partner

Residential Building

106 Drilling using Continuous Flight

Auger piles for Residential

Building Project “Alex

Governorate”.

2014 Green Real Estate

Investment and

Projects Management

Company

Residential Building

107 Drilling using Continuous Flight

Auger piles for Residential

Building Project “Cairo

Governorate”.

2014 Alfa Industries and

Construction Company Residential Building

108 Drilling using Continuous Flight

Auger piles for Holding

Company for drinking water and

sanitary drainage” Abdul Qader

Station Metal bridge” Project.

2014 Alexandria

Construction

“Talaat Moustafa”

Holding Company for

drinking water and

sanitary drainage

109 Drilling using Continuous Flight

Auger piles for Residential

Building Project “Alex

Governorate”.

2014 Osos for investment

and real estate

development

Residential Building

110 Drilling using Continuous Flight

Auger piles for Residential

Building Project “Alex

Governorate”.

2014 Taiba Real Estate

Investment and

Development

Company

Residential Building

111 Drilling using Continuous Flight

Auger piles for Residential

Building Project “Alex

Governorate”.

2014 Zidan Contracting

Company Residential Building

112 Drilling using Continuous Flight

Auger piles for Residential

Building Project “Alex

Governorate”.

2014 Sama Investment and

Development

Company

Residential Building

Page 36: INDEX [] · 2019-03-13 · Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25 ELGindy Contracting in brief “ELGENDY

( P a g e :36)

Tele fax: 002 03 4294424 - Mobile: 002 01066676350 -WhatsApp: 002 01094855591

Email: [email protected] - [email protected] - Web Site: www.el-gindy.com

Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25

NO. Project Date General Contractor Owner

113 Drilling using Continuous Flight

Auger piles for Residential

Building Project “Beheira

Governorate”.

2014 Subcontractor Residential Building

114 Drilling using Continuous Flight

Auger piles for Residential

Building Project “Beheira

Governorate”.

2014 Subcontractor Residential Building

115 Drilling using Continuous Flight

Auger piles for Residential

Building Project “Alex

Governorate”.

2014 Alex Towers Real

Estate Investment Residential Building

116 Drilling using Continuous Flight

Auger piles for Residential

Building Project “Alex

Governorate”.

2014 Al Rowad Trading and

Real Estate Investment

Company

Residential Building

117 Drilling using Continuous Flight

Auger piles for Commercial

building Project Dokki “Giza

Governorate”.

2014 Consultant

Eng.: Abdel Aziz

Mahmoud

ITAMCO

Ghabbour Group

118 Drilling using Continuous Flight

Auger piles for Residential

Building Project “Alex

Governorate”.

2014 Subcontractor Residential Building

119 Drilling using Continuous Flight

Auger piles for Residential

Building Project “Alex

Governorate”.

2014 Subcontractor Residential Building

120 Drilling using Continuous Flight

Auger piles for Residential

Building Project “Alex

Governorate”.

2014 Subcontractor Residential Building

121 Drilling using Continuous Flight

Auger piles for Residential

Building Project “Alex

Governorate”.

2014 Subcontractor Residential Building

122 Drilling using Continuous Flight

Auger piles for Residential

Building Project “Alex

Governorate”.

2014 Subcontractor Residential Building

Page 37: INDEX [] · 2019-03-13 · Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25 ELGindy Contracting in brief “ELGENDY

( P a g e :37)

Tele fax: 002 03 4294424 - Mobile: 002 01066676350 -WhatsApp: 002 01094855591

Email: [email protected] - [email protected] - Web Site: www.el-gindy.com

Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25

NO. Project Date General Contractor Owner

123 Drilling using Continuous Flight

Auger piles for Residential

Building Project “Alex

Governorate”.

2014 Subcontractor Residential Building

124 Drilling using Continuous Flight

Auger piles for Residential

Building Project “Alex

Governorate”.

2014 Subcontractor Residential Building

125 Drilling using Continuous Flight

Auger piles for Residential

Building Project “Alex

Governorate”.

2014 Subcontractor Residential Building

126 Drilling using Continuous Flight

Auger piles for Residential

Building Project “Alex

Governorate”.

2014 Subcontractor Residential Building

127 Drilling using Continuous Flight

Auger piles for Residential

Building Project “Alex

Governorate”.

2014 Subcontractor Residential Building

128 Drilling using Continuous Flight

Auger piles for Residential

Building Project “Alex

Governorate”.

2014 Subcontractor Residential Building

129 Drilling using Continuous Flight

Auger piles for Residential

Building Project “Alex

Governorate”.

2014 Subcontractor Residential Building

130 Drilling using Continuous Flight

Auger piles for Residential

Building Project “Alex

Governorate”.

2014 Subcontractor Residential Building

131 Drilling using Continuous Flight

Auger piles for Residential

Building Project “Alex

Governorate”.

2014 Subcontractor Residential Building

132 Drilling using Continuous Flight

Auger piles for Residential

Building Project “Alex

Governorate”.

2014 Subcontractor Residential Building

Page 38: INDEX [] · 2019-03-13 · Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25 ELGindy Contracting in brief “ELGENDY

( P a g e :38)

Tele fax: 002 03 4294424 - Mobile: 002 01066676350 -WhatsApp: 002 01094855591

Email: [email protected] - [email protected] - Web Site: www.el-gindy.com

Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25

NO. Project Date General Contractor Owner

133 Drilling using Continuous Flight

Auger piles for Residential

Building Project “Alex

Governorate”.

2014 Subcontractor Residential Building

134 Drilling using Continuous Flight

Auger piles for Residential

Building Project “Alex

Governorate”.

2014 Subcontractor Residential Building

135 Drilling using Continuous Flight

Auger piles for Residential

Building Project “Alex

Governorate”.

2014 Subcontractor Residential Building

136 Drilling using Continuous Flight

Auger piles for Residential

Building Project “Alex

Governorate”.

2014 Subcontractor Residential Building

137 Drilling using Continuous Flight

Auger piles for Residential

Building Project “Alex

Governorate”.

2014 Subcontractor Residential Building

138 Drilling using Continuous Flight

Auger piles for Residential

Building Project “Alex

Governorate”.

2014 Subcontractor Residential Building

139 Drilling using Continuous Flight

Auger piles for Residential

Building Project “Alex

Governorate”.

2014 Subcontractor Residential Building

140 Drilling using Continuous Flight

Auger piles for Residential

Building Project “Alex

Governorate”.

2014 Subcontractor Residential Building

141 Drilling using Continuous Flight

Auger piles for Residential

Building Project “Alex

Governorate”.

2014 Subcontractor Residential Building

142 Drilling using Continuous Flight

Auger piles for Residential

Building Project “Alex

Governorate”.

2014 Subcontractor Residential Building

Page 39: INDEX [] · 2019-03-13 · Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25 ELGindy Contracting in brief “ELGENDY

( P a g e :39)

Tele fax: 002 03 4294424 - Mobile: 002 01066676350 -WhatsApp: 002 01094855591

Email: [email protected] - [email protected] - Web Site: www.el-gindy.com

Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25

NO. Project Date General Contractor Owner

143 Drilling using Continuous Flight

Auger piles for Residential

Building Project “Alex

Governorate”.

2014 Subcontractor Residential Building

144 Drilling using Continuous Flight

Auger piles for Residential

Building Project “Alex

Governorate”.

2014 Subcontractor Residential Building

145 Drilling using Continuous Flight

Auger piles for Residential

Building Project “Alex

Governorate”.

2015 EL Safa Contracting

Company Residential Building

146 Drilling using Continuous Flight

Auger piles for Residential

Building Project “Alex

Governorate”.

2015 EL Saraya Company Residential Building

147 Drilling using Continuous Flight

Auger piles for Residential

Building Project “Alex

Governorate”.

2015 Miami Group

Contracting Company Residential Building

148 Drilling using Continuous Flight

Auger piles for Residential

Building Project “Alex

Governorate”.

2015 EL Safwa Contracting

Company Residential Building

149 Drilling using Continuous Flight

Auger piles for Rehab City

Project “Cairo Governorate”.

2015 Alexandria

Construction

“Talaat Moustafa”

Rehab City

150 Drilling using Continuous Flight

Auger piles for TOLIP Hotel

Project “Alex Governorate”.

2015 Partners for Real

Estate Development

and Reconstruction

TOLIP Hotel

151 Drilling using Continuous Flight

Auger piles for Propane Tower

Project “Alex Governorate”.

2015 Egyptian Maintenance

Company Abu Qir Petroleum

152 Drilling using Continuous Flight

Auger piles for Residential

Building Project “Alex

Governorate”.

2015 Subcontractor Residential Building

Page 40: INDEX [] · 2019-03-13 · Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25 ELGindy Contracting in brief “ELGENDY

( P a g e :40)

Tele fax: 002 03 4294424 - Mobile: 002 01066676350 -WhatsApp: 002 01094855591

Email: [email protected] - [email protected] - Web Site: www.el-gindy.com

Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25

NO. Project Date General Contractor Owner

153 Drilling using Continuous Flight

Auger piles for Residential

Building Project “Alex

Governorate”.

2015 Subcontractor Residential Building

154 Drilling using Continuous Flight

Auger piles for Residential

Building Project “Alex

Governorate”.

2015 Subcontractor Residential Building

155 Drilling using Continuous Flight

Auger piles for Residential

Building Project “Alex

Governorate”.

2015 Subcontractor Residential Building

156 Drilling using Continuous Flight

Auger piles for Residential

Building Project “Alex

Governorate”.

2015 Subcontractor Residential Building

157 Drilling using Continuous Flight

Auger piles for Residential

Building Project “Alex

Governorate”.

2015 Subcontractor Residential Building

158 Drilling using Continuous Flight

Auger piles for Residential

Building Project “Alex

Governorate”.

2015 Subcontractor Residential Building

159 Drilling using Continuous Flight

Auger piles for Residential

Building Project “Alex

Governorate”.

2015 Subcontractor Residential Building

160 Drilling using Continuous Flight

Auger piles for Residential

Building Project “Alex

Governorate”.

2015 Subcontractor Residential Building

161 Drilling using Continuous Flight

Auger piles for Residential

Building Project “Alex

Governorate”.

2015 Subcontractor Residential Building

162 Drilling using Continuous Flight

Auger piles for Residential

Building Project “Alex

Governorate”.

2015 Subcontractor Residential Building

Page 41: INDEX [] · 2019-03-13 · Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25 ELGindy Contracting in brief “ELGENDY

( P a g e :41)

Tele fax: 002 03 4294424 - Mobile: 002 01066676350 -WhatsApp: 002 01094855591

Email: [email protected] - [email protected] - Web Site: www.el-gindy.com

Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25

NO. Project Date General Contractor Owner

163 Drilling using Continuous Flight

Auger piles for Residential

Building Project “Alex

Governorate”.

2015 Subcontractor Residential Building

164 Drilling using Continuous Flight

Auger piles for Residential

Building Project “Alex

Governorate”.

2015 Subcontractor Residential Building

165 Drilling using Continuous Flight

Auger piles for Residential

Building Project “Alex

Governorate”.

2015 Subcontractor Residential Building

166 Drilling using Continuous Flight

Auger piles for Residential

Building Project “Alex

Governorate”.

2015 Subcontractor Residential Building

167 Drilling using Continuous Flight

Auger piles for Residential

Building Project “Alex

Governorate”.

2015 Subcontractor Residential Building

168 Drilling using Continuous Flight

Auger piles for Residential

Building Project “Alex

Governorate”.

2015 Subcontractor Residential Building

169 Drilling using Continuous Flight

Auger piles for Residential

Building Project “Alex

Governorate”.

2015 Subcontractor Residential Building

170 Drilling using Continuous Flight

Auger piles for Residential

Building Project “Alex

Governorate”.

2015 Subcontractor Residential Building

171 Drilling using Continuous Flight

Auger piles for Residential

Building Project “Alex

Governorate”.

2015 Subcontractor Residential Building

172 Drilling using Continuous Flight

Auger piles for Residential

Building Project “Alex

Governorate”.

2015 Subcontractor Residential Building

Page 42: INDEX [] · 2019-03-13 · Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25 ELGindy Contracting in brief “ELGENDY

( P a g e :42)

Tele fax: 002 03 4294424 - Mobile: 002 01066676350 -WhatsApp: 002 01094855591

Email: [email protected] - [email protected] - Web Site: www.el-gindy.com

Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25

NO. Project Date General Contractor Owner

173 Drilling using Continuous Flight

Auger piles for Residential

Building Project “Alex

Governorate”.

2015 Subcontractor Residential Building

174 Drilling using Continuous Flight

Auger piles for Residential

Building Project “Alex

Governorate”.

2015 Subcontractor Residential Building

175 Drilling using Continuous Flight

Auger piles for Residential

Building Project “Alex

Governorate”.

2015 Subcontractor Residential Building

176 Drilling using Continuous Flight

Auger piles for Residential

Building Project “Alex

Governorate”.

2015 Subcontractor Residential Building

177 Drilling using Continuous Flight

Auger piles for Residential

Building Project “Alex

Governorate”.

2015 Subcontractor Residential Building

178 Drilling using Continuous Flight

Auger piles for Residential

Building Project “Alex

Governorate”.

2015 Subcontractor Residential Building

179 Drilling using Continuous Flight

Auger piles for Residential

Building Project “Alex

Governorate”.

2015 Subcontractor Residential Building

180 Drilling using Continuous Flight

Auger piles for Residential

Building Project “Alex

Governorate”.

2015 Subcontractor Residential Building

181 Drilling using Continuous Flight

Auger piles for Residential

Building Project “Alex

Governorate”.

2015 Subcontractor Residential Building

182 Drilling using Continuous Flight

Auger piles for Residential

Building Project “Alex

Governorate”.

2015 Subcontractor Residential Building

Page 43: INDEX [] · 2019-03-13 · Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25 ELGindy Contracting in brief “ELGENDY

( P a g e :43)

Tele fax: 002 03 4294424 - Mobile: 002 01066676350 -WhatsApp: 002 01094855591

Email: [email protected] - [email protected] - Web Site: www.el-gindy.com

Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25

NO. Project Date General Contractor Owner

183 Drilling using Continuous Flight

Auger piles for Residential

Building Project “Alex

Governorate”.

2015 Subcontractor Residential Building

184 Drilling using Continuous Flight

Auger piles for Residential

Building Project “Alex

Governorate”.

2015 Subcontractor Residential Building

185 Drilling using Continuous Flight

Auger piles for Hawamdia

Drinking water station Project

“Giza Governorate”.

2016 Alexandria

Construction

“Talaat Moustafa”

Holding Company

for drinking water

and sanitary

drainage

186 Drilling using Continuous Flight

Auger piles for Radio drinking

water station Project “Matrouh Governorate”.

2016 Tabarak Contracting

Company Holding Company

for drinking water

and sanitary

drainage

187 Drilling using Continuous Flight

Auger piles Sokhna Port Project

“Red Sea Governorate”.

2016 Delta Company for

Foundations

Sokhna Port

188 Drilling using Continuous Flight

Auger piles for Pyramid Power

Station Project “Cairo

Governorate”.

2016 EL Rodania General

Contracting Company

South Cairo

Electricity

Distribution

Company

189 Drilling using Continuous Flight

Auger piles for Lafarge Project. 2016 EL Ahmadi

Contracting Company Lafarge Egypt

190 Drilling using Continuous Flight

Auger piles for Tank Halayeb

and Shalatin Project Red Sea

Governorate.

2016 Golden Mix Company Arab Contractors

Company

191 Drilling using Continuous Flight

Auger piles for Residential

Building Project “Alex

Governorate”.

2016 Sama Company Residential Building

192 Drilling using Continuous Flight

Auger piles for Residential

Building Project “Alex

Governorate”.

2016 EL Safwa Investment

and Development

Company

Residential Building

Page 44: INDEX [] · 2019-03-13 · Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25 ELGindy Contracting in brief “ELGENDY

( P a g e :44)

Tele fax: 002 03 4294424 - Mobile: 002 01066676350 -WhatsApp: 002 01094855591

Email: [email protected] - [email protected] - Web Site: www.el-gindy.com

Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25

NO. Project Date General Contractor Owner

193 Drilling using Continuous Flight

Auger piles for Residential

Building Project “Alex

Governorate”.

2016 Zidan Contracting

Company Residential Building

194 Drilling using Continuous Flight

Auger piles for Green Towers

Project “Alex Governorate”.

2016 Salah Eddin Amer and

Partners Company Residential Building

195 Drilling using Continuous Flight

Auger piles for Residential

Building Terrace Smouha

Project “Alex Governorate”.

2016 Mediterranean

Investment Company Solik Group for Real

Estate Investment

196 Drilling using Continuous Flight

Auger piles for Residential

Building Project “Alex

Governorate”.

2016 Subcontractor Residential Building

197 Drilling using Continuous Flight

Auger piles for Residential

Building Project “Alex

Governorate”.

2016 Subcontractor Residential Building

198 Drilling using Continuous Flight

Auger piles for Residential

Building Project “Alex

Governorate”.

2016 Subcontractor Residential Building

199 Drilling using Continuous Flight

Auger piles for Residential

Building Project “Alex

Governorate”.

2016 Subcontractor Residential Building

200 Drilling using Continuous Flight

Auger piles for Residential

Building Project “Alex

Governorate”.

2016 Subcontractor Residential Building

201 Drilling using Continuous Flight

Auger piles for Residential

Building Project “Alex

Governorate”.

2017 Subcontractor Industrial building

202 Drilling using Continuous Flight

Auger piles for Residential

Building Project “Cairo

Governorate”.

2017 Subcontractor Residential Building

Page 45: INDEX [] · 2019-03-13 · Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25 ELGindy Contracting in brief “ELGENDY

( P a g e :45)

Tele fax: 002 03 4294424 - Mobile: 002 01066676350 -WhatsApp: 002 01094855591

Email: [email protected] - [email protected] - Web Site: www.el-gindy.com

Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25

NO. Project Date General Contractor Owner

203 Drilling using Continuous Flight

Auger piles for Residential

Building Project “Alex

Governorate”.

2017 Subcontractor Residential Building

204 Drilling using Continuous Flight

Auger piles for Residential

Building Project “Alex

Governorate”.

2017 Gharably Integrated

Engineering Company Tolip Sea Square

205 Drilling using Continuous Flight

Auger piles for Tank Halayeb

and Shalatin Project Red Sea

Governorate.

2017 House Architectural

Company Holding Company

for drinking water

and sanitary

drainage

206 Drilling using Continuous Flight

Auger piles for Residential

Building Project “Alex

Governorate”.

2017 Bashayer elkaar 2 Residential complex

207 Drilling using Continuous Flight

Auger piles for Marine pier

crane Project “Alex

Governorate”.

2017 Abna Abd El Salam

El Feky Company Ras Al Teen Port

Alexandria Port

Authority

208 Drilling using Continuous Flight

Auger piles for Residential

Building Project “Alex

Governorate”.

2017 Modern Palace

Contracting Company

“ALQSR...CO”

Residential Building

209 Drilling using Continuous Flight

Auger piles for Residential

Building Project “Damietta

Governorate”.

2017 EL Orouba Company Residential complex

210 Drilling using Continuous Flight

Auger piles for Amreya

Petroleum Refining Company

Project “Alex Governorate”.

2017 Samy Group for

Contracting and

Engineering

Consultancy

Amreya Petroleum

Refining Company

211 Drilling using Continuous Flight

Auger piles for Residential

Building Project “Alex

Governorate”.

2017 EL Hussam and Sayed

Mahmoud Company

and their partner

Residential Building

212 Drilling using Continuous Flight

Auger piles for ANRPC

Industrial drainage Project “Alex

Governorate”.

2017 Samy Group for

Contracting and

Engineering

Consultancy

ANRPC

Page 46: INDEX [] · 2019-03-13 · Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25 ELGindy Contracting in brief “ELGENDY

( P a g e :46)

Tele fax: 002 03 4294424 - Mobile: 002 01066676350 -WhatsApp: 002 01094855591

Email: [email protected] - [email protected] - Web Site: www.el-gindy.com

Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25

NO. Project Date General Contractor Owner

213 Drilling using Continuous Flight

Auger piles for Gasco

Administrative building Project

“Alex Governorate”.

2017 Arabian Construction

Company Egyptian Natural

Gas Company

214 Drilling using Continuous Flight

Auger piles for Residential

Building Project “Alex

Governorate”.

2017 Subcontractor Residential Building

215 Drilling using Continuous Flight

Auger piles for Branis Marsa

Alam Project “Red Sea

Governorate”.

2017 Kassed Kher Company

for General Supplies

and Contracting

General facility

216 Drilling using Continuous Flight

Auger piles for Residential

Building TAWA Project “Alex

Governorate”.

2017 MAS for engineering

and contracting Residential Building

217 Drilling using Continuous Flight

Auger piles for Residential

Building Project “Alex

Governorate”.

2018 Bashayer elkaar 3 Residential complex

218 Drilling using Continuous Flight

Auger piles for Residential

Building Project “Alex

Governorate”.

2018 EL wataniya awqaf Residential complex

219 Drilling using Continuous Flight

Auger piles for Jabal al Asfar

drainage station Mokattam Cairo

Project.

2018 Alexandria

Construction

“Talaat Moustafa”

Holding Company

for drinking water

and sanitary

drainage

220 Drilling using Continuous Flight

Auger piles for Halayeb Factory

in New Damietta Project.

2018 Sama Egypt

Contracting Halayeb Co. For

dairy products and

juices

221 Drilling using Continuous Flight

Auger piles for Novoment FZE

Company Project “Alexandria

Free Zone Amreya”.

2018 MAS for engineering

and contracting Novoment FZE

Company

222 Drilling using Continuous Flight

Auger piles for septic tank in the

Siwa oasis Project.

2018 Subcontractor

Eng. Mohamed Abdel

Hamid Mahmoud

General facility

Page 47: INDEX [] · 2019-03-13 · Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25 ELGindy Contracting in brief “ELGENDY

( P a g e :47)

Tele fax: 002 03 4294424 - Mobile: 002 01066676350 -WhatsApp: 002 01094855591

Email: [email protected] - [email protected] - Web Site: www.el-gindy.com

Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25

NO. Project Date General Contractor Owner

223 Drilling using Continuous Flight

Auger piles for Bridge of

pedestrian in Amreya Project.

2018 Engineering

Development

Company

General facility

224 Drilling using Continuous Flight

Auger piles for Mosque Bashayer

elkaar 3 Project.

2018 Alexandria Company

for General

Contracting

General facility

225 Drilling using Continuous Flight

Auger piles for Al Fahad Paper

Stores Project.

2018 Subcontractor KAMAL SAAD El Fahad Paper

Manufacturing

Company

226 Drilling using Continuous Flight

Auger piles for El Kafoury

Bridge, Borg El Arab Project.

2018 Wadi El Bina

Company General facility

227 Drilling using Continuous Flight

Auger piles for the desert road

Bridge Project.

2018 Engineering

Development

Company

General facility

228 Drilling using Continuous Flight

Auger piles for Lord Stores

Company Project “Alexandria

Free Zone Amreya”.

2018 MAS for engineering

and contracting Lord Company

229 Drilling using Continuous Flight

Auger piles for Residential

Building Project “Alex

Governorate” El Ibrahimiya.

2018 Subcontractor

MR. Ayman Residential Building

230 Drilling using Continuous Flight

Auger piles for Residential

Building Project Al Salama

Tower “Victoria Alex

Governorate”.

2018 Subcontractor

MR Khaled Arabi

Ahmed

Residential Building

231 Drilling using Continuous Flight

Auger piles for Apartment

complex “Nasr City”.

2018 Al Ammar Company Residential Building

Page 48: INDEX [] · 2019-03-13 · Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25 ELGindy Contracting in brief “ELGENDY

( P a g e :48)

Tele fax: 002 03 4294424 - Mobile: 002 01066676350 -WhatsApp: 002 01094855591

Email: [email protected] - [email protected] - Web Site: www.el-gindy.com

Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25

Bored Piles

Page 49: INDEX [] · 2019-03-13 · Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25 ELGindy Contracting in brief “ELGENDY

( P a g e :49)

Tele fax: 002 03 4294424 - Mobile: 002 01066676350 -WhatsApp: 002 01094855591

Email: [email protected] - [email protected] - Web Site: www.el-gindy.com

Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25

Bored Piles

In general, bored piles offer the most economical foundation as they can be constructed in a wide choice of

diameters, typically ranging from 300mm to 1800mm, and to depths of up to 70m at rakes of up to 1:4.

They can thus be tailored precisely to the particular requirements of the building or excavation. This

flexibility means that bored piles can provide solid foundation elements suitable for almost all site

conditions.

Bored piles can be classified into two main groups, according to their load bearing behavior: friction piles,

which transfer loads mainly by frictional resistance along the shaft; and end bearing piles in which load is

primarily transferred to the surrounding soil of through the pile base.

Depending on the structural requirements, bored piles may be constructed singly, in groups or as walls

using secant, contiguous or king piles, with or without infill.

Page 50: INDEX [] · 2019-03-13 · Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25 ELGindy Contracting in brief “ELGENDY

( P a g e :50)

Tele fax: 002 03 4294424 - Mobile: 002 01066676350 -WhatsApp: 002 01094855591

Email: [email protected] - [email protected] - Web Site: www.el-gindy.com

Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25

Projects with Petrojet

Company

Page 51: INDEX [] · 2019-03-13 · Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25 ELGindy Contracting in brief “ELGENDY

( P a g e :51)

Tele fax: 002 03 4294424 - Mobile: 002 01066676350 -WhatsApp: 002 01094855591

Email: [email protected] - [email protected] - Web Site: www.el-gindy.com

Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25

NO. Project Date General Contractor Owner

1 Drilling using Bored piles for

LNG Project “Rachid Edko

Burullus ”.

2004 Petrojet - Northern

Branch

Egyptian LNG

2 Drilling using Bored piles for

Alexandria Fertilizer Company

Project “Rachid”.

2004 Petrojet - Northern

Branch

Alexandria Fertilizer

Company

3 Drilling using Bored piles for

Sugar Factory Project “Nubaria”.

2006 Petrojet - Northern

Branch

Nubaria Sugar

Factory

4 Drilling using Bored piles for El -

Wastani station Project.

2010 Petrojet - Northern

Branch

El Wastani

Petroleum

5 Drilling using Bored piles for

Sumed expansions Project.

2012 Petrojet - Northern

Branch

Arab Petroleum

Pipelines Company

6 Drilling using Bored piles for El -

Wastani station Project.

2013 Petrojet - Northern

Branch

El Wastani

Petroleum

7 Drilling using Bored piles for

Tanks Rachid project “Edko

Burullus”.

2017 Petrojet - Northern

Branch

Rashpetco

Page 52: INDEX [] · 2019-03-13 · Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25 ELGindy Contracting in brief “ELGENDY

( P a g e :52)

Tele fax: 002 03 4294424 - Mobile: 002 01066676350 -WhatsApp: 002 01094855591

Email: [email protected] - [email protected] - Web Site: www.el-gindy.com

Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25

Projects with other

companies

Page 53: INDEX [] · 2019-03-13 · Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25 ELGindy Contracting in brief “ELGENDY

( P a g e :53)

Tele fax: 002 03 4294424 - Mobile: 002 01066676350 -WhatsApp: 002 01094855591

Email: [email protected] - [email protected] - Web Site: www.el-gindy.com

Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25

NO. Project Date General Contractor Owner

1 Drilling using Bored piles for

Mufti water station in Kafr El

Sheikh project.

2010 Horace Engineering

Works Holding Company for

drinking water and

sanitary drainage

2 Drilling using Bored piles for

talkha Bridge project. 2014 National

Construction

Company (SAMCO)

General Authority for

Roads and Bridges

and Land Transport

3 Drilling using Bored piles for Mit

Ghamr Bridge project.

2014 National

Construction

Company (SAMCO)

General Authority for

Roads and Bridges

and Land Transport

4 Drilling using Bored piles for Mit

Ghamr Bridge project.

2015 National

Construction

Company (SAMCO)

General Authority for

Roads and Bridges

and Land Transport

5 Drilling using Bored piles for

Dafra Bridge project “stage 01”.

2015 National

Construction

Company (SAMCO)

General Authority for

Roads and Bridges

and Land Transport

6 Drilling using Bored piles for

Dafra Bridge project “stage 02”.

2015 National

Construction

Company (SAMCO)

General Authority for

Roads and Bridges

and Land Transport

7 Drilling using Bored piles for

Ismailia Bridge project.

2015 National

Construction

Company (SAMCO)

General Authority for

Roads and Bridges

and Land Transport

8 Drilling using Bored piles for

Banha Bridge project.

2015 National

Construction

Company (SAMCO)

General Authority for

Roads and Bridges

and Land Transport

9 Drilling using Bored piles for establishment of the regional ring

road “Sector 5” project.

2016 Peixring company General Authority for

Roads and Bridges

and Land Transport

10 Drilling using Bored piles for Ain

Sokhna Port project.

2016 Delta Foundations

Company

Egyptian Maritime

Ports Authority Ain

Sokhna Port

11 Drilling using Bored piles for The

Road Ring regional project Benha

Cairo Alexandria sector.

2016 CEEC GHCB

Company

General Authority for

Roads and Bridges

and Land Transport

Page 54: INDEX [] · 2019-03-13 · Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25 ELGindy Contracting in brief “ELGENDY

( P a g e :54)

Tele fax: 002 03 4294424 - Mobile: 002 01066676350 -WhatsApp: 002 01094855591

Email: [email protected] - [email protected] - Web Site: www.el-gindy.com

Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25

Helical Piles

Page 55: INDEX [] · 2019-03-13 · Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25 ELGindy Contracting in brief “ELGENDY

( P a g e :55)

Tele fax: 002 03 4294424 - Mobile: 002 01066676350 -WhatsApp: 002 01094855591

Email: [email protected] - [email protected] - Web Site: www.el-gindy.com

Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25

Helical Piles (Screw piles)

A helical anchor/pile is an extendable deep foundation system with helical bearing plates welded to a

central steel shaft. Load is transferred from the shaft to the soil through these bearing plates.

Helices can be press-formed to a specified pitch or simply consist of flat plates welded at a specified pitch

to the pile's shaft. The number of helices, their diameters and position on the pile shaft as well as steel

plate thickness are all determined by a combination of:

1) The combined structure design load requirement.

2) The geotechnical parameters.

3) Environmental corrosion parameters.

4) The minimum design life of the structure being supported or restrained

Page 56: INDEX [] · 2019-03-13 · Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25 ELGindy Contracting in brief “ELGENDY

( P a g e :56)

Tele fax: 002 03 4294424 - Mobile: 002 01066676350 -WhatsApp: 002 01094855591

Email: [email protected] - [email protected] - Web Site: www.el-gindy.com

Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25

Page 57: INDEX [] · 2019-03-13 · Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25 ELGindy Contracting in brief “ELGENDY

( P a g e :57)

Tele fax: 002 03 4294424 - Mobile: 002 01066676350 -WhatsApp: 002 01094855591

Email: [email protected] - [email protected] - Web Site: www.el-gindy.com

Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25

NO. Project Date General Contractor Owner

1 Helical Piles implementation for

Residential Building Project

Rachid, Edko, Burullus

” Alexandria Governorate”.

1995 Subcontractor Residential Building

2 Helical Piles implementation for

Residential Building Project

“Beheira Governorate”.

2006 Subcontractor Residential Building

3 Helical Piles implementation for

Residential Building Project

“Beheira Governorate”.

2008 Subcontractor Residential Building

4 Helical Piles implementation for

Residential Building Project” Cairo

Governorate”.

2010 Subcontractor Residential Building

5 Helical Piles implementation for

Residential Building Project Apis

area” Alexandria Governorate”.

2012 Consultant

Eng. Fathy Abdel

Rabo

Residential Building

6 Helical Piles implementation for

Residential Building Project

Damanhur “Beheira Governorate”.

2015 Subcontractor Residential Building

Page 58: INDEX [] · 2019-03-13 · Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25 ELGindy Contracting in brief “ELGENDY

( P a g e :58)

Tele fax: 002 03 4294424 - Mobile: 002 01066676350 -WhatsApp: 002 01094855591

Email: [email protected] - [email protected] - Web Site: www.el-gindy.com

Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25

Micro piles

Page 59: INDEX [] · 2019-03-13 · Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25 ELGindy Contracting in brief “ELGENDY

( P a g e :59)

Tele fax: 002 03 4294424 - Mobile: 002 01066676350 -WhatsApp: 002 01094855591

Email: [email protected] - [email protected] - Web Site: www.el-gindy.com

Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25

Micro piles

Micro piles are described as small diameter pile that can be installed in almost any type of soil and that

can carry loads up to 500 tones depending on the type of it.

Micro piles are widely used in the construction field because of the low vibration and no noise; they are

widely used in housing areas, schools, hospitals or any locations which doesn’t allow making noise while

pile driving process. They have high carrying capacity, less site constraint problems and can be designed

to have very low settlements. Also, Micro piles are used to stabilize or upgrade existing foundation by

installing them through pre-drilled holes determined by load characteristics.

Installation of Micro Pile

Micro piles are steel reinforced placed into a small diameter hole and scaled to the ground by grout

injections under relatively high pressure.

Page 60: INDEX [] · 2019-03-13 · Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25 ELGindy Contracting in brief “ELGENDY

( P a g e :60)

Tele fax: 002 03 4294424 - Mobile: 002 01066676350 -WhatsApp: 002 01094855591

Email: [email protected] - [email protected] - Web Site: www.el-gindy.com

Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25

Projects with Petrojet

Company

Page 61: INDEX [] · 2019-03-13 · Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25 ELGindy Contracting in brief “ELGENDY

( P a g e :61)

Tele fax: 002 03 4294424 - Mobile: 002 01066676350 -WhatsApp: 002 01094855591

Email: [email protected] - [email protected] - Web Site: www.el-gindy.com

Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25

NO. Project Date General Contractor Owner

1 Supply Steel pipes for micro piles

reinforcement for ELWastani

Lines Project, Al-Burullus.

2017 Petrojet - Northern

Branch Wasco Company

2 Micro piles implementation for

CCR Project.

2017 Petrojet - Northern

Branch ANRPC Company

3 Supply Steel pipes for micro piles

reinforcement of ELWastani

station Damietta Project.

2017 Petrojet - Northern

Branch Wasco Company

4 Supply Steel pipes for micro piles

reinforcement of Electrical Power

Station from Al-Burullus to

Damietta, Algamil gas pipe line

Project.

2017 Petrojet - Northern

Branch New Burullus power

station

Page 62: INDEX [] · 2019-03-13 · Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25 ELGindy Contracting in brief “ELGENDY

( P a g e :62)

Tele fax: 002 03 4294424 - Mobile: 002 01066676350 -WhatsApp: 002 01094855591

Email: [email protected] - [email protected] - Web Site: www.el-gindy.com

Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25

Projects with other

companies

Page 63: INDEX [] · 2019-03-13 · Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25 ELGindy Contracting in brief “ELGENDY

( P a g e :63)

Tele fax: 002 03 4294424 - Mobile: 002 01066676350 -WhatsApp: 002 01094855591

Email: [email protected] - [email protected] - Web Site: www.el-gindy.com

Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25

NO. Project Date General Contractor Owner

1 Micro piles implementation for

Residential Building Project

Damanhur “Beheira

Governorate”.

2011 Dream Palace

Contracting Residential Building

2 Micro piles implementation for

Residential Building Project

Apis area” Alexandria

Governorate”.

2012 Subcontractor Residential Building

3 Micro piles implementation for

Residential Building Project

Damanhur “Beheira

Governorate”.

2014 Dream Palace

Contracting Residential Building

4 Micro piles implementation for

Dry Yeast storage project.

2018 LESAFFRE EGYPT LESAFFRE EGYPT

Page 64: INDEX [] · 2019-03-13 · Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25 ELGindy Contracting in brief “ELGENDY

( P a g e :64)

Tele fax: 002 03 4294424 - Mobile: 002 01066676350 -WhatsApp: 002 01094855591

Email: [email protected] - [email protected] - Web Site: www.el-gindy.com

Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25

Strauss piles

Page 65: INDEX [] · 2019-03-13 · Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25 ELGindy Contracting in brief “ELGENDY

( P a g e :65)

Tele fax: 002 03 4294424 - Mobile: 002 01066676350 -WhatsApp: 002 01094855591

Email: [email protected] - [email protected] - Web Site: www.el-gindy.com

Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25

Projects with Petrojet

Company

Page 66: INDEX [] · 2019-03-13 · Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25 ELGindy Contracting in brief “ELGENDY

( P a g e :66)

Tele fax: 002 03 4294424 - Mobile: 002 01066676350 -WhatsApp: 002 01094855591

Email: [email protected] - [email protected] - Web Site: www.el-gindy.com

Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25

NO. Project Date General Contractor Owner

1 Strauss piles implementation for

Abu Qir For Fertilizers Project. 1997 Petrojet - Northern

Branch Abu Qir For Fertilizers

2 Strauss piles implementation for

Petroleum Cooperative Society Project.

1997 Petrojet - Northern

Branch

Petroleum

Cooperative Society

3 Strauss piles implementation for

Boiler Project in Alexandria

Petroleum Company.

1997 Petrojet - Northern

Branch Alexandria

Petroleum

4 Strauss piles implementation for

Drainage lines Petrogas Project. 1999 Petrojet - Northern

Branch Petrogas

5 Strauss piles implementation for

Warehouses Project. 1999 Petrojet - Northern

Branch Petrogas

6 Strauss piles implementation for

Egyptian Petrochemical Line 24

inches Project.

1999 Petrojet - Northern

Branch

Egyptian

Petrochemical

Company

7 Strauss piles implementation for

Alexandria Petroleum Project. 1999 Petrojet - Northern

Branch Alexandria

Petroleum

8 Strauss piles implementation for

Alexandria Petroleum Project. 2000 Petrojet - Northern

Branch Alexandria

Petroleum

9 Strauss piles implementation for

Nitrogen tank base Project. 2001 Petrojet - Northern

Branch Alexandria

Petroleum

10 Strauss piles implementation for

Abu Qir For Fertilizers Project. 2002 Petrojet - Northern

Branch Abu Qir For Fertilizers

11 Strauss piles implementation for

Petrogas Project. 2003 Petrojet - Northern

Branch Petrogas

12 Strauss piles implementation for

Warehouses Project.

2003 Petrojet - Northern

Branch Alexandria

Petroleum

13 Strauss piles implementation for

Lines Project “Edko Burullus”.

2003 Petrojet - Northern

Branch Rashpetco

14 Strauss piles implementation for

Southern warehouses Project.

2004 Petrojet - Northern

Branch Alexandria

Petroleum

15 Strauss piles implementation for

Alexandria For Fertilizers Project.

2004 Petrojet - Northern

Branch

Alexandria For

Fertilizers

16 Strauss piles implementation for

Egyptian Linear Alkyl Project” ELAB”.

2007 Petrojet - Northern

Branch

Egyptian Linear

Alkyl

17 Strauss piles implementation for

Alexandria National Refine and

Petrochemical Project.

2008 Petrojet - Northern

Branch

ANRPC

Page 67: INDEX [] · 2019-03-13 · Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25 ELGindy Contracting in brief “ELGENDY

( P a g e :67)

Tele fax: 002 03 4294424 - Mobile: 002 01066676350 -WhatsApp: 002 01094855591

Email: [email protected] - [email protected] - Web Site: www.el-gindy.com

Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25

NO. Project Date General Contractor Owner

18 Strauss piles implementation for

Methanol Project.

2008 Petrojet -East

Branch

Methanex

Corporation

19 Strauss piles implementation for

Petrogas Project. 2008 Petrojet - Northern

Branch

Petrogas

20 Strauss piles implementation for

Methanol Project.

2009 Petrojet -East

Branch

Methanex

Corporation

21 Strauss piles implementation for

Egyptian Linear Alkyl Project

” ELAB”.

2011 Petrojet - Northern

Branch

Egyptian Linear

Alkyl

22 Strauss piles implementation for

Administrative Building Northern

Branch Project.

2015 Petrojet - Northern

Branch

Petrojet - Northern

Branch

Page 68: INDEX [] · 2019-03-13 · Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25 ELGindy Contracting in brief “ELGENDY

( P a g e :68)

Tele fax: 002 03 4294424 - Mobile: 002 01066676350 -WhatsApp: 002 01094855591

Email: [email protected] - [email protected] - Web Site: www.el-gindy.com

Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25

Projects with other

companies

Page 69: INDEX [] · 2019-03-13 · Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25 ELGindy Contracting in brief “ELGENDY

( P a g e :69)

Tele fax: 002 03 4294424 - Mobile: 002 01066676350 -WhatsApp: 002 01094855591

Email: [email protected] - [email protected] - Web Site: www.el-gindy.com

Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25

NO. Project Date General Contractor Owner

1 Strauss piles implementation for

Egyptian Radio and Television

Union Project.

2000 Alfa General

Contracting

Egyptian Radio and

Television Union

2 Strauss piles implementation for

” qasr alradda” Project.

2001 Subcontractor Residential Building

3 Strauss piles implementation for

Residential Building Project.

2002 Subcontractor Residential Building

4 Strauss piles implementation for

AMOC Company Project.

2007 Subcontractor AMOC

5 Strauss piles implementation for

Drainage Station in Maamoura

Project.

2007 Horace Engineering

Works

Holding Company for

drinking water and

sanitary drainage

6 Strauss piles implementation for

al agouza hospital Project.

2009 wadi AL nil for

General Contracting

al agouza hospital

7 Strauss piles implementation for

Drainage in the village of Wafaa

Delengat Project.

2009 Arab Contractors Holding Company for

drinking water and

sanitary drainage

8 Strauss piles implementation for

Residential Building Project

” Kafr Al sheikh governorate”.

2010 Subcontractor Residential Building

9 Strauss piles implementation for

The Greek Club Project.

2011 Al Bonyan

Engineering and

Contracting

Company

The Greek Club

10 Strauss piles implementation for

Marine Scaffolding Project.

2011 National Company Egyptian Ports

Authorities Maritime

Transport Sector

11 Strauss piles implementation for

the river pier Project.

2012 Qalaa Holdings National River Ports

Management

Company

12 Strauss piles implementation for

Holding Company for drinking

water and sanitary drainage”

Abdul Qader Station” Project.

2013 Alexandria

Construction

“Talaat Moustafa”

Holding Company for

drinking water and

sanitary drainage

13 Strauss piles implementation for

Propane Tower Project.

2015 Egyptian Maintenance

Company Abu Qir Petroleum

14 Strauss piles implementation for

the river pier Project.

2015 Qalaa Holdings National River Ports

Management

Company

Page 70: INDEX [] · 2019-03-13 · Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25 ELGindy Contracting in brief “ELGENDY

( P a g e :70)

Tele fax: 002 03 4294424 - Mobile: 002 01066676350 -WhatsApp: 002 01094855591

Email: [email protected] - [email protected] - Web Site: www.el-gindy.com

Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25

Vibroflotation

“stone column”

Page 71: INDEX [] · 2019-03-13 · Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25 ELGindy Contracting in brief “ELGENDY

( P a g e :71)

Tele fax: 002 03 4294424 - Mobile: 002 01066676350 -WhatsApp: 002 01094855591

Email: [email protected] - [email protected] - Web Site: www.el-gindy.com

Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25

Ground Improvement by Vibroflotation Machine

Vibroflotation is a ground improvement technique used at a considerable depth that by using a powered

electrically or hydraulically probe, it strengthens the soil. The vibroflotation will compact the soil making

it suitable to support design loads.

Page 72: INDEX [] · 2019-03-13 · Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25 ELGindy Contracting in brief “ELGENDY

( P a g e :72)

Tele fax: 002 03 4294424 - Mobile: 002 01066676350 -WhatsApp: 002 01094855591

Email: [email protected] - [email protected] - Web Site: www.el-gindy.com

Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25

Page 73: INDEX [] · 2019-03-13 · Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25 ELGindy Contracting in brief “ELGENDY

( P a g e :73)

Tele fax: 002 03 4294424 - Mobile: 002 01066676350 -WhatsApp: 002 01094855591

Email: [email protected] - [email protected] - Web Site: www.el-gindy.com

Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25

Page 74: INDEX [] · 2019-03-13 · Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25 ELGindy Contracting in brief “ELGENDY

( P a g e :74)

Tele fax: 002 03 4294424 - Mobile: 002 01066676350 -WhatsApp: 002 01094855591

Email: [email protected] - [email protected] - Web Site: www.el-gindy.com

Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25

NO. Project Date General Contractor Owner

1 Stone Column implementation for

Marine Warehouses Project.

2010 Eastern for

Contracting and

Quarries Company

River Ports Authority

2 Stone Column implementation for

Marine Scaffolding Project.

2013 National River

Transport Company

NRTC

Nubaria river port

Page 75: INDEX [] · 2019-03-13 · Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25 ELGindy Contracting in brief “ELGENDY

( P a g e :75)

Tele fax: 002 03 4294424 - Mobile: 002 01066676350 -WhatsApp: 002 01094855591

Email: [email protected] - [email protected] - Web Site: www.el-gindy.com

Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25

Pile Load Test and Plate

Load Test

Page 76: INDEX [] · 2019-03-13 · Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25 ELGindy Contracting in brief “ELGENDY

( P a g e :76)

Tele fax: 002 03 4294424 - Mobile: 002 01066676350 -WhatsApp: 002 01094855591

Email: [email protected] - [email protected] - Web Site: www.el-gindy.com

Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25

Pile Load Test and Plate Load Test Compression pile load test Elgindy offers all types of Pile Load Testing and Pile Driving Analysis to ensure a pile's conformance

with project specifications and local building codes. From an initial wave equation analysis to aid in

establishing pile driving criteria to static / dynamic testing to confirm a test pile's compressive, tensile and

lateral load carrying capacities.

Page 77: INDEX [] · 2019-03-13 · Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25 ELGindy Contracting in brief “ELGENDY

( P a g e :77)

Tele fax: 002 03 4294424 - Mobile: 002 01066676350 -WhatsApp: 002 01094855591

Email: [email protected] - [email protected] - Web Site: www.el-gindy.com

Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25

Page 78: INDEX [] · 2019-03-13 · Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25 ELGindy Contracting in brief “ELGENDY

( P a g e :78)

Tele fax: 002 03 4294424 - Mobile: 002 01066676350 -WhatsApp: 002 01094855591

Email: [email protected] - [email protected] - Web Site: www.el-gindy.com

Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25

Page 79: INDEX [] · 2019-03-13 · Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25 ELGindy Contracting in brief “ELGENDY

( P a g e :79)

Tele fax: 002 03 4294424 - Mobile: 002 01066676350 -WhatsApp: 002 01094855591

Email: [email protected] - [email protected] - Web Site: www.el-gindy.com

Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25

Projects with Petrojet

Company

Page 80: INDEX [] · 2019-03-13 · Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25 ELGindy Contracting in brief “ELGENDY

( P a g e :80)

Tele fax: 002 03 4294424 - Mobile: 002 01066676350 -WhatsApp: 002 01094855591

Email: [email protected] - [email protected] - Web Site: www.el-gindy.com

Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25

NO. Project Date General Contractor Owner

1 Pile Load Test for Various

Projects.

1990 Petrojet - Northern

Branch

Various companies

2 Pile Load Test for Various

Projects.

1991 Petrojet - Northern

Branch

Various companies

3 Pile Load Test for Various

Projects.

1992 Petrojet - Northern

Branch

Various companies

4 Pile Load Test for Various

Projects.

1993 Petrojet - Northern

Branch

Various companies

5 Pile Load Test for Various

Projects.

1994 Petrojet - Northern

Branch

Various companies

6 Pile Load Test for Various

Projects.

1995 Petrojet - Northern

Branch

Various companies

7 Pile Load Test for Various

Projects.

1996 Petrojet - Northern

Branch

Various companies

8 Pile Load Test for Alexandria

Petroleum Project.

1997 Petrojet - Northern

Branch

Alexandria Petroleum

Company

9 Pile Load Test for ABUK

Company Project.

1997 Petrojet - Northern

Branch

Abu Qir For

Fertilizers

10 Pile Load Test for Amreya

Petroleum Project.

1997 Petrojet - Northern

Branch

Amreya Petroleum

11 Pile Load Test for Petroleum

Cooperative Society Project.

1997 Petrojet - Northern

Branch

Petroleum

Cooperative Society

12 Pile Load Test for Petrojet

Northern Branch Project.

1998 Petrojet - Northern

Branch

Petrojet - Northern

Branch

13 Pile Load Test for Various

Projects.

1999 Petrojet - Northern

Branch

Various companies

14 Pile Load Test for Various

Projects.

2000 Petrojet - Northern

Branch

Various companies

15 Pile Load Test for Various

Projects.

2001 Petrojet - Northern

Branch

Various companies

16 Pile Load Test for Various

Projects.

2002 Petrojet - Northern

Branch

Various companies

17 Pile Load Test for Petrogas

Project.

2003 Petrojet - Northern

Branch

Petrogas Company

18 Pile Load Test for Various

Projects.

2004 Petrojet - Northern

Branch

Various companies

19 Pile Load Test for ABUK

Company Project.

2005 Petrojet - Northern

Branch

Abu Qir For

Fertilizers

Page 81: INDEX [] · 2019-03-13 · Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25 ELGindy Contracting in brief “ELGENDY

( P a g e :81)

Tele fax: 002 03 4294424 - Mobile: 002 01066676350 -WhatsApp: 002 01094855591

Email: [email protected] - [email protected] - Web Site: www.el-gindy.com

Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25

NO. Project Date General Contractor Owner

20 Pile Load Test for Sugar Factory

Project.

2006 Petrojet - Northern

Branch

Nubaria Sugar Factory

21 Pile Load Test for ANRPC

Project.

2008 Petrojet - Northern

Branch ANRPC Company

22 Pile Load Test for methanol

Project.

2008 Petrojet - Northern

Branch Methanex Corporation

23 Pile Load Test for methanol

Project.

2009 Petrojet - Northern

Branch Methanex Corporation

24 Pile Load Test for El Wastani

Petroleum Project.

2010 Petrojet - Northern

Branch

El Wastani Petroleum

25 Pile Load Test for Petrogas

Project.

2010 Petrojet - Northern

Branch

Petrogas Company

26 Pile Load Test for El Wastani

Petroleum Project.

2013 Petrojet - Northern

Branch

El Wastani Petroleum

27 Pile Load Test for Egyptian

Petrochemicals Company Project.

2014 Petrojet - Northern

Branch

Egyptian

Petrochemicals

Company

28 Pile Load Test for El Nasr

Petroleum Company Project.

2014 Petrojet - Eastern

Branch

El Nasr Petroleum

Company

29 Pile Load Test for Petrogas

Project.

2014 Petrojet - Northern

Branch

Petrogas Company

30 Pile Load Test for ERC Mostorod

Project. 2014 Petrojet - Southern

Branch

Egyptian Refining

Company

31 Pile Load Test for ABUK

Company Project.

2014 Petrojet - Northern

Branch

Abu Qir For

Fertilizers

32 Pile Load Test for Beni Suef silos

Project.

2015 Petrojet - Southern

Branch

Egyptian Holding

Company for silos and

storage

33 Pile Load Test for Petrogas

Project.

2015 Petrojet - Northern

Branch

Petrogas Company

34 Pile Load Test for ANRPC-CCR

Project.

2016 Petrojet - Northern

Branch ANRPC Company

35 Pile Load Test for Petrobel

Project.

2017 Petrojet - Eastern

Branch

Belayim Petroleum

36 Pile Load Test for Tanks Rachid

project “Edko Burullus”.

2017 Petrojet - Northern

Branch

Rashpetco

37 Pile Load Test for ANRPC-CCR

Project.

2017 Petrojet - Northern

Branch ANRPC Company

Page 82: INDEX [] · 2019-03-13 · Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25 ELGindy Contracting in brief “ELGENDY

( P a g e :82)

Tele fax: 002 03 4294424 - Mobile: 002 01066676350 -WhatsApp: 002 01094855591

Email: [email protected] - [email protected] - Web Site: www.el-gindy.com

Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25

NO. Project Date General Contractor Owner

38 Pile Load Test for Portobello

Station at Port Said Project.

2018 Petrojet - Northern

Branch

Portobello

39 Pile Load Test for Western Desert

Operating Petroleum Hamra tanks

Project.

2018 Petrojet - Northern

Branch WEPCO

Page 83: INDEX [] · 2019-03-13 · Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25 ELGindy Contracting in brief “ELGENDY

( P a g e :83)

Tele fax: 002 03 4294424 - Mobile: 002 01066676350 -WhatsApp: 002 01094855591

Email: [email protected] - [email protected] - Web Site: www.el-gindy.com

Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25

Projects with other

companies

Page 84: INDEX [] · 2019-03-13 · Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25 ELGindy Contracting in brief “ELGENDY

( P a g e :84)

Tele fax: 002 03 4294424 - Mobile: 002 01066676350 -WhatsApp: 002 01094855591

Email: [email protected] - [email protected] - Web Site: www.el-gindy.com

Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25

NO. Project Date General Contractor Owner

1 Pile Load Test for Various

Projects.

1987 Various Subcontractor

Various companies

2 Pile Load Test for Various

Projects.

1988 Various Subcontractor

Various companies

3 Pile Load Test for Various

Projects.

1989 Various Subcontractor

Various companies

4 Pile Load Test for Various

Projects.

1990 Various Subcontractor

Various companies

5 Pile Load Test for Various

Projects.

1991 Various Subcontractor

Various companies

6 Pile Load Test for Various

Projects.

1992 Various Subcontractor

Various companies

7 Pile Load Test for Various

Projects.

1993 Various Subcontractor

Various companies

8 Pile Load Test for Various

Projects.

1994 Various Subcontractor

Various companies

9 Pile Load Test for Various

Projects.

1995 Various Subcontractor

Various companies

10 Pile Load Test for Various

Projects.

1996 Various Subcontractor

Various companies

11 Pile Load Test for Minya Culture

Theater Project. 1997 Helwan Hotel

Construction Company Minya Culture

Theater

12 Pile Load Test for Petrogas

Project.

1998 Subcontractor Petrogas Company

13 Pile Load Test for Egyptian

Foundations Project. 1998 Subcontractor Egyptian Foundations

Company

14 Pile Load Test for Residential

Building Project.

1998 HEPCO for

Foundations

Residential Building

15 Pile Load Test for ASPEC

Project.

1999 Engineering

Consulting Office ASPEC

16 Pile Load Test for Various

Projects.

2000 Various Subcontractor

Various companies

17 Pile Load Test for Various

Projects.

2001 Various Subcontractor

Various companies

18 Pile Load Test for Various

Projects.

2002 Various Subcontractor

Various companies

19 Pile Load Test for Various

Projects.

2003 Various Subcontractor

Various companies

Page 85: INDEX [] · 2019-03-13 · Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25 ELGindy Contracting in brief “ELGENDY

( P a g e :85)

Tele fax: 002 03 4294424 - Mobile: 002 01066676350 -WhatsApp: 002 01094855591

Email: [email protected] - [email protected] - Web Site: www.el-gindy.com

Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25

NO. Project Date General Contractor Owner

20 Pile Load Test for Hyate Lawqaf

Residential complex Project.

2004 Hyate Lawqaf Residential complex

21 Pile Load Test for Various

Projects.

2005 Various Subcontractor

Various companies

22 Pile Load Test for Sugar Factory

Project.

2006 Subcontractor Nubaria Sugar Factory

23 Pile Load Test for Various

Projects.

2007 Various Subcontractor

Various companies

24 Pile Load Test for Grand Ville

Smouha Project.

2008 FACB Engineering

Consultant Grand Ville Smouha

25 Pile Load Test for Residential

complex Project.

2008 National Corporation

for Foundations Residential complex

23 Pile Load Test for Various

Projects.

2009 Various Subcontractor

Various companies

27 Pile Load Test for Alexandria

chamber of commerce Egypt

Project.

2009 Faculty of Engineering

Alexandria University Alexandria chamber

of commerce Egypt

28 Pile Load Test for Pharos

University in Alexandria Project.

2010 Concrete Company Pharos University in

Alexandria

29 Pile Load Test for Drainage

Station in Maamoura Project.

2011 Horace Engineering

Works

Holding Company for

drinking water and

sanitary drainage

30 Pile Load Test for Residential

complex Project.

2012 Horema Soil

Investigation and

Quality Control

Residential complex

31 Pile Load Test for Mobinil

Towers Project.

2013 Faculty of Engineering

Alexandria University Central Miami

32 Pile Load Test for Egyptian

Petrochemicals Company Project.

2014 National Corporation

for Foundations

Egyptian

Petrochemicals

Company

33 Pile Load Test for ERC Mostorod

Project. 2014 Delta Company for

Foundations Egyptian Refining

Company

34 Pile Load Test for Commercial

building Project Dokki “Giza

Governorate”.

2014 Consultant

Eng.: Abdel Aziz

Mahmoud

ITAMCO

Ghabbour Group

35 Pile Load Test for talkha Bridge project.

2014 National

Construction

Company (SAMCO)

General Authority for

Roads and Bridges

and Land Transport

Page 86: INDEX [] · 2019-03-13 · Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25 ELGindy Contracting in brief “ELGENDY

( P a g e :86)

Tele fax: 002 03 4294424 - Mobile: 002 01066676350 -WhatsApp: 002 01094855591

Email: [email protected] - [email protected] - Web Site: www.el-gindy.com

Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25

NO. Project Date General Contractor Owner

36 Pile Load Test for Mit Ghamr

Bridge project.

2014 National

Construction

Company (SAMCO)

General Authority for

Roads and Bridges

and Land Transport

37 Pile Load Test for Mit Ghamr

Bridge project.

2015 National

Construction

Company (SAMCO)

General Authority for

Roads and Bridges

and Land Transport

38 Pile Load Test for Dafra Bridge project “stage 01”.

2015 National

Construction

Company (SAMCO)

General Authority for

Roads and Bridges

and Land Transport

39 Pile Load Test for Dafra Bridge project “stage 02”.

2015 National

Construction

Company (SAMCO)

General Authority for

Roads and Bridges

and Land Transport

40 Pile Load Test for Ismailia Bridge

project.

2015 National

Construction

Company (SAMCO)

General Authority for

Roads and Bridges

and Land Transport

41 Pile Load Test for Banha Bridge

project.

2015 National

Construction

Company (SAMCO)

General Authority for

Roads and Bridges

and Land Transport

42 Pile Load Test for Residential

complex project.

2015 Geotech Egypt

Prof Dr. Hassan M

Abouseeda

Saraya Company

43 Pile Load Test for establishment

of the regional ring road “Sector

5” project.

2016 Peixring company General Authority for

Roads and Bridges

and Land Transport

44 Pile Load Test for Ain Sokhna

Port project.

2016 Delta Foundations

Company

Egyptian Maritime

Ports Authority Ain

Sokhna Port

45 Pile Load Test for The Road Ring

regional project Benha Cairo

Alexandria sector.

2016 CEEC GHCB

Company

General Authority for

Roads and Bridges

and Land Transport

46 Pile Load Test for ANRPC-CCR

Project.

2016 Al Amar Consulting

Group ANRPC Company

47 Pile Load Test for Residential

Building Project “Alex

Governorate”.

2017 Bashayer elkaar 2 Residential complex

48 Pile Load Test for Residential

Building TAWA Project “Alex

Governorate”.

2017 MAS for engineering

and contracting Residential Building

Page 87: INDEX [] · 2019-03-13 · Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25 ELGindy Contracting in brief “ELGENDY

( P a g e :87)

Tele fax: 002 03 4294424 - Mobile: 002 01066676350 -WhatsApp: 002 01094855591

Email: [email protected] - [email protected] - Web Site: www.el-gindy.com

Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25

NO. Project Date General Contractor Owner

49 Pile Load Test for Residential

Building Project “Alex

Governorate”.

2018 EL wataniya awqaf Residential complex

50 Pile Load Test for Residential

Building Project “Alex

Governorate”.

2018 Bashayer elkaar 3 Residential complex

51 Pile Load Test for Dry Yeast

storage project.

2018 LESAFFRE EGYPT LESAFFRE EGYPT

Page 88: INDEX [] · 2019-03-13 · Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25 ELGindy Contracting in brief “ELGENDY

( P a g e :88)

Tele fax: 002 03 4294424 - Mobile: 002 01066676350 -WhatsApp: 002 01094855591

Email: [email protected] - [email protected] - Web Site: www.el-gindy.com

Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25

Supervision for Pile Load

Test and Plate Load Test

Page 89: INDEX [] · 2019-03-13 · Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25 ELGindy Contracting in brief “ELGENDY

( P a g e :89)

Tele fax: 002 03 4294424 - Mobile: 002 01066676350 -WhatsApp: 002 01094855591

Email: [email protected] - [email protected] - Web Site: www.el-gindy.com

Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25

NO. Project Date General Contractor Owner

1 Supervision for Pile Load Test in

Abu Madi gas field station

Project.

2001 Petromaint

Gasco

2 Supervision for Pile Load Test in

WEPCO Project.

2003 Petrojet - Northern

Branch

WEPCO

3 Supervision for Pile Load Test in

LNG Project.

2004 Petrojet - Northern

Branch

Egyptian LNG

4 Supervision for Pile Load Test in

Nubaria Station Project.

2008 NATGAS Nubaria Natural Gas

5 Supervision for Pile Load Test in

Residential Building Terrace

Smouha Project “Alex

Governorate”.

2016 Mediterranean

Investment Company Solik Group for Real

Estate Investment

6 Supervision for Pile Load Test in

Residential Building TAWA

Project “Alex Governorate”.

2017 MAS for engineering

and contracting Residential Building

7 Supervision for Pile Load Test in

Novoment FZE Company Project

“Alexandria Free Zone”.

2018 MAS for engineering

and contracting Novoment FZE

Company

8 Supervision for Pile Load Test in

the Emirati District in Port Said

Project.

2018 Petrojet - Eastern

Branch

Belayim Petroleum

Page 90: INDEX [] · 2019-03-13 · Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25 ELGindy Contracting in brief “ELGENDY

( P a g e :90)

Tele fax: 002 03 4294424 - Mobile: 002 01066676350 -WhatsApp: 002 01094855591

Email: [email protected] - [email protected] - Web Site: www.el-gindy.com

Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25

Soil shoring

Page 91: INDEX [] · 2019-03-13 · Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25 ELGindy Contracting in brief “ELGENDY

( P a g e :91)

Tele fax: 002 03 4294424 - Mobile: 002 01066676350 -WhatsApp: 002 01094855591

Email: [email protected] - [email protected] - Web Site: www.el-gindy.com

Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25

Soil shoring Retained piles " Secant piles''

Page 92: INDEX [] · 2019-03-13 · Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25 ELGindy Contracting in brief “ELGENDY

( P a g e :92)

Tele fax: 002 03 4294424 - Mobile: 002 01066676350 -WhatsApp: 002 01094855591

Email: [email protected] - [email protected] - Web Site: www.el-gindy.com

Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25

Page 93: INDEX [] · 2019-03-13 · Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25 ELGindy Contracting in brief “ELGENDY

( P a g e :93)

Tele fax: 002 03 4294424 - Mobile: 002 01066676350 -WhatsApp: 002 01094855591

Email: [email protected] - [email protected] - Web Site: www.el-gindy.com

Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25

Page 94: INDEX [] · 2019-03-13 · Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25 ELGindy Contracting in brief “ELGENDY

( P a g e :94)

Tele fax: 002 03 4294424 - Mobile: 002 01066676350 -WhatsApp: 002 01094855591

Email: [email protected] - [email protected] - Web Site: www.el-gindy.com

Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25

Page 95: INDEX [] · 2019-03-13 · Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25 ELGindy Contracting in brief “ELGENDY

( P a g e :95)

Tele fax: 002 03 4294424 - Mobile: 002 01066676350 -WhatsApp: 002 01094855591

Email: [email protected] - [email protected] - Web Site: www.el-gindy.com

Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25

Projects with Petrojet

Company

Page 96: INDEX [] · 2019-03-13 · Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25 ELGindy Contracting in brief “ELGENDY

( P a g e :96)

Tele fax: 002 03 4294424 - Mobile: 002 01066676350 -WhatsApp: 002 01094855591

Email: [email protected] - [email protected] - Web Site: www.el-gindy.com

Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25

NO. Project Date General Contractor Owner

1 Soil shoring by using Secant piles

system for Abu Qir For Fertilizers Project.

1997 Petrojet - Northern

Branch Abu Qir For Fertilizers

2 Soil shoring by using Secant piles

system for Petroleum Cooperative

Society Project.

1997 Petrojet - Northern

Branch Petroleum

Cooperative Society

3 Soil shoring by using Secant piles

system for Boiler Project in

Alexandria Petroleum Company.

1997 Petrojet - Northern

Branch Alexandria

Petroleum

4 Soil shoring by using Secant piles

system for Drainage lines

Petrogas Project.

1999 Petrojet - Northern

Branch

Petrogas

5 Soil shoring by using Secant piles

system for Warehouses Project. 1999 Petrojet - Northern

Branch Petrogas

6 Soil shoring by using Secant piles

system for Egyptian

Petrochemical Line 24 inches Project.

1999 Petrojet - Northern

Branch Egyptian

Petrochemical

Company

7 Soil shoring by using Secant piles

system for Alexandria Petroleum

Project.

1999 Petrojet - Northern

Branch Alexandria

Petroleum

8 Soil shoring by using Secant piles

system for Alexandria Petroleum

Project.

2000 Petrojet - Northern

Branch

Alexandria

Petroleum

9 Soil shoring by using Secant piles

system for Nitrogen tank base

Project.

2001 Petrojet - Northern

Branch Alexandria

Petroleum

10 Soil shoring by using Secant piles

system for Abu Qir For Fertilizers Project.

2002 Petrojet - Northern

Branch Abu Qir For Fertilizers

11 Soil shoring by using Secant piles

system for Petrogas Project. 2003 Petrojet - Northern

Branch Petrogas

12 Soil shoring by using Secant piles

system for Warehouses Project.

2003 Petrojet - Northern

Branch Alexandria

Petroleum

13 Soil shoring by using Secant piles

system for Lines Project “Edko

Burullus”.

2003 Petrojet - Northern

Branch

Rashpetco

14 Soil shoring by using Wood

shuttering system for Al Burullus

Power Station Project.

2003 Petrojet - Northern

Branch Al Burullus Power

Station

Page 97: INDEX [] · 2019-03-13 · Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25 ELGindy Contracting in brief “ELGENDY

( P a g e :97)

Tele fax: 002 03 4294424 - Mobile: 002 01066676350 -WhatsApp: 002 01094855591

Email: [email protected] - [email protected] - Web Site: www.el-gindy.com

Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25

NO. Project Date General Contractor Owner

15 Soil shoring by using Wood

shuttering system for Rashpetco

Project.

2003 Petrojet - Northern

Branch

Rashpetco

16 Soil shoring by using Secant piles

system for Southern warehouses

Project.

2004 Petrojet - Northern

Branch Alexandria

Petroleum

17 Soil shoring by using Secant piles

system for Alexandria For

Fertilizers Project.

2004 Petrojet - Northern

Branch Alexandria For

Fertilizers

18 Soil shoring by using Berline

Wall system for Rashpetco

Project.

2005 Petrojet - Northern

Branch

Rashpetco

19 Soil shoring by using Wood

shuttering system for Rashpetco

Project.

2005 Petrojet - Northern

Branch

Rashpetco

20 Soil shoring by using Secant piles

system for Egyptian Linear Alkyl

Project” ELAB”.

2007 Petrojet - Northern

Branch

Egyptian Linear

Alkyl

21 Soil shoring by using Berline

Wall system for GASCO line

Project.

2008 Petrojet - Northern

Branch

Egyptian Natural

Gas Company

22 Soil shoring by using Secant piles

system for Alexandria National

Refine and Petrochemical Project.

2008 Petrojet - Northern

Branch

ANRPC

23 Soil shoring by using Secant piles

system for Methanol Project.

2008 Petrojet -East

Branch

Methanex

Corporation

24 Soil shoring by using Secant piles

system for Petrogas Project. 2008 Petrojet - Northern

Branch

Petrogas

25 Soil shoring by using Secant piles

system for Methanol Project.

2009 Petrojet -East

Branch

Methanex

Corporation

26 Soil shoring by using Secant piles

system for E. styrenics Project.

2010 Petrojet - Northern

Branch

Egyptian Styrene

and Polystyrene

Production

28 Soil shoring by using Berline

Wall system for Petrochemicals

Project.

2010 Petrojet - Northern

Branch

Egyptian

Petrochemicals

Company

28 Soil shoring by using Secant piles

system for Egyptian Linear Alkyl

Project” ELAB”.

2011 Petrojet - Northern

Branch

Egyptian Linear

Alkyl

Page 98: INDEX [] · 2019-03-13 · Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25 ELGindy Contracting in brief “ELGENDY

( P a g e :98)

Tele fax: 002 03 4294424 - Mobile: 002 01066676350 -WhatsApp: 002 01094855591

Email: [email protected] - [email protected] - Web Site: www.el-gindy.com

Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25

NO. Project Date General Contractor Owner

29 Soil shoring by using Secant piles

system for Egyptian

Petrochemical Project.

2013 Petrojet - Northern

Branch

Egyptian

Petrochemical

Company

30 Soil shoring by using Secant piles

system for Petrogas Company

Project.

2014 Petrojet - Northern

Branch

Petrogas Company

31 Soil shoring by using Secant piles

system for Petrogas Company

Project.

2015 Petrojet - Northern

Branch

Petrogas Company

32 Soil shoring by using Wood

shuttering system for Mariout

Silos Project.

2015 Petrojet - Northern

Branch

Mariout Silos

33 Soil shoring by using Wood

shuttering system for

Petrochemicals Project.

2015 Petrojet - Northern

Branch

Egyptian

Petrochemicals

Company

34 Soil shoring by using Wood

shuttering system for GRE

Project.

2016 Petrojet - Northern

Branch

Rashpetco

35 Soil shoring by using Berline

Wall system for GASCO line

Project.

2016 Petrojet - Northern

Branch

Egyptian Natural

Gas Company

36 Soil shoring by using Wood

shuttering system for GASCO line

Project.

2016 Petrojet - Northern

Branch

Egyptian Natural

Gas Company

37 Soil shoring by using Secant piles

system for Alexandria National

Refine and Petrochemical CCR

Project.

2016 Petrojet - Northern

Branch

ANRPC

38 Soil shoring by using Secant piles

system for Tanks Rachid project

“Edko Burullus”.

2017 Petrojet - Northern

Branch

Rashpetco

39 Soil shoring by using Berline

Wall system for septic tank

AMOC project.

2018 Petrojet - Northern

Branch

AMOC

40 Soil shoring by using Wood

shuttering system for Edco Abu

Homs Gas Line project.

2018 Petrojet - Northern

Branch

Edco Gas Station

Abu Homs

41 Soil shoring by using sheet piles

system for Alexandria Petroleum

project.

2018 Petrojet - Northern

Branch

Alexandria

Petroleum

Page 99: INDEX [] · 2019-03-13 · Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25 ELGindy Contracting in brief “ELGENDY

( P a g e :99)

Tele fax: 002 03 4294424 - Mobile: 002 01066676350 -WhatsApp: 002 01094855591

Email: [email protected] - [email protected] - Web Site: www.el-gindy.com

Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25

Projects with other

companies

Page 100: INDEX [] · 2019-03-13 · Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25 ELGindy Contracting in brief “ELGENDY

( P a g e :100)

Tele fax: 002 03 4294424 - Mobile: 002 01066676350 -WhatsApp: 002 01094855591

Email: [email protected] - [email protected] - Web Site: www.el-gindy.com

Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25

NO. Project Date General Contractor Owner

1 Soil shoring by using Secant piles

system for Various Projects.

2000 Various Subcontractor

Various companies

2 Soil shoring by using Secant piles

system for Various Projects.

2001 Various Subcontractor

Various companies

3 Soil shoring by using Secant piles

system for Various Projects.

2002 Various Subcontractor

Various companies

4 Soil shoring by using Secant piles

system for Various Projects.

2003 Various Subcontractor

Various companies

5 Soil shoring by using Secant piles

system for Various Projects.

2004 Various Subcontractor

Various companies

6 Soil shoring by using Secant piles

system for Various Projects.

2005 Various Subcontractor

Various companies

7 Soil shoring by using Secant piles

system for Various Projects.

2006 Various Subcontractor

Various companies

8 Soil shoring by using Secant piles

system for Various Projects.

2007 Various Subcontractor

Various companies

9 Soil shoring by using Secant piles

system for Court of Zefta

Gharbiya Governorate Project.

2008 wadi AL nil for

General Contracting

Court of Zefta

10 Soil shoring by using Secant piles

system for Holding Company for

drinking water and sanitary

drainage” Abdul Qader Station”

Project.

2009 Alexandria

Construction

“Talaat Moustafa”

Holding Company for

drinking water and

sanitary drainage

11 Soil shoring by using Secant piles

system for Various Projects.

2010 Various Subcontractor

Various companies

12 Soil shoring by using Secant piles

system for Holding Company for

drinking water and sanitary

drainage” Abdul Qader Station”

Project.

2011 Alexandria

Construction

“Talaat Moustafa”

Holding Company for

drinking water and

sanitary drainage

13 Soil shoring by using Secant piles

system for Holding Company for

drinking water and sanitary

drainage” Abdul Qader Station”

Project.

2012 Alexandria

Construction

“Talaat Moustafa”

Holding Company for

drinking water and

sanitary drainage

14 Soil shoring by using Secant piles

system for Commercial building

Project Dokki “Giza Governorate”.

2014 Consultant

Eng.: Abdel Aziz

Mahmoud

ITAMCO

Ghabbour Group

Page 101: INDEX [] · 2019-03-13 · Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25 ELGindy Contracting in brief “ELGENDY

( P a g e :101)

Tele fax: 002 03 4294424 - Mobile: 002 01066676350 -WhatsApp: 002 01094855591

Email: [email protected] - [email protected] - Web Site: www.el-gindy.com

Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25

NO. Project Date General Contractor Owner

15 Soil shoring by using Secant piles

system for Residential Building Al-Hurriya Al-Ibrahimi Road

Project Alexandria Governorate.

2015 Subcontractor Residential Building

16 Soil shoring by using Secant piles

system for Residential Building Laurent Project Alexandria

Governorate.

2015 Subcontractor Residential Building

17 Soil shoring by using Secant piles

system for Residential Building

Project, Tutankhamun Street,

Smouha, Alexandria.

2015 Geotech Egypt

Prof Dr. Hassan M

Abouseeda

Saraya Company

18 Soil shoring by using struts

system for Residential Building

Corniche El Maadi, Giza

Governorate, Project.

2015 Al Mashrik

Contracting

Company

Residential Building

Saraya-Almashreq

El Maadi

19 Soil shoring by using Secant piles

system for Water station

Hawamdia area, Giza Project.

2016 Alexandria

Construction

“Talaat Moustafa”

Holding Company for

drinking water and

sanitary drainage

20 Soil shoring by using Secant piles

system for Radio drinking water

station Project “Matrouh

Governorate”.

2016 Tabarak Contracting

Company Holding Company for

drinking water and

sanitary drainage

21 Soil shoring by using Secant piles

system for Green Towers Project

“Alex Governorate”.

2016 Salah Eddin Amer and

Partners Company Residential Building

22 Soil shoring by using Secant piles

system for Residential Building

Terrace Smouha Project “Alex

Governorate”.

2016 Mediterranean

Investment Company Solik Group for Real

Estate Investment

23 Soil shoring by using struts

system for Water station

Hawamdia area, Giza Project.

2016 Alexandria

Construction

“Talaat Moustafa”

Holding Company for

drinking water and

sanitary drainage

24 Soil shoring by using Secant piles

system for Residential Building

Project “Alex Governorate”.

2017 EL Hussam and Sayed

Mahmoud Company

and their partner

Residential Building

Page 102: INDEX [] · 2019-03-13 · Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25 ELGindy Contracting in brief “ELGENDY

( P a g e :102)

Tele fax: 002 03 4294424 - Mobile: 002 01066676350 -WhatsApp: 002 01094855591

Email: [email protected] - [email protected] - Web Site: www.el-gindy.com

Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25

NO. Project Date General Contractor Owner

25 Soil shoring by using struts

system for Water station

Hawamdia area, Giza Project.

2017 Alexandria

Construction

“Talaat Moustafa”

Holding Company for

drinking water and

sanitary drainage

26 Soil shoring by using sheet piles

system for Sonker project, Ain

Sokhna port.

2018 Egyptian Company

for Trading and

Contracting

DP WORLD

SOKHNA

27 Soil shoring by using Secant piles

system for septic tank in the Siwa

oasis Project.

2018 Subcontractor

Eng. Mohamed Abdel

Hamid Mahmoud

General facility

Page 103: INDEX [] · 2019-03-13 · Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25 ELGindy Contracting in brief “ELGENDY

( P a g e :103)

Tele fax: 002 03 4294424 - Mobile: 002 01066676350 -WhatsApp: 002 01094855591

Email: [email protected] - [email protected] - Web Site: www.el-gindy.com

Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25

Dewatering

Page 104: INDEX [] · 2019-03-13 · Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25 ELGindy Contracting in brief “ELGENDY

( P a g e :104)

Tele fax: 002 03 4294424 - Mobile: 002 01066676350 -WhatsApp: 002 01094855591

Email: [email protected] - [email protected] - Web Site: www.el-gindy.com

Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25

Dewatering

Deep wells.

The Deep Well System is also a versatile predrainage dewatering system which can pump high and low

volumes of groundwater. This method is best suited to homogeneous aquifers that extend well below the

bottom of the excavation. Deep well systems consist of one or more individual wells, each of which has

its own submersible pump at the bottom of the well.

Advantages:

- Ability to penetrate strata impervious to the jetting method of well point systems.

- Capable of pumping tens to thousands of gallons per minute per well.

- Deep Wells can be effective when placed outside of the jobsite work area.

Deep well dewatering systems are used when large volumes of groundwater must be pumped, highly

permeable soils result in rapid recharging of the aquifer, and/or the depth of excavation excludes other

dewatering methods.

Page 105: INDEX [] · 2019-03-13 · Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25 ELGindy Contracting in brief “ELGENDY

( P a g e :105)

Tele fax: 002 03 4294424 - Mobile: 002 01066676350 -WhatsApp: 002 01094855591

Email: [email protected] - [email protected] - Web Site: www.el-gindy.com

Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25

Page 106: INDEX [] · 2019-03-13 · Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25 ELGindy Contracting in brief “ELGENDY

( P a g e :106)

Tele fax: 002 03 4294424 - Mobile: 002 01066676350 -WhatsApp: 002 01094855591

Email: [email protected] - [email protected] - Web Site: www.el-gindy.com

Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25

Page 107: INDEX [] · 2019-03-13 · Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25 ELGindy Contracting in brief “ELGENDY

( P a g e :107)

Tele fax: 002 03 4294424 - Mobile: 002 01066676350 -WhatsApp: 002 01094855591

Email: [email protected] - [email protected] - Web Site: www.el-gindy.com

Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25

Page 108: INDEX [] · 2019-03-13 · Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25 ELGindy Contracting in brief “ELGENDY

( P a g e :108)

Tele fax: 002 03 4294424 - Mobile: 002 01066676350 -WhatsApp: 002 01094855591

Email: [email protected] - [email protected] - Web Site: www.el-gindy.com

Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25

Page 109: INDEX [] · 2019-03-13 · Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25 ELGindy Contracting in brief “ELGENDY

( P a g e :109)

Tele fax: 002 03 4294424 - Mobile: 002 01066676350 -WhatsApp: 002 01094855591

Email: [email protected] - [email protected] - Web Site: www.el-gindy.com

Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25

Projects with Petrojet

Company

Page 110: INDEX [] · 2019-03-13 · Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25 ELGindy Contracting in brief “ELGENDY

( P a g e :110)

Tele fax: 002 03 4294424 - Mobile: 002 01066676350 -WhatsApp: 002 01094855591

Email: [email protected] - [email protected] - Web Site: www.el-gindy.com

Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25

NO. Project Date General Contractor Owner

1 Supply and install submersible

pumps for Petrogas Project.

1997 Petrojet - Northern

Branch

Petrogas

2 Dewatering by using Deep Well

System for Abu Qir For Fertilizers

Project.

1997 Petrojet - Northern

Branch Abu Qir For

Fertilizers

3 Dewatering System for septic tank

Petrojet Merghem Project.

1997 Petrojet - Northern

Branch Petrojet - Northern

Branch

4 Dewatering System for septic tank

Apis Workshop Project.

1998 Petrojet - Northern

Branch Petrojet - Northern

Branch

5 Dewatering System for septic tank

Petrojet Merghem Project.

1998 Petrojet - Northern

Branch Petrojet - Northern

Branch

6 Supply and install iron pipes for

ethylene plant Project.

1998 Petrojet - Northern

Branch SIDPEC

7 Dewatering by using Deep Well

System for SIDPEC Project.

1998 Petrojet - Northern

Branch SIDPEC

8 Dewatering by using Deep Well

System for Facilities Project.

1999 Petrojet - Northern

Branch SIDPEC

9 Dewatering by using Deep Well

System for Ethylene Project.

1999 Petrojet - Northern

Branch SIDPEC

10 Dewatering by using Deep Well

System for Administrative

building Project.

1999 Petrojet - Northern

Branch SIDPEC

11 Dewatering by using Deep Well

System for GASCO Project.

1999 Petrojet - Northern

Branch Egyptian Natural Gas

Company

12 Dewatering by using Deep Well

System for Warehouses Project.

1999 Petrojet - Northern

Branch SIDPEC

13 Implementation of manhole for

ethylene Project.

1999 Petrojet - Northern

Branch SIDPEC

14 Dewatering by using Deep Well

System for Industrial Security

Building Project.

1999 Petrojet - Northern

Branch SIDPEC

15 Dewatering by using Deep Well

System for MIDOR Project.

2000 Petrojet - Northern

Branch Middle East Oil

Refinery

16 Implementation of manhole and

Caisson for Sports stadiums

External sewage line Project.

2000 Petrojet - Northern

Branch SIDPEC

17 Supply and install submersible

pumps for Sports stadiums

Project.

2000 Petrojet - Northern

Branch Petrojet - Northern

Branch

Page 111: INDEX [] · 2019-03-13 · Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25 ELGindy Contracting in brief “ELGENDY

( P a g e :111)

Tele fax: 002 03 4294424 - Mobile: 002 01066676350 -WhatsApp: 002 01094855591

Email: [email protected] - [email protected] - Web Site: www.el-gindy.com

Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25

NO. Project Date General Contractor Owner

18 Dewatering System for septic tank

Alexandria Petroleum Project.

2000 Petrojet - Northern

Branch Alexandria Petroleum

19 Dewatering by using Deep Well

System for Warehouses Project.

2000 Petrojet - Northern

Branch SIDPEC

20 Dewatering by using Deep Well

System for ZAFCO Project.

2000 Petrojet - Northern

Branch ZAFCO

21 Dewatering by using Deep Well

System for AMOC Project.

2000 Petrojet - Northern

Branch AMOC

22 Dewatering by using Deep Well

System for SIDPEC Project.

2001 Petrojet - Northern

Branch SIDPEC

23 Dewatering System for septic tank

Alexandria Petroleum Project.

2001 Petrojet - Northern

Branch Alexandria Petroleum

24 Dewatering by using Deep Well

System for ASPPC Project.

2001 Petrojet - Northern

Branch ASPPC

25 Dewatering by using Deep Well

System for Alexandria Petroleum

Maintenance Project.

2001 Petrojet - Northern

Branch Alexandria Petroleum

Maintenance

26 Dewatering by using Deep Well

System for Al Burullus Gas

Project.

2002 Petrojet - Northern

Branch Al Burullus Gas

Company

27 Dewatering by using Deep Well

System for ASPPC Project.

2002 Petrojet - Northern

Branch ASPPC

28 Dewatering by using Deep Well

System for Abu Qir For Fertilizers

Project.

2002 Petrojet - Northern

Branch Abu Qir For

Fertilizers

29 Dewatering System for septic tank

Petrogas Warehouses Project.

2002 Petrojet - Northern

Branch Petrogas

30 Dewatering by using Deep Well

System for Al Burullus Gas

Project.

2003 Petrojet - Northern

Branch Al Burullus Gas

Company

31 Dewatering by using Deep Well

System for The line of Burullus

Abu Homs Project.

2003 Petrojet - Northern

Branch Al Burullus Gas

Company

32 Dewatering by using Deep Well

System for Algamil gas pipe line

Project.

2003 Petrojet - Northern

Branch Rasheed Company

33 Implementation of manhole for

Abu Hummus Electricity Station

Project.

2003 Petrojet - Northern

Branch Abu Hummus

Electricity Station

Page 112: INDEX [] · 2019-03-13 · Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25 ELGindy Contracting in brief “ELGENDY

( P a g e :112)

Tele fax: 002 03 4294424 - Mobile: 002 01066676350 -WhatsApp: 002 01094855591

Email: [email protected] - [email protected] - Web Site: www.el-gindy.com

Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25

NO. Project Date General Contractor Owner

34 Dewatering by using Deep Well

System for Egyptian

Petrochemicals Project.

2003 Petrojet - Northern

Branch Egyptian

Petrochemicals

35 Dewatering System for septic tank

Al Burullus Gas Company

Project.

2003 Petrojet - Northern

Branch Al Burullus Gas

Company

36 Dewatering by using Deep Well

System for Nubaria Power Station

Project.

2003 Petrojet - Northern

Branch Nubaria Power Station

37 Dewatering by using Deep Well

System for Gasco Power Station

Project.

2003 Petrojet - Northern

Branch Egyptian Natural Gas

Company

38 Dewatering by using Deep Well

System for ANRPC Project.

2004 Petrojet - Northern

Branch ANRPC

39 Dewatering by using Deep Well

System for Alexandria Fertilizers

Project.

2004 Petrojet - Northern

Branch Alex Fert

40 Dewatering by using Deep Well

System for WEPCO Project. 2004 Petrojet - Northern

Branch WEPCO

41 Dewatering by using Deep Well

System for Damietta Rasheed

Edkou Line Project.

2004 Petrojet - Northern

Branch Rasheed Company

42 Dewatering by using Deep Well

System for Amreya Petroleum

Project.

2004 Petrojet - Northern

Branch Amreya Petroleum

Refining Company

43 Dewatering System for septic tank

Alexandria Petroleum Project.

2005 Petrojet - Northern

Branch Alexandria Petroleum

44 Dewatering by using Deep Well

System for Petrojet Warehouses

Merghem Project.

2006 Petrojet - Northern

Branch Petrojet - Southern

Branch

45 Dewatering by using Deep Well

System for Damietta Rasheed

Edkou Line Project.

2006 Petrojet - Northern

Branch Rasheed Company

46 Dewatering by using Deep Well

System for ELAB Project.

2006 Petrojet - Northern

Branch Egyptian Linear Alkyl

47 Dewatering by using Deep Well

System for Egyptian

Petrochemicals Project.

2007 Petrojet - Northern

Branch Egyptian

Petrochemicals

Page 113: INDEX [] · 2019-03-13 · Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25 ELGindy Contracting in brief “ELGENDY

( P a g e :113)

Tele fax: 002 03 4294424 - Mobile: 002 01066676350 -WhatsApp: 002 01094855591

Email: [email protected] - [email protected] - Web Site: www.el-gindy.com

Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25

NO. Project Date General Contractor Owner

48 Dewatering by using Deep Well

System for ELAB Project.

2007 Petrojet - Northern

Branch

Egyptian Linear Alkyl

49 Dewatering by using Deep Well

System for Warehouses Project. 2007 Petrojet - Northern

Branch Rasheed Company

50 Dewatering by using Deep Well

System for Workshop Project.

2007 Petrojet - Northern

Branch Rasheed Company

51 Dewatering by using Deep Well

System for Methanex Corporation

Project.

2008 Petrojet - Northern

Branch Methanex Corporation

52 Dewatering by using Deep Well

System for LNG Project.

2008 Petrojet - Northern

Branch Egyptian Liquefied

Natural Gas

53 Dewatering by using Deep Well

System for Burullus Project.

2009 Petrojet - Northern

Branch Al Burullus Gas

Company

54 Dewatering by using Deep Well

System for Methanex Corporation

Project.

2009 Petrojet - Northern

Branch Methanex Corporation

55 Dewatering by using Deep Well

System for NATGAS Project.

2009 Petrojet - Northern

Branch NATGAS

56 Dewatering by using Deep Well

System for E.styrenics Project

2009 Petrojet - Northern

Branch Egyptian Styrene and

Polystyrene

Production Company

57 Dewatering by using Deep Well

System for Burullus Project.

2010 Petrojet - Northern

Branch Al Burullus Gas

Company

58 Dewatering by using Deep Well

System for Rashid Petroleum

Project.

2010 Petrojet - Northern

Branch Rashpetco

59 Dewatering by using Deep Well

System for Abu El Matamir silo

Project.

2010 Petrojet - Northern

Branch Abu El Matamir silo

60 Dewatering by using Deep Well

System for Petrogas Globular tank

Project.

2010 Petrojet - Northern

Branch Petrogas

61 Dewatering by using Deep Well

System for E.styrenics Project

2010 Petrojet - Northern

Branch Egyptian Styrene and

Polystyrene

Production Company

62 Dewatering by using Deep Well

System for Burullus Project.

2011 Petrojet - Northern

Branch Al Burullus Gas

Company

63 Supply and install iron pipes for

ethylene Project.

2011 Petrojet - Northern

Branch Petrogas

Page 114: INDEX [] · 2019-03-13 · Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25 ELGindy Contracting in brief “ELGENDY

( P a g e :114)

Tele fax: 002 03 4294424 - Mobile: 002 01066676350 -WhatsApp: 002 01094855591

Email: [email protected] - [email protected] - Web Site: www.el-gindy.com

Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25

NO. Project Date General Contractor Owner

64 Dewatering by using Deep Well

System for Sumed Ain Sokhna

Supply of ships by sea fuel

Project

2011 Petrojet - Eastern

Branch

General Authority of

Red Sea Ports

65 Dewatering by using Deep Well

System for ANRPC Project.

2011 Petrojet - Northern Branch

ANRPC

66 Dewatering by using Deep Well

System for Burullus Project.

2012 Petrojet - Northern Branch

Al Burullus Gas

Company

67 Rental for Deep Well Dewatering

for Sumed Ain Sokhna Supply of

ships by sea fuel Project.

2012 Petrojet - Eastern

Branch

General Authority of

Red Sea Ports

68 Dewatering by using Deep Well

System for BP, Metobas Project.

2012 Petrojet - Northern Branch

British Petroleum

(BP worldwide)

69 Dewatering by using Deep Well

System for Petrochemicals

Project.

2012 Petrojet - Northern Branch

Egyptian

Petrochemicals

Company

70 Dewatering by using Deep Well

System for LNG Project.

2012 Petrojet - Northern Branch

Egyptian Liquefied

Natural Gas

71 Dewatering by using Deep Well

System for Petrochemicals Project

(The first stage).

2013 Petrojet - Northern Branch

Egyptian

Petrochemicals

Company

72 Dewatering by using Deep Well

System for Petrochemicals Project

(The second stage).

2013 Petrojet - Northern Branch

Egyptian

Petrochemicals

Company

73 Dewatering by using Deep Well

System for LNG Project.

2013 Petrojet - Northern Branch

Egyptian Liquefied

Natural Gas

74 Dewatering by using Deep Well

System for Cooling Tower

Project.

2013 Petrojet - Northern Branch

Egyptian

Petrochemicals

Company

75 Dewatering by using Deep Well

System for Ethylene Project.

2013 Petrojet - Northern Branch

Egyptian

Petrochemicals

Company

76 Dewatering by using Deep Well

System for Burullus Project.

2013 Petrojet - Northern Branch

Al Burullus Gas

Company

77 Dewatering System for septic tank

Gas Station Desouq Project.

2013 Petrojet - Northern Branch

Gas Station Desouq

78 Dewatering by using Deep Well

System for MOPCO Project.

2014 Petrojet - Northern Branch

Misr Fertilizers

Production Company

(MOPCO)

Page 115: INDEX [] · 2019-03-13 · Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25 ELGindy Contracting in brief “ELGENDY

( P a g e :115)

Tele fax: 002 03 4294424 - Mobile: 002 01066676350 -WhatsApp: 002 01094855591

Email: [email protected] - [email protected] - Web Site: www.el-gindy.com

Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25

NO. Project Date General Contractor Owner

79 Dewatering by using Deep Well

System for Petrogas Caisson

Project.

2014 Petrojet - Northern

Branch Petrogas

80 Supply and install submersible

pumps for Villa Petro Beach

Project.

2014 Petrojet - Northern

Branch Villa Petro Beach

81 Dewatering by using Deep Well

System for Cooling Tower

Project.

2015 Petrojet - Northern

Branch Egyptian

Petrochemicals

Company

82 Dewatering by using Deep Well

System for Gasco Project.

2015 Petrojet - Northern

Branch Egyptian Natural Gas

Company

83 Supply and install HDPE

Polyethylene Pipes for Petrogas

Lines Project.

2015 Petrojet - Northern

Branch Petrogas

84 Dewatering by using Deep Well

System for Nubaria silos Project.

2015 Petrojet - Northern

Branch Nubaria silos

85 Dewatering by using Deep Well

System for Mariout Silos Project.

2015 Petrojet - Northern

Branch Mariout Silos

86 Dewatering by using Deep Well

System for Burullus Project.

2015 Petrojet - Northern

Branch Al Burullus Gas

Company

87 Dewatering by using Deep Well

System for Petrojet Management

Building North Branch Project.

2015 Petrojet - Northern

Branch Petrojet - Northern

Branch

88 Dewatering by using Deep Well

System for Petrogas Globular tank

Project.

2015 Petrojet - Northern

Branch Petrogas

89 Dewatering by using Deep Well

System for Taurus Libra Project.

2016 Petrojet - Northern

Branch Al Burullus Gas

Company

90 Dewatering by using Deep Well

System for Petrogas warehouse

Project.

2016 Petrojet - Northern

Branch Petrogas

91 Dewatering by using Deep Well

System for ANRPC CCR Caisson

Project.

2016 Petrojet - Northern

Branch ANRPC

92 Dewatering by using Deep Well

System for Giza Fayoum Project.

2016 Petrojet - Northern

Branch Rasheed Company

93 Dewatering by using Deep Well

System for Rashid Project.

2016 Petrojet - Northern

Branch Rasheed Company

Page 116: INDEX [] · 2019-03-13 · Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25 ELGindy Contracting in brief “ELGENDY

( P a g e :116)

Tele fax: 002 03 4294424 - Mobile: 002 01066676350 -WhatsApp: 002 01094855591

Email: [email protected] - [email protected] - Web Site: www.el-gindy.com

Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25

NO. Project Date General Contractor Owner

94 Dewatering by using Deep Well

System for The Ismailia road

tunnel Project.

2016 Petrojet - Ismailia

Branch

Suez Canal

Authority- Ismailia

Branch

95 Dewatering by using Deep Well

System for the 24-inch line of

Rashid Project.

2016 Petrojet - Northern

Branch British Petroleum

(BP worldwide)

96 Dewatering by using Deep Well

System for Foundations ANRPC

CCR Project.

2016 Petrojet - Northern

Branch ANRPC

97 Dewatering by using Deep Well

System for Gasco Project.

2016 Petrojet - Northern

Branch Egyptian Natural Gas

Company

98 Dewatering by using Well point

system for E-Z-5702 + E-Z-5602

project.

2016 Petrojet - Northern

Branch British Petroleum

(BP worldwide)

99 Dewatering by using Well point

system for BP-Raven project.

2016 Petrojet - Northern

Branch British Petroleum

(BP worldwide)

100 Implementation of discharge pipe

line and Dewatering by using

Well point system and Deep

Wells System for “line 4000 m”

BP Adco project.

2017 Petrojet - Northern

Branch British Petroleum

(BP worldwide)

101 Dewatering by using Well point

system for Giza Fayoum” line

1500 m” Project.

2017 Petrojet - Northern

Branch Rasheed Company

102 Dewatering by using Well point

system and Deep Wells System

for E-Z- (2801 + 2802) project.

2017 Petrojet - Northern

Branch British Petroleum

(BP worldwide)

103 Dewatering by using Well point

system and Deep Wells System

for E-Z- (5601 + 5604) project.

2017 Petrojet - Northern

Branch British Petroleum

(BP worldwide)

104 Dewatering by using Well point

system and Deep Wells System

for E-Z- (5606 + 6001) project.

2017 Petrojet - Northern

Branch British Petroleum

(BP worldwide)

105 Dewatering by using Deep Well

System for Rasheed Adco project.

2017 Petrojet - Northern

Branch Rasheed Company

106 Dewatering by using Deep Well

System for Algamil gas pipe line

project.

2017 Petrojet - Northern

Branch Egypt Gas

(EGAS)

Page 117: INDEX [] · 2019-03-13 · Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25 ELGindy Contracting in brief “ELGENDY

( P a g e :117)

Tele fax: 002 03 4294424 - Mobile: 002 01066676350 -WhatsApp: 002 01094855591

Email: [email protected] - [email protected] - Web Site: www.el-gindy.com

Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25

NO. Project Date General Contractor Owner

107 Dewatering by using Deep Well

System for The Ismailia road

tunnel Project.

2017 Petrojet - Ismailia

Branch

Suez Canal

Authority- Ismailia

Branch

108 Dewatering by using Well point

system and Deep Wells System

for Offshore Connection BP line

1900 m Project.

2017 Petrojet - Northern

Branch British Petroleum

(BP worldwide)

109 Dewatering by using Deep Well

System for Foundations BP-

Raven Project.

2017 Petrojet - Northern

Branch British Petroleum

(BP worldwide)

110 Dewatering by using Deep Well

System for The Ismailia road

tunnel RS-A Project.

2017 Petrojet - Ismailia

Branch

Suez Canal

Authority- Ismailia

Branch

111 Dewatering by using Deep Well

System for Sharing Facilities

Burullus-Adco Project.

2017 Petrojet - Northern

Branch British Petroleum

(BP worldwide)

112 Dewatering by using Deep Well

System for Sonecker, Ain Sukhna

warehouses and Storage Station

(GASOI + LPG) project.

2017 Petrojet - Eastern

Branch

DP World Sokhna

Port Authority of Ain

Sukhna

113 Dewatering by using Deep Well

System for Tie in CCR project.

2017 Petrojet - Northern

Branch ANRPC

114 Dewatering by using Well point

system for Giza Fayoum -Adco

Project.

2017 Petrojet - Northern

Branch British Petroleum

(BP worldwide)

115 Implementation of manhole for Adco BP-Raven project.

2017 Petrojet - Northern

Branch British Petroleum

(BP worldwide)

116 Dewatering by using Deep Well

System for Sonecker, Ain Sukhna

warehouses and Storage Station

(GASOI + LOP) project.

2017 Petrojet - Eastern

Branch

DP World Sokhna

Port Authority of Ain

Sukhna

117 Dewatering by using Deep Well

System for Foundations

Expansion Inside AMOC project.

2018 Petrojet - Northern

Branch AMOC

118 Dewatering System for septic tank

Adco BP-Raven project.

2018 Petrojet - Northern

Branch British Petroleum

(BP worldwide)

Page 118: INDEX [] · 2019-03-13 · Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25 ELGindy Contracting in brief “ELGENDY

( P a g e :118)

Tele fax: 002 03 4294424 - Mobile: 002 01066676350 -WhatsApp: 002 01094855591

Email: [email protected] - [email protected] - Web Site: www.el-gindy.com

Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25

NO. Project Date General Contractor Owner

119 Supply and install HDPE

Polyethylene Pipes for Expansion

Inside AMOC project.

2018 Petrojet - Northern

Branch

AMOC

120 Dewatering by using Deep Well

System for septic tank AMOC

project.

2018 Petrojet - Northern

Branch

AMOC

121 Dewatering by using Deep Well

System for Petrobel Abu Madi gas

line (24 – 26 – 32 inch) project.

2018 Petrojet - Northern

Branch

PETROBEL

122 Dewatering by using Deep Well

System for Edco Abu Homs Gas

Line project.

2018 Petrojet - Northern

Branch

Edco Gas Station Abu

Homs

123 Dewatering by using Deep Well

System for Tarqeeq El Alamein

Project.

2018 Petrojet - Northern

Branch

Tarqeeq El Alamein

New El Alamein City

124 Dewatering by using Deep Well

System and Well point system for

LNG Project.

2018 Petrojet - Northern

Branch

LNG

Page 119: INDEX [] · 2019-03-13 · Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25 ELGindy Contracting in brief “ELGENDY

( P a g e :119)

Tele fax: 002 03 4294424 - Mobile: 002 01066676350 -WhatsApp: 002 01094855591

Email: [email protected] - [email protected] - Web Site: www.el-gindy.com

Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25

Projects with other

companies

Page 120: INDEX [] · 2019-03-13 · Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25 ELGindy Contracting in brief “ELGENDY

( P a g e :120)

Tele fax: 002 03 4294424 - Mobile: 002 01066676350 -WhatsApp: 002 01094855591

Email: [email protected] - [email protected] - Web Site: www.el-gindy.com

Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25

NO. Project Date General Contractor Owner

1 Dewatering by using Deep Well

System for Various Projects.

1990

Various Subcontractor

Various companies

2 Dewatering by using Deep Well

System for Various Projects. 1991 Various

Subcontractor

Various companies

3 Dewatering by using Deep Well

System for Various Projects.

1992 Various Subcontractor

Various companies

4 Dewatering by using Deep Well

System for Various Projects. 1993 Various

Subcontractor

Various companies

5 Dewatering by using Deep Well

System for Various Projects. 1994 Various

Subcontractor

Various companies

6 Dewatering by using Deep Well

System for Agami Bianchi Beach

Alexandria, Project.

1995 Subcontractor Bianchi Beach

7 Dewatering by using Deep Well

System for Iron and steel

Egyptian company Project.

1995 Subcontractor Iron and Steel

Egyptian Company

8 Dewatering by using Deep Well

System for Educational Buildings

Project.

1995 Rulan Company Educational Buildings

9 Dewatering by using Deep Well

System for Iron and steel

Egyptian company Project.

1996 Subcontractor Iron and Steel

Egyptian Company

10 Dewatering by using Deep Well

System for Agami Bianchi Beach

Alexandria Project.

1996 Subcontractor Bianchi Beach

11 Dewatering by using Deep Well

System for Sidi Kreir Power

Station Project.

1996 Arab International

Contracting

Sidi Kreir Power

Station

12 Dewatering by using Deep Well

System for Villa in King Mariout

Project.

1996 Subcontractor Dr. Ahmed Ragab

13 Dewatering by using Deep Well

System for Fardous Association

Project.

1997 Subcontractor Fardous Association

14 Implementation of manhole for

summer moon hotel Alexandria

Project.

1997 Subcontractor summer moon hotel

15 Dewatering by using Deep Well

System for Fardous Association

Project.

1998 Subcontractor Fardous Association

Page 121: INDEX [] · 2019-03-13 · Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25 ELGindy Contracting in brief “ELGENDY

( P a g e :121)

Tele fax: 002 03 4294424 - Mobile: 002 01066676350 -WhatsApp: 002 01094855591

Email: [email protected] - [email protected] - Web Site: www.el-gindy.com

Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25

NO. Project Date General Contractor Owner

16 Dewatering by using Deep Well

System for Al Qafila Trading and

Contracting Project.

1998 Subcontractor Al Qafila Trading and

Contracting

17 Dewatering by using Deep Well

System for Mina Village Project. 1998 Subcontractor Mina Village

18 Dewatering by using Deep Well

System for Andalus and the Hijaz

housing Project.

1998 Subcontractor Andalus and the Hijaz

housing

19 Dewatering by using Deep Well

System for Abu Sultan Project. 1998 Subcontractor Wahat Al ahlam

20 Dewatering by using Deep Well

System for Various Projects.

1999 Al Ahlia Contracting Al Ahlia Contracting

21 Dewatering by using Deep Well

System for Agami Bianchi Beach

Alexandria, Project.

1999 Subcontractor Residential Building

22 Dewatering by using Deep Well

System for Agami Bianchi Beach

Alexandria, Project.

1999 Various

Subcontractor

Various Residential

Building

23 Dewatering by using Deep Well

System for Air Defense Buildings

Project.

1999 Al Ahlia for

Foundation

Air Defense Buildings

24 Dewatering by using Deep Well

System for Fardous Association

Project.

1999 Subcontractor Fardous Association

25 Dewatering by using Deep Well

System for Al-Nasser Mills

Project.

1999 Al Ahlia for

Foundation

Al-Nasser Mills

26 Dewatering by using Deep Well

System for Al - Amreya Spinning

and Weaving Project.

1999 Subcontractor Al - Amreya Spinning

and Weaving

27 Dewatering by using Deep Well

System for SIDPEC Project.

1999 Toyo Engineering

Corporation SIDPEC

28 Dewatering by using Deep Well

System for Petrochemicals

Project.

1999 Samsung

Engineering

SIDPEC

29 Dewatering by using Deep Well

System for Presidential Palace

Project.

1999 Dr. Hamdy Hamed Presidential Palace

Page 122: INDEX [] · 2019-03-13 · Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25 ELGindy Contracting in brief “ELGENDY

( P a g e :122)

Tele fax: 002 03 4294424 - Mobile: 002 01066676350 -WhatsApp: 002 01094855591

Email: [email protected] - [email protected] - Web Site: www.el-gindy.com

Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25

NO. Project Date General Contractor Owner

30 Dewatering by using Deep

Well System for Fardous

Association Project.

2000 Subcontractor Fardous Association

31 Dewatering by using Deep

Well System for SIDPEC

Project.

2000 TOYO Company SIDPEC

32 Dewatering by using Deep

Well System for Al Gomhuria

Hospital in Karamouz, Project.

2000 HCCD Construction

Egyptian Contracting

Company for Building

Al Gomhuria Hospital

in Karamouz

33 Dewatering by using Deep

Well System for Villa in

Agami Bianchi Beach Project.

2000 Subcontractor ENG. Magdy El Deeb

34 Dewatering by using Deep

Well System for Villa in Agami Bianchi Beach Project.

2000 Subcontractor ENG. Habib Atta

Allah

35 Dewatering by using Deep

Well System for Villa in Agami Bianchi Beach Project.

2000 Subcontractor Mr. Abdullah George

36 Dewatering by using Deep

Well System for Villa in

Agami Bianchi Beach Project.

2000 Subcontractor Mr. Massad Abdel

Salam

37 Dewatering System for septic

tank Alexandria Petroleum

Project.

2000 Subcontractor Alexandria Petroleum

Company

38 Dewatering by using Deep

Well System for mobile station

in Agami, Project.

2000 Subcontractor mobile station in

Agami

39 Dewatering by using Deep

Well System for EEPI

Company Project.

2000 Adcon Company European Egyptian

Pharmaceutical

Industries

40 Dewatering by using Deep

Well System for McDonald's

Project.

2000 Subcontractor McDonald's Egypt

King Mariot

41 Dewatering by using Deep

Well System for Various

Projects.

2001

Various Subcontractor Various companies

42 Dewatering System for septic

tank EEPI Company Project.

2001 Adcon Company European Egyptian

Pharmaceutical

Industries

Page 123: INDEX [] · 2019-03-13 · Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25 ELGindy Contracting in brief “ELGENDY

( P a g e :123)

Tele fax: 002 03 4294424 - Mobile: 002 01066676350 -WhatsApp: 002 01094855591

Email: [email protected] - [email protected] - Web Site: www.el-gindy.com

Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25

NO. Project Date General Contractor Owner

43 Dewatering by using Deep Well

System for Sidi Kerir village

Project.

2001 Al Omran Integrated

Contracting Company

Sidi Kerir village

44 Dewatering by using Deep Well

System for Presidential Palace

Project.

2001 Dr. Hamdy Hamed Presidential Palace

45 Implementation of manhole for

summer moon hotel Alexandria

Project.

2001 Subcontractor summer moon hotel

46 Implementation of manhole for

SIDPEC Project.

2001 TOYO Company SIDPEC

47 Dewatering by using Deep Well

System for Alexandria

Petroleum Project.

2001 Orascom Construction Alexandria Petroleum

Company

48 Dewatering by using Deep Well

System for Petrochemicals

Project.

2001 Subcontractor Egyptian

Petrochemicals

Company

49 Dewatering by using Deep Well

System for ASPPC Project.

2001 Subcontractor Alexandria Specialty

Petroleum Products

Company

50 Dewatering by using Deep Well

System for Mina Village Project.

2001 African consultant Office Mina Village

51 Dewatering by using Deep Well

System for Petromaint Project.

2001 Subcontractor Alexandria Petroleum

Maintenance

52 Dewatering by using Deep Well

System for International Liquid

Gas Production Company

Project.

2001 Subcontractor International Liquid

Gas Production

Company

53 Dewatering by using Deep Well

System for SIDPEC Project.

2001 TOYO Company SIDPEC

54 Dewatering by using Deep Well

System for SIDPEC Project.

2001 Alexandria Petroleum

Maintenance SIDPEC

55 Dewatering by using Deep Well

System for Various Projects.

2002

Various Subcontractor Various companies

56 Dewatering by using Deep Well

System for Mina Village Project.

2002 African consultant Office Mina Village

57 Dewatering by using Deep Well

System for SIDPEC Project.

2002 Alexandria Petroleum

Maintenance SIDPEC

58 Dewatering by using Deep Well

System for McDonald's Project.

2002 Subcontractor McDonald's Egypt

King Mariot

Page 124: INDEX [] · 2019-03-13 · Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25 ELGindy Contracting in brief “ELGENDY

( P a g e :124)

Tele fax: 002 03 4294424 - Mobile: 002 01066676350 -WhatsApp: 002 01094855591

Email: [email protected] - [email protected] - Web Site: www.el-gindy.com

Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25

NO. Project Date General Contractor Owner

59 Dewatering by using Deep Well

System for Various Projects.

2003

Various Subcontractor Various companies

60 Dewatering by using Deep Well

System for Mina Village Project.

2003 African consultant Office Mina Village

61 Dewatering by using Deep Well

System for Various Projects.

2004

Various Subcontractor Various companies

62 Dewatering by using Deep Well

System Residential Building

Project.

2004 Subcontractor Residential Building

63 Dewatering by using Deep Well

System for Agami Bianchi

Beach Alexandria, Project.

2004 Subcontractor Residential Building

64 Dewatering by using Deep Well

System for Agami, Alexandria,

Project.

2004 Subcontractor Residential Building

65 Dewatering by using Deep Well

System for Apis School

Complex Project.

2005 MAS Engineering and

Contracting Apis School Complex

66 Dewatering by using Deep Well

System for Residential Building

Project.

2005 Subcontractor Residential Building

67 Dewatering by using Deep Well

System for Residential Building

Project.

2005 Morganti Construction Residential Building

68 Dewatering by using Deep Well

System for Residential Building

Project.

2005 Lotus Contracting

Company Residential Building

69 Dewatering by using Deep Well

System for Residential Building

Project.

2005 Dar Al Maghrabi

Building and Trading Residential Building

70 Dewatering by using Deep Well

System for Various Projects.

2006

Various Subcontractor Various companies

71 Dewatering by using Deep Well

System for Olympic Stadium of

the Armed Forces in Burj Al

Arab Project.

2006 Subcontractor Olympic Stadium of

the Armed Forces in

Burj Al Arab

72 Dewatering by using Deep Well

System for Gasco Power Station

Project.

2006 Subcontractor Egyptian Natural Gas

Company

Page 125: INDEX [] · 2019-03-13 · Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25 ELGindy Contracting in brief “ELGENDY

( P a g e :125)

Tele fax: 002 03 4294424 - Mobile: 002 01066676350 -WhatsApp: 002 01094855591

Email: [email protected] - [email protected] - Web Site: www.el-gindy.com

Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25

NO. Project Date General Contractor Owner

73 Dewatering by using Deep Well

System for Residential Building

Project.

2006 Dar Al Maghrabi

Building and Trading Residential Building

74 Dewatering by using Deep Well

System for Residential Building

Project.

2006 Subcontractor Residential Building

75 Dewatering by using Deep Well

System for ASPPC Project.

2006 Subcontractor Alexandria Specialty

Petroleum Products

Company

76 Dewatering by using Deep Well

System for Al-Watania Project.

2006 Kased Khair General

Supplies and

Contracting

Al-Watania

77 Dewatering by using Deep Well

System for Residential Building

Project.

2006 Subcontractor Mimary Group

78 Dewatering by using Deep Well

System for Egyptian German

Porcelain Project.

2006 Subcontractor Egyptian German

Porcelain

79 Dewatering by using Deep Well

System for Onyx Company

Project.

2006 Subcontractor Onyx Company

80 Dewatering by using Deep Well

System for Various Projects.

2007

Various Subcontractor Various companies

81 Dewatering by using Deep Well

System for Residential Building

Project.

2007 Subcontractor Residential Building

82 Dewatering by using Deep Well

System for Holding Company

for drinking water and sanitary

drainage Project.

2007 Horse Engineering Works

Alex. Co Holding Company for

drinking water and

sanitary drainage

83 Dewatering by using Deep Well

System for Holding Company

for drinking water and sanitary

drainage Project.

2007 Alexandria Construction

“Talaat Moustafa” Holding Company for

drinking water and

sanitary drainage

84 Dewatering by using Deep Well

System for SUMED Project.

2007 Lotus Contracting

Company Arab Petroleum

Pipelines Company

85 Dewatering by using Deep Well

System for Al-Watania Project.

2007 Kased Khair General

Supplies and

Contracting

Al-Watania

Page 126: INDEX [] · 2019-03-13 · Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25 ELGindy Contracting in brief “ELGENDY

( P a g e :126)

Tele fax: 002 03 4294424 - Mobile: 002 01066676350 -WhatsApp: 002 01094855591

Email: [email protected] - [email protected] - Web Site: www.el-gindy.com

Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25

NO. Project Date General Contractor Owner

86 Dewatering by using Deep Well

System for Residential Building

Project.

2007 Concrete Company Residential Building

87 Dewatering by using Deep Well

System for Alexandria Sporting

Club Project.

2007 Amco Company Alexandria Sporting

Club

88 Dewatering by using Deep Well

System for Grand Ville Smouha

Project.

2007 Arab Investment

Company Grand Ville Smouha

89 Dewatering by using Deep Well

System for Alexandria Port

Authority Project.

2007 Orascom Construction Alexandria Port

Authority

90 Dewatering by using Deep Well

System for Zefta Court Project.

2008 wady Alnil for General

Contracting

Zefta Court

91 Dewatering by using Deep Well

System for Holding Company

for drinking water and sanitary

drainage Project.

2008 Horse Engineering

Works Alex. Co

Holding Company for

drinking water and

sanitary drainage

92 Dewatering by using Deep Well

System for Residential Building

Project.

2008 Subcontractor Residential Building

93 Dewatering by using Deep Well

System for L.G.N Project.

2008 Lotus Construction Egyptian Liquefied

Natural Gas

94 Dewatering by using Deep Well

System for Nile Company for

Foreign Trade Project.

2008 Lotus Construction Nile Company for

Foreign Trade

95 Dewatering by using Deep Well

System for Rashpetco Project.

2008 Egyptian Maintenance Rashpetco

96 Dewatering by using Deep Well

System for Holding Company

for drinking water and sanitary

drainage Project.

2008 Alexandria

Construction

“Talaat Moustafa”

Holding Company for

drinking water and

sanitary drainage

97 Dewatering by using Deep Well

System for Alexandria

Petroleum Project.

2008 Kram Real Estate

Investment Company

Alexandria Petroleum

98 Dewatering by using Deep Well

System for Holding Company

for drinking water and sanitary

drainage King Mariot Project.

2008 Alexandria

Construction

“Talaat Moustafa”

Holding Company for

drinking water and

sanitary drainage

Page 127: INDEX [] · 2019-03-13 · Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25 ELGindy Contracting in brief “ELGENDY

( P a g e :127)

Tele fax: 002 03 4294424 - Mobile: 002 01066676350 -WhatsApp: 002 01094855591

Email: [email protected] - [email protected] - Web Site: www.el-gindy.com

Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25

NO. Project Date General Contractor Owner

99 Dewatering by using Deep Well

System for Residential Building

Project.

2008 Subcontractor Residential Building

100 Dewatering by using Deep Well

System for Residential Building

Project.

2008 Lotus Construction Residential Building

101 Dewatering by using Deep Well

System for Residential Building

Project.

2009 Saif Construction

Company Residential Building

102 Dewatering by using Deep Well

System for Alexandria

Petroleum Project.

2009 Kram Real Estate

Investment Company

Alexandria Petroleum

103 Dewatering by using Deep Well

System for Alexandria

Petroleum Project.

2009 First Group Company Residential Building

104 Dewatering by using Deep Well

System for Nile Company for

Foreign Trade Project.

2008 Lotus Construction Residential Building

105 Dewatering by using Deep Well

System for Residential Building

Project.

2009 Kram Real Estate

Investment Company

Residential Building

106 Dewatering by using Deep Well

System for Nubaria gas station

in Kom Hamada Project.

2009 NATGAS Nubaria gas station in

Kom Hamada

107 Dewatering by using Deep Well

System for Residential Building

Project.

2009 Jazeera Company Residential Building

108 Dewatering by using Deep Well

System for Apartment complex

Project.

2009 Subcontractor City Light

Construction and

Development

109 Dewatering by using Deep Well

System for Administrative and

Commercial Building in Al

Batal Ahmed Abdel Aziz Street

Project.

2009 Engineering Trading

Contracting Company

Ceramica Cleopatra

Group

110 Dewatering by using Deep Well

System for Residential Building

Project.

2009 Future House Real

Estate

Residential Building

Page 128: INDEX [] · 2019-03-13 · Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25 ELGindy Contracting in brief “ELGENDY

( P a g e :128)

Tele fax: 002 03 4294424 - Mobile: 002 01066676350 -WhatsApp: 002 01094855591

Email: [email protected] - [email protected] - Web Site: www.el-gindy.com

Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25

NO. Project Date General Contractor Owner

111 Dewatering by using Deep Well

System for Residential Building

Project.

2009 El madina company Residential Building

112 Dewatering by using Deep Well

System for EL Najjar Mall

Alexandria Carrefour Project.

2009 Piling-Tech EL Najjar Mall

Alexandria Carrefour

113 Dewatering by using Deep Well

System for Zefta Court Project.

2009 wady Alnil for General

Contracting

Zefta Court

114 Dewatering by using Deep Well

System for Rasheed Water

Station Project.

2010 NATGAS Rasheed Water

Station

115 Dewatering by using Deep Well

System for BituNil Project.

2010 Subcontractor BituNil

116 Dewatering by using Deep Well

System for El-Dekheila Port

Project.

2010 Eagle Engineering and

Land Development

El-Dekheila Port

117 Dewatering by using Deep Well

System for Residential Building

Project.

2010 El madina company Residential Building

118 Dewatering by using Deep Well

System for Royal Hospital

Project.

2010 MAS for engineering

and contracting

Royal Hospital

119 Dewatering by using Deep Well

System for Residential Building

Project.

2010 EL muemrwn AL Arab Residential Building

120 Dewatering by using Deep Well

System for Residential Building

Project.

2010 Subcontractor Residential Building

121 Dewatering by using Deep Well

System for New Arish Arab

Contractors Drainage Authority

Project.

2010 Alex Star for General

Contracting and Real

Estate Investment

Arab Contractors

Drainage Authority

(Osman Ahmed

Osman & Co.)

122 Dewatering by using Deep Well

System for Administrative and

Commercial Building in Al

Batal Ahmed Abdel Aziz Street

Project.

2010 Engineering Trading

Contracting Company

Ceramica Cleopatra

Group

123 Dewatering by using Deep Well

System for Agami Bianchi

Beach Alexandria, Project.

2010 El Baron for

Construction

Residential Building

Page 129: INDEX [] · 2019-03-13 · Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25 ELGindy Contracting in brief “ELGENDY

( P a g e :129)

Tele fax: 002 03 4294424 - Mobile: 002 01066676350 -WhatsApp: 002 01094855591

Email: [email protected] - [email protected] - Web Site: www.el-gindy.com

Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25

NO. Project Date General Contractor Owner

124 Dewatering by using Deep Well

System for Residential Building

Project.

2010 Subcontractor Residential Building

125 Dewatering by using Deep Well

System for Al Haramain Towers

Project.

2010 Emar Real Estate Residential Building

126 Dewatering by using Deep Well

System for Al Orouba Village

Project.

2011 Subcontractor Al Orouba Village

127 Dewatering by using Deep Well

System for Residential Building

Project.

2011 Subcontractor Residential Building

128 Dewatering by using Deep Well

System for Drainage Station in

Al Mamoura Project.

2011 Egyco - El Nasr for

Buildings and

Constructions

Holding Company for

drinking water and

sanitary drainage

129 Dewatering by using Deep Well

System for El-Dekheila Port

Project.

2011 Eagle Engineering and

Land Development

El-Dekheila Port

130 Dewatering by using Deep Well

System for Residential Building

Project.

2011 Subcontractor Residential Building

131 Dewatering by using Deep Well

System for Sumed Ain Sokhna

Project.

2011 Subcontractor DP WORLD Sokhna

132 Dewatering by using Deep Well

System for Smouha Flowers

Project.

2012 Ameriya For

Contracting

Residential Building

133 Dewatering by using Deep Well

System for Holding Company

for drinking water and sanitary

drainage Project.

2012 Alexandria

Construction

“Talaat Moustafa”

Holding Company for

drinking water and

sanitary drainage

134 Dewatering by using Deep Well

System for Alsaraya Gardens

Smouha Project.

2012 African consultant

Office

Residential Building

135 Dewatering by using Deep Well

System for Residential Building

Project.

2012 Subcontractor Residential Building

136 Dewatering by using Deep Well

System for Residential Building

Project.

2012 Subcontractor Residential Building

Page 130: INDEX [] · 2019-03-13 · Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25 ELGindy Contracting in brief “ELGENDY

( P a g e :130)

Tele fax: 002 03 4294424 - Mobile: 002 01066676350 -WhatsApp: 002 01094855591

Email: [email protected] - [email protected] - Web Site: www.el-gindy.com

Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25

NO. Project Date General Contractor Owner

137 Dewatering by using Deep Well

System for Residential Building

Project.

2012 AL AMIR Contracting Residential Building

138 Dewatering by using Deep Well

System for Residential Building

Project.

2012 SABB Engineering and

Construction

Residential Building

139 Dewatering by using Deep Well

System for Residential Building

Project.

2012 Al Saraya Company Residential Building

140 Dewatering by using Deep Well

System for Residential Building

Project.

2012 Subcontractor Residential Building

141 Dewatering by using Deep Well

System for Residential Building

Project.

2012 Al Omran Office for

Studies and Design

Residential Building

142 Dewatering by using Deep Well

System for Residential Building

Project.

2012 Al Mashreq

Development Company

Residential Building

143 Dewatering by using Deep Well

System for Drainage Station in

Apis Project.

2012 Egyco - El Nasr for

Buildings and

Constructions

Holding Company for

drinking water and

sanitary drainage

144 Dewatering by using Deep Well

System for Residential Building

Project.

2013 Subcontractor Residential Building

145 Dewatering by using Deep Well

System for Residential Building

Project.

2013 Riyad AL ammar

company

Residential Building

146 Dewatering by using Deep Well

System for Residential Building

Project.

2013 Subcontractor Residential Building

147 Dewatering by using Deep Well

System for Residential Building

Project.

2013 Subcontractor Residential Building

148 Dewatering by using Deep Well

System for Holding Company

for drinking water and sanitary

drainage Project.

2013 Egyco - El Nasr for

Buildings and

Constructions

Holding Company for

drinking water and

sanitary drainage

149 Dewatering by using Deep Well

System for Residential Building

Project.

2013 Al Saraya Real Estate

Investments Company

Residential Building

Page 131: INDEX [] · 2019-03-13 · Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25 ELGindy Contracting in brief “ELGENDY

( P a g e :131)

Tele fax: 002 03 4294424 - Mobile: 002 01066676350 -WhatsApp: 002 01094855591

Email: [email protected] - [email protected] - Web Site: www.el-gindy.com

Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25

NO. Project Date General Contractor Owner

150 Dewatering by using Deep Well

System for Residential Building

Project.

2013 Subcontractor Residential Building

151 Dewatering by using Deep Well

System for Residential Building

Project.

2013 Subcontractor Residential Building

152 Dewatering by using Deep Well

System for Residential Building

Project.

2013 Riyadh Company Residential Building

153 Dewatering by using Deep Well

System for Residential Building

Project.

2013 Capital Contracting Residential Building

154 Dewatering by using Deep Well

System for Residential Building

Project.

2013 Subcontractor Residential Building

155 Dewatering by using Deep Well

System for Residential Building

Project.

2013 OSOS for Investment

and Real Estate

Development

Residential Building

156 Dewatering by using Deep Well

System for Residential Building

Project.

2013 El Baron for

Construction

Residential Building

157 Dewatering by using Deep Well

System for Residential Building

Project.

2013 EL Hussam and Sayed

Mahmoud Company and

their partner

Residential Building

158 Dewatering by using Deep Well

System for Residential Building

Project.

2013 Al Ammar Company Residential Building

159 Dewatering by using Deep Well

System for Residential Building

Project.

2013 Al Sanhouri

Contracting and

Trading Company

Residential Building

160 Dewatering by using Deep Well

System for Residential Building

Project.

2014 Subcontractor Residential Building

161 Dewatering by using Deep Well

System for Administrative

building Project.

2014 ITAB Paper Company Administrative

building

162 Dewatering by using Deep Well

System for Residential Building

Project.

2014 Subcontractor Residential Building

Page 132: INDEX [] · 2019-03-13 · Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25 ELGindy Contracting in brief “ELGENDY

( P a g e :132)

Tele fax: 002 03 4294424 - Mobile: 002 01066676350 -WhatsApp: 002 01094855591

Email: [email protected] - [email protected] - Web Site: www.el-gindy.com

Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25

NO. Project Date General Contractor Owner

163 Dewatering by using Deep Well

System for Commercial building

Project Dokki “Giza Governorate”.

2014 Consultant

Eng. Abdel Aziz

Mahmoud

ITAMCO

Ghabbour Group

164 Dewatering by using Deep Well

System for Residential Building

Project.

2014 Subcontractor Residential Building

165 Dewatering by using Deep Well

System for Mina Village Project.

2014 African consultant Office Mina Village

166 Dewatering by using Deep Well

System for GEMS Academy

Alexandria Project.

2014 MAS for engineering

and contracting

GEMS Academy

Alexandria

167 Dewatering by using Deep Well

System for Residential Building

in Damanhour Project.

2014 Subcontractor Residential Building

168 Dewatering by using Deep Well

System for Residential Building

Project.

2014 Subcontractor Residential Building

169 Dewatering by using Deep Well

System for Residential Building

Project.

2015 Al Mashrik Contracting

Company

Residential Building

Saraya-Almashreq

El Maadi

170 Dewatering by using Deep Well

System for Residential Building

Project.

2015 Subcontractor Residential Building

171 Dewatering by using Deep Well

System for Residential Building

Project.

2015 Panorama City Residential Building

172 Dewatering by using Deep Well

System for Residential Building

Project.

2015 Al-Sherouk For

Recruitment

Residential Building

173 Dewatering by using Deep Well

System for Residential Building

Project.

2015 Bright House Residential Building

174 Implementation of Pizometer

and Pumping Test, Middle East

Oil Refinery Project.

2015 Enppi and

DAPPOLONIA

MIDOR

175 Implementation of Pizometer

and Pumping Test, Zohr Project,

Port Said.

2016 Enppi and

DAPPOLONIA

MIDOR

Page 133: INDEX [] · 2019-03-13 · Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25 ELGindy Contracting in brief “ELGENDY

( P a g e :133)

Tele fax: 002 03 4294424 - Mobile: 002 01066676350 -WhatsApp: 002 01094855591

Email: [email protected] - [email protected] - Web Site: www.el-gindy.com

Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25

NO. Project Date General Contractor Owner

176 Dewatering by using Deep Well

System for Residential Building

Project.

2016 Subcontractor

MR. Ahmed Mohamed

Osman

Residential Building

177 Dewatering by using Deep Well

System for Residential Building

Project.

2016 Subcontractor

Eng. Helmy El Houfi

Residential Building

178 Implementation of Deep wells,

Pizometer and Pumping Test,

EL mamoura city view Project.

2016 Subcontractor

Housing and Building

National Research

Center

179 Dewatering by using Deep Well

System for Residential Building

Project.

2016 Subcontractor

Eng. Mahmoud Ragab

El Safwa For

Investment and Urban

Development

180 Dewatering by using Deep Well

System for Residential Building

Smouha Towers Project.

2016 Subcontractor

Eng. Osama

Residential Building

181 Dewatering by using Deep Well

System for Sidi Kerir Station

Project.

2016 Petroleum Pipe

Company (PPC)

Petroleum Pipe

Company (PPC)

182 Dewatering by using well point system for Nile Delta Gas Development project.

2016 DR. Hamza and

Partners Office

British Petroleum

(BP worldwide)

183 Rental and Installation of Pumps

at BP West Nile Delta Gas

Development project.

2016 British Petroleum

(BP worldwide)

British Petroleum

(BP worldwide)

184 Implementation of Pizometer for

BP West Nile Delta Gas

Development project.

2017 DR. Hamza and

Partners Office

British Petroleum

(BP worldwide)

185 Dewatering by using well point

system for Nile Delta Gas

Development project.

2017 DR. Hamza and

Partners Office

British Petroleum

(BP worldwide)

186 Dewatering by using well point

system for Nile Delta Gas

Development Beach area

project.

2017 DR. Hamza and

Partners Office

British Petroleum

(BP worldwide)

187 Dewatering by using well point

system for Nile Delta Gas

Development Raven Area

project.

2017 DR. Hamza and

Partners Office

British Petroleum

(BP worldwide)

Page 134: INDEX [] · 2019-03-13 · Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25 ELGindy Contracting in brief “ELGENDY

( P a g e :134)

Tele fax: 002 03 4294424 - Mobile: 002 01066676350 -WhatsApp: 002 01094855591

Email: [email protected] - [email protected] - Web Site: www.el-gindy.com

Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25

NO. Project Date General Contractor Owner

188 Rental and Installation of Pumps

at BP West Nile Delta Gas

Development project.

2017 Van Oord Middle East

Egypt Branch

British Petroleum

(BP worldwide)

189 Dewatering by using Deep Well

System for Sump number EZ

5802 - EZ8202 project at BP

West Nile Delta Gas

Development.

2017 British Petroleum

(BP worldwide)

British Petroleum

(BP worldwide)

190 Rental for collection water tanks

at BP West Nile Delta Gas

Development project.

2017 British Petroleum

(BP worldwide)

British Petroleum

(BP worldwide)

191 Supply staff to work in the field

of Dewatering System for West

Nile Delta Onshore Gas

Terminal project.

2017 Braun Construction

Group

British Petroleum

(BP worldwide)

192 Dewatering by using Deep Well

System for Pharos University

project.

2017 MAS for engineering

and contracting

Pharos University in

Alexandria (P.U.A)

193 Dewatering by using Deep Well

System for TAWA Towers

project.

2017 MAS for engineering

and contracting

Residential Building

194 Dewatering by using Deep Well

System for Green Towers

project.

2017 Subcontractor

DR. Murad Salah Al

Din Amer

Residential complex

195 Dewatering by using Deep Well

System for Residential Building

Project.

2017 Subcontractor

Eng. Helmy El Houfi

Residential Building

196 Dewatering by using Deep Well

System for Residential Building

Project.

2017 Subcontractor

Eng. Walid Fathy

Residential Building

197 Dewatering by using well point

system for Nile Delta Gas

Development project.

2018 Jan De Nul

Eng. Wesley

Vermeerschen

British Petroleum

(BP worldwide)

198 Dewatering by using well point

system for Nile Delta Gas

Development project.

2018 BRAUN Company British Petroleum

(BP worldwide)

199 Dewatering by using well point

system for Sokhna port project.

2018 The Egyptian Company

for Contracting and

Trading

DP WORLD Sokhna

Page 135: INDEX [] · 2019-03-13 · Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25 ELGindy Contracting in brief “ELGENDY

( P a g e :135)

Tele fax: 002 03 4294424 - Mobile: 002 01066676350 -WhatsApp: 002 01094855591

Email: [email protected] - [email protected] - Web Site: www.el-gindy.com

Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25

NO. Project Date General Contractor Owner

200 Dewatering by using Deep Well

System for Halaib Dairy and

Juice Project in New Damietta

“Damietta Governorate”

2018 Sama Egypt for

Contracting Halaib Dairy and

Juice Company

201 Dewatering by using Deep Well

System for Residential Building

Project.

2018 Subcontractor

Eng. Helmy El Houfi

Residential Building

202 Dewatering by using Deep Well

System for Residential Building

Project.

2018 Subcontractor

MR. Adel Yousry

Residential Building

203 Dewatering by using Deep Well

System for Residential Building

Royal Palace Project.

2018 Eng. Yasser Makram Residential Building

204 Dewatering by using Deep Well

System for Residential Building

Royal Sporting Project.

2018 Subcontractor

Eng. Yasser Makram

Residential Building

205 For pre-cast piles works,

installing Pipes for piles with

depth 6 m by machine (DHJ)

with its crew of operators.

2018 IMPRESUB

International

LLC - ARE

Port Said Port

Authorities

ZOHR Development

Project

206 Dewatering by using Deep Well

System for Jabal al Asfar

drainage station Mokattam Cairo

Project.

2018 Alexandria Construction

“Talaat Moustafa” Holding Company for

drinking water and

sanitary drainage

207 Rental for collection water tanks

at BP West Nile Delta Gas

Development project.

2018 British Petroleum

(BP worldwide)

British Petroleum

(BP worldwide)

208 Rental for collection water tanks

at BP West Nile Delta Gas

Development project.

2018 Braun Construction

Group

British Petroleum

(BP worldwide)

Page 136: INDEX [] · 2019-03-13 · Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25 ELGindy Contracting in brief “ELGENDY

( P a g e :136)

Tele fax: 002 03 4294424 - Mobile: 002 01066676350 -WhatsApp: 002 01094855591

Email: [email protected] - [email protected] - Web Site: www.el-gindy.com

Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25

Soil Grouting

Page 137: INDEX [] · 2019-03-13 · Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25 ELGindy Contracting in brief “ELGENDY

( P a g e :137)

Tele fax: 002 03 4294424 - Mobile: 002 01066676350 -WhatsApp: 002 01094855591

Email: [email protected] - [email protected] - Web Site: www.el-gindy.com

Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25

Soil Grouting.

The main categories of injection grouting available are:

Permeation Grouting

Grout filling of accessible pores between the solid particles in a permeable soil. This technique is

generally used to reduce permeability and/or to strengthen and stiffen the ground.

Hydro Fracture Grouting

Involves the deliberate fracturing of the soil or rock by grout under pressure. The resulting compaction

and stiffening of the rock or soil mass can, in appropriate conditions, provide ground improvement where

permeation grouting is not practicable.

Compensation Grouting

An active technique to mitigate settlement arising from other engineering works (such as tunnel

excavation) in order to provide protection to existing structures. Compensation grouting can take the form

of permeation, compaction, or hydro fracture grouting depending on the local conditions of the given

project.

Compaction grouting

The injection of stiff mortar or paste instead of grout to displace and compact the soil in situ, thus

improving its engineering characteristics.

Rock Grouting

Grout infilling of discontinuities, fissures, fractures or joints in mass rock with the intention of reducing

permeability and increasing the competence of the mass rock. This technique is particularly employed for

dam construction and tunneling.

Page 138: INDEX [] · 2019-03-13 · Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25 ELGindy Contracting in brief “ELGENDY

( P a g e :138)

Tele fax: 002 03 4294424 - Mobile: 002 01066676350 -WhatsApp: 002 01094855591

Email: [email protected] - [email protected] - Web Site: www.el-gindy.com

Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25

Page 139: INDEX [] · 2019-03-13 · Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25 ELGindy Contracting in brief “ELGENDY

( P a g e :139)

Tele fax: 002 03 4294424 - Mobile: 002 01066676350 -WhatsApp: 002 01094855591

Email: [email protected] - [email protected] - Web Site: www.el-gindy.com

Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25

Grouting Using Tube A Manchette (TAM)

The injection methods that can be employed for the previous techniques range from packer injection

via a Tube a Manchette (TAM), packer injection direct into rock, descending / ascending, stage

grouting or grout injection direct via drilling tools (end of casing grouting) or lancing

Page 140: INDEX [] · 2019-03-13 · Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25 ELGindy Contracting in brief “ELGENDY

( P a g e :140)

Tele fax: 002 03 4294424 - Mobile: 002 01066676350 -WhatsApp: 002 01094855591

Email: [email protected] - [email protected] - Web Site: www.el-gindy.com

Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25

Page 141: INDEX [] · 2019-03-13 · Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25 ELGindy Contracting in brief “ELGENDY

( P a g e :141)

Tele fax: 002 03 4294424 - Mobile: 002 01066676350 -WhatsApp: 002 01094855591

Email: [email protected] - [email protected] - Web Site: www.el-gindy.com

Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25

Page 142: INDEX [] · 2019-03-13 · Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25 ELGindy Contracting in brief “ELGENDY

( P a g e :142)

Tele fax: 002 03 4294424 - Mobile: 002 01066676350 -WhatsApp: 002 01094855591

Email: [email protected] - [email protected] - Web Site: www.el-gindy.com

Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25

Page 143: INDEX [] · 2019-03-13 · Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25 ELGindy Contracting in brief “ELGENDY

( P a g e :143)

Tele fax: 002 03 4294424 - Mobile: 002 01066676350 -WhatsApp: 002 01094855591

Email: [email protected] - [email protected] - Web Site: www.el-gindy.com

Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25

Page 144: INDEX [] · 2019-03-13 · Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25 ELGindy Contracting in brief “ELGENDY

( P a g e :144)

Tele fax: 002 03 4294424 - Mobile: 002 01066676350 -WhatsApp: 002 01094855591

Email: [email protected] - [email protected] - Web Site: www.el-gindy.com

Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25

Projects with Petrojet

Company

Page 145: INDEX [] · 2019-03-13 · Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25 ELGindy Contracting in brief “ELGENDY

( P a g e :145)

Tele fax: 002 03 4294424 - Mobile: 002 01066676350 -WhatsApp: 002 01094855591

Email: [email protected] - [email protected] - Web Site: www.el-gindy.com

Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25

NO. Project Date General Contractor Owner

1 Soil Grouting for Polyethylene

Project.

2000 Petrojet - Northern

Branch SIDPEC

2 Soil Grouting for AMOC

Project.

2002 Petrojet - Northern

Branch AMOC

3 Soil Grouting for ANRPC

Project.

2002 Petrojet - Northern

Branch ANRPC

4 Soil Grouting for Alexandria

Petroleum Project.

2002 Petrojet - Northern

Branch Alexandria Petroleum

5 Soil Grouting for Burullus BP

lines Project.

2002 Petrojet - Northern

Branch British Petroleum

(BP worldwide)

6 Soil Grouting for Middle East

Oil Refinery Project.

2003 Petrojet - Northern

Branch MIDOR

7 Soil Grouting for ADCO

Damietta BP lines Project.

2003 Petrojet - Northern

Branch British Petroleum

(BP worldwide)

8 Soil Grouting for Simian Sina

lines Project.

2004 Petrojet - Northern

Branch BG Egypt

9 Soil Grouting for Burullus BP

lines Project.

2004 Petrojet - Northern

Branch British Petroleum

(BP worldwide)

10 Soil Grouting for Egyptian

Petrochemicals Project.

2005 Petrojet - Northern

Branch Egyptian

Petrochemicals

Company

11 Soil Grouting for West Delta Simian Sina lines Project.

2005 Petrojet - Northern

Branch BG Egypt

12 Soil Grouting for Methanol

Damietta Project.

2006 Petrojet -East

Branch

Methanex Corporation

13 Soil Grouting for Arab

Petroleum Pipelines Project.

2007 Petrojet - Northern

Branch SUMED

14 Soil Grouting for Egyptian

Petrochemicals Project.

2015 Petrojet - Northern

Branch Egyptian

Petrochemicals

Company

15 Soil Grouting for Beni Suef silos

Project.

2015 Petrojet - Southern

Branch

Egyptian Holding

Company for silos and

storage

16 Soil Grouting for Western

Desert Operating Petroleum

Hamra tanks Project.

2017 Petrojet - Northern

Branch WEPCO

Page 146: INDEX [] · 2019-03-13 · Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25 ELGindy Contracting in brief “ELGENDY

( P a g e :146)

Tele fax: 002 03 4294424 - Mobile: 002 01066676350 -WhatsApp: 002 01094855591

Email: [email protected] - [email protected] - Web Site: www.el-gindy.com

Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25

Projects with other

companies

Page 147: INDEX [] · 2019-03-13 · Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25 ELGindy Contracting in brief “ELGENDY

( P a g e :147)

Tele fax: 002 03 4294424 - Mobile: 002 01066676350 -WhatsApp: 002 01094855591

Email: [email protected] - [email protected] - Web Site: www.el-gindy.com

Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25

NO. Project Date General Contractor Owner

1 Soil Grouting for Residential

Building Project.

1996 MAC International

Engineering

Residential Building

2 Soil Grouting for Ducale Hotel

Venice Project.

1998 Subcontractor MR. Ghaith Said Al

Mabrouk

Ducale Hotel Venice

3 Soil Grouting for SIDPEC

Project.

2000 Toyo Engineering Corporation

SIDPEC

4 Soil Grouting for SIDPEC

Project.

2000 Samsung Engineering SIDPEC

5 Soil Grouting for Residential

Building Project.

2000 Subcontractor DR. Mohamed El Naggar

Residential Building

6 Soil Grouting for Iron and steel

company Egyptian Project.

2001 Esaco Manufacturing Engineering and

Contracting s. a. e

Iron and steel

company Egyptian

7 Soil Grouting for Unilever

Bright Factory Project.

2003 Subcontractor

Unilever Bright

Factory

8 Soil Grouting for Residential

Building Project.

2004 Subcontractor

Residential Building

9 Soil Grouting for Residential

Building Project.

2005 Subcontractor MR. Mahmoud Ismail

Residential Building

10 Soil Grouting for Dar El Ashaa

Center Project.

2008 Subcontractor

Dar El Ashaa Center

11 Soil Grouting for Residential

Building Project.

2008 Subcontractor

Residential Building

12 Soil Grouting for Palm Hills

Developments Project.

2009 Palm Hills Developments Palm Hills

Developments

13 Soil Grouting for Rasheed Gas

Station Project.

2010 NATGAS NATGAS

14 Soil Grouting for Sama Smouha

Project.

2010 Subcontractor

Residential Building

Sama Smouha

15 Soil Grouting for Dar El Ashaa

Center Project.

2011 Eagle for Constructions Dar El Ashaa Center

16 Soil Grouting for Zamzam

Towers Project.

2011 Nahawand Contracting

and Investment

Company

Residential complex

17 Soil Grouting for Residential

Building Project.

2011 Subcontractor MR. Murad

Residential Building

Page 148: INDEX [] · 2019-03-13 · Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25 ELGindy Contracting in brief “ELGENDY

( P a g e :148)

Tele fax: 002 03 4294424 - Mobile: 002 01066676350 -WhatsApp: 002 01094855591

Email: [email protected] - [email protected] - Web Site: www.el-gindy.com

Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25

NO. Project Date General Contractor Owner

18 Soil Grouting for Residential

Building Project.

2012 Subcontractor MR. Abdel Razek

Residential Building

19 Soil Grouting for Nice Village

Project.

2012 Mimary Group Nice Village

20 Soil Grouting for Residential

Building Project.

2012 Subcontractor DR. Azmi Saleh

Residential Building

21 Soil Grouting for Bank Misr

Project.

Kimberro Company Bank Misr

22 Soil Grouting for Residential

Building Project.

2014 Subcontractor Ahmad AL sukari

Residential Building

23 Soil Grouting for Residential

Building Project.

2014 Al Mashreq Architectural

Constructions Co

Residential Building

Saraya Al Mashreq

Maadi

24 Soil Grouting for Nile Dolphin

Hotel Project.

2014 Delta Foundations Eng. Alaa Bashir

Nile Dolphin Hotel

25 Soil Grouting for Commercial

building Project Dokki “Giza

Governorate”.

2014 Consultant

Eng. Abdel Aziz

Mahmoud

ITAMCO

Ghabbour Group

26 Soil Grouting for EL Horreya

for Local Society and

Environment Development

Project.

2014 EL Horreya for Local

Society and

Environment

Development

EL Horreya for Local

Society and

Environment

Development

27 Soil Grouting for Best of France

Project.

2015 Engineering Consulting

Office - Dr. Bahaa El

Menoufy

Best of France

28 Soil Grouting for Best of France

Project.

2016 Engineering Consulting

Office - Dr. Bahaa El

Menoufy

Best of France

29 Soil Grouting for Alexandria

Commercial advancement Co,

(APT).

2016 Lotus Construction Co Alexandria Commercial

advancement Co 30 Soil Grouting for Sewage

Project, Damietta, Ezbet lehem.

2016 Delta Trading and

Contracting Holding Company for

drinking water and sanitary drainage

31 Soil Grouting for Residential

Building Project.

2016 Subcontractor DR. Hakki

Residential Building

32 Soil Grouting for Villa

Chancellor charity, King Mariot.

2016 Chancellor charity Chancellor charity

Page 149: INDEX [] · 2019-03-13 · Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25 ELGindy Contracting in brief “ELGENDY

( P a g e :149)

Tele fax: 002 03 4294424 - Mobile: 002 01066676350 -WhatsApp: 002 01094855591

Email: [email protected] - [email protected] - Web Site: www.el-gindy.com

Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25

NO. Project Date General Contractor Owner

33 Soil Grouting for Ras Al Teen

Port project.

2017 Abnaa Abdul Salam Ras Al Teen Port

34 Soil Grouting for Uptown Cairo

project” Cairo Mokattam”.

2018 Al Shafar for Real Estate Investment and

General Contracting “ASGC”

LEVANA

Uptown Cairo

35 Soil Grouting for Residential

complex in the fifth assembly

project, Cairo.

2018 Subcontractor Alaa Al Shimi

Residential complex

36 Soil Grouting for June 30 project

at Ismailia” Southern Section of

30 June Axis”.

2018 Gharably Integrated

Engineering Company

GIECO

Ismailia Roads and

Bridges Authority

37 Soil Grouting for June 30 project

at Ismailia” Southern Section of

30 June Axis”.

2018 Egyptian Company For

Integrated Contracting -

ECIC

Ismailia Roads and

Bridges Authority

Page 150: INDEX [] · 2019-03-13 · Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25 ELGindy Contracting in brief “ELGENDY

( P a g e :150)

Tele fax: 002 03 4294424 - Mobile: 002 01066676350 -WhatsApp: 002 01094855591

Email: [email protected] - [email protected] - Web Site: www.el-gindy.com

Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25

Underground construction

Caisson sinking

Page 151: INDEX [] · 2019-03-13 · Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25 ELGindy Contracting in brief “ELGENDY

( P a g e :151)

Tele fax: 002 03 4294424 - Mobile: 002 01066676350 -WhatsApp: 002 01094855591

Email: [email protected] - [email protected] - Web Site: www.el-gindy.com

Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25

Page 152: INDEX [] · 2019-03-13 · Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25 ELGindy Contracting in brief “ELGENDY

( P a g e :152)

Tele fax: 002 03 4294424 - Mobile: 002 01066676350 -WhatsApp: 002 01094855591

Email: [email protected] - [email protected] - Web Site: www.el-gindy.com

Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25

Page 153: INDEX [] · 2019-03-13 · Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25 ELGindy Contracting in brief “ELGENDY

( P a g e :153)

Tele fax: 002 03 4294424 - Mobile: 002 01066676350 -WhatsApp: 002 01094855591

Email: [email protected] - [email protected] - Web Site: www.el-gindy.com

Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25

NO. Project Date General Contractor Owner

1 Caisson sinking for Petrogas

Project.

2002 Petrojet - Northern

Branch

Petrogas

2 Caisson sinking for Alexandria

Fertilizers Project.

2004 Petrojet - Northern Branch

AlexFert

3 Caisson sinking for Alexandria

Petroleum Company Project.

2005 Alexandria Petroleum

Maintenance

Alexandria Petroleum

Company

4 Caisson sinking for Methanol

Damietta Project.

2008 Petrojet -East

Branch

Methanex Corporation

5 Caisson sinking for Holding

Company for drinking water and

sanitary drainage Project.

2009 EGYCO

El Nasr Building and

Construction

Holding Company for

drinking water and

sanitary drainage

6 Caisson sinking for Petrogas

Project.

2010 Petrojet - Northern

Branch

Petrogas

7 Caisson sinking for Holding

Company for drinking water and

sanitary drainage Project.

2011 Alexandria Construction

“Talaat Moustafa”

Holding Company for

drinking water and

sanitary drainage

8 Caisson sinking for Egyptian

Styrenics Project.

2011 Petrojet - Northern

Branch

Egyptian Styrenics Co

9 Caisson sinking for ANRPC

Project.

2011 Petrojet - Northern

Branch

ANRPC

10 Caisson sinking for Crash

Project.

2011 Subcontractor

Crash

Coca-Cola Company

11 Caisson sinking for Holding

Company for drinking water and

sanitary drainage Project.

2012 Alexandria Construction

“Talaat Moustafa”

Holding Company for

drinking water and

sanitary drainage

12 Caisson sinking for North Africa for silos Project.

2013 Man, Crew for Metal

Buildings and

Contracting

North Africa for silos

13 Caisson sinking for Petrogas

Project.

2015 Petrojet - Northern

Branch

Petrogas

14 Caisson sinking for ANRPC

Project.

2016 Petrojet - Northern

Branch

ANRPC

15 Caisson sinking for Petrogas

Project.

2016 Petrojet - Northern

Branch

Petrogas

Page 154: INDEX [] · 2019-03-13 · Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25 ELGindy Contracting in brief “ELGENDY

( P a g e :154)

Tele fax: 002 03 4294424 - Mobile: 002 01066676350 -WhatsApp: 002 01094855591

Email: [email protected] - [email protected] - Web Site: www.el-gindy.com

Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25

Building Construction

Page 155: INDEX [] · 2019-03-13 · Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25 ELGindy Contracting in brief “ELGENDY

( P a g e :155)

Tele fax: 002 03 4294424 - Mobile: 002 01066676350 -WhatsApp: 002 01094855591

Email: [email protected] - [email protected] - Web Site: www.el-gindy.com

Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25

Page 156: INDEX [] · 2019-03-13 · Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25 ELGindy Contracting in brief “ELGENDY

( P a g e :156)

Tele fax: 002 03 4294424 - Mobile: 002 01066676350 -WhatsApp: 002 01094855591

Email: [email protected] - [email protected] - Web Site: www.el-gindy.com

Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25

Projects with Petrojet

Company

Page 157: INDEX [] · 2019-03-13 · Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25 ELGindy Contracting in brief “ELGENDY

( P a g e :157)

Tele fax: 002 03 4294424 - Mobile: 002 01066676350 -WhatsApp: 002 01094855591

Email: [email protected] - [email protected] - Web Site: www.el-gindy.com

Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25

NO. Project Date General Contractor Owner

1 Building for stores and

workshops.

1998 Petrojet - Northern

Branch SIDPEC

2 Implementation of a mosque

Sidpec company.

1998 Petrojet - Northern

Branch

SIDPEC

3 Implementation of Caravan for

the security stuff.

1998 Petrojet - Northern

Branch SIDPEC

4 Construction of administrative

building Sidpec.

1998 Petrojet - Northern

Branch

SIDPEC

5 Construction of procurement

department offices.

1998 Petrojet - Northern

Branch

SIDPEC

6 Implementation of concrete

slabs work.

1999 Petrojet - Northern

Branch Ameria Petroleum

7 Construction Electricity

building.

1999 Petrojet - Northern

Branch Gasco

8 Implementation of water outlet

Wall.

1999 Petrojet - Northern

Branch SIDPEC

9 Construction of Electricity

building.

1999 Petrojet - Northern

Branch SIDPEC

10 Implementation and

Construction of fire building.

2000 Petrojet - Northern

Branch SIDPEC

11 Implementation and

Construction of communications

room.

2000 Petrojet - Northern

Branch

Gasco

12 Implementation and construction

of Petrochemical building.

2000 Petrojet - Northern

Branch

Petrochemical

13 Implementation and construction

of tennis table building.

2000 Petrojet - Northern

Branch Petrochemical

14 Implementation and work of

stadium’s bathrooms.

2000 Petrojet - Northern

Branch Petrochemical

15 Supply and installation of

Petrogas building.

2001 Petrojet - Northern

Branch Petrogas

16 Mixed waterproofing treatment

unit.

2001 Petrojet - Northern

Branch Ameria Petroleum

17 Supply and installation of

SIDPEC building.

2001 Petrojet - Northern

Branch SIDPEC

Page 158: INDEX [] · 2019-03-13 · Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25 ELGindy Contracting in brief “ELGENDY

( P a g e :158)

Tele fax: 002 03 4294424 - Mobile: 002 01066676350 -WhatsApp: 002 01094855591

Email: [email protected] - [email protected] - Web Site: www.el-gindy.com

Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25

NO. Project Date General Contractor Owner

18 Implementation of security stuff

Room.

2001 Petrojet - Northern

Branch

SIDPEC

19 Drilling and Reinforced

Concrete for structural elements.

2001 Petrojet - Northern

Branch

SIDPEC

20 Supply and Implementation of

galvanized wire fence.

2002 Petrojet - Northern

Branch

Gasco

21 Blacksmith and carpentry works

for structural elements.

2002 Petrojet - Northern

Branch

Gasco

22 Supply and Implementation of

steel fence.

2002 Petrojet - Northern

Branch

Gasco

23 Implementation of carpentry and

blacksmith for DIKE WALL.

2002 Petrojet - Northern

Branch

SIDPEC

24 Supply and installation of

marble staircase.

2002 Petrojet - Northern

Branch

Gasco

25 carpeting works for rain water

drainage.

2003 Petrojet - Northern

Branch

Ethylene

26 completion of the table tennis

building.

2003 Petrojet - Northern

Branch

SIDPEC

27 Finishing works industrial

buildings.

2003 Petrojet - Northern

Branch

Petrojet - Northern

Branch

28 Carpentry and blacksmith,

works for structural elements.

2003 Petrojet - Northern

Branch

BGC

Burullus Gas Company

29 Supply and Construction for

stone buildings.

2003 Petrojet - Northern

Branch

Petrojet - Northern

Branch

30 Supply and Implementation for

red brick and lime stone walls.

2004 Petrojet - Northern

Branch

Abu Qir Fertilizer

31 Supply and work of a metal

fence and gate.

2004 Petrojet - Northern

Branch

BGC

Burullus Gas Company

32 Supply and Implementation of

stairs unnecessary fonts

orchards.

2004 Petrojet - Northern

Branch

BGC

Burullus Gas Company

33 carpentry and blacksmith for

structural elements.

2004 Petrojet - Northern

Branch

BGC

Burullus Gas Company

34 Supply and installation of L.N.G

Temporary wall.

2005 Petrojet - Northern

Branch

Egyptian Gas

Company

Page 159: INDEX [] · 2019-03-13 · Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25 ELGindy Contracting in brief “ELGENDY

( P a g e :159)

Tele fax: 002 03 4294424 - Mobile: 002 01066676350 -WhatsApp: 002 01094855591

Email: [email protected] - [email protected] - Web Site: www.el-gindy.com

Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25

NO. Project Date General Contractor Owner

35 Supply and Implementation of

bricks wall.

2005 Petrojet - Northern

Branch

Abu Qir Fertilizer

36 Supply and implementation of

iron door for gate.

2005 Petrojet - Northern

Branch

BGC

Burullus Gas Company

37 Supply and installation of 1.5 m

height fence.

2005 Petrojet - Northern

Branch

Egyptian Gas

Company

38 Supply and installation of a

wash basin.

2005 Petrojet - Northern

Branch

BGC

Burullus Gas Company

39 Corrugated steel sheets work. 2006 Petrojet - Northern

Branch

BGC

Burullus Gas Company

40 Supply and installation of

galvanized iron covers.

2006 Petrojet - Northern

Branch

BGC

Burullus Gas Company

41 Supply and installing accessories

and Painting Doors.

2006 Petrojet - Northern

Branch

BGC

Burullus Gas Company

42 Electrical building finishing

works.

2006 Petrojet - Northern

Branch

BGC

Burullus Gas Company

43 Supply and installation of steel

sheets ICON.

2006 Petrojet - Northern

Branch

Nubaria

44 Blacksmith works for

roadblocks.

2007 Petrojet - Northern

Branch

Ameria Petroleum

45 Blacksmith and carpentry works

for connecting beams.

2007 Petrojet - Northern

Branch

Burullus Gas

46 Isolation works for Foundations. 2007 Petrojet - Northern

Branch

Nubaria

47 Finishing works for electricity

building Semian Sina.

2007 Petrojet - Northern

Branch

BGC

Burullus Gas Company

48 Blacksmith and carpentry work

for connecting beams.

2008 Petrojet - Northern

Branch

Alex Fertilizers

49 Transfer of the company store

and set ceiling for Chemicals

and fire line.

2008 Petrojet - Northern

Branch

ANRP

50 Black smith works for structural elements.

2008 Petrojet - Northern

Branch Alex Fertilizers

Page 160: INDEX [] · 2019-03-13 · Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25 ELGindy Contracting in brief “ELGENDY

( P a g e :160)

Tele fax: 002 03 4294424 - Mobile: 002 01066676350 -WhatsApp: 002 01094855591

Email: [email protected] - [email protected] - Web Site: www.el-gindy.com

Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25

NO. Project Date General Contractor Owner

51 Testing and operation of lift

station sewage.

2008 Petrojet - Northern

Branch Nubaria station

52 Isolation of Foundation

And floors.

2008 Petrojet - Northern

Branch Nubaria station

53 Supply and installation of the

compartment power adapter roof

and supply and installation of

fence wire.

2009 Petrojet - Northern

Branch Nubaria station

54 Caravans finishing works in

Rashid Petroleum Company.

2009 Petrojet - Northern

Branch BGC

Burullus Gas Company

55 Construction of the entire

Administrative Building.

2009 Petrojet - Northern

Branch

Petrojet - Northern

Branch

56 Drainage pit construction. 2009 Petrojet - Northern

Branch

Petrojet - Northern

Branch

Page 161: INDEX [] · 2019-03-13 · Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25 ELGindy Contracting in brief “ELGENDY

( P a g e :161)

Tele fax: 002 03 4294424 - Mobile: 002 01066676350 -WhatsApp: 002 01094855591

Email: [email protected] - [email protected] - Web Site: www.el-gindy.com

Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25

Projects with other

companies

Page 162: INDEX [] · 2019-03-13 · Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25 ELGindy Contracting in brief “ELGENDY

( P a g e :162)

Tele fax: 002 03 4294424 - Mobile: 002 01066676350 -WhatsApp: 002 01094855591

Email: [email protected] - [email protected] - Web Site: www.el-gindy.com

Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25

NO. Project Date General Contractor Owner

1 Building Construction works

for Various Projects.

1995 Various Subcontractor

Various companies

2 Building Construction works

for Various Projects.

1996 Various Subcontractor

Various companies

3 Building Construction works

for Various Projects.

1997 Various Subcontractor

Various companies

4 Building Construction works

for Various Projects.

1998 Various Subcontractor

Various companies

5 Building Construction works

for Various Projects.

1999 Various Subcontractor

Various companies

6 Building Construction works

for Various Projects.

2000 Various Subcontractor

Various companies

7 Building Construction works

for Various Projects.

2001 Various Subcontractor

Various companies

8 Building Construction works

for Various Projects.

2002 Various Subcontractor

Various companies

9 Works for Treatment plant

and stadiums.

2002 Subcontractor Mena Touristic and

Real Estate

Investment

10 Building Construction works

for Various Projects.

2003 Various Subcontractor

Various companies

11 Building Construction work

for Mena Project.

2003 Subcontractor Mena Touristic and

Real Estate

Investment

12 Water treatment station for Mina village 3

2003 Subcontractor Mena Touristic and Real Estate Investment

13 Building Construction work

for 20 units at Mena Project. 2003 Subcontractor Mena Touristic and

Real Estate Investment

14 construction for Villa in king

Mariot.

2003 Subcontractor Eng. Ayman Abdel

Hamid Mohamed

15 construction for Villa in king

Mariot.

2003 Subcontractor Dr. Khaled

Mohamed Abdel

Hamid

16 Building Construction works

for Various Projects.

2004 Various Subcontractor

Various companies

17 Building Construction works

for Various Projects.

2005 Various Subcontractor

Various companies

Page 163: INDEX [] · 2019-03-13 · Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25 ELGindy Contracting in brief “ELGENDY

( P a g e :163)

Tele fax: 002 03 4294424 - Mobile: 002 01066676350 -WhatsApp: 002 01094855591

Email: [email protected] - [email protected] - Web Site: www.el-gindy.com

Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25

NO. Project Date General Contractor Owner

18 Building Construction works

for Various Projects.

2006 Various Subcontractor

Various companies

19 Building Construction works

for Various Projects.

2007 Various Subcontractor

Various companies

20 Building Construction works

for EL Maamoura drainage

station.

2007 Horse Engineering Works Holding Company

for drinking water

and sanitary

drainage

21 Building Construction works

for Abdelkader drinking

water and sanitary drainage

Project.

2007 Alexandria Construction

“Talaat Moustafa”

Holding Company

for drinking water

and sanitary

drainage

22 Building Construction works

for Various Projects.

2008 Various Subcontractor

Various companies

23 Building Construction works

for drinking water and

sanitary drainage Project.

2008 Alexandria Construction

“Talaat Moustafa”

Holding Company

for drinking water

and sanitary

drainage

24 Supply and implementation

of external paints works.

2008 Subcontractor

Marine Petrojet

25 Building Construction works

for drinking water and

sanitary drainage Project.

2009 Alexandria Construction

“Talaat Moustafa”

Holding Company

for drinking water

and sanitary

drainage

26 Establishment of a

maintenance workshop room.

2009 Subcontractor

Marine Petrojet

27 Drilling and Concrete work. 2009 Egyptian General Buildings Hospital the Pkrmoz

Republic

28 Service Room for line 24inch. 2009 Petromaint Badr EL Din

Petroleum

Page 164: INDEX [] · 2019-03-13 · Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25 ELGindy Contracting in brief “ELGENDY

( P a g e :164)

Tele fax: 002 03 4294424 - Mobile: 002 01066676350 -WhatsApp: 002 01094855591

Email: [email protected] - [email protected] - Web Site: www.el-gindy.com

Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25

Cathodic Protection

Page 165: INDEX [] · 2019-03-13 · Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25 ELGindy Contracting in brief “ELGENDY

( P a g e :165)

Tele fax: 002 03 4294424 - Mobile: 002 01066676350 -WhatsApp: 002 01094855591

Email: [email protected] - [email protected] - Web Site: www.el-gindy.com

Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25

NO. Project Date General Contractor Owner

1 Cathodic Protection work for Simian Sina Project.

2004 Petrojet - Northern

Branch BG Egypt

2 Cathodic Protection work for Karam Aseel station lines 1

Project.

2013 Petrojet - Northern

Branch Bapetco

Badr El Din

Petroleum Co

3 Cathodic Protection work for Amal Petroleum Project.

2012 Petrojet - Eastern

Branch Amal Petroleum

4 Cathodic Protection work for Karam Aseel station lines 2

Project.

2013 Petrojet - Northern

Branch Apache Corporation

5 Cathodic Protection work for Karam Aseel station lines 3

Project.

2013 Petrojet - Northern

Branch Royal Dutch Shell

6 Cathodic Protection work for CCR Project.

2016 Petrojet - Northern

Branch ANRPC

7 Cathodic Protection work for BP

Raven Project. 2017 Petrojet - Northern

Branch Bechtel Corporation

Page 166: INDEX [] · 2019-03-13 · Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25 ELGindy Contracting in brief “ELGENDY

( P a g e :166)

Tele fax: 002 03 4294424 - Mobile: 002 01066676350 -WhatsApp: 002 01094855591

Email: [email protected] - [email protected] - Web Site: www.el-gindy.com

Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25

Tunneling works

Page 167: INDEX [] · 2019-03-13 · Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25 ELGindy Contracting in brief “ELGENDY

( P a g e :167)

Tele fax: 002 03 4294424 - Mobile: 002 01066676350 -WhatsApp: 002 01094855591

Email: [email protected] - [email protected] - Web Site: www.el-gindy.com

Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25

NO. Project Date General Contractor Owner

1 Tunneling works of Semian Sina

Project.

2004 Petrojet - Northern

Branch

BGC

Burullus Gas Company

2 Tunneling works of Polyethylene

Project.

2005 Petrojet - Northern

Branch

Petrochemicals

Company

3 Tunneling works of SUMED

expansions Project.

2007 Petrojet - Northern

Branch

Arab Petroleum

Pipelines Company

” SUMED”

4 Tunneling works of drinking

water and sanitary drainage

Project.

2008 Alexandria

Construction

“Talaat Moustafa”

Holding Company for

drinking water and

sanitary drainage

5 Tunneling works of El Montazah

Bridge.

2009 Alexandria

Construction

“Talaat Moustafa”

Holding Company for

drinking water and

sanitary drainage

6 Tunneling works of Town Gas Project.

2011 Petrojet - Northern

Branch

Town Gas Company

7 Tunneling works of drinking

water and sanitary drainage

Project.

2011 Alexandria

Construction

“Talaat Moustafa”

Holding Company for

drinking water and

sanitary drainage

8 Tunneling works of 24-inch line Rasheed Company, Burullus.

2016 Petrojet - Northern

Branch Rasheed Company

“Rashpetco”

Page 168: INDEX [] · 2019-03-13 · Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25 ELGindy Contracting in brief “ELGENDY

( P a g e :168)

Tele fax: 002 03 4294424 - Mobile: 002 01066676350 -WhatsApp: 002 01094855591

Email: [email protected] - [email protected] - Web Site: www.el-gindy.com

Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25

Repairing works

Page 169: INDEX [] · 2019-03-13 · Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25 ELGindy Contracting in brief “ELGENDY

( P a g e :169)

Tele fax: 002 03 4294424 - Mobile: 002 01066676350 -WhatsApp: 002 01094855591

Email: [email protected] - [email protected] - Web Site: www.el-gindy.com

Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25

NO. Project Date General Contractor Owner

1 Repairing works for Alexandria

Petroleum Project.

2005 Petrojet - Northern

Branch

Alexandria Petroleum Company

2 Repairing works for work north

sewage station Project Abdel

Kader Amriyah area,

Alexandria.

2007 Alexandria for

constructions

” Talaat Mustafa”

Holding Company for

drinking water and

sanitary drainage

3 Repairing works for Al

Hawamdiya sewage station

Project, Giza - Cairo.

2008 Alexandria For

Construction

“Talaat Moustafa”

Holding Company for

drinking water and

sanitary drainage

4 Repairing works for collecting

sump for Ethylene project.

2010 Petrojet - Northern

Branch

The Egyptian Ethylene

and Derivatives

Company

5 Repairing works for Polyethylene

Project.

2013 Petrojet - Northern

Branch

Petrochemicals

Company

6 Repairing works for Administrative

building (ITAMCO) project, Dokki

area, Cairo.

2014 Consultant

Eng. Abdel Aziz

Mahmoud

ITAMCO

Ghabbour Group

7 Repairing works for circular

tank Petrogas project.

2015 Petrojet - Northern

Branch

Petrogas Company

8 Repairing works for Cooling

tower Project.

2015 Petrojet - Northern

Branch

Petrochemicals

Company

9 Repairing works for Test cooling

tower Project.

2015 Petrojet - Northern

Branch

Petrochemicals

Company

10 Repairing works for Residential

building Saraya Al Mashreq

Towers Maadi, Cairo.

2015 El Masherek For Building

and Reconstruction Saraya Al Mashreq

Towers Maadi

11 Repairing works for circular

tank Petrogas project.

2016 Petrojet - Northern

Branch

Petrogas Company

12 Repairing works for Western

Desert Operating Petroleum

Hamra tanks Project.

2017 Petrojet - Northern

Branch WEPCO

Page 170: INDEX [] · 2019-03-13 · Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25 ELGindy Contracting in brief “ELGENDY

( P a g e :170)

Tele fax: 002 03 4294424 - Mobile: 002 01066676350 -WhatsApp: 002 01094855591

Email: [email protected] - [email protected] - Web Site: www.el-gindy.com

Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25

Offshore Construction

Page 171: INDEX [] · 2019-03-13 · Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25 ELGindy Contracting in brief “ELGENDY

( P a g e :171)

Tele fax: 002 03 4294424 - Mobile: 002 01066676350 -WhatsApp: 002 01094855591

Email: [email protected] - [email protected] - Web Site: www.el-gindy.com

Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25

NO. Project Date General Contractor Owner

1 Offshore Construction for Line Sumed oil Project.

2006 Petrojet - Northern

Branch

SUMED

Arab Petroleum

Pipelines Company

2 Offshore Construction for

National Company for the

management of river ports

Project.

2011 Subcontractor QALAA HOLDINGS

National Company for

the management of

river ports

3 Offshore Construction for

National Company for the

management of river ports

Project.

2015 Subcontractor QALAA HOLDINGS

National Company for

the management of

river ports

Page 172: INDEX [] · 2019-03-13 · Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25 ELGindy Contracting in brief “ELGENDY

( P a g e :172)

Tele fax: 002 03 4294424 - Mobile: 002 01066676350 -WhatsApp: 002 01094855591

Email: [email protected] - [email protected] - Web Site: www.el-gindy.com

Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25

Project Management

Page 173: INDEX [] · 2019-03-13 · Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25 ELGindy Contracting in brief “ELGENDY

( P a g e :173)

Tele fax: 002 03 4294424 - Mobile: 002 01066676350 -WhatsApp: 002 01094855591

Email: [email protected] - [email protected] - Web Site: www.el-gindy.com

Address: Alexandria, Egypt, Smouha, end of 14 May Bridge, Land Mark Buildings, Entrance: B”, Second Floor Flat No.25

NO. Project Date General Contractor Owner

1 Sabban Towers, Porto Arabia,

the Pearl, Qatar.

2009 Subcontractor Afrina Trading and

Construction Company

2 Jumana Tower, Porto Arabia,

the Pear.l

2010 Subcontractor Afrina Trading and

Construction Company

3 Anadalusia Tower, Jeddah,

Saudi Arabia.

2011 Subcontractor Hill International

4 Jabal Omar, Makkah Al

Mokarramah, Kingdom of

Saudi Arabia.

2012 Subcontractor Jabal Omar

Development Company

5 Oil and Gas Refineries, Khafji,

Kingdom of Saudi Arabia.

2013 Subcontractor Khafji Joint Operations

(KJO) Aramco Gulf

6 Consulting for Dewatering

system for Al Hijaz project,

Kingdom of Saudi Arabia.

2014 Subcontractor

Eng. Sami

Mohammed Abdul

Hamid El Desouki